HomeMy WebLinkAboutContract 47172-FP4 -Department ofiTP-&WConst.Services
CPN# 7 Date
Project anager
Risk Management Canady z-' - ZT `1VO RT H® CIN SECRETARY'
D.O.E. Brotherton Sze /� CONTRACTNO.
CFA Westerman/Scanned
Esteban Perez/Scanned
The Proceeding people have been Contacted
concerning the request for final payment& have ATION AND PUBLIC WORKS J�'9 �p() —C �;)o?a o
released this project for such payment. T PROJECT COMPLETION
Developer Projects)
Clearance Conducted By 04"Zo�a City Project Ns: 02220
72
Regarding contract 117179 for SUMMER CREEK SOUTH PHASE 4 as required by the WATER DEPARTMENT
as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon the
recommendation of the Assistant Director of the Trans or blit Works Department has accepted the project
as complete. D
JAN 0 9 2017
Original Contract Price: $431,045.50
Amount of Approved Change Orders: By
Ns
Revised Contract Amount:
Total Cost Work Completed: $431,045.50
Recomm nded for Acceptance Date
Asst. Dir �cto , TPW - Infrastructure Design and Construction
lye
Accepted Date
Asst. Director, WATER DEPARTMENT
l
As . Ci Manager bate
OFFICIAL RECORD
Comments: CITY SECRETARY
JFMAILA+ D FT.WORTH,TX
JAN 11 2017
ao
Initial:
Rev.9/22/16
th JAN 092017 00�gy
City Project Numbers 02220 DOE Number 7179
Contract Name SUMMER CREEK SOUTH PHASE 4 Estimate Number I
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 12/15/2016
Project Funding
Project Manager Buckley City Secretary Contract Number 117179
Inspectors RODGERS / CROWLEY Contract Date 9/3/2015
Contractor GRA-TEX UTILITIES,INC. Contract Time 115 CD
PO BOX 700 Days Charged to Date 344 CD
ARLINGTON, TX 76004 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $431,045.50
Less %Retained $0.00
Net Earned $431,045.50
Earned This Period $431,045.50
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $431,045.50
Wednesday,December 21,2016 Page 4 of 4
-Pa cod-- c�a a
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name SUMMER CREEK SOUTH PHASE 4
Contract Limits
Project Type WATER&SEWER
City Project Numbers 02220
DOE Number 7179
Estimate Number 1 Payment Number 1 For Period Ending 12/19/2016
CD
City Secretary Contract Number 117179 Contract Time I IGD
Contract Date 9/3/2015 Days Charged to Date 344
Project Manager Buckley Contract is 100.00 Complete
Contractor GRA-TEX UTILITIES,INC.
PO BOX 700
ARLINGTON, TX 76004
Inspectors RODGERS / CROWLEY
Wednesday,December 21,2016 Page 1 of 4
City Project Numbers 02220
DOE Number 7179
Contract Name SUMMER CREEK SOUTH PHASE 4 Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 12/19/2016
Project Funding
UNIT I:WATER IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total
Quanity Total
1 40 PVC WATER PIPE 50 LF $20.00 $1,000.00 50 $1,000,00
2 8"PVC WATER PIPE 3795 LF $31.00 $117,645.00 3795 $117,645.00
3 6"GATE VALVE 5 EA $800.00 $4,000.00 5 $4,000.00
4 8"GATE VALVE 9 EA $1,100.00 $9,900.00 9 $9,900.00
5 CONENCT TO EXISTING 4-12"WATER MAIN 2 EA $1,000.00 $2,000.00 2 $2,000.00
6 FIRE HYDRANT 5 EA $2,700.00 $13,500.00 5 $13,500.00
7 DUCTILE IRON WATER FITTINGS 3 TN $2,000.00 $6,000.00 3 $6,000.00
8 TRENCH SAFETY 3845 LF $0.10 $384.50 3845 $384.50
9 1"WATER SERVICE 90 EA $650.00 $58,500.00 90 $58,500.00
10 1"WATER SERVICE TO HOA LOTS 4 EA $750.00 $3,000.00 4 $3,000.00
-------------- - -------- ------------------
Sub-Total of Previous Unit $215,929.50 $215,929.50
UNIT II:SANITARY SEWER IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total
Quanity Total
---------------------------------- - ----
1 ------------------- ---------- ----
1 8"PVC SEWER PIPE 3272 LF $28.00 $91,616.00 3272 $91,616.00
2 8"PVC SEWER PIPE CSS BACKFILL 128 LF $50.00 $6,400.00 128 $6,400.00
3 4'MANHOLE 21 EA $2,700.00 $56,700.00 21 $56,700.00
4 4'EXTRADEPTH MANHOLE 25 VF $150.00 $3,750.00 25 $3,750.00
5 EPDXY MANHOLE LINE 16 VF $225.00 $3,600.00 16 $3,600.00
6 4"SEWER SERVICE,TWO-WAY CLEANOUT 90 EA $400.00 $36,000.00 90 $36,000.00
7 POST-CCV INSEPCTION 3400 LF $3.00 $10,200.00 3400 $10,200.00
8 MANHOLE VACUUM TESTING 21 EA $150.00 $3,150.00 21 $3,150.00
9 TRENCH SAFETY 3400 LF $0.50 $1,700.00 3400 $1,700.00
10 TRENCH WATER STOPS 5 EA $400.00 $2,000.00 5 $2,000.00
Sub-Total of Previous Unit $215,116.00 $215,116.00
--------------------------------------
Wednesday,December 21,2016 Page 2 of 4
City Project Numbers 02220
DOE Number 7179
Contract Name SUMMER CREEK SOUTH PHASE 4 Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 12/15/2016
Project Funding
Contract Information Summary
Original Contract Amount $431,045.50
Chance Orders
Total Contract Price $431,045.50
PiI Date � " ( Total Cost of Work Completed
$431,045.50
Con c or Less %Retained $0.00
� � Z %/_ Net Earned $431,045.50
Date cv
In ec' n upery o, Earned This Period $431,045.50
Retainage This Period $0.00
Date
ProbeLess Liquidated Damages
MAr, Days @ /Day $0.00
Date 1 �� LessPavement Deficiency $0.00
Asst Diirre,Vtor/ /W-Infrastructure Desib and Construction Less Penalty $0.00
L' ` elz( — Date ! T Less Previous Payment $0.00
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $431,045.50
Wednesday,December 21,2016 Page 3 of 4
FORTWORTR,
TRANSPORTATION AND PUBLIC WORKS
STATEMENT OF CONTRACT TEVIE
STATEMENT#
FINAL STATEMENT# 1 �torGra-Tex
2220
NAME OF PROJECT:
WAR-7 2016
PROJECT NO.: FINAL INSPECTION DATE 7/18/2016
WD
2220 CD
CONTRACT TIME 210 X
PERIOD FROM: 12/1/2016 TO: 12/15/2016 MID - Month IDEVEL N
WORK ORDER EFFECTIVE: 12/1/2015 n MID y -
DAY OF MONTH DAYS REASON FOR DAY OF MONTH DAYS REASON FOR
CHARGED DAYS CREDITED CHARGED DAYS CREDITED
1 16 Thu NIA
2 17 Fri N/A
3 18 Sat NIA
4 19 Sun N/A
5 20 Mon N/A
6 21 Tue NIA
7 22 Wed NIA
8 23 Thu NIA
9 24 =e i N/A
10 25 Sat NIA
11 26 Sun NIA
12 27 Mon NIA
13 28 Tac NIA
14 29 Fri NIA
15 30 Sat NIA
31 S NIA
&
Not Applicable SAT,SUN,and WEATHER UTILITIES OTHERS DAYS TOTAL DAYS
HOLIDAYS RELOCATE CHARGED
THIS PERIOD 0 0 0 0 0 0
PREVIOUS PERIOD 0 344 344
TOTAL TO DATE 1 0 1 0 0 1 0 344 344
REMARKS:
Time Was Stopped 11/8/2016
Signature v ` Signature:
(Print Name) (Print N e) John Crowley
CONTRACTOR DATE INSPECTOR DATE
AFFIDAVIT
STATE OF TEXAS
COUNTY OFTARRANT
Before me, the undersigned authority, a Notary Public in the state aforesaid, on this day
personally appeared Sheldon Rosenbaum, PRESIDENT OF GRA-TEX UTILITIES inc,
known to me to be a credible person, who being by me duly sworn, upon his oath
disposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That there are no claims pending for personal injury and/or property damages;
On contract described as SUMMER CREEK SOUTH PHASE 4 in the City of Fort
Worth, Texas
GRA-TEX UTILITIES inc.
BY � —
President
Subscribed and sworn before me on this
qday of ee�n6ei , 2016.
r4bTAPU IN AND FOR
I T U TY, TEXAS
r HUGDAHLSR
My commission expires My Go GREG mission Expires
February 1,2018
SURETEC INSURANCE COMPANY
9737 Great Hills Trail, Suite 320, Austin, Tx 78759
OWNER ❑
CONSENT OF SURETY ARCHITECT ❑
CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
OTHER ❑
BOND NO.: 4403256
TO OBLIGEE:
(Name and Address) CONTRACT FOR:
SummerCreek South Development and the Water,Sanitary Sewer&Drainage
City of Fort Worth Improvements
927 Taylor St.
PROJECT: CONTRACT DATED:
(Name and Address) September 3rd,2015
City Project No 02220m Summer Creek South
PRINCIPAL: Gra-Tex Utilities, Inc.
At the request of the Obligee and the Principal indicated above,(Insert name and address of Surety)
SureTec Insurance Company, 9737 Great Hills Trail, Suite 320,Austin, Tx 78759
on bond of SURETY,
(Insert name and address of Contractor) Gra-TeX Utilities, Inc.
P.O.Box 700 Arlington,TX 76004
,CONTRACTOR,
and conditioned on the representation by Obligee that all Contract provisions relating to the payment of final
payment under the Contract have been satisfied by Principal as of the date of final payment,and that no claims
by Obligee or any third parry are known or believed by Obligee or its representatives to exist as of the date of
final payment,representations as to the truth and accuracy of the foregoing conditions being deemed to have
been made by Obligee in connection with this request for Consent of Surety,hereby approves of the final
payment to the Principal,and agrees that final payment in accordance with the terms hereof shall not relieve the
Surety of its obligations to
(Insert name and address of Obligee) City of Fort Worth
927 Taylor St. Fort Worth,TX 76102
,OBLIGEE,
as set forth in said Surety's bond.
IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: December 6th,2016
(Insert in writing the month followed by the numeric date and year.)
SureTec Insurance Company
M(SignaturUeof authorized representative)
Rhonda Wells,
Attest: ,Attorney-in-Fact
(Seal): (Printed name and title)
SURETEC CONSENT TO FINAL PAYMENT REV. 1.1.2004
POA#: 4221022-Arlington
SureTec Insurance Company
LIMITED POWER OF ATTORNEY
Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make,constitute and appoint
Jim H. Barr, Russell Board, Roger'A. Redden, Rhonda Wells
its true and lawful Attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute, acknowledge
and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for:
Three Million and 00/100 Dollars($3,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President, sealed with the corporate
seal of the Company and duly attested by its Secretary,hereby ratifying and confirming all that the said Attorney-in-Fact may do in the
premises. Said appointment shall continue in force until 05/18/2017 and is made under and by authority of the following
resolutions of the Board of Directors of the SureTec Insurance Company:
Be it Resolved, that the President, any Vice-President, any Assistant Vice-President, any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company,to execute, acknowledge and
deliver,any and all bonds,recognizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attomey-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20`� of April,
1999)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President,and its corporate seal
to be hereto affixed this 21st day of March,A.D.2013.
0SRa�%w SURETEC INSURANCE COMPANY
O= By:
W: w a= John ox Jr: resident
State of Texas ss:
County of Harris s
,aA+
`�'MNI!lNI11III*II11N�
On this 21st day of March,A.D.2013 before me personally came John Knox Jr.,to me known,who,being by me duly sworn,did depose and say,that he
resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument;that he knows the seal of said Company;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the
Board of Directors of said Company;and that he signed his name thereto by like order.
srue� JACQUELYN MALDONADO
® Notary Public
State of Texas
�oF My comm.Exp.5/18/2017 Jacq elyn Maldonado,Notary Public
My commission expires May 18,2017
I,M.Brent Beaty,Assistant Secretary of SURETEC INSURANCE COMPANY,do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney,executed by said Company,which is still in full force and effect; and furthermore,the resolutions of the Board of Directors,set
out in the Power of Attorney are in full force and effect. )
Given under my hand and the seal of said Company at Houston, Texas this l¢ day of ` ev—, b� ,A.D.
A.Bre t Beaty,Assistant§ecretary
Any instrument issued in excess of the penalty stated above is totally void and without any validity.
For verification of the authority of this power you may call(713)812-0800 any business day between 8:00 am and 5:00 pm CST.
SureTec Insurance Company
THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION
Statutory Complaint Notice/Filing of Claims
To obtain information or make a complaint:You may call the Surety's toll free telephone number for information or to make a
complaint or file a claim at: 1-866-732-0099.You may also write to the Surety at:
SureTec Insurance Company
9737 Great Hills Trail, Suite 320
Austin, Tx 78759
You may contact the Texas Department of Insurance to obtain information on companies,coverage,rights or complaints at 1-800-252-
3439.You may write the Texas Department of Insurance at
PO Box 149104
Austin,TX 78714-9104
Fax#:512-490-1007
Web:hiLtp://www-tdi.state.tx.us
Email:ConsumerProtection@tdi.texas.gov
PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim,you should contact the
Surety first. If the dispute is not resolved,you may contact the Texas Department of Insurance.
Texas Rider 06042014
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Summer Creek South Phase 4
PROJECT NUMBER: 2220
DOE NUMBER: 7179
WATER
PIPE LAID SIZE TYPE OF PIPE LF
C900 45 PVC
50
C900 8" PVC 3795
FIRE HYDRANTS: 5 VALVES(16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
SDR 35 8" PVC 3272
SDR 35 8" PVC CSS Back fill 128
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
=`` The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
FORTWORTH REV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Gra-Tex Utlities,Inc. Summer Creek South Phase 4
DOEInspector DOENumber
John Crowley Project#02220
C.Fj".rorrn. Project Manager
21 Water 0 Waste Water❑ Storm Drainage❑ Pavement Pat Buckley
Initial ContractAmount P--J—Difficulty
$431,045.50 Q Simple Qi Routine Q Complex
Final ContractAmount Date
$431,045.50 12/20/2016
In PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 3 20 15
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 3 60 45
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 3 60 45
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 3 20 15
11 Property Restoration 5 Y 3 20 15
12 After Hours Response 5 Y 3 20 15
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 343
BONUS POINTS(25 Ma)dmum)(B)
III)CONTRACTOR'S RATING TOTAL SCORE(TS) 343
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS] x 100%) 343 / 448 = 77%
Performance Category Good
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good a80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector Signature Contractor -a�
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth- 1000 Throckmorton Street-Fort Worth,TX 76012-6311
(817) 392-7941 -Fax: (817) 392-7845
Summercreek South Development, ltd
3045 LackCanddRd • Fort-Worth, 2X 76116 817-731-7595
December 27,2016
Gra-Tex Utilities,Inc.
P.O. Box 700
Arlington,Texas 76004
JLB Contracting,CLC
P.O. Box 24131
Fort Worth,Texas 76124
Mels Electric,L.P.
6305 S. IH 45
Wilmer,Texas 75172
Ref:SUMMER CREEK SOUTH PHASE 4,City Project No. 02220
Gentlemen,
Per the Contract Section 00 52 43 AGREEMENT,Article 3.3 Liquidated Damages the Developer,
SUMMERCREEK SOUTH DEVELOPMENT, LTD hereby eliminates any financial damages suffered by
Developer against each Contractor for Work not completed within calendar days stated in Article 3.2 of
same AGREEMENT.
Sincerely,
SUMMERCREEK SOUTH DEVELOPMENT, LTD
L< ,OW0,10
Larry R.Gill, Pr "ect Developer
for Tim H. Fleet, President
FORTWORTHREV:02'22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
n PROJECT INFORMATION Date: ;12/20/2016
Name of Contractor Project Name
Gra-Tex Utlities,Inc. Summer Creek South Phase 4
DOEInspector jProjectManager
John Crowley Pat Buckley
DOENumber PmjacrDiculr» Tvno nfCnntrnct
Pro#02220 O Simple QQ Routine Q Complex ❑✓ Water 0 Waste Water❑ Storm Drainage❑ Pavement
Initial ContractAmount Final ContractAmount
Il)PERFORMANCE EVALUATION
0-!Wdeqnate 1-Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING �ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 61 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector - 2 C1anty&Sufficiency of Details
3 A of Measured Quantities _ `3 Applicability of Sp ecifications j
�4 DiR l;y Of Professionalisma j,4 Accuracy of Plan Quantities
5p Citizen Complaint Resolution (PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 3 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments ---M�4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe,
III)COMMENTS&SIGNATURES
COAEUEENTS
Signature Contractor •�G
Signature DOE Inspector (�
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311