HomeMy WebLinkAboutContract 47659-FP2 [Risk
epartment of TP W Const. Services
PN# D to
roject Manager 1 ( Z�j /(�, ],
Mana ement Can d - ' WORTH,
C1TY$E.O.E. g Brotherton /r, �_- O R ! HO CONMAC N
CFA Westerman/Scanned �I
Esteban Perez/Scanned 17 7461
The Proceeding people have been Contacted
concerning the request for final payment& have ATION AND PUBLIC WORKS
released this project for such payment. iF PROJECT COMPLETION
Developers�Projects) // ) �-7 ��� 7Szz
Clearance Conducted By �� [ ��} J�L21,ti�kll/t �/ 5�� / City Project Ns: 02665
Regarding contract 117522 for THE PARK OF FOSSIL CREEK as required by the
TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director
of the TRANSPORTATION& PUBLIC WORKS upon the recommendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete.
Original Contract Price: $334,911.26
Amount of Approved Change Orders: Ns
Revised Contract Amount:
Total Cost Work Completed: $334,911.26
i
i,
Recomme de for Acceptance Date
Asst. Direc or, TPW - Infrastructure Design and Construction
7
Accepted Date
Direct r, TRANSPORTATIO & PUBLIC WOR{<S ���Z ��
Asst. City Manager Date z_
Comments:
JAN 5 2017 OFFICIAL RECORD
SA i
Initial; CITY SECRETARY
FT.WORTH,TX
Rev.9/22/16
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name THE PARK OF FOSSIL CREEK
Contract Limits
Project Type PAVING
City Project Numbers 02665
DOE Number 7522
Estimate Number 1 Payment Number 1 For Period Ending 11/30/2016
WD
City Secretary Contract Number 117522 Contract Time 4VM
Contract Date Days Charged to Date 269
Project Manager Long Contract is 100.00 Complete
Contractor STABILE&WINN,INC.
P.O.BOX 79380
SAGINAW, TX 76179-0380
Inspectors LAYER / SALAZAR
Wednesday,November 30,2016 Page 1 of 4
I�
SI
City Project Numbers 02665 DOE Number 7522
Contract Name THE PARK OF FOSSIL CREEK Estimate Number I
Contract Limits Payment Number 1
Project Type PAVING For Period Ending 11/30/2016
Project Funding
PAVING
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 6"LIME TREATMENT 6181 SY $2.40 $14,834.40 6181 $14,834.40
2 HYDRATED LIME 93 TN $150.00 $13,950.00 93 $13,950.00
3 6"CONC PVMT 5834 SY $41.79 $243,802.86 5834 $243,802.86
4 4"CONC SIDEWALK 10176 SF $5.25 $53,424.00 10176 $53,424.00
5 BARRIER FREE RAMP 8 EA $912.50 $7,300.00 8 $7,300.00
6 MANHOLE ADJUSTMENT 8 EA $200.00 $1,600.00 8 $1,600.00
Sub-Total of Previous Unit $334,911.26 $334,911.26
Wednesday,November 30,2016 Page 2 of 4
City Project Numbers 02665 DOE Number 7522
Contract Name THE PARK OF FOSSIL CREEK Estimate Number I
Contract Limits Payment Number I
Project Type PAVING For Period Ending 11/30/2016
Project Funding
Conti-act hiformation Summary
Original Contract Amount $334,911.26
Chan,ae Orders
Total Contract Price $334,911.26
Date�2 2 /d Total Cost of Work Completed $334,911.26
,Z-44'C ctor Less %Retained $0.00
Date
Net Earned $334,911.26/Z-6- �
Inspection Supervisor Earned This Period $334,911.26
/ Retainage This Period $0.00
Date /�"
Less Liquidated Damages
Project Manager
t 1 1� I� Days n /Day $0.00
pn Date LessPavement Deficiency $0.00
Ass. ' e tor[fPW-Infrastructure Design and Construction Less Penalty $0.00
Date l Less Previous Payment $0.00
Directo Contracting Departs nt Plus Material on Hand Less 15% $0.00
Balance Due This Payment $334,911.26
Wednesday,November 30,2016 Page 3 of 4
City Project Numbers 02665 DOE Number 7522
Contract Name THE PARK OF FOSSIL CREEK Estimate Number I
Contract Limits Payment Number 1
Project Type PAVING For Period Ending 11/30/2016
Project Funding
Project Manager Long City Secretary Contract Number 117522
Inspectors LAYER / SALAZAR Contract Date
Contractor STABILE&WINN,INC. Contract Time 40 WD
P.O.BOX 79380 Days Charged to Date 269 WD
SAGINAW, TX 76179-0380 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $334,911.26
Less %Retained $0.00
Net Earned $334,911.26
Earned This Period $334,911.26
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $334,911.26
Wednesday,November 30,2016 Page 4 of 4
FORTWORTH rev 03/05/07
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: The Park of Fossil Creek
PROJECT NO.: 02665 CONTRACTOR: Stabile&Winn,Inc.
DOE NO.: 7522
PERIOD FROM 03/07/16 TO: 11/30/16 FINAL INSPECTION DATE: 30-Nov-16
WORK ORDER EFFECTIVE: CONTRACT TIME: 40 O WB* CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
I. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
IL 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS
PERIOD
PREVIOUS
PERIOD
TOTALS 1269
TO DATE
*REMARKS:
/2 S" 2- ,b l a
C RACTOR DATE IN CTO DATE
ENGINEERING DEPARTlNIENT
° The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTHREV:8/20/16
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Stabile&Winn Inc. The Park of Fossil creek
Inspector City Project N:anber
Edwin R.Rodriguez,Sr. 02665
Construrvon Components Project Manager
❑ Water❑ wastewater[] Storm Drainage Pavement Aaron Long
Initial ContactAmount ProjectDififtuli)+
$334,911.26 O Simple Routine O Complex
Final Contract Amount Date
$334,911.26 11/30/2016
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 441
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 441
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating(ITS/MS] * 100%) 441 / 448 = 98%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Inspector Signature Contractor Signature
Inspector's Supervisor Signature
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•8851 Camp Bowie West Blvd. •Fort Worth,Thi 76116•(817)392-8306
CONSENT OF
SURETY COMPANY
TO FINAL PAYMENT Bond #CA 4099260
Project: The Parks of Fossil Creek
To (Owner):
City of Fort Worth, Texas and
Silver Bay Group, LLC
1000 Throclonorton St. Contract For: See above
Ft Worth, TX 76102
Contract Date: January 27, 2016
Contractor:
Stabile & Winn, Inc.
P O Box 79380
Saginaw, TX 76179-0380
In accordance with the provision of the Contract between the Owner and the Contractor as
defined above,the Great American Insurance Company of New York
301 E Fourth Street
Cincinnati, OH 45202
,Surety Company,
on bond of Stabile &Winn,Inc.
P O Box 79380
Saginaw,TX 76179-0380
,Contractor
hereby approves of the final payment to the contractor and agrees that final payment to the
contractor shall not relieve the Surety Companies of any of their obligations to the
City of Fort Worth,Texas and Silver Bay Group,LLC
1000 Throckmorton St.
Ft Worth, TX 76102
,Owner
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
the Surety Companies have hereunto set their hand this 17th day of November, 2016.
Great American Insurance Company of
New York
Witness: Surety Company
Tracy Tuck r, rney-in-Fact
GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
New York
Administrative Office:301 E 4TH STREET • CINCINNATI,OHIO 45202 • 513-369-5000 • FAX 513-723-2740
The number of persons authorized by
this power of attorney is not more than FIVE No.0 14893
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS:That the GREAT AMERICAN INSURANCE COMPANY OF NEW YORK,a corporation
organized and existing under and by virtue of the laws of the State of New York, does hereby nominate,constitute and appoint the
person or persons named below its true and lawful attorney-in-fact,for it and in its name, place and stead to execute on behalf of
the said Company,as surety,any and all bonds, undertakings and contracts of suretyship,or other written obligations in the nature
thereof;provided that the liability of the said Company on any such bond,undertaking or contract of suretyship executed under this
authority shall not exceed the limit stated below.
Name Address Limit of Power
TRACY TUCKER STEVEN TUCKER ALL OF ALL
W.LAWRENCE BROWN BENNETT BROWN FORT WORTH, $100,000,000.00
KEVIN J.DUNN TEXAS
This Power of Attorney revokes all previous powers issued on behalf of the attorney(s)-in-fact named above.
IN WITNESS WHEREOF,the GREAT AMERICAN INSURANCE COMPANY OF NEW YORK has caused these presents to be signed
and attested by its appropriate officers and its corporate seal hereunto affixed this 22ND day of DECEMBER , 2015
Attest GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
X
a4C—
J
SEAL 11
(ow- e. A4
Assistant Secretary Dirisional.Senror I ice President
DAVID C.KITCHIN(877-377-2405)
STATE OF OHIO, COUNTY OF HAMILTON-ss:
On this 22ND day of DECEMBER 2015 ,before me personally appeared DAVID C.KITCHIN,to me known,
being duly sworn, deposes and says that he resides in Cincinnati, Ohio,that he is a Divisional Senior Vice President of the Bond
Division of Great American Insurance Company of New York,the Company described in and which executed the above instrument;
that he knows the seal; that it was so affixed by authority of his office under the By-Laws of said Company, and that he signed
his name thereto by like authority.
.10 SYRw Koil rlo �- � // �y
No�ry�3faM dOhb �lt�
My Cont nhft 6lpi"06.18,2020eq�
This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Great
American Insurance Company of New York by unanimous written consent dated May 14,2009.
RESOLVED: That the Divisional President,the several Divisional Senior Vice Presidents,Divisional Vice Presidents and Divisional
Assistant Vice Presidents, or any one of them, be and hereby is authorized, from time to time, to appoint one or more Attorneys-in-Fact
to execute on behalf of the Company, as surety,any and all bonds, undertakings and contracts of suretyship, or other written obligations
in the nature thereof,•to prescribe their respective duties and the respective limits of their authority,and to revoke any such appointment
at any time.
RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant
Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond,
undertaking, contract of suretyship, or other written obligation in the nature thereof,such signature and seal when so used being hereby
adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the
Company with the same force and effect as though manually affixed.
CERTIFICATION
I, STEPHEN C. BERAHA,Assistant Secretary of Great American Insurance Company of New York,do hereby certify that
the foregoing Power of Attorney and the Resolutions of the Board of Directors of May 14, 2009 have not been revoked and are
now in full force and effect.
Signed and sealed this 17tnday of November 2016
SEAL ;
1D •�'O��
Assistant Secretary
S1 185L(06/15)
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
f
Before me,the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Jerry Henderson,
Vice President Of Stabile & Winn, Inc.,known to me to be a credible
person,who being by me duly sworn,upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
The Parks of Fossil Creek DOE #7522
BY
erry Henderson, Vice President
Subscribed and sworn before me on this date 28 of November.,2016
Public
Tarrant, Texas
sy-,
NofaY Public YESENIA SAi.AZAR
=o
*= rState of Texas
'; Comm.Empires 12-16-2014
� FxNotary ID 13047082-7
FORTWORTHREV:02/22,07
t� r,
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: 11/30/2016
Name of Contractor Project Name
'Stabile&Winn Inc. The Park of Fossil Creek
DOE Inspector Project!Clanger
Edwin R.Rodriguez,Sr. Aaron Long
DOE Number Project Dculty Type of Contract
7522 1 O Simple QQ Routine Q Complex ❑ Water❑ Waste Water❑ Storm DrainageE] Pavement
Initial Contract Amount Final Contract Amount
$334,911.26 $334,911.26
I1)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 3 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 1 13 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution I 1PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 3 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
(D The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311