HomeMy WebLinkAboutContract 31476 CITY SECRETARY
03-10-05P03 :08 RCVn CONTRACT NO. LfJLtLPZL0
FORT WORTH WATER DEPARTMENT
PRETREATMENT SERVICES DIVISION CONTRACT
WHEREAS, the City of Fort Worth and the City of Richland Hills entered into a contract
for the treatment of wastewater, such contract being City of Fort Worth City Secretary Contract
No. 15783, dated June 8, 1987; and
WHEREAS,the City of Richland Hills has adopted an Industrial Pretreatment Ordinance,
#643, within its jurisdiction; and
WHEREAS, the City of Richland Hills has requested that the City of Fort Worth perform
sampling of industrial wastes within the jurisdiction of the City of Richland Hills, as well as
performing the analysis of such samples; and
WHEREAS, the City of Fort Worth is agreeable to performing the sampling and analysis
on behalf of the City of Richland Hills.
NOW, THEREFORE, the City of Fort Worth, hereinafter referred to as "Fort Worth",
and the City of Richland Hills, hereinafter referred to as "Richland Hills", hereby agree as
follows:
1.
As of the date of this agreement, there are two Significant Industrial Users (SIUs) within
the jurisdiction of Richland Hills, such as Accurate Metal Stamping and Royal Baths. This
agreement and the charges contained herein are for the two existing SIUs. Except as provided
otherwise herein, if additional SIUs locate within Richland Hills's jurisdiction, this agreement
will be either amended to include the additional SIUs or Fort Worth's obligations hereunder shall
be limited to the existing SIUs.
2.
Fort Worth agrees to perform the following basic services which are related to Industrial
Connection and Monitoring, section 9 of the City of Fort Worth City Secretary Contract
No.15783 (the Contract), for Richland Hills:
a) With Richland Hills representative(s), conduct an annual inspection of the two SIU
facilities within the jurisdiction of Richland Hills.
b) Obtain a minimum of two (2) samples per year from the SIU's for analysis and
compliance with the Contract. Sampling and analysis shall be in accord with Exhibit
"A"attached.
c) Assist Richland Hills in conducting two (2) semi-annual reports of SIUs by providing
forms to Richland Hills to be forwarded to the SIU and for return to Fort Worth. pp n
31" A �i7�V P.G
d) Assist Richland Hills with an annual survey and permitting of new SIUs within
Richland Hills's jurisdiction.
e) Assist Richland Hills in determining if new industries within Richland Hills's
jurisdiction are required to be permitted so as to be in compliance with the Contract.
3.
Richland Hills agrees to pay Fort Worth for the basic services required hereunder as
follows:
a) The sum of$423.93 ($161.68 + $262.25) monthly for pretreatment services described
under Section 2.
b) A monthly Customer Service Charge in the amount of$25.00
These charges shall be included in the monthly wastewater statement submitted to Richland Hills
pursuant to the Contract and shall be paid at the time such statement is due and payable.
4.
Richland Hills agrees to pay to Fort Worth for additional services as may be requested by
Richland Hills:
a) Richland Hills agrees to pay Fort Worth an additional fee for services provided to
support and assist pretreatment related enforcement actions by Richland Hills against
noncompliant SIUs. A fee not to exceed $100.00 per employee per day for such
services requiring Fort Worth attendance at show cause hearings, administrative
hearings or meetings involving enforcement actions.
b) Richland Hills agrees to provide Fort Worth written notice 96 hours in advance to
appear and testify in enforcement actions.
c) Anything beyond the scope of contract for sampling will be at cost per sample for
listed parameters as listed on Exhibit"A".
These charges shall be included in the monthly wastewater statement submitted to Richland Hills
pursuant to the Contract and shall be paid at the time such statement is due and payable.
5.
This agreement shall terminate on December 31, 2006, unless renewed as herein after
specified. Richland Hills may renew this agreement on a bi-yearly basis by giving Fort Worth at
least thirty (30) days prior written notice of its intent to renew. Within fifteen (15) days after
receipt of such notice Fort Worth shall advise Richland Hills of any escalation in charges. Within
T�]{ �L":
n
three (3) business days, Richland Hills shall confirm in writing that it agrees to the escalation in
charges. Failure to so notify Fort Worth shall render the agreement terminated at the end of the
then current term.
6.
Nothing contained in this agreement shall be construed as amending, limiting or reducing
Richland Hills's obligations contained in the Contract.
APPROVED by the City of Fort Worth and the City of Richland Hills this the 8th day of
February.2005.
ATTEST: CITY OF FO T RTH, TEXAS
471 dZ
Marti A Hen x, City Secretary Marc A O , Assistan Manager
APPROVED AS TO FORM AND LEGALITY:
Gary teinbe ger Marcella Olson
Assistant City Attorney Assistant Director Water Dept.
c "4tmn
Sebastian Fichera,REM •►,► ►►►+ ,, ` NO M&C REQUIRED
Pretreatment Services Mana�a`���.AND �� >,
.4k
. . ..t
AT-ET: C 1 TY OF RICHLAND HILLS, TX
Ki Sutter, dity Secretary James Quin, City Melhager
APPROVED T FORM AND LEGALITY:
Tim Sraila, City Attorney
CATY M IC;IPMA, �1
EXHIBIT "A"
Accurate Metal Stangping
MONITORING FEE CALCULATION
The cost for Accurate Metal Stamping follows the same procedure as for Fort Worth's permitted
industrial users. It includes sampling and analysis cost.Administration cost for inspection,
permitting and sampling are also included in cost calculation. Sampling events are held at six-
month intervals.
Annual Sampling will include the followins parameters
Calculation Of Cost For.Outfall A
Parameters Number of Days Cost
9 Metals 2 days(24 hour Composite Sample) 2*100(Composite fee)+16*12.50
(Ag,As,Cd,Cr,Cu,Ni,Hg,Pb, (Analysis cost for metals)+2*22.60
Zn) (Analysis cost for Mercury)_
$445.20
Cyanide 2 days(Grab Sample) 2*20.00(Analysis cost for
cyanide)=$40.00
Oil&Grease 2 days(Grab Sample) 2*34.60(Analysis cost for Oil&
Grease)=$69.20
Total Analysis and Sampling Cost $445.20+$40.00+$69.20=S
554.40
Administration Unit ijOutfall)+1(Inspections)+ 7* $197.96=S 1385.72
For Outfall A 3(Permit)+ 2 A/ C=7
Outfall A Cost=S 1,940.12
Monthly Cost-= $ 161.68
Calculation Of Cost For Outfall B
Parameters Number of Days Cost
7 Metals 2 days(24 hour Composite Sample) 2*100(Composite fee)+14*12.50
As Cd Cr Cu Ni,Pb Zn (Analysis cost for metals =S375.00
Cyanide 2 days(Grab Sample) 2*20.00(Analysis cost for cyanide)_
$40.00
Total Analysis and Sampling Cost $375.00+$40.00—$415.00
Administration Unit 2jOutfall}+0(Inspections)+ 4*$196.96=$791.84
For Outfall B 0 ermit +2(QA/Q =4
Outfall B Cost= S 1,206.84
Monthly Cost=S 100.57
Total Monthly Cost = $ 262.25
F1�I-IC-IAkL i E C 0 r
J�0 •}rr,'V�tl�' tl�YU 1
Royal Baths
MONITORING FED CALCULATION
The cost fbr Royal Bath follows the same procedure as for Fort Worth's permitted industrial.
users. It includes sampling and analysis cost. Administration cost for inspection,permitting and
sampling are also included in cost calculation. Sampling events are held at six-month intervals.
Annual Sampling will 'include the following Darameters
Calculation Of Cost For Outfall A
Parameters Number of Days Cost
9 Metals 2 days (24 hour Composite 2*100 (Composite
(Ag, As, Cd, Cr, Cu,Ni, Hg, Sample) fee)+16*12.50 (Analysis cost
Pb, Zn) for metals)+2*22.60 (Analysis
cost for Mercury) = $445.20
Cyanide 2 days(Grab Sample) 2*20.00 (Analysis cost for
c aside) = $40.00
Oil & Grease 2 days (Grab Sample) 2*34.60 (Analysis cost for Oil
& Grease) =$69.20
Total Analysis and Sampling $445.20 +$40.00+$69.20 =
Cost T44A d0
W✓✓T.T
Administration Unit I foutfall)+1(Inspections)+ 7* $197.96=$ 1385.72
. For Outfall A 3 Permit,'+2 (QA/QC)=7
Outfall A Cost= $ 1,940.12
Monthly Cost= $ 161.68
u
n
?''JU`IR Y�LiSe