Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 48539
CITY CONTRACTNO. Developer and Project Information Cover Sheet: Developer Company Name: Lennar Homes of Texas Land and Construction,Ltd Address, State,Zip Code: 1707 Marketplace Blvd, Suite 100, Irving, TX, 75063 Phone&Email: 469-587-5206,david.aughinbaugh@lennar.com Authorized Signatory,Title: Stewart Parker,Vice President Project Name and Brief Sendera Ranch East Phase 12 Description: Project Location: North and East of intersection of Pollyann Trail and Broomstick Rd Plat Case Number: None Plat Name: None Mapsco: 06F Council District: 7 City Project Number: 100322 CFA Number: 2016-076 DOE Number: <DOE#> To be completed by st Received by: 2 Date: PM I a s rn C) -� rn 00 00 s Fz � wya City of Fort Worth,Texas OF'F'ICIAL RECORD Standard Conununity Facilities Agreement CFA Official Release Date: 10.07.2015 CITY SECRETARY Page 1 of 11 FTS WORTH,TX STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Lennar Homes of Texas Land and Construction Ltd ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Sendera Ranch East Phase 12 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 2 of 11 further acknowledges that said acceptance process requires the Developer's contractor(s) to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and worlunanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ©', Sewer (A-1) El, Paving (B) ©', Storm Drain (B-1) ❑X Street Lights & Signs (C) FA. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims,suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the hnprovements if at City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 11 Cost Summary Sheet Project Name: Sendera Ranch East Phase 12 CFA No.: 2016-076 CP No.: 100322 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 392,211.90 2.Sewer Construction $ 378,122.00 Water and Sewer Construction Total $ 770,333.90 B. TPW Construction 1.Street $ 864,730.00 2.Storm Drain $ 200,063.00 3.Street Lights Installed by Developer $ 115,500.00 4. Signals $ - TPWConstructionCostTotal $ 1,180,293.00 Total Construction Cost(excluding the fees): $ 1,950,626.90 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 15,406.68 D. Water/Sewer Material Testing Fee(2%) $ 15,406.68 Sub-Total for Water Construction Fees $ 30,813.36 E. TPW Inspection Fee(4%) $ 42,591.72 F. TPW Material Testing(2%) $ 21,295.86 G. Street Light Inspsection Cost $ 4,620.00 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 68,507.58 Total Construction Fees: $ 99,320.94 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 1,950,626.90 x Completion Agreement=100%/Holds Plat $ 1,950,626.90 Cash Escrow Water/Sanitary Sewer=125% $ 962,917.38 Cash Escrow Paving/Storm Drain=125% $ 1,475,366.25 Letter of Credit= 125%w/2yr expiration period $ 2,438,283.63 City of Fort Wortli,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective naive by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Lennar Homes of Texas Land and Construction, Ltd. Jesus J. Chapa 1 Assistant City Manager 1 �� Name: Stewart Parker Date: / Title: Vice President Recommended by: Date: �� `�/ i fl- If ATTEST: (Only if required by Developer) Wendy Chi-Bab lal,EMBA,P.E. Development Engineering Manager Water Department Signature Name: b,4 (j Douglas V6. Wiersig,P.E. F Of,T Director •'' �2� Transportation &Public Works Department ��•' ,� Approved as to Form &Legality: 's ATTEST: • � •ACAS. Richard A.McCracken Assistant City Attorney ary J I City Se r tary M&C No. N'14 Date: tZI30lite Foy t29S : A114— OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 FT.WORTH,TX Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ©� Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map ®. Exhibit A: Water hnprovments ® Water Cost Estimate ®' Exhibit A-1: Sewer Improvements Sewer Cost Estimate ®, Exhibit B: Paving Improvements ® Paving Cost Estimate © Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate ®. Exhibit C: Street Lights and Signs Improvements ®' Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100322 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 Project Item Information Bidder's Proposal Bidlist Item No. Description Unit of p Measure Specification Section No. Sheet 5 Sheet 6 Bid Quantity Unit Price Bid Value 3305.0109 Trench Safety for Water LF 33 05 10 4,177 1,222 5,399 $0.10 $539.90 3311.0001 Ductile Iron Water Fittings w/Res TON 3311 11 3.5 3.5 $4,000.00 $14,000.00 3311.0241 8"Water Pie LF 33 11 10 33 11 12 4,177 4,177 $32.00 $133,664.00 3311,0441 12"Water Pie LF 33 11 10 33 11 12 1,222 1,222 $44.00 $53,768.00 3312.0001 Fire Hydrant EA 33 12 40 8 8 $3,750.00 $30,000.00 3312.3003 8"Gate Valve EA 33 12 20 22 22 $950.00 $20,900.00 3312.3005 12"Gate Valve EA 33 12 20 8 8 $2,200.00 $17,600.00 3305.0116 Concrete Encasement for Utility Pipes LF 33 05 10 40 40 $20.00 $800.00 9999.0001 1"Water Service to be Installed on Ex Main EA 1000000 2 2 $1,250.00 $2,500.00 9999.0002 Ductile Iron Water Pipe(Whip Downs Under Sewer and Storm, Detail 33 05 12-D162) LF 00 00 00 285 234 $60.00 $14,040.00 9999.0003 11"Water Service EA 00 00 00 116 116 $900.00 $104,400.00 Total Street Water Bid $392,211.90 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 Project Item Information Bidders Proposal Bidlist Item No. Description Unit of Measure Specification Section No, Sheet 7 Sheet 8 Sheet 9 Sheet 10 Sheet l l Bid Quantity Unit Price Bid Value 3301.0002 Post-CCTV Inspection LF 3301 31 1,269 1,065 704 1,739 4,777 $2.00 $9,554.00 3301.0101 Manhole Vacuum Testing EA 3301 30 26 26 $100.00 $2600.00 3305.0109 Trench Safety LF 33 05 10 1 269 1 065 704 1,739 4 777 $1.00 $4,777.00 3331.3101 4"Sewer Service EA 3331 50 116 116 $600.00 $69,60000 3331.4115 8"Sewer Pipe-SDR 26 LF 33 11 10 33 31 12 33 31 20 1,269 1,065 704 1 739 4 777 $38.00 $181,526.00 3331.4116 8"Sewer Pipe,CSS Backfill LF 33 11 10 33 31 12 33 3120 94 58 66 102 320 $55.00 $17,600.00 3339.1003 4'Extra Depth Manhole IVF 33 39 10,33 39 20 25.6 9.3 18.6 7.5 61 $165.00 $10,065.00 3339.1001 4'Manhole EA 33 39 10,33 39 20 26 26 $3,000.00 $78,000.00 9999.0004 4"Sewer Service,on Existing Main,Concrete Pavement Repair EA 00 00 00 2 2 $2.200.00 $4,400.00 Total Sanitary Sewer Bid 1 $378,122.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 Project Item Information Bidder's Proposal Bidlist Item No. Description Unit of Specification Section Bid p Measure No. Sheet 24 Sheet 25 Sheet 26 Sheet 27 Sheet 28 Sheet 29 Shcct 30 Shcct 31 Unit Price Bid Value Quantity 0241.0800 Remove Rip Rap SF 10241 13 144 144 $3.00 $432.00 0241.3015 Remove 36"Storm Line LF 0241 14 16 16 $30.00 $480.00 0241.4401 Remove 36"Headwall/SET EA 0241 14 1 1 $1,200.00 $1,200.00 3137.0102 Large Stone Riprap,dry SY 31 37 00 16 25 16 57 $75.00 $4,275.00 3305.0109 Trench Safety LF 33 05 10 505 72 489 62 294 210 65 244 1,941 $1.00 $1,941.00 3341.0201 21"RCP Class III LF 3341 10 251 72 251 62 43 29 54 47 357 $45.00 $16,065.00 3341.0205 24"RCP Class III LF 3341 10 281 2401 251 41 ill 197 1,021 $50.00 $51,050.00 3341.0208 27"RCP Class III LF 3341 10 199 47 246 $60.00 $14,760.00 3341.0302 30"RCP Class III LF 33 41 10 140 140 $65.00 $9,100.00 3341.0309 36"RCP Class III LF 3341 10 177 177 $80.00 $14160.00 3349.0001 4'Storm Junction Box EA 33 49 10 2 1 1 1 1 6 $4,000.00 $24,000.00 3349.5001 10'Curb Inlet EA 33 49 20 3 2 1 2 8 $2,400.001 $19,200.00 3349.5002 15'Curb Inlet EA 33 49 20 1 2 2 2 7 $4,000.00 $28,000.00 3305.0012 Concrete Collar EA 33 05 17 1 21 1 2 1 1 8 $250.00 $2,000.00 9999.0005 24"Sloped End Headwall EA 00 00 00 1 1 $2,500.00 $2,500.00 9999.0006 27"Sloped End Headwall EA 00 00 00 1 1 $3,000.00 $3,000.00 9999.0007 36"Sloried End Headwall EA 00 00 00 1 1 $3,500.00 $3,500.00 9999.0008 Inlet Protection EA 00 00 00 1 3 2 2 1 2 2 2 18 $100.00 $1,800.00 9999.0009 10'Curb Inlet Non-Standard De th EA 1000000 1 1 $2,600.001 $2 600.00 Total Storm Sewer Bid $200,063.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 Bidder's Proposal Bidlist Item No. Desai tin. Unit of Specification P Measure Section N.. Sh-t 36 Sheet 37 Sheet 38 Shcet 39 Sheet 40 Shea 4l Sheet 42 Sheet 43 Sheet 44 Shect 56 Bid Quantity Unit Price Bid Value 3211.0400 Hydrated Lime 30lbs/s TN 3211 29 8 11 4 25 3 24 23 39 30 166.7 $175.00_$29.172.50 3211.0400 H drated Lime 36 lbs/sTN 3211 29 64 77 29 170.8 $175.00 $29,890.00 3211.0501 6"Lime Treatment SY 3211 29 524 719 258 1,682 210 1,611 1,504 2,616 1,987 11,111 $3.00 $33,333.00 3211.0502 8"Lime Treatment SY 321129 3,579 4,300 1,609 9,488 $3.25 $30,836.00 3213.0101 6"Conc Pvmt SY 32 13 13 505 610 248 1,595 194 1,512 1,412 2,452 1,859 10,387 $33.00 $342,771.00 9999.0010 7.5 Conc Pvmt SY 00 00 00 3,413 4.1001 1,530 9,043 $37.50 $339,112.50 3213.0301 4"Conc Sidewalk SF 32 13 20 9051 905 $3.001 $2,715.00 3213.0501 Barrier Free Ramp,Type R-1 EA 32 13 20 5 71 1 1 1 1 1 17 $1.200.00 $20,400.00, 3213.0504 Barrier Free Ramp,Type M-2 EA 32 13 20 1 31 1 1 1 1 1 9 $1,200.00 $10,800.00 3213.0506 Barrier Free Ramp,Type P-1 EA 32 13 20 1 3 1 1 1 1 1 9 $1,200.00 $10,800.00 9999.0011 Construct Type III Barricade EA 00 00 00 1 1 1 1 1 1 6 $750.00 $4,500.00 9999.0012 Remove&Relocate Standard EOR Barricade EA 00 00 00 11 2 $400.00 $800.00 9999.0013 StopSigns EA 00 00 00 2 2 $600.00 $1,200.00 9999.0014 Street Name Blade Pair EA 00 00 00 20 20 $300.00 $6,000.00 9999.0015 Street Sign Pole EA1000000 8 8 $300,001 $2,400.00 Total Paving Bid I $864,730.00j CITY SF FORT WOR-RI STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Faun Rc,'kx d 20120120 Project Item Information Bidder's Proposal Bidlist Item No. Description Unit of Measure Specification Section No. Sheet 56 Bid Quantity Unit Price Bid Value 2605.3015 2"CONDT PVC SCH 80 T LF 26 05 33 2,100 2,100 $12.00 $25,200.00 3441.3201 LED LightingFixture 70W EA 3541 20 24 24 $500.00 $12,000.00 3441.3301 Rd Illum Foundation TY 4 EA 34 41 20 24 24 $1,000.00 $24,000.00 3441.3301 Rwdy Ilium AssernblX TY 8,11,D-25,and D-30 EA 34 41 20 24 24 $2,000.00 $48,000.00 9999.0016 6-6-6 I np ex AIUM Elec Uonductor w 0 Copper roun in Pole Only LF 1000000 1 2,10011 2,100 $3.00 $6,300.00 Total Street Lights Bid $115,500.00 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 JOHN DAY RD. SONGBIRD LN tll D E L F— u- 12 —u-M O 04 l0 O 01 3 e J v C. PROJECT LOCATION > LL o z Q x m U NI o•pmv�o W l z a O 0/ 1 x \) X �/ NO Y, /0 s V . . Q� cgNyo� 1 0 Lu 00 CA a ti F�q o� VICINITY MAP SENDERA RANCH EAST N PHASE 12 O N 3 MAPSCO NO. 06-E SCALE: 1=2000 COUNCIL DISTRICT � JL cocli � FP16-010 X 777 MAIN STREET u- 3 FORT WORTH, TX 76102 J PHONE 817-735-6000 FUTURE SENDERA RANCH EAST . s 52 � ' / � // �I_LJ—LL1—I_L�I I�LJ ---� / ` z 4 o / ( o i / �\ ! 3 T7__TT�� �T7 i�� / � y �� 16 7 2115 ' eLJ_1 1 _I-I 14 �° 30 9 f 13 28 1 1 1 1 m 1 72625 ,— L1-I_L-I-L-1_I_L-1 2� 10 3 4 24 23 SCALE:1" = 300'�N 5 I I I I I I I I I I I I I 89 �0 8 910oc�� ss 7 8 2221 7 7 11 r _ 1 6 s 12 9 20 LI_ FUTURE 1_1_1 LEGEND -. 1112 5 2 13 10 19 1 _ SENDERA __ PROPOSED WATER LINE 4 4 22 21 14 11 18 I RANCH EAST PROPOSED GATE VALVE 20 15 1 1 1 3 Ex.B" o 3 a0 3 23 12 17 PROPOSED FIRE HYDRANT i < ' 2 2 24 19 16 13 1 16 z I I I I I I I I I I I EXISTING WATER LINE i 1 1 25 18 17 14 15 EXISTING FIRE HYDRANT a w-s -s w-2_I_1 _I_LJ_LJ_L 1J. 8 S GUARD RN 8 12" N 7 I-T T T I-T EXISTING GATE VALVE w 1 2 3 4 5 6 7 8 9 10 11 12 1314 15 1617 18 19 1 1 1 1 I 1 1 1 1 1 LIMITS OF PROJECT in PHASE 11 2 —1—L--J—L-J—L i cL FP# 15-035T—I_TT— w " 2319-9 2All 0 LJ_LLJ_LJJ1_�1� �j POLl.YANN TRAI 8 L 0 19 o z 2 8 o I w - _I_LL1—I_L Wx 1s ' _2 1 ice' WATER PHASE VIII-2 oo x 15 1 N 812 AYCEE LANE\ oPo FP# 13-075 14 7 — r— EXHIBIT 'A' g i °P 12 s _ _ SENDERA RANCH EAST 1 ' �5 ll') I L_ PHASE 12 cn 10' 3 --j F N JA i,,oOBS cn 3 777 MAIN STREET FORT WORTH, TX 76102 J ooh PHASE VIII-1 PHONE 817-735-6000 FP# 008-000 FUTURE SENDERA _ < i� <_ RANCH EAST "/ C����`�\y ,�^� I_T7 1—T-7-1-7 -77 s 2 / / �I_LJ_I_LJ_I_L� �lJ �\ 1s` 1 moo° (ter 15 ------ N 14 30 y I I I I I I I I I I I I 13 28 1 1 1 1 1 1 1 o 1 _- \L 11 �yi/,�\� 12 1 72625 _J_L1_I_1—I_LJ_I_LJ_ I `° ,� 11 ° 2 24 FD r _ ` i �' i \ 10 3 4 23 SCALE:1" = 300' w 5 _'� - �\ 89 8 9 6 7 22 ��-���-���-� - 7 7 10 11 8 21 6 6 12 s 20 LI_ FUTURE 12 5 5 2 1314 10 1s SENDERA 4 4 22 21 1 11 18 7-1— RANCH EAST rT� 20 15 3 EX,a" 3 3 23 W 12 17 1 1 1 1 1 I 1 1 1 1 I LEGEND ` w� 0 z 2 2 24 1 9 16 13 1 5 16 a 1 1 25 18 17 14 15 PROPOSED SAN SEWER - SAGUARO DRIVE PROPOSED MANHOLE N 7-77 T-I-T7 FT7 EXISTING SAN SEWER 1 2 3 4 5 6 7 8 910111213141516171819 PHASE 1 1 I I 2 _I_ J_L J_ EXISTING MANHOLEAl - - __ __ —� CL FP# 15-035 2 T 1 T T l 7 1 LIMITS OF PROJECT - - y CN 23 22 21 20 LJ_LLJ_LIJ-L x v L PLLY�NN iT_RAI - o X.B" 19 77-1-77-1-777-1—T-7 q � 2 8 x. o _I_L�_I_LLL_I_L 17 o I I w 16 9 1 2 00 PHASE VIII-2 w 15 WASTEWATER JAYCEE IANE\ Ro FP# 13-075 14 7 —1 r-7 EXHIBIT 'A-1 ' 12 6 = _ SENDERA RANCH EAST 11 1 L_ PHASE 12 O04 - l 10 4 --I -- 1 o�X�o 3 AL ,M N x 0 777 MAIN STREET 00 � PHASE VIII-1� FORT WORTH, TX 76102 e� PHONE 817-735-6000 i � � FP# 008-000 FUTURE SENDERA --I_L1_I_L1_I_L1_I_LI RANCH EAST "' /'� �y // TTT—TT—i—TT —T7 —li 1_i—i —li— 7 6 2 _ 5 N, F— / �\��/ /<� 4 3 2 1 �TT TTT 1 1—T 1 16 1 1 15 _I_I _I_I —I_ ---- N 14 30 9 13 28 12 1 72625 , L1_I_L_1—LJ_LLJ_ _� \ \ 11 v 2 3 24 r 1 p 4 23 —T T T T T (—T�! f T—1—I—T SCALE:1" = 300' cisa 5 1 I 1 �� `� ` 9 8 9 6 7 I N — T __� \ 1 8 10 8 21 LEGEND r' 1_—,1 1111 7 7 1112 s 20 FUT'URE' . 2 56 5 6 2 1314 10 19 L SENDERA J 1 PROPOSED 29'B-B _� _ 4 4 22 21 11 1s 7 RANCH EAST T T T ROADWAY/50 ROW —4 r— 20 15 a = 3 3 23 ;:: 12 17 _ 1 PROPOSED 41'B—B t\ a 2 2 24 19 16 13 1 16 ROADWAY/60'ROW \ a 1 1 25 18 17 14 15 1_I_1_I_1J_LJ_L1J. PROPOSED 4'SIDEWALK __________— sA 17AR0• �F.- .. :: :.. •. ...: (BY HOMEBUILDER) - I 7-77-1—T-1—T7—f T7CNI O w 1 2 3 4 5 6 7 2 9 10 11 12 13 14 15 16 17 18 19 1 1 1 1 1 1 1 BY DEVELOPER)OPOSED ADA RAMPS PHASE 11 _I_LJ_LJ_I_ �I FP# 15-035 2 T T T T I LIMITS OF PROJECT - - `1--[ 7�_� 23 22 21 20 �. 1J_L1J_11J�_LLJ j 9� POLLYANN TRAIL -'- u 0 19 T7 I -F—f 777 T7 2 8 I 17 w 16 PAVING N PHASE VIII-2 15 E—I FP# 13-075 14 7 —T EXHIBIT 'B' J 112 6 = _J SENDERA RANCH EAST 11 511 __I _ PHASE 12 04 10 4 AL N s \ _ _ --T---F— FORT 777 MAIN STREET WORTH TX 76102 o \max\\\ \ g�oo� \� PHASE VIII-1 PHONE 817-735-6000 FP 008-000 FUTURE / __I_L1_I_L1_I_L1_I_L1 SENDERA RANCH EAST 6 2 / )��/ �I_L-1_1—LI LL 5 4 32 / TT r��7 >—TT 16—1 X 14 0309 N 13 oQe 26 7 1226 M 11 .� 2 3 2524 i4 T—f F-T7 F-T7 —T-1 I—T r— \ 10 s 4 23 SCALE:1" = 300' I I I I I I I _j L, I I I I I 9 8 �OOc�gr 5 6 22 7 8 A' +�—���— —���—� C14s ' \ 7 7 10 11 8 21 _� --i 6 s 12 9 20 Ll— FUTURE t2 5 5 2 13 10 191 SENDERA 4 4 22 21 14 11 18 T— RANCH EAST FT-1- o __� r— 20 15 N Spo4 3 3 23 w 12 17 _I_ I 1 1 1 1 1 1 1 1 LEGEND I I I I I I I 11 1 Ex Aa 2 2 24 LLo 19 16 131 16 'I PROPOSED STORM i 1 1 25 18 17 14 15 _ — 1_I_1_I_L�_LJ_L1J. DRAIN LINE U AGUARO DRIVE T o ss PROPOSED INLET N % 1 2 3 4516 718 9 1011112131411ji617181s PROPOSED MANHOLE PHASE 11 a EXISTING STORM FP# 15-035DRAIN LINE ul N 72 y T 1 T T T I _�- � 23 22 21 20 EXISTING INLET T 1J_LIJ_LLJ1_�LJ W POLIYANN TRAIL o EXISTING MANHOLE ■ 19' • LIMITS OF PROJECT — — —I_L�l—I_LL1_I_L W 17 ° 1 w 16 ' 2 STORM -i_I� N PHASE VIII-2 15 1 N JAYCEE NE \ FP# 13-075 141 -� -� EXHIBIT 'B-1 ' g 5 12 6 _ _ SENDERA RANCH EAST 11 511 1 L_ PHASE 12 C11 4 °Na ACOBS 04 N `\ 00777 MAIN STREET I—I—ITI— \���` PHASE VIII-1 FORT WORTH, TX 76102 PHONE 817-735-6000 000 FP# 008— FUTURE SENDERA `/ , RANCH EAST "/ ��/'���y // --1—T-7 7-7—F7 �1-7 0 g 2 / / L-i—I—LL—_L� �L-1 5 4 F 77T7 (-T7 — i \ / 16 2 1 0° a 15 030 to 13 28 7 1 1 I I 1 1 1 1 1 1 1 l 12 �� 1 2625 , L1_I_l—I-LL—LLL_ 2 —T77T F-T7 f T7I—T 24 _ _ _ _ 1 r— 10 s� 4 23 SCAEE:1" = 300' Lo —T — A �1 �� 89 8 9 G �qr 6 7 22 +�— +�— +�—�+�—� 7 7 1011 g 21 s s 12 13 9 20 LI_ FUTURE 12 5 5 2 10 191 SENDERA —'A . 4 4 22 21 14 11 18 T 7 RANCH EAST �T- -- 1 r- 1 1 1 1 1 m 0 3 3 23 w 20 15 12 17 _I_ 1 1 1 1 LEGEND } 71 2 2 24 a 19 16 13 1 16 1 1 1 I 1 1 z 1 1 25 " 18 17 14 15 PROPOSED STREET .�. a — 1_I_1_I_LJ_LJ_L_L LIGHT V r� SAGUARO IVE N 7—I T—FT7-77 7TT LIMITS OF PROJECT — — 1 2 341516 7 2 9101111213141116171819 I I I I I I I I I I I PHASE 11 _I_ 1 —LL—LI� —�—� FP# 15-035 2 T L T L T 1 1 EXISTING STREET LIGHT 232221 20 JLLi_ L I � 1L_LL _LLJ j POLLYANN TRAIL vo o a 19 T7 T7 T7T 1 7 2 8 1 1 1 1 1 1 i J_L,1_I_LL1_I_L X 17 o I I NW 16 ' 2 1 STREET LIGHTS PHASE VIII-2 15 I N JAYCEE E Imo\ U oP�oPo FP# 13-075 14 7 — r— EXHIBIT 'C' 12 s _ _ SENDERA RANCH EAST 11 57---1 L_ PHASE 12 ol 10 4 — j F JACOBS N _ —V, 777 MAIN STREET � ITS FORT WORTH TX 76102 PHASE VIII-1 i , ;:k�\\\ � ego° PHONE 817-735-6000 FP# 008-000 Al FUTURE SENDERA /--l_l-T-f-I T-f-I-T 7 RANCH EAST 7 2 �\ J �\ 6 5 / ��\�' /`�� 1 4 3 2 6ut 15 LL 14 0 30 9 13 66 ��� �\ 11 \yi ,�\ 12 2� 1 2625 ,�J_L1L_L_1—LJ-LLJ- a1 _� �\ �� ���� 11 ° 2 3 24 N r� \ 10 s 4 23 TT-TT-f I-T7-(-T i 77 SCALE:1" = 300' �No0 5 6 I g 9 8 9 �qr 7 22 7 7 1011 g 21 12 9 20 Li- FUTURE 6 6 5 2 13 5 10 191 SENDERA 14 4 4 22 21 11 18 T-I_ RANCH EAST I-T�I- _� r� 20 15 N - 0 3 3 23 W 12 17 1 1 1 1 1 1 1 1 1 1 2 2 24 0 19 16 13 1 16 1 25 �" 18 17 14 15 LEGEND _ 1_I_1_I_1J_LJ_L1J. SAGUARO DRIVE 7—TT—I—T—I-1--1—I—TT STOP SIGN AND STREET NAME I cl w 1 2 3 41516 7 2 911 ol11 12 13 1411 116 17 18 19 PHASE 11 _I_LJ_LJ-L 1 ��-�� STREET NAME SIGN ONLY CL FP# 15-035 f 2 7-1-77-1—F77 STREET LIGHT TO INCLUDE STOP s ( 23 22 21 20 SIGN AND STREET NAME SIGN ��� III III 1J_�lJ_LLJ1_LL� �j POLLYANN TRAIL o STREET LIGHT TO INCLUDE a o 1 T-f—I—T 7—7 T T 7—I—T T STREET NAME BLADES 8 e _I_L -I_LL1_I_L LIMITS OF PROJECT — - - — t 17 o I I w16 2 STREET SIGNS `� PHASE VIII-2 15 I N JAYCEE E Imo\ i 013 P# 13-075 14 7 -�, EXHIBIT 'C-1' g 5� 12 6 = _J SENDERA RANCH EAST PHASE 12 _ I N 10 4 —� I-- cl i- J J J/ACOBS N �oP° 777 MAIN STREET PHASE VIII 11_ FORT WORTH, TX 76102 \ 0�o PHONE 817-735-6000 \ FPS 008-000