HomeMy WebLinkAboutContract 29196 10-21-03P03 02 RCVD CITY SECRETARY CONTRACT NO.
CITY OF FORT WORTH,TEXAS
DEPARTMENT OF ENGINEERING
STATE OF TEXAS §
KNOWN ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
THIS AGREEMENT, entered into the day of September, 2003, by and between
the CITY OF FORT WORTH, a municipal corporation of Tarrant and Johnson Counties,
Texas, acting herein by and through Marc Ott, its duly authorized Assistant City Manager,
hereinafter called the "City", and MACTEC Engineering & Consulting, Inc., an
independent contractor, acting by and through Patrick D. Bolton, P. E., its duly authorized
Assistant Vice President, hereinafter called "Engineer".
WITNESSETH
That for and in consideration of mutual covenants and agreements herein contained, the
parties hereto mutually agree as follows:
ARTICLE I
SERVICES
Section 1. Engineer hereby agrees to perform as a per job independent contractor such
professional services as may be requested by the City during the term of this agreement.
These professional services shall be performed in connection with geotechnical
investigation for bridge foundations, drainage structures, retaining walls, levees, dams,
roads, landfills, utilities and other civil works as may be required during the life of this
contract and include laboratory analysis, field work, and reports. These services shall also
include material testing.
Section 2. In addition to the professional engineering services to be performed under
Section 1 above, Engineer shall render the following professional services:
1. Attend such conferences with City officials as may be determined necessary
to ensure the drilling, testing, and analysis will proceed in an economical and
orderly manner.
2. Advise the City on special aspects of each project as may be requested by
the City.
3. Furnish all necessary personnel, drilling equipment, laboratory testing
equipment, and materials necessary to perform all testing and other work required
and contemplated under this contract and at such time and in such manner so as not
CURIA ROD
CITY M��C ARY
QQAA Q
FT. WORK EX.
to delay the geotechnical investigation by the City. Engineer shall also furnish all
necessary barricades, signs and other warning devices and their appurtenances so as
to comply with all applicable local, state and federal laws,rules and regulations.
ARTICLE II
CITY'S OBLIGATIONS AND COMPENSATION
Section 1. All testing or other work to be performed under this contract will be performed
in writing by the City. City shall not pay for any testing or other work performed by
Engineer or its subcontractors that has not been ordered in writing. It is specifically agreed
that Engineer shall not be compensated for any alleged additional work resulting from oral
orders of any person.
City shall make available to Engineer in the performance of the contract, all existing plans,
maps, field notes, statistics, computations, and other data in its possession relative to the
sites designated for investigation. City assumes no responsibility for the accuracy of such
data furnished to Engineer by the City, its agents, contractors, or subcontractors.
Section 2. City agrees to pay Engineer for testing services on a unit price per authorized
test basis. The unit price to be paid for each authorized service shall not exceed the unit
price amount set out in the schedule of Fees and Services, attached hereto, marked "Exhibit
A", and incorporated herein for all purposes incident to this contract. In no event shall the
total contract price paid by the City for all services performed hereunder exceed the sum of
Two Hundred Thousand Dollars ($200,000.00).
The method of payment shall be as follows: Payment for services rendered shall be due
upon completion of the particular services so ordered and receipt by City of Engineer's
invoice for payment of same.
Acceptance by Engineer of said payment shall operate as and shall release the City from all
claims or liabilities under this contract for anything related to, done, or furnished in
connection with the services for which payment is made, including any act or omission of
the City in connection with such services.
ARTICLE III
TERM
This agreement shall be for a term of twenty-four (24) months, beginning upon contract
execution date.
ARTICLE IV
INDEPENDENT CONTRACTOR
Engineer shall operate hereunder as an independent contractor, and not as an officer, agent,
servant, or employee of the City_ Engineer shall have exclusive control of and the
exclusive right to control the details of the work to be performed hereunder and all persons
performing same, and shall be solely responsible for the acts and omissions of its officers,
GEOTECHNICAL SERVICES
ANNUAL CONTRACT
Page 2 of 8
I
agents, employees, contractors and subcontractors. The doctrine of respondent superior
shall not apply as between City and Engineer, its officers, agents, employees, contractors,
and subcontractors, and nothing herein shall be construed as creating a partnership or joint
venture between City and Engineer.
ARTICLE V
PROFESSIONAL COMPETENCE AND INDEMNIFICATION
Section 1. The standard of care applicable to the Engineer's services will be the degree of
skill and diligence normally employed in the State of Texas by professional engineers or
consultants performing the same or similar services at the time such services re performed.
All work performed by Engineer shall comply in all aspects with all applicable local, state
and federal laws and with all applicable rules and regulations promulgated by the local,
state and national boards, bureaus and agencies. Approval by the City shall not constitute
or be deemed to be a release of the responsibility and liability of Engineer or its officers,
agents, employees, contractors and subcontractors for the accuracy and competency of its
drilling, testing, and reporting, and other engineering services performed hereunder.
Section 2. In this connection, Engineer shall indemnify,hold harmless and defend the City
and all of its officers, agents, servants and employees from and against any and all claims
or suits for property damage or loss and/or personal injury, including death, to any and all
persons of whatsoever kind or character, including but not limited to employees of
Engineer, employees of subcontractors, and all other persons performing work incident to
this contract which may rise out of or be connected with directly or indirectly to the extent
caused by:
a. The negligent, defective or deficient execution, performance, attempted
performance or non-performance of this contract by Engineer.
b. Any act, omission, defect, deficiency or negligence of Engineer in drilling
and testing,reporting,recommendations or any other engineering services;
C. Any neglect in the safeguarding of the work by Engineer or its
subcontractors;
d. Failure by Engineer or its subcontractors to properly execute the work;
e. Defective work or materials; and/or
f. Striking, cutting, impaling or tearing any cables, utility lines, pipes and
other matter located beneath the surface due to the negligence or wrongful acts of
Engineer.
Engineer shall likewise indemnify, and hold harmless, City for any and all injury or
damage to City property arising out of, or in connection with, and to the extent caused by
any and all negligent acts or omissions of Engineer, its officers, agents, employees or
subcontractors.
GEOTECHMCAL SERVICES
ANNUAL CONTRACT
Page 3 of 8
w
ARTICLE VI
INSURANCE
Section 1. Engineer shall not commence work under this contract until it has obtained all
insurance required under this Article and the City has approved such insurance, nor shall
Engineer allow any subcontractor to commence work on its subcontract until all similar
insurance of the subcontractor has been so obtained and approval given by the City;
provided, however, Consultant may elect to add any sub-consultant as an additional
insured under its liability policies.
Commercial General Liability
$5,000,000 each occurrence
$5,000,000 aggregate
Automobile Liability
$1,000,000 each accident (or reasonably equivalent limits of
coverage if written on a split limits basis). Coverage shall be on any
vehicle used in the course of the PROJECT.
Worker's Compensation
Coverage A: statutory limits
Coverage B: $100,000 each accident
$500,000 disease—policy limit
$100,000 disease—each employee
Professional Liability
$1,000,000 each claim/annual aggregate
Section 2. Additional Insurance Requirements
a. Except for employer's liability insurance coverage under Engineer's worker's
compensation insurance policy and professional liability insurance, the City,
its officers, employees and servants shall be endorsed as an additional insured
on Engineer's insurance policies.
b. Certificates of insurance shall be delivered to the Department of Engineering's
contract administrator, 1000 Throckmorton Street, Fort Worth" TX 76102,
prior to commencement of work.
c. Any failure on part of the City to request required insurance documentation
shall not constitute a waiver of the insurance requirements specified herein.
d. Each insurance policy shall be endorsed to provide the City a minimum thirty
days notice of cancellation, non-renewal, and/or material change in policy
terms or coverage. A ter: days notice shall be acceptable in the event of non-
payment of premium.
GEOTECWCAL SERVICES
ANN;;AL CONTRACT
Page 4 of 8
e. Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A: VII or equivalent measure of financial strength
and solvency.
f. Deductible limits, or self-funded retention limits, on each policy must not
exceed $10,000.00 per occurrence unless otherwise approved by the City.
g. Other than worker's compensation insurance, in lieu of traditional insurance,
City may consider alternative coverage or risk treatment measures through
insurance pools or risk retention groups. The City must approve in writing any
alternative coverage.
h. Workers' compensation insurance policy(s) covering employees employed on
the project shall be endorsed with a waiver of subrogation providing rights of
recovery in favor of the City.
i. City shall not be responsible for the direct payment of insurance premium
costs for Engineer's insurance.
j. Engineer's insurance policies shall each be endorsed to provide that such
insurance is primary protection and any self-funded or commercial coverage
maintained by City shall not be called upon to contribute to loss recovery.
k. In the course of the contract, Engineer shall report, in a timely manner, to
City's officially designated contract administrator any known loss occurrence
which could give rise to a liability claim or lawsuit or which could result in a
property loss.
1. Engineer's liability shall not be limited to the specified amounts of insurance
required herein.
m. Upon the request of City, Engineer shall provide complete copies of all
insurance policies required by these contract documents.
ARTICLE VII
TRANSFER OR ASSIGNMENT
City and Engineer each bind themselves, and their respective successor and assigns, to this
agreement. Engineer, its successors and assigns, shall not assign, sublet or transfer any
interest in this agreement without prior written consent of the City.
GEOTECHNICAL SERVICES
ANNUAL CONTRACT
Page 5 of 8
r
ARTICLE VIII
TERMINATION OF CONTRACT
Section 1. City may terminate this contract at any time, for any cause, by notice in writing
to Engineer. Upon receipt of such notice, Engineer shall immediately discontinue all
services and work hereunder and the placing of all orders or the entering into contracts for
supplies, assistance, facilities, and materials, in connection with the performance of this
contract and shall proceed to cancel promptly all existing contracts insofar as they are
chargeable to this contract.
Section 2. If City chooses to terminate this contract under Article VIII, Section 1, upon
receipt of notice of termination, Engineer shall discontinue services rendered up to the date
of such termination based upon calculations in Article 11, Section 2 and the attached
incorporated Schedule of Fees and Services (Exhibit "A").
Section 3. All reports, whether partial or complete, prepared under this contract, including
the original drawings, whether furnished by the City, its officers, agents, employees,
consultants, engineers, or contractors, or prepared by Engineer, shall be or become the
property of the City, and shall be furnished to the City prior to or at the time such services
are completed, or upon termination or expiration of this agreement. Reports and Work
Product prepared by Engineer will not be used by the City for purposes or for project sites
other than those for which they were prepared by Engineer.
ARTICLE IX
RIGHT TO AUDIT
(a) Engineer agrees that the City shall, until the expiration of three (3) years after final
payment under this contract, have access to and the right to examine any directly
pertinent books, documents, papers and records of Engineer involving transactions
relating to this contract. Engineer agrees that the City shall have access during normal
working hours to all necessary facilities and shall be provided adequate and appropriate
workspace in order to conduct audits in compliance with the provisions of this section.
City shall give Engineer reasonable advance notice of intended audits.
(b) Engineer further agrees to include in all its subcontracts hereunder, a provision to the
effect that the subcontracting consultant agrees that the City shall, until the expiration
of three (3) years after final payment under the subcontract, have access to and the right
to examine any directly pertinent books, documents, papers and records of such sub-
consultant, involving transactions to the subcontract, and further, that City shall have
access during normal working hours to all sub-consultant facilities, and shall be
provided adequate and appropriate work space in order to conduct audits in compliance
with the provisions of this article. City shall give Engineer and any sub-consultant
reasonable advance notice of intended audit.
GEOITCHNICAL SERVICES
ANNU.AI CONTRACT
Page 0 ol,8
(c) Engineer and sub-consultants agree to photocopy such documents as may be requested
by the City. The City agrees to reimburse Engineer for the cost of copies at the rate
published in the Texas Administrative Code in effect as of the time copying is
performed.
ARTICLE X
MINORITY AND WOMAN BUSINESS ENTERPRISE
(M/WBE)PARTICIPATION
In accordance with City Ordinance No. 15530, the City has goals for the participation of
minority business enterprises and woman business enterprises ("M/WBE") in City
contracts. Engineer acknowledges the M/WBE goal established for this contract and its
commitment to meet that goal. Any misrepresentation of facts (other than a negligent
misrepresentation) and/or the commission of fraud by the Engineer may result in the
termination of this agreement and debarment from participating in City contracts for a
period of time of not less than three (3) years.
ARTICLE XI
OBSERVE AND COMPLY
Engineer shall at all times observe and comply with all federal and State laws and
regulations and with all City ordinances and regulations which in any way affect this
agreement and the work hereunder, and shall observe and comply with all orders, laws
ordinances and regulations which may exist or may be enacted later by governing bodies
having jurisdiction or authority for such enactment. No plea of misunderstanding or
ignorance thereof shall be considered. Engineer agrees to defend, indemnify and hold
harmless City and all of its officers, agents and employees from and against all claims or
liability arising out of the violation of any such order, law, ordinance, or regulation,
whether it be by itself or its employees.
ARTICLE XIII
VENUE
Should any action, whether real or asserted, at law or in equity, arise out of or under this
Contract, venue for said action shall be exclusively in Tarrant County, Texas.
IN WITNESS THEREOF, the parties hereto have made and executed this agreement in
multiple originals the day and year first above written, in Fort Worth, Tarrant County,
Texas.
GEOTECHNICAL SERVICES
ANNUAL CONTRACT
Page 7 of 8
a
ATTE : CIT F F RT
BY. B
loria Pear on Marc Ott
City Secretary Assistant City Manager
APPROVAL RECOMMENDED: MACTEC ENGINEERING&
CONSULTING, INC.
BY: - BY:
Doug Rademaker, Director Patrick D. Bolton, P.E.
Department of Engineering Assistant Vice President
APPROVED AS TO FORM AND 4�O,.-L- :-: f-e—, �N j
LEGALITY: Contract Authorization
°s ,2;, : s
Date
Assistant ity Attorney
C-- Iii �da-01
�,ontr t Authorization
late
11 r jl°lU
g j !�pv
'y
GEOTECHNICAL SERVICES �' `•�yv"TH, TEX.
ANNUAL.CONTRACT
Page 8 of 8
EXHIBIT "A"
MACTEC ENGINEERING AND CONSULTING,INC.
2003 SCHEDULE OF FEES
GEOTECHNICAL ENGINEERING SERVICES
A. FIELD WORK
Drilling with intermittent tube samples in cohesive soils,
standard penetration in cohesionless soils
0-50 feet,per foot...................................................................................................................$9.75
50-100 feet,per foot.............................................................................................................$12.50
Sampling chemical or water injected sites,per foot....................................................................$12.00
Core borings in shale or soft limestone,NX-size,per foot.........................................................$17.00
Coring set-up charge(per boring).............................................................................................$120.00
Auger borings in soil,no samples,per foot..................................................................................$7.50
Stand-by time in excess of 30 minutes,per hour.......................................................................$145.00
Mobilization,round-trip($175.00 Minimum),per mile...............................................................$2.50
Per Diem,per man/day,each......................................................................................................$70.00
Minimum Drill Fee Per Trip.....................................................................................................$575.00
B. LABORATORY WORK
AtterbergLimits,each................................................................................................................$50.00
Grain-size(mechanical),each.....................................................................................................$30.00
Finer than 200 sieve, each...........................................................................................................$20.00
Unconfined Compression test-soil,each...................................................................................$35.00
Unconfined Compression test-rock,each..................................................................................$45.00
Moisture Density Relationship(ASTM D-698),each...............................................................$160.00
Lime-pH Series, each................................................................................................................$100.00
Absorption Swell Test,each.......................................................................................................$80.00
ConsolidationTest,each...........................................................................................................$350.00
C. PERSONNEL
StaffEngineer(Grade I)............................................................................................................. $67.00
StaffEngineer(Grade II)........................................................................................................... $77.00
ProjectEngineer ...................................................................................................................... $87.00
SeniorEngineer .................................................................................................................... $110.00
ProjectManager ................................................................................................................... $130.00
PrincipalEngineer ....................................................................................................................$155.00
ChiefEngineer .................................................................. .................................................$200.00
�N "
1 EXHIBIT A
MACTEC ENGINEERING AND CONSULTING, INC.
2003 PERSONNEL FEE SCHEDULE
FORT WORTH OFFICE
Charges will be made at the following rates for time spent by professionals in setting up and closing out projects, evaluation or
analysis of field and laboratory data, report preparation, conferences, and consultation as pertaining to the practice of
geotechnical, materials, facilities and environmental services. They include indirect general and administrative overhead and
supplies. Special non-listed charges may apply for hazardous waste sites. Court appearances,depositions,etc.,will be charged at
1.5 times the standard rate.
STAFF I:
Architect,Engineer,Geologist,Scientist per hour............................................................................................................$ 67.00
STAFF II:
Architect,Engineer,Geologist, Scientist per hour.............................................................................................................$77.00
PROJECT:
Architect,Engineer,Geologist,Scientist,per hour...........................................................................................................$ 87.00
SENIOR:
Architect,Engineer,Geologist, Scientist,Project Manager,per hour ............................................................................$110.00
PRINCIPAL/PROJECT MANAGER:
Technical Director,Engineer,Geologist,Scientist,Project Manager,per hour ............................................................$155.00
Charges will be made at the following rates for time of engineering technicians spent in sampling, conducting field and laboratory
inspections, and tests not otherwise charged on a unit test basis. They include indirect general and administrative overhead.
Overtime, at client's request,over eight(8)hours per day, Saturday, Sunday and Holiday work will be charged at 1.5 X standard
rate.
ENGINEERING/SCIENCE TECHNICIAN
(Engineering,Asbestos,Environmental,Laboratory,Roofing Services)
Technician,per hour............................................................................................................................................................$ 45.00
Technician,Overtime,per hour ........................................................................................................................................$ 67.50
SeniorTechnician,per hour...............................................................................................................................................$ 55.00
SeniorTechnician,Overtime,per hour.............................................................................................................................$ 90.00
SUPPORT PERSONNEL
Admin/Word Processor clerical,per hour.....................................................................................................................$ 45.00
CADD Operator,including equipment,per hour............................................................................................................$ 55.00
REIMBURSABLE EXPENSES
TRAVEL AND LODGING,expenses charged at actual subsistence cost plus 15%service charge.
COMPANY OR PRIVATE VEHICLE TRAVEL,per mile...........................................................................................$ 0.50
Special equipment or supplies, permits, shipping charges, special printing or other items not customarily provided by MACTEC
will be charged at cost multiplied by 1.15.
SUBCONTRACT services outside MACTEC(if required)will be invoiced at our cost multiplied by 1.15.
EXHIBIT A�
MACTEC ENGINEERING AND CONSULTING,INC.
2003 SCHEDULE OF FEES
CONSTRUCTION TESTING AND INSPECTION SERVICES
[. TECHNICIAN SERVICES - Time spent in direct project, services in the field or laboratory, including travel, report
preparation,tests not charged on unit test basis,etc.
A. Engineering Technician for routine testing services,per hour........................................................................................$ 45.00
B. Senior Engineering Technician for special test or inspections,per hour........................................................................$ 55.00
C. AWS Level II Steel Inspector,per hour...........................................................................................................................$60.00
D. Clerical, per hour..............................................................................................................................................................$45.00
E. CADD Services, per hour................................................................................................................................................$55.00
II. ENGINEERING SERVICES-Field inspection and evaluation travel time,consultation or meetings
related to the project,etc.,(charge only if services requested)
A. Project Engineer,Project Manager,per hour...................................................................................................................$ 87.00
B. Senior Engineer,P.E.,per hour......................................................................................................................................$ 110.00
C. Principal Engineer,P.E.,per hour..................................................................................................................................$155.00
D. Chief Engineer,P.E.,per hour........................................................................................................................................$ 180.00
(Hourly Charges are based on Portal-to-Portal Time)
(Unit Test Charges for Projects Outside a 30 Mile Radius will be Charged an Additional$20.00 Per Trip Vehicle
Usage.)
Ill. FIELD TESTING SERVICES
A. Soil Testing
1. Field Density Tests
a. Drive Cylinder Method (ASTM D-2937), Sand Cone Method (ASTM D-I556), Nuclear
Method
(ASTM D-2922)minimum of four tests,per test...........................................................................$ 27.00
B. Concrete Testing
1. Technician to job site for sampling of fresh concrete,slump test,cast set of
concrete cylinders(6"x I2"),curing,testing,up to four cylinders per set.................................See Technician Rate
(Allow one hour per set of cylinders)
Additionalcylinder per set,each.....................................................................................................................$ 16.25
2. Slump Test(ASTM C-143),other than one per set of cylinders................................................See Technician Rate
3. Unit Weight of Fresh Concrete(ASTM C-138),other than one per set of cylinders,per test...See Technician Rate
4. Air Content of Fresh Concrete by Volumetric Method (ASTM D-173) or Pressure Method (ASTM
D-231),other than one per set of cylinders,per test...................................................................See Technician Rate
5. Concrete or Asphalt Coring Diamond Bit Charge,per 4 inch core diameter,each
(1) Portland Cement Concrete...............................................................................................................$40.00
1
EXHIBIT\ A
MACTEC ENGINEERING AND CONSULTING,INC.
2003 SCHEDULE OF FEES(CONT.)
(2) Asphalt............................................................................................................................................$ 40.00
(3) Personnel,at appropriate rates.
IV. SUPPLEMENTAL LABORATORY SERVICES
A. Soil Testing
1. Standard Laboratory Compaction test,(ASTM)D-698),per test................................................................$ 160.00
2. Modified Laboratory Compaction test,(ASTM D-1557),per test...............................................................$ 180.00
3. Grain Size wash 200,per sample....................................................................................................................$ 50.00
B. Concrete Testing
1. Compressive test of concrete cylinder,including curing,testing or holding in reserve,
andreporting,per test....................................................................................................................................$ 16.25
2. Concrete core test,compressive strength,per test...........................................................................................$ 40.00
C. Asphalt Testing
1. Bitumen and Gradation,each........................................................................................................................$ 150.00
2. Marshall Stability,each...................................................................................................................................$ 75.00
V. Overtime Charges-For work required during other than normal 8-hour day or 40-hour week,or on Saturdays,Sundays,and holidays,
multiply technician services by 1.5.
2
r�
City of Fort Worth, Texas
imAyar And C n communicaifo 4
oucil
DATE REFERENCE NUMBER TOGNAME PAGE
6/24/03 **C-19629 30MACTEC 1 of 2
SUBJECT AWARD OF CONTRACT TO MACTEC ENGINEERING AND CONSULTING, INC. FOR
GEO-TECHNICAL AND CONSTRUCTION MATERIALS TESTING SERVICES FOR
VARIOUS CITY OF FORT WORTH PROJECTS
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a contract with Mactec
Engineering and Consulting, Inc. for geo-technical and construction material testing services for a
period of 24 months with an aggregate fee not to exceed $200,000.
DISCUSSION:
Since 1982, the City has periodically negotiated requirement contracts with firms to perform geo-
technical and construction materials testing services for various City projects. The requirement
contracts provide the City with additional capacity as needed and allows for rapid response to
departmental needs with already established unit prices. Funding is provided from each individual
project.
The City's previous contract with Landtec Engineers, LLC will expire on July 15, 2003. Staff recently
solicited unpriced proposals from seven firms. A total of six proposals were received. Those firms
submitting proposals were:
• CMJ Engineering, Inc.
• Kleinfelder
• Mactec Engineering and Consulting, Inc.
• PSI
• Terra-Mar, Inc.
• Landtec Engineers, LLC
Each firm's proposal was evaluated based upon pre-established selection criteria, which included, but
was not limited to, qualifications of personnel, experience and performance on previous City contracts,
and availability of testing equipment.
Mactec Engineering and Consulting, Inc., a Fort Worth-based firm, was selected by an inter-
departmental committee of City staff as the most qualified to perform the proposed services.
All City departments requiring geo-technical and/or construction materials testing services will be able
to utilize the services of the recommended firm under this contract. The contract will terminate 24
months after execution or after billing for services total $200,000, whichever occurs first.
Mactec Engineering and Consulting, Inc. is in compliance with the City's M/WBE Ordinance by
committing to 20% M/WBE participation. The City's goal on this project is 20%.
City of Fort Worth, Texas
4velvor And Council COMI"Unicat�c�n
DATE REFERENCE NUMBER LOG NAME PAGE
6/24/03 **C-1 9629 30MACTEC 2 of 2
SUBJECT AWARD OF CONTRACT TO MACTEC ENGINEERING AND CONSULTING, INC. FOR
GEO-TECHNICAL AND CONSTRUCTION MATERIALS TESTING SERVICES FOR
VARIOUS CITY OF FORT WORTH PROJECTS
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budgets as appropriated of
the various Capital Improvement Program Funds.
MO:r
Submitted for City Manager's FUNDT-ACCOUNTI CENTER I AMOUNT CITY SECRETARY
Office by: (to)
Marc Ott 8476
Originating Department Head:
Douglas Rademaker 6157 (from) APPROVED 06/24/03
Additional Information Contact:
Douglas Rademaker 6157