HomeMy WebLinkAboutContract 47659-FP3 Department of TP &W Const.Services
CPN# �� Date r
ProjectManage
r
Risk Management Lf WORTH,
D.O.E. Brotherton
CFA Westerman/Scanned — f>_ C1TYSECRETARy
Esteban Perez/Scanned CONTRACTNO
The Proceeding people have been Contacted
concerning the request for final payment& have VTION AND PUBLIC WORKS
released this project for such payment. :PROJECT COMPLETION
>eveloper Projects) �D� 7��z
Clearance Conducted By ���' � CfC � /j�� City Project Ns: 02665
Regarding contract 117522 for THE PARK OF FOSSIL CREEK as required by the
TRANSPORTATION& PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director
of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete.
Original Contract Price: $60,000.00
Amount of Approved Change Orders: Ne
Revised Contract Amount:
Total Cost Work Completed: $60,000.00
J 3'�7
Recomme de for Acceptance Date
Asst. Dire tor, TPW - Infrastructure Design and Construction
Accepted Dat
® Direc r, TRANS PORTA ON & PUBLIC WORKS
As . City Manager Date
Comments: BIWAZZ, D
JAN 6 2017 OFFICIAL RECORD
Initial: CITY SECRETARY
FT,WORTH,TX
Rev.9/22/16
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name THE PARK OF FOSSIL CREEK
Contract Limits
Project Type STREET LIGHT
City Project Numbers 02665
DOE Number 7522
Estimate Number 1 Payment Number I For Period Ending 11/30/2016
CD
City Secretary Contract Number 117522 Contract Time 2CD
Contract Date Days Charged to Date 269
Project Manager Long Contract is 100.00 Complete
Contractor BEAN ELECTRICAL,INC
821 E ENON
FORT WORTH, TX 76140
Inspectors LAYER / SALAZAR
Wednesday,November 30,2016 Page 1 of 4
City Project Numbers 02665 DOE Number 7522
Contract Name THE PARK OF FOSSIL CREEK Estimate Number I
Contract Limits Payment Number I
Project Type STREET LIGHT For Period Ending 11/30/2016
Project Funding
STREET LIGHT
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No, Quanity Total Quanity Total
1 6-6-6 TRIPLEX ALUM ELEC CONDUCTOR 965 LF $2.00 $1,930.00 965 $1,930.00
2 2"CONDT PVC SCH 80 965 LF $8.00 $7,720.00 965 $7,720.00
3 ORNAMENTAL ASSMBLY 12 EA $3,345.83 $40,150.00 12 $40,150.00
4 RDWY ILLUM FOUNDATION 12 EA $850.00 $10,200.00 12 $10,200.00
Sub-Total of Previous Unit $60,000.00 $60,000.00
Wednesday,November 30,2016 Page 2 of 4
City Project Numbers 02665 DOE Number 7522
Contract Name THE PARK OF FOSSIL CREEK Estimate Number I
Contract Limits Payment Number I
Project Type STREET LIGHT For Period Ending 11/30/2016
Project Funding
Contract Information Summary
Original Contract Amount $60,000.00
Chance Orders
Total Contract Price $60,000.00
Date Z—� �7 Total Cost of Work Completed $60,000.00
Contractor ,,,,�� / Less %Retained $0.00
`7V46a, y.�_ Date !Z Net Earned $60,000.00
Inspection Supervisor Earned This Period $60,000.00
Retainage This Period $0.00
Date �'� j' Less Liquidated Damages
Project Manager
Days @ /Day $0.00
Date ,3.1/ LessPavement Deficiency $0.00
Ass. ire or PW-Infrastructure Design and Construction Less Penalty $0.00
Date Less Previous Payment $0.00
Dire or ontracting Departure Plus Material on Hand Less 15% $0.00
Balance Due This Payment $60,000.00
I
I
Wednesday,November 30,2016 Page 3 of 4
I
City Project Numbers 02665 DOE Number 7522
Contract Name THE PARK OF FOSSIL CREEK Estimate Number I
Contract Limits Payment Number I
Project Type STREET LIGHT For Period Ending 11/30/2016
Project Funding
Project Manager Long City Secretary Contract Number 117522
Inspectors LAYER / SALAZAR Contract Date
Contractor BEAN ELECTRICAL,INC Contract Time 21 CD
821 E ENON Days Charged to Date 269 CD
FORT WORTH, TX 76140 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $60,000.00
Less %Retained $0.00
Net Earned $60,000.00
Earned This Period $60,000.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $60,000.00
Wednesday,November 30,2016 Page 4 of 4
FORTWORTH
rev 03/05/07
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:I
NAME OF PROJECT: The Park of Fossil Creek
PROJECT NO.: 02665 CONTRACTOR: Bean Electrical,Inc.
DOE NO.: 7522
PERIOD FROM 03/07/16 TO: 11/30/16 FINAL INSPECTION DATE: 30-Nov-16
WORK ORDER EFFECTIVE; CONTRACT TIME: 50 0 WG* CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS
PERIOD
PREVIOUS
PERIOD
TOTALS
269
TO DATE
*REMARKS:
2-JA 1
(/c-
00NTR69f0tX DATE ECT DATE
ENGINEERING DEPARTMENT
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845
FORTWORTHREV:8/20/16
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Bean Electrical,Inc. The Park of Fossil creek
Inspector City Project Number
Edwin R.Rodriguez,Sr. 02665
Construction Components Project Manager
❑ Water❑ wastewater[] stormDrainage[] Pavement Aaron Long
Initial Contract Amount ProjectDculty
$59,999.96 0 Simple Routine 0 Complex
Final Contract Amount Date
$59,999.96 11/30/2016
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 441
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 441
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS] *100%) 441 / 448 = 98%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Inspector Signature Contractor Signature
Inspector's Supervisor Signature � ��
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•8851 Camp Bowie West Blvd. •Fort Worth,TK 76116• (817)392-8306
FORTWORTHREV:02,22,07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: 11/30/2016
Name of Contractor Project Name
'Bean Electrical,Inc. The Park of Fossil Creek
DOE Inspector Project Manager
Edwin R.Rodriguez,Sr. Aaron Long
DOE Number Project D culty Type of Conbact ;3 T-A EET 6 1 G TS
7522 O Simple * Routine Q Complex ❑ Water❑ Waste Water❑ Storm DrainagED Pavement
Initial Contract Amount Final ContractAmount
$59,999.96 1$59,999.96
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions 3
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3
3 Accuracy of Measured Quantities 3 3 Applicability of Specifications 3
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution 3 PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 3 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager 3
1 Change Order Processing Time 3 13 Communication
2 Timliness of Contractor Payments 3 14 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
'' ag
(817)392-7941 •Fax:(817)392-7845
AFFIDAVIT
STATE OF TEXAS
County of TARRANT
Before me,the undersigned authority, a notary public in the state and county aforesaid on
this day personally appeared Roy E. Bean, ll, President of Bean Electrical, In., known to me to be a
credible person,who being by me duly sworn, upon his oath deposed and said;
That all persons,firms, associations, corporations, or other organizations furnishing labor
and or materials have been paid in full;
That the wage scale established by the City council in the City of Fort Worth has been paid
in full;
That there are no claims pending for personal injury and/or property damages;
On Contract described as;
The Park of Fossil Creek, CFA 2015-094
BY
oy . Bean, II/President
Subscribed and sworn before me on this 5t" day of December, 2016.
CHERYLE R. ESPREE
Notory Public, State of Texas
� • A :P Comm.Expires 02-29-2020
Ndtary Public °^�OF��`� Notary ID 1890225
Tarrant Cly. State of Texas
CONSENT OF OWNER x
SURETY COMPANY ARCHITECT ❑
TO FINAL PAYMENT CONTRACTOR ❑
SURETY ❑
OTHER ❑ Bond#4405320
PROJECT: The Park of Fossil Creek-Street Lights Improvements,
(name,address)
TO(Owner)Silver Bay Group,LLC ARCHITECT'S PROJECT NO:
1000 N.Beltline Road#202 CONTRACT FOR: construction
Irving,TX SUB-CONTRACT DATE: 1/28/2016
75061
SUBCONTRACTOR:Bean Electrical,Inc.
In accordance with the provisions of the Contract between the Contractor and the Sub-Contractor as indicated
above,the
(here insert name and address of Surety Company)
SureTec Insurance Company
1330 Post Oak Blvd.,Ste 1100
Houston, TX 77056
,SURETY COMPANY,
on bond of
(here insert name and address of Contractor)
Bean Electrical,Inc.
821 E Enon
Fort Worth,TX 76140 CONTRACTOR,
hereby approves of the final payment to the Sub-Contractor, and agrees that final payment to the Sub-
Contractor shall not relieve the Surety company of any.of its obligations to
(here insert name and address of Owner)
Silver Bay Group,LLC
1000 N.Beltline Road#202
Irving,TX 75061
,OWNER,
as set forth in the said Surety Company's bond
IN WITNESS WHEROF,
The Surety Company has hereunto set its hand this 5th day of December, 2016.
SureTec Insur21 ceompany
Surety_Company
Signa e of Authoriz Representative
Attest
(seal): Johnny Moss, Attorney-in-Fact
Title
NOTE:This form is tube used as a companion document to AIA DOCUMENT 6706,CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBT AND CLAIMS,
Current Edition
AIA DOCUMENT G707*CONSENT OF SURETY COMPANY TO FINAL PAYMENT*APRIL 1970 EDITION*AIA
1970 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE.NW WASHINGTON,D.C.2006
WARNING: Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution.
POA#: 4221049
SureTec Insurance Company
LIMNED POWER OF ATTORNEY
,know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make,constitute and appoint Tony Fierro,Jay Jordan,Johnny Moss,Steven W.Searcey,Robert J.Shuya,
Mistie Beck,Jeremy Barnett,Robert G.Kanuth,Jade Porter,Jennifer Cisneros
its true and lawful Attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute,acknowledge
and deliver any and all bonds,recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for:
Five Million and 00/100 Dollars($5,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President,sealed with the corporate
seal of the Company and duly attested by its Secretary,hereby ratifying and confirming all that the said Attorney-in-Fact may do in the
premises. Said appointment shall continue in force until 05/18/2017 and is made under and by authority of the following
resolutions of the Board of Directors of the SureTec Insurance Company:
Be it Resolved, that the President,any Vice-President,any Assistant Vice-President,any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attorneys)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company,to execute,acknowledge and
deliver,any and all bonds,recognizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 206 of April,
1999)
In Witness Whereof,SURETEC INSURANCE COMPANY has caused these presents to be signed by its President,and its corporate seal
to be hereto affixed this 3rd day of August,A,O, 2015
SURETEC INSURANCE COMPANY
aSURAI�C�
X...� t.0�r By:
w w t nz John I ax Jr: resident
State of Texas ss:
County of Harris .........,•,
On this 3rd day of August,A.D. 2015 before me personally came John Knox Jr.,to me known,who,being by me duly swom,did depose and say,that be
resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument;that he knows the seal of said Company;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the
Board of Directors of said Company;and that he signed his name thereto by like order.
�v* uif JACQUELYN MALDONADO
Notary Public
state o1 Texas 14 fylwc
My Comm.Exp.5/18/2017 Jacq elyn Maldonado,Notary Public
My commission expires May 18,2017
I,M.Brent Beaty,Assistant Secretary of SURETEC INSURANCE COMPANY,do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney,executed by said Company,which is still in full force and effect;and furthermore,the resolutions of the Board of Directors,set
out in the Power of Attorney are in full force and effect.
Given under my hand and the seal of said Company at Houston, Texas this 6 qday Jf )Ur7 j"_K � A.D.
Bre t Beaty,Assistant ecretary
Any Instrument issued in excess of the penalty stated above is totally void and without any validity.
For verification of the authority of this power you may call(713)812.0800 any business day between 8:00 am and 5:00 pm CST.