HomeMy WebLinkAboutContract 29398 CCITY ON TRACT No. Y� �� AMENDMENT NO. 1 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. 28765 (No M&C needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Carter & Burgess, Inc., (Engineer) made and entered into City Secretary Contract No. 28765 (the Contract) which was authorized by the City Council by M&C C-19600 on the 20th day of May, 2003; and WHEREAS, the Contract involves engineering services for the following project: Engineering Contract for repair of existing pavement on section of Taxiway H. Carter & Burgess, Inc. will prepare construction documents for the repair of pavement along Taxiway H,just east of the intersection with Taxiway A, at Alliance Airport. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated June 20, 2003, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $2,675.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$22,165.87. 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED on this the C (D, U day of G , 2003_, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APP OVED: A.Douglas Rademaker, P.E. Marc Ott Director, Department of Assistant City danager Engineering ENGINEER ATTEST: GlorVa Pearson, City Secretary By: Name: L. Darrell Thompson, P.E.. contract Authorization Principal/Vice-President Carter &Burgess, Inc. Date APPROVED AS TO FORM AND LEGALITY: r Gary Steinberger Assistant City Attorney OFFIV1AL A� ILiN/J tl CITY Wf!;1R1Uv FT. ` `:� K. 777 Main Street,Floor 29 Carter Fort Worth,Texas 76102 �Burgess P.O. Box 901082 Fort Worth,Texas 76101-2082 Phone: 817.222.8500 Fax: 817.222.8550 www.c-b.cam June 20, 2003 Gopal Sahu, P.E. City of Fort Worth Engineering Department 1000 Throckmorton Street Fort Worth, Texas 76102 Re: Alliance Airport Taxiway H Pavement Repair Dear Mr. Sahu, As I discussed with you when we met, the design fee for the Taxiway H Pavement Repair project was renegotiated with Mr. Tim Ward. This was due to DBE requirements being added to our contract. These requirements will cause us to incur additional design costs. In order to meet these new DBE requirements, we will be outsourcing the reproduction of the bid documents to a local firm. The cost for the reproduction along with associated project management costs come to $2,675.00. The breakdown is as follows: Design (Carter & Burgess) Labor $ 615.00 Document Reproduction Lump Sum $2,060.00 (Trevino & Assoc., DBE Contractor) Total $2,675.00 We respectfully request our contract be modified to reflect these additional services. Attached you will find a break down of the new fee negotiated with Mr. Ward. Please contact me at (817) 735-6208 if you have any questions. f ose oto, P.E. Project Manager JXS/Ic HAJab\01 1853\W P\Car\01 1 85301 103.doc Enclosure cc: Tim Ward, Alliance Airport Carter&Burgess,Inc. Carter&Burgess Architects/Engineers,Inc. Carter&Burgess Consultants, Inc. C&B Architects/Engineers,Inc. C&B Architects/Engineers,P.C. C&B Nevada,Inc. Nixon &Laird Architects/Engineers,P.C. Attachment B COMPENSATION Carter&Burgess Fee Proposal Design Services Taxiway H Pavement Repair Project Alliance Airport Labor Hour Estimate Project Project Senior Project CADD Admin Director Manager Engineer Engineer Technician Assistant Site Visit 4 4 Prepare FAA Construction Safety Plan 2 8 4 Cover Sheet/index of Drawings 2 4 Site Plan/Contractor Access Plan 41 4 Erosion/Sedimentation Control Plan 41 4 Taxiway Closure/Demolition Plan 1 4 4 Pavement Replacement Plan 4 8 4 Erosion/Sedimentation Control Details 2 4 Miscellaneous Details 4 4 Pavement&Joint Details 2 4 4 Coordination Meetings 4 8 QA/QC 4 Specifications 2 6 4 Contracts 6 4 Construction Cost Estimate 2 4 Total Hours 0 311 01 62 321 12 Fee Proposal Hourly Hours Labor Rate Cost Project Principal $ 58.00 0 $ - Project Manager $ 37.26 31 $ 1,155.06 Senior Engineer $ 42.00 0 $ - Project Engineer $ 32.00 62 $ 1,984.00 CARD Technician $ 23.25 32 $ 744.00 Administrative Assistant $ 16.00 12 $ 192.00 Salary Cost $ 4,075.06 Overhead Rate @ 176.72% $ 7,201.45 Sub-Total $11,276.51 Profit @ 15% $ 1,691.48 C&B Labor Cost $12,967.98 C&B Survey Cost $ 1,500.00 Bid Document Reproduction(DBE Contractor) $ 2,060.00 Expenses Mileage $ 100.00 Courier $ 100.00 Printing&Plotting $ 100.00 Reproduction $ 100.00 Total Expenses $ 400.00 Total Cost $16,927.98 C I 17J�'�a t:7 Attachment B COMPENSATION Carter & Burgess Fee Proposal Construction Support Services Taxiway H Pavement Repair Project Alliance Airport Labor Hour Estimate Project Project CADD Admin Manager Engineer Technician Assistant Attend Pre-Construction Meeting 4 Review & approve shop dwgs & submittals 12 Respond to RFIs 12 Site visits (2) 8 Final Inspection 4 4 Prepare Punch List 4 4 Total Hours 0 44 0 8 Labor Cost Hourly Hours Salary Rate Cost Project Manager $ 37.26 0 $ - Project Engineer $ 32.00 44 $ 1,408.00 CADD Technician $ 23.25 0 $ - Administrative Assistant $ 16.00 8 $ 128.00 Salary Cost $ 1,536.00 Overhead Rate at 176.72% $ 2,714.42 Sub Total $ 4,250.42 Profit at 15% $ 637.56 Total C&B Labor Cost $ 4,887.98 Expenses Mileage $ 100.00 Courrier $ 150.00 Reproduction $ 100.00 Total Expenses $ 350.00 Total Construction Support Services $ 5,237.98