Contract 31482
- SE�RE�ITY . `�R CITY SECRETARY C CONTRACT NO. D.O.E. FILE SPECIFICATIONS CONTRACTOR'S BONDING CO. and ' CONTRACT DOCUMENTS CONSTRUCTION'S COPY for CLIENT DEPARTMENT SANITARY SEWER REHABILITATION CONTRACT LXVII, PART 1 Mike Moncrief Charles R. Boswell Mayor City Manager D.O.E. NO. 4144 to THE CITY OF FORT WORTH, TEXAS ROBERT D.GOODE,P.E. A.DOUGLAS RADEMAKER,P.E. S.FRANK CURMB,P.E. DIRECTOR,TRANSPORTATION DIRECTOR,DEPARTMENT OF ACTING DIRECTOR AND PUBLIC WORKS DEPARTMENT ENGINEERING WATER DEPARTMENT WATER PROJECT NO. PS53-060530177970 ' SEWER PROJECT NO. PS58-070580175790 0 PREPARED BY: Lockwood, Andrews &Newnam, Inc. • f2i4lG i?Esc E�l1B�i i 307 W. 7`h Street, Suite 1250 .....,,,.00"4006691 Fort Worth, Texas 76102 8=7 S (817) 820-0420 fit „,.�° 2004 ORIGINAL . . 4:V11 03-11-05A1O:50 RCVQ wwwXFWNet.0r1g FORT WORTH Print M&C COUNCIL ACTION: Approved on 2/17/2005 -Ordinance No. 16296-02-2005 DATE: 2/17/2005 REFERENCE NO.: "C-20522 LOG NAME: 30LXVII CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Adopt an Appropriation Ordinance and Authorize Execution of Contract to Conatser Construction TX, LP, for Sanitary Sewer Rehabilitation Contract LXVII (67), Part 1 RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of$1,311,799.00 from the Water& Sewer Operating Fund to the Water Capital Project Fund in the amount of$55,940.00 and Sewer Capital Project Fund in the amount of$1,255,859; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriation in the Water Capital Project Fund in the amount of$55,940.00 and the Sewer Capital Project Fund in the amount of $1,255,859, from available funds; and 3. Authorize the City Manager to execute a contract with Conatser Construction TX, LP in the amount of $1,189,799.00 for Sanitary Sewer Rehabilitation Contract LXVII (67), Part 1. DISCUSSION: On May 13, 2003, (M&C C-19585), the City Council authorized the City Manager to execute an engineering agreement with Lockwood, Andrews & Newnam, Inc. The project consists primarily of the replacement of the following sanitary sewer mains: L-2351 Beginning from the Carrol Street/West 5th Street intersection, southerly along the east right-of- way line of Carrol Street to the West 7th Street/Carrol Street intersection, then easterly along the north right- of-way line of West 7th Street intersection, then southerly 200 feet, then easterly 800 feet; and L-1898 Beginning from a point located 150 feet west of the West 5th Street/Greenleaf Street intersection, westerly to the Harold Street/West 5th Street intersection, then southerly along Harold Street 6th to the West 6th Street/Harold Street intersection, then westerly along West 6th Street to the Stayton Streettwest 6th Street intersection, then southerly along Stayton Street to the West 7th Street/Stayton Street intersection. In addition, the deteriorated water main on West 6th Street will be replaced. The proposed improvements consist of the replacement of approximately 4,900 ft. of primarily 8, 12 and 30- inch sanitary sewer pipe and 600 feet of 8-inch water pipe. BID ADVERTISEMENT: The project was advertised for bid on December 30 and January 6, 2004. On January 27, 2005, the following bids were received: Bidder Amount Time of Completion Conatser Construction TX, LP $1,189,799.00 120 Calendar Days Gin-Spen, Inc. $1,213,141.54 William J. Schultz, Inc. dba Circle "C" Construction, Inc. $1,289,513.00 Patco Utilities, Inc. $1,384,787.40 Jackson Construction, Ltd $1,543,268.00 In addition to the contract cost, $84,000 (Water: $4,000; Sewer: $80,000) is required for inspection and survey and $38,000 (Water: $5,000; Sewer: $33,000) is required for project contingencies. Conatser Construction TX, LP is in compliance with the City's M/WBE Ordinance by committing to 4% M/WBE participation and documenting good faith effort. Conatser Construction TX, LP identified several subcontracting and supplier opportunities. However, the M/WBE-certified firms contacted in the areas identified did not submit the lowest bids. The City's goal on this project is 21%. The project is located in COUNCIL DISTRICT 9, Mapsco 76B and C. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval and completion of recommendation 1, and the adoption of the attached appropriation ordinance, funds will be available in the current capital budgets, as appropriated, of the Water Capital Project Fund and the Sewer Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers 1&2 1)PE45 538070 0609020 $55,940.00 PW53 472045 060530177970 $55,940.00 1)PE45 538070 0709020 $1,255,859.00 1&2) PS58 472045 070580175790 $1.255,859.00 $46,940.00 2) PW53 531350 030530177970 $4,000.00 3)PS58 541200 070580175790 $_11 42,859.00 2) PW53 541200 060530177970 $51,940.00 2) PS58 531350 030580175790 $80,000.00 2) PS58 541200 070580175790 $1,175.859.00 Submitted for City Manager's Office by: Marc Ott (8476) Originating Department Head: A. Douglas Rademaker (6157) Additional Information Contact: A. Douglas Rademaker (6157) ATTACHMENTS 30LXVII.pdf SPECIFICATIONS and CONTRACT DOCUMENTS for SANITARY SEWER REHABILITATION CONTRACT LXVII, PART 1 Mike Moncrief Charles R. Boswell Mayor City Manager D.O.E.NO. 4144 in THE CITY OF FORT WORTH,TEXAS ROBERT D.GOODE,P.E. A.DOUGLAS RADEMAKER,P.E. S.FRANK CURMB,P.E. DIRECTOR,TRANSPORTATION DIRECTOR,DEPARTMENT OF ACTING DIRECTOR AND PUBLIC WORKS DEPARTMENT ENGINEERING WATER DEPARTMENT WATER PROJECT NO.PS53-060530177970 SEWER PROJECT NO.PS58-070580175790 PREPARED BY: P T Lockwood Andrews &Newnam,Inc. ,�� ch I?SL�FI�'t�"9!�► i 307 W. 7 Street, Suite 1250 Fort Worth,Texas 76102 jf4 (817) 820-0420 �� s a � 2004 TABLE OF CONTENTS INSTRUCTIONS TO BIDDERS MBE/WBE BID SPECIFICATIONS PART B - PROPOSAL PART C- GENERAL CONDITIONS PART Cl -SUPPLEMENTARY CONDITIONS PART D- SPECIAL CONDITIONS PART DA-ADDITIONAL SPECIAL CONDITIONS PART F - BONDS PART G -CONTRACT DOCUMENTS PART H - PERMANENT EASEMENT,TEST HOLE REPORTS, LEVEE CROSSING PERMIT, RAILROAD PERMIT, STREET REPAIR DETAILS NOTICE TO BIDDERS Sealed Proposals for the following: Sanitary Sewer Rehabilitation Contract 67 Part 1 Water Project No: PW53-060530177970 Sewer Project No: PS58-070580175790 DOE No. 4144 The Construction of: Section A—Water Replacement 600 L.F.—8"Water Line Section B—Sanitary Sewer Replacement 2,350 L.F.—30"Sanitary Sewer Line 2,200 L.F.— 12"Sanitary Sewer Line 420 L.F.—8"Sanitary Sewer Line Addressed t o Charles B oswell, City M anager of the C ity o f Fort Worth, Texas, will be received a t the Purchasing Office until 1:30 p.m. January 27, 2005 and then publicly opened and read aloud at 2:00 p.m., in the Council chambers. Plans, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth,Texas. Sets may be obtained on a nonrefundable basis for thirty dollars ($30.00)per set. Bidders are hereby informed that plans and specifications will be available for pick-up Monday, January 3, 2005. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract at any time. Bidders must submit the complete specifications book or risk rejection of bid. The water and sanitary sewer improvements included in this project must be performed by a contractor who is pre-qualified by the Water Department at the time of bid opening. The procedures for pre- qualifications are outlined in the"Special Instructions to Bidders". For additional information, please contact Mr. Craig Schellbach, P.E., Lockwood, Andrews & Newnam, Inc. at (817) 820-0420, or Mr. Liam Conlon City of Fort Worth Department of Engineering at (817) 392- 6824. Advertising Dates: December 30, 2004 January 06, 2005 COMPREHENSIVE NOTICE TO BIDDERS Sealed Proposals for the following: FOR: Sanitary Sewer Rehabilitation Contract 67 Part 1 Water Project No: PW53-060530177970 Sewer Project No: PS58-070580175790 DOE No.4144 Addressed to Mr. Charles Boswell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 p.m. January 27. 2005, and then publicly opened and read aloud at 2:00 p.m., in the Council chambers. Plans, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. Sets may be obtained on a nonrefundable basis for thirty dollars ($30.00) per set. The documents contain additional information for prospective bidders. All bidders will be required to comply with Provision 5159a of"Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as amended to City Ordinance No. 7400 (Fort Worth City Code Sections 13-A-21 through 12-A-29), prohibiting discrimination in employment practices. Bid security is required in accordance with Paragraph 2 of the Special Instruction to Bidders. The major work on the above-referenced project shall consist of the following: Section A—Water Replacement 600 L.F.—8"Water Line Section B—Sanitary Sewer Replacement 2,350 L.F.—30"Sanitary Sewer Line 2,200 L.F.—12"Sanitary Sewer Line 420 L.F.—8"Sanitary Sewer Line Included in the above will be all other miscellaneous items of construction as outlined in the Plans and Specifications. The City reserves the right to reject any and/or all bids and waive any and/or all formalities. Bidders shall not separate, detach, or remove any portion, segment, or sheets from the contract document at any time. Bidders must complete the proposal sections and submit the complete specifications book or face rejection of the bid as non-responsive. AWARD OF CONTRACT: No bid may be withdrawn until the expiration of ninety (90) days from the date bids are opened. The award of contract, if made, will be within ninety(90) days after the opening of bids, but in no case will the award be made until all the necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the contract. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the Proposal form. Bids that do not acknowledge receipt of all addenda may be rejected as being non-responsive. Information regarding the status of addenda may be obtained by contacting the Department of Engineering at(817)392-7910. In accord with City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, GOOD FAITH EFFORT FORM with Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to who delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. Bidders are advised that the City of Fort Worth has not acquired all necessary Railroad Crossing permits for the construction of the project as shown in the Plans. Bidders are hereby notified that the City anticipates obtaining the necessary permits by the start of construction. In the event the necessary Railroad Crossing permits are not obtained, the City reserves the right to terminate the award of the contract at any time before the contractor begins any construction work on the project. In addition, Bidders shall hold their unit prices until the City has completed the acquisition of all permits. The contractor shall be prepared to commence construction without all executed Railroad Crossing permits and shall submit a schedule to the City of how construction will proceed in the other areas of the project that do not require permits. The Managing Department for this project is the Department of Engineering. SUBMISSION OF BID: This document is designed as a single construction contract. The proposal has been separated into TWO SECTIONS, SECTION A — Water line replacements, and SECTION B — Sanitary sewer line replacements. Award of contract, if made, shall be to the responsive bidder for BOTH sections. The prospective bidder must submit their bid for the TWO sections and complete the Summary page of the Bid Proposal Section. For additional information, please contact Mr. Craig Schellbach, P.E., Lockwood, Andrews & Newnam, Inc. at (817) 820-0420 or Mr. Liam Conlon, City of Fort Worth Department of Engineering at (817) 392- 6824. Charles R. Boswell Marty Hendrix City Manager City Secretary Advertising Dates: Department of Engineering A. Douglas Rademaker, P.E., Director December 30, 2004 January 06, 2005 By. Rick Trice, P.E.,Acting Assistant Director SPECIAL INSTRUCTIONS TO BIDDERS 1) PREOUALIFICATION REOUIREMENTS: All contractors submitting bids are required to be prequalified by the Fort Worth Water Department prior to submitting bids. This prequalification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement,an acceptable experience record,an acceptable equipment schedule and any other documents the Department may deem necessary,to the Director of the Water Department at least seven(7) calendar days prior to the date of the opening of bids. _ a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status to the submitting company. This statement must be current and not more than one(1)year old. In the case that a bidding date falls within the time a new statement is being prepared,the previous statement shall be updated by proper verification. b) For an experience record to be considered to be acceptable for a given project,it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be received. c) The Director of the Water Department shall be the sole judge as to the acceptability for financial qualification to bid on any Fort Worth Water Department project. d) Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. e) The City,in its sole discretion,may reject any bid for failure to demonstrate experience and/or expertise. f) Any proposals submitted by a non-prequalified bidder shall be returned unopened,and if inadvertently opened,shall not be considered. g) The City will attempt to notify prospective bidders whose qualifications(financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a waiver of any necessary prequalification. y 2. BID SECURITY: A cashier's check,or an acceptable bidder's bond,payable to the City of Fort Worth,in an amount of not less than five(5 0/6)percent of the largest possible total of the bid submitted must accompany the bid,and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten(10)days after the contract has been awarded To be an acceptable surety on the bid bond,the surety must be authorized to do business in the state of Texas. In addition, the surety must(1)hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law;or(2)have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. i Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City,in its sole discretion,will determine the adequacy of the proof required herein. 3. BONDS: A performance bond,a payment bond,and a maintenance bond each for one hundred (100%)percent of the contract price will be required,Reference C 3-3.7. 4. WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with the following: 06/04/03 (a) The contractor shall comply with all requirements of Chapter 2258,Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258,Texas Government Code. Such prevailing wage rates are included in these contract documents. (b) The contractor shall,for a period of three(3)years following the date of acceptance of the work, maintain records that show(i)the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract;and(ii)the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of D-3 Right to Audit pertain to this inspection. (c) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs(a)and(b)above. (d) With each partial payment estimate or payroll period,whichever is less,an affidavit stating that the contractor has complied with the requirements of Chapter 2258,Texas Government Code. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal,the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDERS: Pursuant to Article 601g,Texas Revised Civil Statutes,the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business in located. "Nonresident bidder"means a bidder whose principal place of business is not in this state,but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. This provision does not apply if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the bid amount is$25,000.00 or less,the contract amount shall be paid within forty- ` five(45)calendar days after completion and acceptance by the City. 9. AGE: In accordance with the policy("Policy")of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers,members,agents employees,program participants or subcontractors,while engaged in performing this contract,shall,in connection with the employment,advancement or discharge of employees or in connection with the terms,conditions or privileges of their employment,discriminate against persons because of their age except on the bases of a bona fide occupational qualification,retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers,members,agents,employees, subcontractors,program participants,or persons acting on their behalf,shall specify,in solicitations or 06/04/03 advertisements for employees to work on this contract,a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification,retirement plan or statutory requirements. Contractor warrants it will fully comply with the policy and will defend,indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractor against City arising out of Contractor's and/or its subcontractors'alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"),Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public,nor in the availability,terms and/or conditions of employment for applicants for employment with,or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal,state and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors'alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accord with City of Fort Worth ro Ordinance No. 15530,the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary.The bidder shall submit the MBE/WBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM,PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM("with Documentation")and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m.,five(5)City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. 4 Upon request,Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise(MBE)and/or women business enterprise (WBE)on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books,records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts(other than a negligent misrepresentation)and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal,State or local laws or ordinances relating to false statements. Further,any such misrepresentation of facts(other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three(3)years. 12. FINAL PAYMENT,ACCEPTANCE AND WARRANTY: a. The contractor will receive full payment(less retainage)from the city for each pay period. b. Payment of the retainage will be included with the final payment after acceptance of the project as being complete. C. The project shall be deemed complete and accepted by the City as of the date the final punch list has been completed,as evidenced by a written statement signed by the contractor and the City. d. The warranty period shall begin as of the date that the final punch list has been completed. _= 06/04/03 e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due and payable. f. In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding(i)final quantities,or(ii)liquidated damages,city shall make a progress payment in the amount that city deems due and payable. g. In the event of a dispute regarding either final quantities or liquidated damages,the parties shall attempt to resolve the differences within 30 calendar days. r 06/04/03 s ips Im MBE/WBE Bid Specifications PP Pm P& Ps lw lw Pff FORT WORTH W'�''"'�� City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is$26,000 or more,the M/WBE goal is applicable. PE If the total dollar value of the contract is less than$25,000,the M/WBE goal is not applicable. POLICY STATEMENT on It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. M/WBE PROJECT GOALS The City's MBEM/BE goal on this project is 21 %of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated MMBE goal,or 2. Good Faith Effort documentation,or; 3. Waiver documentation,or; 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department,within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. Subcontractor Utilization Form, if goal is received by 5:00 p.m.,f ive(5)C ity b usiness d ays a fter t he b id met or exceeded: opening date,exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m.,f ive(5)C ity b usiness d ays a fter t he b id Utilization Form, if participation is less than opening date,exclusive of the bid opening date. I" stated goal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m.,f ive(5)C ity b usiness d ays a fter t he b id Utilization Farm,if no M/WBE participation: opening date,exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received by 5:00 p.m.,f ive (5)C ity b usiness d ays a fter t he b id perform all subcontracting/supplier work:- op enin date, exclusive of the bid opening date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m.,f ive(5)C ity b usiness d ays a fter t he b id to met or exceed goal. opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S MMBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS Any questions, please contact the M/WBE Office at(817)871-6104. Rev.5130/03 I ATTACHMENT IA Page 1 of 4 FORT WORTH City of Fort Worth Ir Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: Check applicable block to describe prime X PROJECT NAME: MNV/DBE NON-MM/DBE BID DATE SS k e h A b Co n-1- ra c-+ L Y V I I , �,r+ 1 OI a. _7 05 City's MMBE Project Goal: Prime's MMBE Project Utilization: PROJECT NUMBER -7-n-70 % 02 I % gO 1 Z57 90 Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the MNVBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional _ and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications M/WBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Parker,Johnson,Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1St tier, a payment by a subcontractor to r its supplier is considered 2"d tier ALL M/VVBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have �s been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency(NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business Enterprise(DBE)is synonymous with Minority/Women Business Enterprise(M/WBE). If hauling services are utilized, the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The MNVBE may lease trucks from another MNVBE firm, including M/WBE owner-operators, and receive full MNVBE credit. The MNVBE may lease trucks from non-MNVBEs, including owner-operators, but will only receive credit for the fees and commissions earned by the MNVBE as outlined in the lease agreement. I■ PE Rev.5/30/03 ATTACHMENT 1A FORT Page 2 of 4 Primes are required to identify ALL subcontractors/suppliers,regardless of status;i.e., Minority,Women and non-M/WBEs. Please list M/WBE firms first,use additional sheets if necessary. pw Certification N (check one) o SUBCONTRACTOR/SUPPLIER T n Company Name ; N T Detail Detail *� Address e M w T D W Subcontracting Work Supplies Purchased Dollar Amount Telephone/Fax r B B R D B E E C T E A kawl c4* RAY MATERIALS Su f pl1�..5 $a J r 70o. 0 ps 6633 Grapevine Hwy. CP N.Richland Hills,TX 76180 I t/ (817)590-2536 RAY MIX 6633 Grapevine H wy. f'ed 1 m X %/ , OZ � . N.Richland Hills,TX 76180 ✓ C j- w #. (817)590-2536 5LLpPI Cq f17lSS CENTEX SEEDING,Inc. seed I evi 4 `t' ' •vo PO Box 2077 S,0 Keller,Texas 76116 I (8 17)306-8510 fax(8 17)306-8901 t: BARCUS PIPELINE INSPECTION pw 6317 Cook Hill Rd. � �1 UO Burleson,TX 76028 `t' { ✓ Sov (817)447-3720 COWTOWN MATERIALS W Y\C- PO Box 162327 91900. D Fort Worth,Texas 76161 . v (817)7596 191`1 ( ✓ ✓ '� I r r,!�x fax(817)759-1716 1� REYNOLDS ASPHALT& CONSTRUCTION COMPANY AcPt,,A 1,t- -,000^pD PO Box 370 I Euless,Texas 76039 (817)267-3131 Rev.5130103 r" ATTACHMENT 1A 0 FORT WORTH Page 3 of 4 Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e.,Minority,Women and non-M/WBEs. Please list M/WBE firms first, use additional sheets if necessary. Certification E (check one) SUBCONTRACTOR/SUPPLIER T r Company Name i N T Detail Detail Address M W c X r Subcontracting Work Supplies Purchased Dollar Amount Telephone/Fax r B B T D F2 O F E E E C T E A NATIONAL WATERWORKS Oa4 Q r �- PO Box 840700 Dallas,Texas 75284 I Su 800 252-1557 A Pw TE W TUNNEL TECHNOLOGIES,INC. ^ A 1 ¢ 2525 B 1e I J�Y-V Cp-5�j 1AD-0 D Dallas,Texas 7525212 $ (v)972-298-3570(f)214-879-0844 FM pp Rev.5/30/03 I ATTACHMENT 1A Y FoR� Page 4 of 4 Total Dollar Amount of M/WBE Subcontractors/Suppliers $ p 0 S� , lOD• Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $ ��oZf y 17 QO TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ 5 ) 5) rte)7 0 0 The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a Request for Approval of Change/Addition. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1) year. AZZ r A o n ure YY)�. Title Corftd MarnePritia{it cift ot) Ds�S.�_ r►�KuL�i D�r-� � X. 1- v � -�7 t� 5 - y S5 Company Game Telephone and/or Fax ,.� e Address ail Addy s3 C41ft teOp Date Rev.5/30/03 r ATTACHMENT 1B FORT WORTH Page 1 of 1 FM City of Fort Worth s� Prime Contractor Waiver Form PRIME COMPANY NAME: Check applicable block to describe rime PROJECT NAME: MM//DBE NON-MM//DBE BID DATE City's MMBE Project Goal: PROJECT NUMBER G 21% If both answers to this form are YES, do not complete ATTACHMENT 1C(Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1C. This form is only applicable if both answers are yes. Failure to complete this form in its entirety and be received by the Managing Department on or before 5:00 p.m.,five (5)City business days after bid opening, exclusive of the bid opening date,will result in the bid being considered non-responsive to bid specifications. r Will you perform this entire contract without subcontractors? YES rIf yes, please provide a detailed explanation that proves based on the size and scope of this project, NO this is your normal business practice and provide an operational erofile of your business. Will you perform this entire contract without suppliers? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. NO The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/WBE(s)on this contract, the payment therefore r and any proposed changes to the original M/WBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the M/WBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three(3)years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one(1)year. rAuthorized Signature Printed Signature rTitle Contact Name(if different) canpany Name Phone Number Fax Number Addfm Email Address rCity/StawZIP Date Rev.V36/03 v l pa ATTACHMENT 1C Page 1 of 3 ob FORT WORTH City of Fort Worth PM Good Faith Effort Form PRIME COMPANY NAME: Check applicable block to describe rime L PROJECT NAME: I M/W/DBE NON-M/W/DBE BID DA E City's M/WBE Project Goal: PROJECT NUMBER PS 5 3— Uoo 5WI-7-74 7 D 21% If you have failed to secure M/WBE participation and you have subcontracting and/or supplier opportunities or if your DBE participation is less than the City's project goal,you must complete this form. If the bidder's method of compliance with the M/WBE goal is based upon demonstration of a "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 6 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation the facts or intentional discrimination by the bidder. Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m.five(5) City business days after bid opening,exclusive of bid opening date,will result in the bid being considered non-responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunity] for the completion of this project, regardless of whether it is to be provided by a M/WBE or non-M/WBE. (DO NOT LIST NAMES OF FIRMS) On Combined Projects, list each subcontracting and or supplier opportunity through the 2" tier. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities • e s war y-' Rav nslsnm.1 ATTACHMENT IC Page 2 of 3 2.) Obtain a current(not more than three(3)months old from the bid open date) list of M/WBE subcontractors and/or suppliers from the City's M/WBE Office. Yes Date of Listing 111 19104 No 3.) Did you solicit bids from M/WBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened? ✓Yes (If yes,attach M/WBE mail listing to include name of firm and address and a dated copy of letter mailed.) No FW 4.) Did you solicit bids from M/WBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? ✓Yes (if yes,attach list to include name of M/WBE firm, ep rson contacted,phone number and date and time of contact.) No NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a facsimile is used, attach the fax confirmation, which is to provide M/WBE name, date, time, fax number and documentation faxed. NOTE: If the list of MIWBEs for a particular subcontracting/supplier opportunity is ten (10) or less, the bidder must contact the entire list to be in compliance with questions 3 and 4. If the list of M/WBEs for a particular subcontracting/supplier opportunity is ten (10) or more, the bidder must contact at least two- ! thirds (2/3) of the list within such area of opportunity, but not less than ten to be in compliance with questions 3 and 4. 5.) Did you provide plans and specifications to potential MfWBEs or information regarding the location of - plans and specifications in order to assist the MfWBEs? v° Yes No 6.) Submit documentation if M/WBE quotes were rejected. The documentation submitted should be in the forms of a n a ffidavit, i nclude a d etailed a xplanation o f w by t he M 1WBE w as r ejected a nd a ny supporting documentation the bidder wishes to be considered by the City. In the event of a bona fide dispute concerning quotes,the bidder will provide for confidential in-camera access to and inspection of any relevant documentation by City personnel. PP Please use additional sheets, if necessa , and attach. Company Name Telephone Contact Person Scope of Work Reason for Rejection Raw munnms A ATTACHMENT 1C Page 3 of 3 ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain MIWBE participation on this project. The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files h eld b y t heir c ompany t hat w ill substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. The undersigned certifies that the information provided and the M/WBE(s) listed was/were contacted in good faith. It is understood that any M/WBE(s) listed in Attachment 1C will be contacted and the reasons for not using them will be verified by the City's IVIDNBE Iffice. A i Signature Printed Sig tune ,o _ ► . Title Contact Name and Title(if different) �. --.o%^4 A �_� ��1L22� �S 'S34- 1743 ($I��SW—q5S lo Company Name one Number Fax Number Address 6fnaii Address :�u nl Y% �t t� �� I' - a `1 -- 05 CitylStaump Date Rav ARIAnln3 rt Joint Venture FORT WORTH Page 1 of 3 i CITY OF FORT WORTH Joint Venture EliIjbility Form All questions must be answered,use"NA"if applicable. Name of City project: . A joint venture form must be completed on each project RFPBid/Purchasing Number: 1.Joint venture information: Joint Venture Name: PM Joint Venture Address: (If applicable) Telephone: Facsimile: E-mail address: Cellular: Identify the firms that comprise the joint venture: PE Please attach extra sheets if additional space is required to provide detailed explanations of work to be performed by each firm comprising the joint venture M/WBE firm Non-M/WBE Ph name firm name: Business Address: Business Address: i City,State,Zip: City,State,Zip: 1P Telephone Facsimile E-mail Telephone Facsimile F Cellular Cellular a! Certification Status: E-mail address Name of Certifying Agency: 2.Scope of work performed by the Joint Venture: Describe the scope of work of the M/WBE: Describe the scope of work of the non-NVWBE: r Rav srAnmA po Joint Venture Page 2 of 3 VP 3.What is the percentage of M/WBE participation on this joint venture that you wish to be counted toward meeting the project goal? pa 4.Attach a copy of the joint venture agreement. 5.List components of ownership of joint venture: (Do not complete if this information is described in joint venture agreement) Profit and loss sharing: r Capital contributions,including equipment: Other applicable ownership interests: 6.Identify by name,race,sex and firm those individuals(with titles)who are responsible for the day-to-day management and decision making of the joint venture: Financial decisions (to include Account Payable and Receivable): Management decisions: a. Estimating ----------------------------------------------- b. Marketing and Sales ---------------------------------------------- ' c. Hiring and Firing of management personnel --------------------------------------- d. Purchasing of major equipment and/or supplies Supervision of field operations The City's Minority and Women Business Enterprise Office will review your joint venture submission and will have final approval of the M/WBE percentage applied toward the goal for the project listed on this form. NOTE: From and after the date of project award, if any of the participants,the individually defined scopes of work or the dollar amounts/percentages change from the originally approved information, then the participants must inform the City's M/WBE Office immediately for approval. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's M/WBE Ordinance. r Rs v s/gin/nA Joint Venture Page 3 of 3 AFFIDAVIT The undersigned affirms that the foregoing statements are true and correct and include all material information necessary to identify and explain the terms and operation of the joint venture. Furthermore, the undersigned shall agree to provide t o t he j oint venture t he stated scope of work, decision-making responsibilities and payments herein. The City also reserves the right to request any additional information deemed necessary to determine if the joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersigned agree to permit audits, interviews with owners and examination of the books,records and files ►" of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this provision shall result in the termination of any contract, which may be awarded under the provisions of this joint venture's eligibility and may initiate action under F ederal,State and/or Local 1 aws/ordinances c oncerning f alse PM statements------or willful misrepresentation of facts.----- ---------------------- -------------------------------- ----------------------------------------------------------------------- Name of M/WBE firm Name of non-M/WBE firm i Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner 00 Printed Name of Owner Printed Name of Owner tp Signature of Owner Signature of Owner R" Title Title Date Date Notarization State of County of On this day of ,20 ,before me appeared PM and P" to me personally known and who,being duly sworn, did execute the foregoing affidavit and did state that they were N properly authorized to execute this affidavit and did so as their free act and deed. Notary Public Print Name Notary Public Signature Commission Expires (seal) i PART B — PROPOSAL TO: CHARLES R. BOSWELL City Manager Fort Worth, Texas RE: Sanitary Sewer Rehabilitation Contract LXVII (67) Part 1 - 7t' Street Water Project No. PW53-060530177970 Sewer Project No. PS58-070580175790 Pursuant to the foregoing "Notice to Bidders", the undersigned Bidder, has thoroughly examined the plans, specifications and the site, understands the amount of work to be done, and hereby proposes to do all work, furnish all labor, equipment, and materials, necessary to fully complete all the work as provided in the plans and specifications, and subject to the inspection and approval of the Director, Department of Engineering of the City of Fort Worth. The contractor must be pre-qualified in accordance with the Water Department of the City of Fort Worth requirements. Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish Performance, Maintenance Bond for the sewer replacement contract only, and Payment Bond approved by the City of Fort Worth for performing and completing the said work within the time stated and for the following sums, to wit: Sanitary Sewer Rehabilitation Contract LXVII (67) Part 1 -7"'Street Water Project No.—PW53-060530177970 Sewer Project No.—PS58-070580175790 Section A- Water Item Approx. Description of Items with Unit Total No Ouantity Bid Prices Written. Words Price Amout Bid (Furnish-and install, including all appurtenant work, complete in place,the following items) 1) 600 LF 8"C900 DR14 Class 200 PVC Water Pipe Per Linear Foot: �1rt. Dollars and min Cents .bo $ 15,D o0'0 2) 1 EA Connect to Existing 8" Water Line Per Each: E io u l�md Dollars o and 11p Cents $ 'Rlb.OD BP I Section A-Water Item Approx. Description of Items with Unit Total No. Quantity Bid Prices :x'ritten Words Price Amout Bid (Furnish and install, including all appurtenant work,complete in place, the following items) 3) 3 EA 8"Gate Valve and Box Per Each: -fWelu 14u0dA rA rt T Dollars and �0 Cents $ va $ `154 00 4) 1 Ton" M.J. Fittings Per Ton: OMQ,_ThDW;,Qrd Dollars and ;J'Q Cents $ 1,OX.PC1 $J 5) 50 LF 2"Type"K"Water Service Line Per Linear Foot: T; Dollars � I and M Cents $ 0.00 $ x,000.00 6) 2 EA Type A Water Meter and Box Per Each: �n �U Dollars and No Cents $ 00 $ 900,a a 7) 1 LS Temporary Water Service Per Lump Sum: Dollars and jJ 0 Cents $ ,DIrD $ 8) 535 LF Temporary Asphalt Paving Repair(D-90) 2"Hot Mix on 6"Compacted Flex Base Per Linear Foot: Dollars and Cents $ a $ ao ** Fill in from Fitting Table at the end of this section,BP 4 BP 2 Section A-Water Item Approx. Description of Items with Unit Total No. Quantity Bid Prices Written Words Price Amout Bid (Furnish and install, including all appurtenant work,complete in place, the following items) 9) 870 SY 8-inch Pavement Pulverization(DA-32) Per Square Yard: F 1 J"Q' Dollars and HD Cents $ `j.00 $ 1'0 Ay—.ba 10) 13 TN Cement for Stabilization for 8-inch Pulverized Subgrade(30lb/sy), (DA-32), Per Ton: 0&QL9 .lnldro��tal)ollars and N D Cents $ DO $ 11 870 SY 2-inch HMAC Surface Course T e D ( Yp " ") (DA-28), Per Square Yard: Op of Dollars and C) Cents $ T.0 b $ 4_941).60 12) 50 CY Unclassified Street Excavation Per Cubic Yard: . W�h+J Dollars and Cents $ O,vo $ , va 13) 30 SY 7-inch Concrete Valley Gutter Per Square Yard: Dollars and NO __ Cents $ 4D.111 $ 0 D v 14) 50 LF 6-inch PVC Perforated Pipe Subdrain Per Linear Foot: ( Dollars and_ � Cents $ ,[)0 $ l� U D Section A- Sub-Total Water Replacement $ L46 ,QLfD-00 Transfer Sub-Total To Page BP 16 BP 3 w SECTION A-WATER LIST OF CAST IRON FITTINGS AS REQUIRED BY E2-7.11A TO BE SUBMITTED WITH BID No. of Fittings Size of Fitting Type of Fitting Weight Each Fittings lbs) Total Weight bs 3 8"X 8" Tee 200 C 0 p 3 8" M.J. Cap /00 jr o O 1 8" M.J. Solid Sleeve Z 00 2,00 GRAND TOTAL 1100 ,40-5 Contractor shall fill in blanks for"Weight Each Fitting"and"Total Weight'as a part of bid. (Weight should be based on M.J. Fittings). BP4 Section B–Sanitary Sewer Item Approx. Description of Items with Unit Total ivu. vuantitY Bid Prices Written Words Price Amout Bid (Furnish and install, including all appurtenant work,complete in place, the following items) 1) 1,729 LF *30" Sanitary Sewer Pipe All Depths PM Per Linear Foot: Owe-l Iu ,3 d a, r4whiDollars go and No Cents $ 115-011 $ M 49 4935-00 2) 124 LF 30"D.I.P. Sanitary Sewer Pipe All Depths Per Linear Foot: A nAC9uhAq'_'A Dollars and tQ0 Cents $_ 18a. 0 00 3) 110 LF 30"D.I.P. Sanitary Sewer Pipe By Other Than Open Cut,w/48"Steel Casing Per Linear Foot: c'S i X 4 u,Jcl�aA Dollars and T1'p Cents $ $ a 4) 257 LF 30"D.I.P. Sanitary Sewer Pipe(Levee Crossing) By Other Than Open Cut,w/48" Steel Casing (See D-64) Per Linear Foot: &,& r.1 Dollars and 1�j 1Z— Cents $ 0 $ �aM,111 5) 126 LF 30"D.I.P. Sanitary Sewer Pipe(Railroad Crossing) By Other Than Open Cut,w/48" Steel Casing (See D-64) Per Linear Foot: cS i x u n3dNA Dollars and hi D Cents $ M 0 D $ 0 * Per Table on Page BP 17 �r BP 5 Section B—Sanitary Sewer Item Approx. Description of Items with Unit Total No. Quantity Bid Prices Written Words Price Amout Bid (Furnish and install, including all appurtenant work, complete in place, the following items) 6) 10 LF *27" Sanitary Sewer Pipe All Depths Per Linear Foot: 00,M U N)jrQftTvQ Dollars and )JO Cents $.61 $ 1.)W.01 7) 1,892 LF *12"Sanitary Sewer Pipe All Depths Per Linear Foot: R 4 6A Dollars and-N O Cents $ DO $q a 8) 120 LF 12"D.I.P. Sanitary Sewer Pipe By Other Than Open Cut,w/24"Steel Casing All Depths Per Linear Foot: `-T f o_+ ukAve6 Dollars i and hj p Cents $ 2"Po 9) 341 LF *8"Sanitary Sewer Pipe All Depths Per Linear Foot: Dollars O� and Cents $ D 10) 210 LF *6" Sanitary Sewer Pipe All Depths Per Linear Foot: r Dollars and Cents $ 1- 00 $ 4M. U 0 * Per Table on Page BP 17 ■ A. BP 6 Section B—Sanitary Sewer Item Approx. Description of Items with Unit Total No. Ouantity Bid Prices Written Words Price Amout Bid (Furnish and install, including all appurtenant work, complete in place,the following items) 11) 85 LF 12"Ductile Iron Pipe All Depths Per Linear Foot: �94 J Fi OL Dollars and 1 U Cents $ �o D d $ 5 o)5 12) 108 LF 8"Ductile Iron Pipe All Depths Per Linear Foot: Dollars and p Cents $ 60-00 $ ( � 13) 4,370 LF Trench Safety System (Greater Than 5' Depth) Per Linear Foot: W p Dollars and ,,J O Cents $ p D $ DO 14) 1 EA Junction Box,Per Each: nSI Dollars and Cents $ 0 $ 40,00000 15) 686 SF Interior Corrosion Protection for Junction Box Per Square Foot: r� Dollars and Cents $ 5.°a $0-D 16) 7 EA 5' Diameter Standard Manhole 6' in Depth, Per Each: lr ,r JhpUGpnc1 Dollars and NO Cents $ PD $ oni 'U� BP 7 Section B—Sanitary Sewer Item Approx. Description of Items with Unit Total No. Quantity Bid Prices Written Words Price Amout Bid (Furnish and install, including all appurtenant work,complete in place, the following items) 17) 56 VF Additional Depth for 5' Diameter Manhole _ Per Vertical Foot: I u�ou►Jr1� Dollars and �,3i7 Cents $ '�MOO $ dv 18) 1 EA 5' Diameter Drop Manhole 6' in Depth, Per Each: Jg' Dollars and OD Cents $ $ 19) 12 VF Additional Depth for 5' Diameter Drop Manhole Per Vertical Foot: mum A u,,,)ag.1 44 Dollars 00 and 0 Cents $ 0 a $ ,00 20) 10 EA 4' Diameter Standard Manhole 6' in Depth, Per Each: �Z Dollars and p1O Cents $ac�rYo, 21) 13 VF Additional Depth for 4' Diameter Manhole Per Vertical Foot: [)Me A sa �dtg L V1j;�Dollars and Cents $_ � $ llb 22) 3 EA 4' Diameter Drop Manhole 6' in Depth, Per Each: --jb Od Dollars and to Cents $� $ erg `;7 J:�Jlo G:�dta Section B–Sanitary Sewer Item Approx. Description of Items with Unit Total No. Ouantity Bid Prices Written Words Price Amout Bid (Furnish and install, including all appurtenant work, complete in place, the following items) 23) 8 VF Additional Depth for 4' Diameter Drop Manhole Per Vertical Foot: 40 Qrjp.lj,) Dollars and NO Cents $_18D00 $ D.too 24) 13 EA Watertight Gasketed Manhole Insert Per Each: Dollars and N D Cents $ f50.9b $ 25) 8 EA Odor Control Carbon Cartridge Inserts Per Each: �p1 Du�1 rlc� Dollars T and kM Cents $ d=po $ Ito 1M.00 26) 21 EA Concrete Manhole Collar Per Each: — �,(,t d Dollars and-d�0 Cents $_ D 0 $�nu 27) 120 VF Interior Protective Manhole Coating(5' Diameter) Per Vertical Foot: �.. ollars va and Cents $ r 1tiO° 28) 26 VF Interior Protective Manhole Coating(4' Diameter) Per Vertical Foot: l �U nAO[�SiY ollars and Cents $ $ .� 29) 21 EA Vacuum Testing of SS Manhole Per Each: [)k)o HU 0,3 6 f_C1 Dollars and N 1) Cents BP 9 Section B—Sanitary Sewer Item Approx. Description of Items with Unit Total No. Quantity Bid Prices Written Words Price Amout Bid (Furnish and install,including all appurtenant work,complete in place,the following items) 30) 6 EA Abandon Existing Manhole Per Each: ' 1pr Dollars and !JD Cents $ &Z).00 $ 31) 5 EA Remove Existing Manhole Per Each: �iX 1-F Iun1drAa Dollars and rJ D Cents $ $ 3 32) 2EA Pre-Construction D-Hole Per Each: rR,S� OU AkIrOmi Dollars r and N Q Cents $� 00 $D D.�a 33) 30 EA Cut,Plug&Abandon Existing Sanitary Sewer Pipe Per Each: r•- Foup 4LAt-jrJaC4 Dollars and Cents $ � $ 1')Jala�b 34) 1,940 LF Grout Abandoned Sewer Line With Flowable Fill Per Linear Foot: IR Dollars and iJ n Cents $� $ 7D�•�° 35) 100 LF 4" Schedule 40 PVC in Private Property Per item(D-28) Per Linear Foot: Dollars and N 0 Cents $ SS ba $ w; OD i BP 10 Section B—Sanitary Sewer Item Approx. Description of Items with Unit Total No. Ouantity Bid Prices Written Words Price Amout Bid (Furnish and install, including all appurtenant work, complete in place, the following items) 36) 300 LF 4 "PVC in Public ROW Per Linear Foot: ' (�, _Dollars and-�p Cents $ --�O-OD $ r37) 10 EA Sewer Service Tap Per Each: IM S, j 9LjQA►•ed Dollars and Cents $ 4zol $ 6i000-0-11 38) 10 EA 2-Way Cleanout Service Per Each: �rQd � Dollars and 1-4 O Cents $ l W-00 $1, �y 39) 4 EA Remove and Replace Existing 10' Storm Drain Inlet Per Each: Zia ��lp,,t� ,�� Dollars y O and #.1 O Cents $ 40) 155 LF Remove and Replace 18"RCP Storm Drain Per Linear Foot: Dollars Lis and p Cents $_t- $ IAA�5 D 41) 20 CY Type E Concrete Per Cubic Yard: :1 Q Dollars and Qj) Cents $ ,�� $ O ��' O BP It Section B—Sanitary Sewer Item Approx. Description of Items with Unit Total No. Ouantity Bid Prices Written Words Price Amout Bid (Furnish and install, including all appurtenant work, complete in place, the following items) 42) 20 CY Type B Concrete Per Cubic Yard: I 'feTj Dollars and hNfl Cents $ p� $__am.)n 43) 20 CY Crushed Limestone for Misc. Plla—c•ement,Per Cubic Yard: F Dollars and E�EO Cents $ oti $ 0 44) 20 CY Washed Rock for Misc. Placement Per Cubic Yard: Dollars and is) O Cents $��• $ /Co•0 0 45) 1,450 SY Bermuda Grass Solid Sod Per Square Yard: "r4os _ Dollars and t4D Cents $_ • $ M r46) 2,100 SF Remove and Replace Concrete Sidewalk,Per Square Foot: Dollars and Cents $ .p 0 $ bo 47) 450 SF Remove and Replace Concrete Alley Approach Per Square Foot: Dollars and N Cents $ p O $� L� 48) 1,000 LF Remove and Replace Concrete Curb and Gutter, Per Linear Foot: Dollars Ob i and aJp Cents $ O-1.a.00 $ O)a.,bDO BP 12 On Section. B —Sanitary Sewer Item Approx. Description of Items with Unit Total 1W No, Quantity Bid Prices Written Words Price Atnout Bid (Furnish and install, including all appurtenant work,complete in place, the following items) 49) 1,450 LF Permanent HMAC Paving Repair,Fig. "2000-1" Per Linear Foot: Dollars and Cents $ 0� $ (05,o?w, 0 50) 355 LF Permanent Concrete Paving, Fig. "2" Per Linear Foot: }- -� Dollars and NU Cents $ C0.6' 51) 1,750 LF Temporary Asphalt Paving Repair(D-90) 2"Hot Mix on 6"Compacted Flex Base Per Linear Foot: ju)PA11-L,. Dollars and N O Cents $ ,DD $ a) / -00 52) 870 SY 8-inch Pavement Pulverization(DA-32) Per Square Yard: Dollars and rIQ Cents $ rj.00 $ Asp.oo 53) 13 TN Cement for Stabilization for 8-inch Pulverized Subgrade(30lb/sy), (DA-32), Per Ton: OKwO a Dollars and t�Tj Cents $ .p 0 $ y .0 0 54) 870 SY 2-inch HMAC Surface Course(Type"D") (DA-28), Per Square Yard: Dollars and Cents $ �D BP 13 Section B—Sanitary Sewer Item Approx. Description of Items with Unit Total No. Quantity Bid Prices Written Words Price Amout Bid (Furnish and install, including all appurtenant work, complete in place, the following items) 55) 50 CY Unclassified Street Excavation Per Cubic Yard: —1URvAi:A Dollars and Cents $ ,0 0 $T[�OQ tl� 56) 30 SY 7-inch Concrete Valley Gutter Per Square Yard: Dollars and Cents $ 4f.vo $ o.°0 57 50 LF 6-inch PVC Perforated Pipe Subdrain Per Linear Foot: p Dollars and Cents $ d $ Z) 58) 3,190 LF Pre-Construction Television Inspection Per Linear Foot: Dollars and N O Cents $ c .d a $�° U D 59) 5,106 LF Post-Construction Television Inspection f Per Linear Foot: 43r Dollars and Cents $ I . SO $� 0 60) 1 LS Decommission Existing Lift Station(See Plan Sheet 4) Per Lump Sum: ►'1p�Cn Dollars and aJ Cents $ f)1=-1)O $ ,t. BP 14 01/24/2005 144 FAQ— r. uua [ ]104 , Section B—Sanitary Sewer Item Approx. Description of Items with Unit Total i,4o. Quantity Bid Prices Written Words Price Amout Bid (Furnish and install, including all appurtenant work, complete in place, the following items) 61) 200 CY Dispose of Hydrocarbon—Contaminated Soil and Solid Waste Per Cubic Yard: v n nollars and /1() Cents 62) 200 Gallon Dispose of Hydrocarbon -- Contaminated Liquid Waste- Per Gallon: e�: -J— --Dollars and lJ p Cents $ �',vb DO 63) 40 LF 30"Sanitary Sewer Pipe By Other Than Open Cut Per Linear Foot: iX dunldWcA Dollars and Cents $ ECD•[p $ !?; A oco 0O Section B - Sub-Total Sewer Replacement $ (} j�a .�5�.L D Transfer Sub-To al to Page BP 16 DP 15 R Bid Summary For Sanitary Sewer Rehabilitation Part 1 -7th Street Water Project No. PW53-060530177970 Sewer Project No. PS58-070580175790 Section A Sub—Total(Water): $ �, Section B Sub—Total(Sewer): $ a �•00 a Grand Total Section A and Section B: BP 16 CITY APPROVED PRODUCT AND METHOD FOR Contractor shall select type of pipe to be used: STANDARD SPEC. NO. SIZE E1-31 4"thru 30" E1-25 4"thru 15" E 1-27 4"thru 1519 -, �E1-28 4"thru 30" E1-31 18"thru 27" E100-2 18"thru 48" Consult the"City of Fort Worth,Texas Standard Product List'to obtain the Generic/Trade and the Manufacturer for the pipes listed above. Failure to provide the information required above may result in rejection of bid as non-responsive. Only products or methods listed above will be allowed for use in this project. Any substitution shall result in rejection of bid as non-responsive. D.O.E.#4144—Proposal BP 17 Uity of Fort worth B-PROPOSAL (Cont.) Within ten(10)days after acceptance of this Proposal, the undersigned will execute tine formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents,for the faithful performance of the Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas,in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages fort he delay and additional work caused thereby. The undersigned bidder certified that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors,or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No.7278 as amended by City Ordinance No.7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract within 120 calendar days after beginning construction as set forth in the written order to be furnished by the Owner. Bidder agrees that Line"A"with service to the Montgomery Plaza property shall be complete and in service within 90 calendar days. (Complete A or B below, as applicable:) The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Nonresident bidders in the State of , our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. Receipt is acknowledged of the following addenda: Addendum No. 1✓ (SEAL) If Bidder is Corporation Addendum No.2 Addendum No.3 Respectfully submitted, r By: er(r prn-}- Title 154 4t i -1(P119 Address Address Phone: Fax: 71 ny-qS5 to BP 18 Part C General Conditions �s I 1%C7,!p'�i gyp] _ _ �,,. PART C - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER, 1, 1987 • TABLE OF CONTENTS C1-1 DEFINITIONS C1-1.1 Definition of Terms C1-1 (1) C1-1.2 Contract Documents C1-1 (1) C1-1.3 Notice to Bidders C1-1 (2) C1-1.4 Proposal Cl-1 (2). C1-1.5 Bidder C1-1 (2) C1-1.6 General Conditions -C1-1 (2) C1-1.7 Special Conditions C1-1 (2) C1-1.8 Specifications C1-1 (2) C1-1.9 Bond C1-1 (2) C1-1.10 Contract C1-1 (3) C1-1.11 Plans C1-1 (3) C1-1.12 City C1-1 (3) C1-1.13. City Council C1-1 (3) C1-1:14 Mayor C1-1 (3) -� C1-1.15 City Manager C1-1 (3) C1-1.16 City Attorney C1-1 (3) C1-1:17 Director of Public Works C1-1 (4) ,1 C1-1,18 Director, City Water Department. C1-1 (4) C1-1.19, Engineer C1-1 (4)' C1-1.20 Contractor C1-1 (4) C1-1.21 Sureties C1-1 (4) C1-1.22 The Work or .Project Cl-1 >t4-) C1-1.23 Working Day Cl-1 d(4) C1-1424 Calendar Day Cl-1 (4) =' C1-1.25 Legal Holiday C1-1 (4) Cl-1,_26 Abbreviations ' C1-1 (5) C1-1.27 Change Order C1-1 (6) ._� C1-1-.28 Paved Streets and Alleys C1-1 (6) C1-1.29 Unpaved Streets and Alleys C1-1 (6) C1-1.30 _City Streets 'C1-1 (6) C1-1.31 Roadway Cl-1 (6). C1-1.32 Gravel Street C1-1 (6) J . ' C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2 (1Y C2-2.2 Interpretation of Quantities C2-2 (1) C2-2.3 Examination of Contract Documents and Site C2-2 (2) C2-2.4 Submitting of Proposal C2-2 (3) C2-2.5 Rejection of Proposals C2-2 (3)= C2-2.6- Bid Security C2-2 (3) C2-2. 7 Delivery of Proposal C2-2 (4) C2-2. 8 Withdrawing Proposals C2-2 (4 ) C2-2. 9 Telegraphic Modification of Proposals C2-2 (4 ) C2-2.10 Public Opening of Proposal C2-2 (4 ) C2-2. 11 Irregular Proposals C2-2 (4 ) C2-2.12 Disqualification of Bidders C2-2 (5 ) C3-3 AWARD AND EXECUTION OF. D000MENTS C3-3. 1 Consideration oflProposals C3-3 (1) C3-3. 2 Minority Business Enterpise Women-Owned Business Enterprise compliance C3-3 (1 ) C3_3. 3 Equal Employment Provisions . C3-3 (1) C3-3. 4 Withdrawal of Proposals C3-3 (2.) C3-3.5 Award of Contract C3-3. (2 ) C3-3. 6 Return of Proposal Securities C3-3 (2) C3-3. 7 Bonds- C3-3 (2) _ C3-38 Execution of Contract C3-3 (4 ) C3-3. 9 Failure to Execute Contract C3-3 .(4 ) C3-3. 10 Beginning Work C3-3 (4_) C3-3.11 Insurance C3-3 (4 ) C3-3.12 Contractor.'Is Obligations C3-3 1 7 ) C3-3.13 Weekly Payroll C3-3 -:(7) C3-3.14 Contractor 's Contract Administration C3-3 (7) - C3-3.15 Venue C3-1 (8')' C4-4 SCOPE OF WORK _. C4-4.1 Intent. of Contract Documents C4-4 (1) C4-4:. 2 Special' Provisions C4-4 . (l) C4-4. 3 Increased or Decreased Quantities C4-4 U) C4-4. 4 Alteration of Contract Documents C4-4 (2) C4-4.5 Extra Work 'C4-4 (2) C4--4.6 Schedule of Operations C4-4 (3) C4-4.7 Progress Schedules for Water and Sewer P1ant .Facilities C4-4 (4 ) C5-5 CONTROL OF WORK AND MATERIALS - a6k C5-5.1 Authority of Engineer C5--5 ;(1), C5-5. 2 Conformity with Plans C5-5 -'(1) ` C5-50 Coordination of Contract Documents C5-5 1-2) C5-5. 4 Cooperation of Contractor C5-5 (2) C5-5.•.5 Emergency and/or -Rectification Work C5-5 (3 ) C5-5.6 Field Office C5-5 (3) C5-5.7 Construction Stakes C5-5 (3) - C5-5.8 Authority and Duties of Inspectors C5-5 (4 ) C5-5.3 Inspection C5-5 (5) CS-5.10 Removal of Defective and Unaiithorized Work C5-5 (5) C5-5.11 Substitute Materials or Equipment -CS-5 (5) CS-5.12 Samples and Tests of Materials C5-5 (6) C5-5.13 Storage of Materials I . C5-5 (6) C5-5.14 Existing Structures and Utilities C5-5 (7) CS-5.15 ' Interruption of Service C5-5 (7) C5-5.16 Mutual Responsibility of Contractors C5-5 (8) C5-5.17 Cleanup •' C5-5 (8) C5-5.18 Final Inspection C5-5 (9) (7) r C6-6 .LEGAL RELATIONS AND PUBLIC -RESPONSIBILITY C6-6.1 Laws to be Observed C6-6 (1) C6-6.2. Permits and Licenses C6-6 (1 ) C6-6.:3 Patented Devices, Materials and Processes C6-6 (1) C6-6.4 Sanitary Provisions C6-6 (2) C6-6.5 Public Safety and Convenience - C6-6 (2) C6-6.6 Privileges of Contractor in Streets, Alleys, and Right-of-Way C6-6 (3 ) C6-6.7 RailwayjCrossings ' C6-6 (4 ) C6-6.8 Barricades, Warnings and Watchmen C6-6 (4 ) C6-6.9 Use 'of Explosives, Drop Weight, etc. C6-6 (5) C6-6.10 Work Within Easements C6-6 (6 ) C6-6.11 Independent Contractor C6-6 (8) C6-6.12 Contractor ' s Responsibility for Damage Claims C6-6 (8 ) C6-6.13 Contractor ' s Claim for- Damages C6-6 (10) C6-6. 14 Adjustment of Relocation of Public Utilities, •etc. C6-6 (10) C6-6.15 Temporary Sewer Drain Connections C6-6 (10) C6-6.16 Arrangement and Charges of Water Furnished by City C6-6 (11) C6-6. 17 Use of a Section of Portion of the Work C6-6 (11) C6-6.18 Contractor's Responsibility for Work C6-6 (11) C6-6.19 No Waiver of Legal Rights C6-6 (12) C6-6. 20 Personal Liability of Public Officials C6-6 (12) C6-6.21 State Sales Tax C6-6 (12) C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7 (1) C7-7.2 Assignment of Contract C7-7 (1) j C7-7.3 Prosecution of the Work C7-7 (1) C7-7. 4 ' Limitations of Operations C7-7 (2) C7-7.5 Character of Workman and Equipment C7-7 (2) C7-7.6 Work Schedule C7-7 (3 ) C7-7.7 Time of Commencement and Completion C7-7 (4) C7-7. 8 Extension of time of Completion C7-7 (4) C7-7.9 Delays C7-7 (4) } C7-7.10 Time of Completion C7-7 (5) C7-7.11 Suspension by Court Order C7-7 (6) C7-7.12 Temporary Suspension C7-7 (6) C7-7.13 Termination of Contract due to National Emergency C7-7 (7) C7-7.14 Suspension of Abandonment of the Work and Annulment of Contract C7-7 (7) C7-7.15 Fulfillment of Contract C7-7 (9 ) C7-7.16 Termination for Convenience of the Onwer C7-7 (10) C7-7.17 Safety Methods and Practices C7-7 (13 ) C8-8 MEASUREMENT AND PAYMENT C8-8.1 • Measurement of Quantities C8-8 (1) C8-8. 2 Unit Prices C8-8 (1) (3 ) C8-8 . 3 Lump SUM C8-8 (1) C8-8. 4 Scope of Payment C8-8 (1) C8-8 .5 Partial Estimates and Retainage C8-8 (2) C8-8 . 6 Withholding Payment C8-8 (3) C8-8 .7 Final Acceptance C8-8- (3) C8-8 . 8 Final Payment C8-8 (3) C8-8 . 9 Adquacy of Design C8-8 (4) C8-8 .10 GeneraliGuaranty C8-8 (4) C8-8 .11 Subsidiary Work C8-8 (5) C8-8;12 Miscellaneous Placement of Material C8-8 (5) C8-8 .13 Record Documents C8-8 (5) 64 f, w • A � I1 (4) PART C - GENERAL CONDITIONS owl Cl-l: DEFINITIONS. a 111 SECTION.'Cl-'l DEFINITIONS Cl--1 . 1 DEFINITIONS OF TERMS : Whenever in .these Contract -�� Documents the following- terms' or pronouns in place of them. are used , the intent and meaning . shall be understood and .. interpreted as follows: 3 C1-1. 2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents , such as specifications , bonds , addenda , plans , etc . , which govern the teems and performance of the contract . •These are- contained in the General Contract Documents and the Special Contract. Documents. a. GENERAL CONTRACT DOCUMENTS : The General Contract Documents govern all Water Department Projects and include the following items: 1� PART A - NOTICE TO BIDDERS (Sample) White PART B - PROPOSAL .(Sample] White -� PART C. - GENERAL CONDITIONS (CITY) Canary Yellow (Developer) Brown ` PART D - SPECIAL CONDITIONS Green PART E - SPECIFICATIONS El-White, E2-Golden Rod E2A-White PERMITS/EASEMENTS Blue PART F - BONDS (Sample) White 1 PART G - CONTRACT (Sample). White b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General 'Contract Documents and include the following -itemst PART A -. NOTICE TO BIDDERS (Advertisement) Same as above PART B - PROPOSAL (Bid) PART ,C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS a PART G - CONTRACT PART H - PLANS (Usually bound separately) C1-1 (1) C1-1 . 3 NOTICE TO BIDDERS : All of the legal publications r either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the _ notice to bidders. 9 . C1-1. 4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the `Owner desires to have done, together with the bid security, constitutes the Proposal , which becomes binding upon the Bidder when -it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. C1-1 . 5 BIDDER: Any ,person , persons , firm, partnership, company, association, corporation, acting directly 'or through a duly authorized representative, submitting a proposal for performing. the work contemplated under the Contract Documents , I T constitutes. a bidder. C1-1. 6 GENERAL. CONDITIONS : The. General Conditions are the usual construction and contract requirements which govern the performance -of the work so' that it will be carried on in accordance with the customary procedure, the local statutes , and requirement`.s' of the City of Fort Worth' s charter and promulgated ordinances. Wherever there may be a conflict between the General Conditions and Special Conditions , the latter shall take pregedence and shall govern.. C1-1 . 7 SPECIAL CONDITIONS: Special conditions are the specific requirements which are necessary for the particular project covered by the .Contract Documents and not specifically covered in the General Conditions. When considered with the Genera-1 Con'di tlons and other elements of the Contract J Documents -they 'pr.ov,ide the information which the Contractor and Owner should have in order to. gain a thorough knowledge of � the project. C1-1. 8- SPECIFICATIONS:' The Specifications is that section or part of the Contract Documents which .sets forth in detail the requirements which must be met- by` all materials, °construction, workmanship, equipment and services in order to re-nder a completed and useful project. Whenever reference is made to standard specifications, regulations, require ments,• 'statutes, etc . , such referred to documents shall become a.*-.part of the Contract Documents just as though they 'were embodied °therein. C1-1. 9 BOND: The bonder bonds are the written guarantee or security furnished by the Contractor for the prompt and Cl-1 (2) faithful performance of the contract And include the following: a. Performance Bond .(see paragraph C3-3.7) b. Payment Bond (see paragraph .C3-3 .7) C. Maintenance Bond (see' paragraph 'C3-3.7) d. Proposal or Bid Security (see Special Instructions to Bidders, Part A and C2-2.6) C1-1.10 CONTRACT: The Contract.. is the formal signed agreement between the Owner and the Con-t^ractor . covering the mutual understanding of the two contracting .parties about the project_ to be completed under the Contract Documents. C1-1. 11 PLANS: The plans are the drawings or reproductions therefrom made by the Owner's representative showing in detail the location, dimension and position of the various elements ` of' the project , including such profiles , typical cross-sections, layout diagrams, working drawings, preliminary. ;.% drawings and such supplemental drawings as. the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authotized. by the Owner. The plans are usually bound separately from other parts' of the Contract Documents , but they are a part of the Contract Documents just as thoug'h 'they"were bound therein.. C1-1 . 12 CITY: The City o.f Fort Worth, Texas, a municipal corporation, authorized and chartered under the Texas State Statutes, acting by and through its' governing .body or its City Manger, each of which is required by charter to perform specific duties . Responsibility for final:-'enforcement of Contracts. involving' the City of Fort Worth :is'-by Charter vested in the .dity Manager. The terms City and Owner are synonymous. C1-1 . 13 CITY COUNCIL: The duly elected and qualified governing body of the City of Fort Worth, Texas. • C1-1. 14 MAYOR:: The officially elected Mayor, or in his absence, the Mayor Pro tern of the City of Fort Worth, Texas. C1-1. 15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth , Texas , or his duly authorized representative. 7 C1-1.16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas , or his duly authorized representative. Cl-1 (3) C1-1 . 17 DIRECTOR OF PUBLIC WORKS: The duly appointed official of -the City of Fort Worth, referred to in the Charter as the City Engineer, or his duly authorized- representative. C1-1. 18 DIRECTOR , CITY WATER DEPARTMENT: The duly appointed Director of the City Water Department of the City of Fort �I Worth , • Texas , or' hi's duly authorized representative , r . assistant, or agents. ` Cl-1,.19 ENGINEER: The Director. o.f'Public Works',' the Director of the Fort Worth City Water'' Department , or their duly authorized assistants , agents , engineers , inspectors , or superintendents , acting within the scope of the particular duties entrusted to them. .C1-1 . 20 CONTRACTOR: The person , persons , partnership , company, firm, association, or corporation , entering into a . contract with the Owner for the execution of the work, acting directly or through a duly authorized representative. A sub-contractor is a person, firm, corporation, or others under contract with the -principal ,contractor , supplying labor and materials or only labor, for work at the site of the project. C1-1 . 21 SURETIES: The Corporate bodies which are bound by ^l such bonds are required with 'and' for the Contractor . The t J sureties engaged are to be fully.,responsible for the entire and satisfactory fulfillment. of the Contract and for any and Pik all requirements- as set forth in the Contract Documents and approved changes therein. C1-1. 22 .THE WORK OR:*PROJECT: The completed work contemplated in and -covered by the Contract Documents, including but not. �. limited to the .furnishing of all labor, materials, tools , equipment, and incidentals necessary to. produce a completed and serviceable project. ° C1-1. 23 WORKING DAY: A working day is defined as a calendar day, not including Saturdays, Sundays , and legal holidays, in which the weather or other conditions not under the -control 'of, the Contractor permit the performance of the principal unit of work for a period of not less than seven (7 ) hours between 7 : 00 a.m. and 6 : 00 'p.in. , with exceptions as permitted in paragraph C7-7.6. C1-1. 24 CALENDAR DAYS : A calendar day is any day of the week or month, no .days being excepted. C1-1. 25 LEGAL HOLIDAYS: Legal holidays shall be observed as prescribed by the City Council of the City 'of Fora Worth for observance by City employees as follows:' _. C1-1 (4) E 1. New Year's Day January 1 2. M. L. King, Jr. Birthday Third Monday in January 3. Memorial Day Last Monday in May - 4. Independence -Day July 4 x 5. Labor Day First Monday in September 6. Thanksgiving Day Fourth Thursday in Novvember 7. Thanksgiving Friday Fourth Friday in November 8. Christmas Day December 25 9. Such other days in lieu of holidays as the City Council may determine When one of the above named holidays or a special holiday 'is declared by the City Council, falls on Saturday, the holiday' shall be observed on the preceding Friday or if it falls on- Sunday, it shall be observed on the following Monday, by those' employees working on working day operations : Employees working calendar day operations will consider the calendar holiday as the, holiday. C1-1. 26 ABBREVIATIONS : Wherever the abbreviations defined herein appear in Contract Documents, the intent and meaning shall be as follows: AASHTO - American Association of MGD - Million Gallons Per State Highway Transportation Day Officials . ASCE - American Society of Civil CFS Cubic Foot per Engineers Second LAW - In Accordance With ASTM - American Society of Min - Minimum Testing Materials Mono.- Monolithic AWWA - American. Water Works % Percentum Association R - Radius ASA - American Standards Association I.D. - Inside Diameter HI Hydraulic Institute O . D . - Outside ' Diameter - Asph. Asphalt Elev.- Elevation Ave. - Avenue- F - Fahrenheit Blvd.. Boulevard C - Centigrade CI - Cast Iron In. - inch CL - Center Line Ft. - Foot GI - Galvanized Iron St. - Street Lin. - Linear or Lineal CY - Cubic Yard lb. - Pound Yd. - Yard MH - ' Manhole SY - Square Yard Max. - Maximum L.F. - Linear Foot D.I. - Ductile Iron C1-1 (5) C1-1 . 27 CHANGE - ORDER : A " Change Order " is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and.'which was not specifically included 'in the scope of the project on, which bids were submitted. 4Increase in unit quantities stated in the proposal are not the subject matter of a Change :Order unless the increase or dr-c-rease is more than of the amount of the particular item or items in the original proposal. All "Change Orders " shall be prepared by the City from information as necessary furnished by the Contractor. C1-1. 28 - PAVED STREETS AND ALLEYS : A paved. street or alley shall be defined as a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: 1.. Any type. of asphaltic concrete with or without � . separate base material. 2. Any type of asphalt surface treatment , not including an oiled surface , with or, without #` separate base material. Brick, with or without separate base material. 4. Concrete, with or without separate base material. 5. Any combination of the above.. C1-1. 29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, roadway or, other surface is :any _area- except those defined above for "Paved Streets and Alleys. " C1-1430 CITY STREETS:` A city street is defined ,as that area between the right-of-way lines as the street is dedicated. C1-1. 31 ROADWAY: The roadway is defined as the area between parallel lines two ( 2 ' ) feet back. of the curb lines or four (4 ' ) feet back of the average edge of pavement where no curb exists. CI-1. 32 -GRAVEL STREET: A gravel street is any unpaved- street to which has been adaed one or more applications of gravel or similar material other than the natural material found on the street surface before any improvement was made. - Cl-1 (6) SECTION C .- GENERAL CONDITIONS C2-2 INTERPRETATION AND i PREPARATION OF PROPOSAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2. 1 PROPOSAL FORM: The Owner will furnish bidders with proposal . form, which will contain an itemized list of the items of work 'to be done or materials to be furnished and upon which bid °prices are requested. The Proposal form will state the Bidder ' s general understanding of the project -to be completed, provide a space for furnishing the amount of bid security , and state the basis -for en'ter'ing into a formal contract'. The Owner will furnish forms for the Bidder ' s "Experience Record, " "Equipment 'Schedule, " and "Financial Statement," all of which must be -properly executed and filed } with the Director of the City Water Department one week prior • to the hour for opening of bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued.. by an appropriate 'state licensing agency, and shall have been so prepared as to reflect the current •fihancial status. This statement must be current and not more than one (1 ) year old. In the case that a bidding date falls -w. thin the time a new statement is being prepared, the previous stat'emen't "Ahali be updated by- 'proper -verif icatidn: Liquid assets in the amount of ten (10W) percen-t of the- estimated- project cost will be required. For an- experience- record to be considered to be acceptable for a given project, it must reflect -the'.''experience.' of the firm seeking qualification in work of both the same 'nature and magnitude as that of the project` for which bids are to be received, and such e1xperienc.e must have been on projects completed not more than five "(5 ) years prior to the date on, which are to be received , The Director of the Water department shall be- sole judge as to the acceptability': of experience - for- qualification to bid on any Fort. Worth Water Department project; The prospective bidder shall schedule the ' equ'ipment he has available for the project and state that he will rent such additional equipment as may be required to complete the ti project on which he submits a bid. C2-2.2 INTERPRETATION OF QUANTITIES: The quantities of work and materials to be furnished as, may be listed in the proposal C2-2(1) forms or other parts, of . the Contract Documents will be considered as approximate only and will be used for the �. purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in .strict accordance with the Contract Documents and Plans . The quantities of work to be performed and materials to be furnish d may be increased or.. decreased as hereinafter provided , without in any way invalidating the unit prices. bid or any other requirements of the Contract Documents. C2-2 . 3 EXAMINATION OF, CONTRACT DOCUMENTS AND SITE OF PROJECT rs .are advised that the Contract Documents on file with B�.dde _ the Owner shall constitute all 'of the information which the Owner will furnish. All additional information and data. which the owner w` 11 supply after prom ulg ation of the formal contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original . Contract Documents. M A . Bidders ar`e required, prior to the,filing of proposal, to read -. ] and become .familiar with the Contract Documents, to vis;t••the site of the project and-'-examine carefully all local conditions , to inform themselves by their own independent research and i-nve.s.tigatipns, .tests, boring, and by such other means as may be necessary to gain a complete, knowledge of the conditions,._pr which wrll , be encountered during the construction m .J of the'; ject . They must judge for themselves .th_e J difficulties of the work and all attending circumstances affecting the cost of doing the work or the time required for its completion, and obtain,-all information required to make, an,!, intelligent proposal. No information given by the Owner.: or any representative of 'the. Owner other than, that .contained ,in, - the Contract Documents and officially promulgated addenda .� thereto, -shall be binding*.upon the. Owner. Bidders shall rely exclus,ive.ly and solely upon their own, estimAtes ,:, investgation , _.research, tests, explorations, and other data i which are necessary for full and complete information -upQ.n which the proposal is to be ,based. It is mutually agreed that the submission of a proposal is prima-facie evidence that the bidder has made the investigations , examinations and tests herein required. - Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the .Contract Documents will not be allowed. The. logs of Soil Borings, , if any, showing on the -plans are for general information only and may not be correct. Neither the d C1-2(2) Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist. C2-2. 4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the- project contained. in the form shall be correctly filled in and the Bidder shall state the prices , written, in ink in both words and numerals , for which he proposes 'to do the work contemplated or furnishe the materials required. All such prices shall be written legibly. In case ( of discrepancy between the price written in words and the price written in numerals, the price most advantageous to the City shall govern. If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly authorized agent.. If a proposal is submitted by a firm, association,. or partnership, the name and address_ of each member must be given , and the proposal must be si:gned.- by a member of the firm, association , or partnership , or , by a person duly authorized . If a proposal is submitted by a company or corporation, the company or corporate name and business address :rust be given, and the proposal signed by an official or duly authori.zed agent. The corporate seal must be' . aff ixed.. Power of Attorney authorizing , agents or others to sign proposal must be properly certified and must be in writing and submitted withthe proposal: C2-2. 5 REJECTION OF PROPOSALS: -Proposals may be re7ected if they show any alteration of words or figures, additions not called for; . conditiofial•. or unca,lle'd for alternate~ bids, incomplete bids, erasures , or ir,.r,egular.iti.es of, any kind, or contain unbalance' value of -any" items. Proposal tendered or delivered after °•`the official time designated -for receipt of proposal shall be returned to the Bidder unq ened. C2-2 .4 BID• SECURITY: No proposal .will, .be 'considered unless., it is accompanied by a "Pr'oposal Security"' of the character, and in the amount indidated in the "Notirce to Bidders" and -the "Proposal . " The Bid .Security is required by, the Owner as I evidence of good fai�h o'n the impart, of the Bidder, and by way J of a .gua_ranty that if awarded the contract, the Bidder will within the required time execute `a -formal contract and furnish the required performance and other bonds. The bid security of the three lowest bidders will be retained until the contract is awarded or other disposition. 'is made. :thereof. The bid Vsecurity I of all other bidders may be returned promptly after the canvass of ~bids. C2-2(3 ) VJ C2-2 :7 DELIVERY OF PROPOSAL: No proposal will. 'be considered unless it is delivered, accompanied by its proper. Bid. Security, to the City Manager or his representative in the 1 official place of business as set forth in th-e "Notice to Bidders . " It is the Bidder ' s sole responsibility to deliver the proposal at the proper time to the proper place. The mere 1 fact that a proposal was dispatched will ngt be considered. The Bidder' must have the proposal actually delivered. Each proposal shall be in a' sealed envelope plainly marked with the 11 word "PROPOSAL," and the name or description of the project as. J designated in the "Notice to Bidders. " The envelope. shall be addressed to the City Manager, City Hall, Fort. Worth, Texas. •� C2-2. 8 - WITHDRAWING PROPOSALS: Proposals actually filed with the City Manager cannot be withdrawn prior to the time set for opening proposals , •A request for non-consideration of a � . proposal must be made in writing , ad.dresse,d to the City Manager , and f i�led with him prior to, the time set fo.r the opening of proposals., After all proposals not requested :for n s on-conideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly. filed may, at the option 'of ' the Owner, be returned unopened. C2=2. 9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may, his proposal by telegraphic communication_ at any prior to° the' time set for opening' proposals, provided such telegraphic-communic-Ation is received by the City Manag e AW prior to the said proposal opening time, and provided further, ^� that the City Manager is satisfied that a.-written and duly J authenticated confirmation of such telegraphic" communication over the signature of the bidder w-as .�mailed 'prior to the ' proposal opening time. If sugh confirmation is ;not received within forty-eight (48) hours. after .the proposal opening time., ' no further consideration will be given to the proposal. ,. C2-2. 10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly filed and for which no "Non-consideration Request" has been received will``be` . .ublicl , p y, opened and ' - ead aloud tai f the City Manager or, his authorized representative at' th:e trine J and place indicated in the "Notice, to ,Bidders,ld All proposal� which have been open �i ed and read will remain on ile with the. Owner until the -contract has been awarded. Bidders or their authorized representatives are invited to be present ':for' the opening of bids., C2-2.1.1 IRREGULAR PROPOSALS: Pro P osals shall be-' considered as being "Irregular"' .if they show any omissions , alterations of form, additions , or conditions not called for, unauthorized -� alternate bids, or - irregularities of any kind. However,` the 7% C2-2(4) _ - MOO Owner reserves the right to waive any and all irregularities and to make the award of the contract to the best interest of the City. Tendering a proposal after the closing hour is an irregularity which cannot be waived. C2 -2 . 12 DISQUALIFICATION OF BIDDERS : Bidders may be disqualified and their proposals not considered for any of , _ but not limited to, the following reason: a. Reasons for believing that collusion exists among bidders. b. Reasonable grounds for believing that any bidder is 6 •r interested in more than one proposal for work contemplated. C. The bidder being interested in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. d. The bidder being in arrears on any existing contract F or having defaulted on a previous contract. e. The bidder having performed a prior contract in an unsatisfactory manner. f. Lack of competency as revealed by the financial statement, experience record, equipment schedule , and such inquiries as - the Owner may .see fit to make. g. Uncompleted work which, in the judgment of the .Owner, will prevent or hinder the prompt completion of additional work if awarded. h. The bidder not filing with the Owner, one week in advance of the hour of the opening of proposals the following: . �J1. Financial Statement showing the financial condition of the bidder as specified ingPart "A" - Special Instructions. J� 2. A current experience record showing especially the projects of a nature similar to the one under consideration , which have been KI successfully completed by the Bidder. 3. An equipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of a bidder who, in• the judgment of the Engineer , is disqualified under -the requirements stated herein, shall be set aside and not opened. J J C2-2(5) J l } 7 ' , ` � ` � � � i � ` ] " � � { h � ` ] ' � � J , � , � s J ` � . PART C - GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3 . 1 CONSIDERATION OF PROPOSALS: After proposals have been k opened and read aloud, .the proposals will be tabulated on the basis of` the quoted prices , the quantities shown in the proposal, and the application of such formulas or other methods of bringing items to 'a .common basis as may be established in the Contract Documents.. r^. The total obtained by -taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum items. and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the award of the contract is made by the Owner, the right will be reserved to reject. any or all proposals and waive technicalities, to re-advertise for new proposals,. or to proceed with the work in any manner as maybe considered for the best interest of the Owner. C3-3 . 2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner; upon request , complete and accurate information' regarding actual work performed by a Minority Business Enterprise (MBE) and or a a Woman-owned Business Enterprise (WBE) on the contract and the payment therefor. Contractor further agrees, upon request by Owner , to allow and audit and/or an examination of any books, records, or files in the possession of Contractor that will substantiate the actual work performed by the MBE or WBE. Any material misrepresentation of any nature will be grounds for termination of the contract -and for initiating any action under appropriate federal , state or local laws and ordinances relating to false statements; further , any such misrepresentation may be grounds for disqualification of Contractor at Owner ' s discretion for bidding on future Contracts with the Owner for a period of time of not less than six (6 ) months. C3-3 . 3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall comply with Current City Ordinance prohibiting discrimination in employment practices. C3-3 (1) tE S ` The Contractor shall post the required notice to that effect on the project site , and, at his request , will be provided assistance by the City of Fort Worth ' s Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. C3-3 . 4 WITHDRAWAL OF PROPOSALS : AAer a proposal has been read by the Owner it cannot be .withdrawn by the Bidder within forty-five ( 45 ) days after the date on which the proposals were opened. C3-3 .5 AWARD OF CONTRACT: The Owner reserves the right to withholdfinal action on the proposals for a reasonable time, not - to exceed forty-f ive ( 45 ) days after the date of opening proposals, and in no event will an award be made until after investigations have been made as to the respons.ibility., of the proposed awardee. The award of the contract, if an award is made, will be to the lowest and best responsible bidder. , The award of the .contract shall not. become effective until the Owner has notified the Contractor in writing 'of such award. C3-3 . 6 RETURN OF PROPOSAL SECURITIES: As soon as proposed price totals have been determined for comparison of bids , the Own'er .may, : at its discretion, return the proposal security r] M4 which accompanied the proposals which, in its judgment, would not: be considered for the- award. .-All other proposal= securities, usually those of the three lowest bidders, will- be retained by the Owner until the required, contract has been _J executed and bond furnished or the Owner has other'wis e J ' .disposed 'of the bids, after which, they will be '.returned by the 'City Secretary. 1 , C3-3 .7 BONDS : With the execution and delivery of the Contract ., Documents, the Contractor shall furnish to, and file with the owner in the amounts herein required, the following bonds: ! _! a. PERFORMANCE BOND : A good and suf.f icient: performance bond in an amount not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation o'r otherwise , guaranteeing the• full and faithful execution.-of the work -and performance of the- contract, and for 'the protection of the Owner and all other persons against damage by reason of negligence' of the Contractor, or improper execution of the work or the use of inferior materials . This performance C3-3 (2) -' bond shall guarantee the payment for all labor, .materials, equipment, supplies , and services used in the construction of the work, and shall remain " in full force and effect until provisions as above stipulated are accomplished and final payment is made on the project by the City, b. MAINTENANCE BOND : A good and sufficient. maintenance bond, in the amount of not less than - 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt , full and faithful performance of the general guaranty which is set forth in paragraph C8 4.10. * C. PAYMENT BOND: A good and sufficient payment bond, in an amount not less than 100 percent of the amount of the contract , as evidenced. by the proposal- tabulation or otherwise, guaranteeing " the. prompt, full -.and faithful payment' of all claimants, as defined in Article 5160, Revised Civil Statutes of Texas , 1925 , as amended by House. Bill 344 'Acts 56th Legislature, Regular Session, 1959 , effective April 27, 1959 , and/or the latest version thereof, [ supplying. labor and materials in the prosecution of the work provided for in the contract being 7 constructed under these specifications . Payment Bond shall remain in force until all payments` as above stipulated are made. d. OTHER BONDS : Such other bonds as may be required by these Contract Documents shall- be furnished by. the Contractor. No sureties will be accepted by the Owner which are. at the time in default or delinquent on .any bonds or which are interested. in any litigation against the owner. All bonds .' shall be made the' forms furnished by the Owner and shall be J executed .-by an approved surety. company doing business in the City of Fort Worth, Texas, and which is acceptable to the owner'. In order to be acceptable, the name of. the su�.ety shall be included on the current U. S . Treasury list of acceptable sureties, and the amount of bond written by any one acceptable company shall not .exceed the amount shown on the Treasury list for that company. Each bond shall be properly executed by both the .Contractor and Surety Company. Should any surety on- the contract be determined unsatisfactory. at any' time by the Owner, 'notice will be given . the Contractor ' to that effect and the Contractor shall immediately provide a 6�ii�A' ff new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or ; sureties , as required, have qualified and have been accepted by the Owner . The contract. shall not be operative nor will any payments be due orpai,d until approval of� the bonds by the Owner: • a C3-3 . 8 EXECUTION OF CONTR4CT: Within ten (10) days after the Owner has by appropriate resolution.,: or otherwise, awarded the cor't,ract•, the Contractor shall execute and file with the Owner the, and such bonds as may be required -in. the Contract Documents„ No -contract shall. be binding •upon the owner until it has been attested bYthe City Secretary , approved as to form and legality by the City Attorney, and executed for the Owner by either, the 'Mayor or .City Manager. C3-3 . 9 FAILURE .T,O. EXECUTE. CONTRACT : The failure of the P Awardee to execute the required bond or bonds or . to sign the required contract within ten (10 ) days after the contract is awarded shall be considered by' the Owner as an abandonment of. his proposal, and the Owner -may annul the Award. By- reason of the uncertainty of the market prices of material and labor , and .,it bein'g impracticable and difficult to accurately detefthine -the amount of damages occuring to the Owner by .� reason of said awardee' s failure to execute said bonds and .` contract within ten ( l.p0 days,,, the proposal security accompanying 'the proposal shall be the agreed amount of damages which Owner-will. suffer by reason of such failure on the part• of the Awardee and shall thereupon immediately be forfeited to the Owner. The fili:n'g of a proposal will be considered as an acceptance of this provision by the Bidder. C3-3 . 10 BEGINNING WORK: The Contractor shall not commence work until -authorized in writing to do so by the Owner ., Should the Contractor fail to commence work at the site of the. project 'wi"t.hi,in the time in the written authorizati.Qn usually . termed the "Work Order" or "Proceed Order", _it it agreed that the Surety Company will; within ten ( 10 ) days after the commencement, date set forth in such written auiih'orization, .commence the physical execution of the .contract: C3-3 .11 INSURANCE The Contractor shall, not commence work Y under this contract until 'he has obtained all the insurance required - under the- Contract Documents, and such insurance has been approved, by the Owner. The prime Contractor shall be responsible for delivering to the Owner the sub-contractors ' C3-3 (4) certificate of insurance for approval . The prime contractor shall indicate on the certificate of insurance included in the documents for execution whether or -not his insurance covers sub-contractors . It is the intention of the Owner that the insurance coverage require& herein shall include the coverage of all sub-contractors. ' a•. COMPENSATION INSURANCE : The Contra6tor shall r maintain, during the life of this contract , Workers ' Compensation Insurance on all of his employees to be engaged in work on the project under this contract, and for all sub-=contractors. In case any class of employees engaged in hazardous work on the project under this contract is not protected under the Workers ' Compensation Statute, = the Contractor shall provide adequate employer' s Y general liability insurance for- the protection of such of his employees not so protected. b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor shall procure ands shall maintain during the life' of this ' contract Contractor ' s ' Comprehensive General Liability ` Insurance (Public Liability and Property Damage Insurance) in an amount not less than $ 500 , 000 covering each occurrence on account of bodily injury;{ including death, and in an amount not less- than $500 , 000 - covering each occurrence on account of property . - damage with $2,000,000 umbrellA. policy ..coverage. Eft i c. ADDITIONAL LIABILITY_ : The Contractor shall furnish insurance as" separate policies or by additional e-ndorsement to one of the above-mentioned polici_es,. and i.n. ,the amount as set forth- for public liability and property damage, the following insurance: 1. Contingent Liability ( covers General Contr actor "P Liability f'or acts of sub-contractors).: 2. Blasting, pribt to any blasting being done. 3. Collapse of buildings or structures adjacent to excavation ( if excavations are to be -.Perfornred:_ad 'aeent to same) . s 4 . Damage to underground utilities for $500,000. i -. C3-3 (5) . a 5. Builder's risk (where above-ground structures are involved) . 6 . Contractual Liability ( covers all indemnification requirements of Contract) . `1 • d. AUTOMOBILE .INSURANCES BODILY INJURY AND PROPERTY fJ DAMAGE: The Contractor shall procure and maintain , during the life of this Contract, Comprehensive Automobile Liability insurance in• an amount not less than $.2.50 , 000 for injuries including µ accidental death to any one person and subject to the ..same limit for each person an amount. not less than $500 ; 000 oni account 'of one accident , and automobile property, damage insurance in an amount not less than $100,000. • e. SCOPE OF INSURANCE AND SPECIAL HAZARD : The insurance required. .under the above.paragraphs shall provide adequate protection for the Contractor and his sub-contractors , respectively, against damage claims which may arise from'o.perations under this contract, whether: such operations 'be by,; the insured or by anyone directly 'or ,indirectly employed by him, and also against any of the following special �} hazards which may be encountered in .the -performance of the Contract:,. f. PROOF OF CARRIAGE OF :INSURANCE: The Contractor �* shall furnish the Owner with satisfactory proof of. coverage by insurance requir-ed in these Contract• i^ ,Documents .,.in amounts and;-by_ carriers satisfactory .., to the Owner.. (SampJe;.;attac.h:ed.-4Y All insurance J requirements made upon the Contractor shall apply to the sub- oontrac,tor , �4hould th'e Prime . Contractor ' s insurance not cover ° • the sub-contractor's work operations.. g. LOCAL AGENT FOR- 1NSUR41ME- AND BONDING : The insurance and bohdihl companies with whom the Contractor ' s insurance a,nd performance, payment, maintenance and all such other bonds are written - shall be represented by an agent or agents having an office located within the city limits of the i - C3-3 (6) * City of Fort Worth, Tarrant County, Texas . Each such agent shall be a duly qualified, one upon whom service of process may be had , and must have authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort Worth , or any other .claimant, any claims that tpe City of Fort Worth or other claimant or any property owner who has been damaged , may have against the Contractor , insurance, and/or bonding company. If. the local insurance representative is not so empowered by the insurance or bonding companies, then such ,authority must be vested in a local agent or claims .officer residing in the Metroplex, the Fort Worth-Dallas area . The name of the agent or agents shall be set forth on all of such bonds and cer-tif icates of insurance. C3-3 .12 CONTRACTOR' S OBLIGATIONS : Under the Contract, the :Contractor shall pay for all materials , labor and sarvices_, 'when -due: k J C3-3 . 13 WEEKLY PAYROLL: A certified .copy of each payroli . covering payment of wages to all person engaged in- work. on the project at the 's1te 'of the project shall be furnished to .the Owners" representative within seven ( ?) days after-'the .close of -each p`ayiroll period. A copy or copies' of the applicable minimum .wage, rates as set forth in the Contract Documents shall be kept posted in a conspicuous place at the site of' the project at all times during the course of • th'e ` ContrAct• Copies of the wage rates will be furnished the Contractor,°`by the Owner; however, posting and protection%'V'of the wage rates J shall• be the responsibility 'of the` Contractor. C3-3 .14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor, whether a person , persons , partnership , company, firm, association , corporation or other who is approved to do- business with and enters into a contract with the City for' construction of water and/or sanitary sewer facilities, will' have or shall establish a fully operational business office within the Fort Worth-Dallas metropolitan area . The Contractor shall charge, delegate, or .assign this office• (or J 'he may delegate his Project Superintendent ) with full authority to transact all business actions required in the performance of the Contract. This local authority shall be made responsible to act for the Contractor in. all -matters pertaining to the work governed by the Contract whether it be ' administrative or otherwise and as such shall be empowered, thus delegated and directed, to settle all material, labor or other expenditures, all claims against the work or any other C3-3 (7) matter associated such as maintaining adequate and appropriate insurance or security coverage for the project . Such local authority for administration of the work under the Contract S 11 be ma}ptained until all business transactions executed as part of the Contract are complete. Should the Cont,ractor ' s principal., b&se of operations be other than in the Fort Worth-Dalla-q metropolitan :area, notification of� -the Contractor ' s aa,signment -- of 166al authority shall be made" in writing to the Engineer in adv4nce o any,, work on the pr.oject`,' aTSI ,appropria.te y signed ,and sealed, as applicable, by t he Contractor ' s ' responsible officer.", with the understanding that this written assignment of authority to a local representative shall'. become pant' of' the project Contract as though; bound clixectly into the project documents . The a intent of these requirements is that all matters associated with. the Contractor ' s administration , whether it be oriented in furthering the, work, or ,other, be.-governed direct: by local authority. This same requirement .is imposed on--,insurancgf and surety coverage. Should the Contractor 's local representative fa il to perform to the satisfaction of Engineer, the Engineer, , at his.,. sQle discretion , may demand that such local representati""ve be` replaced and the.. Engineer magi at his.so.le discretion', stop all work until a. new local autho.r.ity satisfactory-•to the Engineer `is °,assigned;. . No credit. of working time will be for periods., in which work stQppages- .ire in effect for this reasgn. C3=3..,1.5._VE`NUE,: Venue, of any actign_ heieinunder ..shaall be. ekclus WIely in. Tarrant County, Texas. B C3-3 (8 ) PART C - GENERAL CONDITIONS C4-4 SCOPE OF WORK SECTION C4-4 SCOPE OF WORK C4-4 . 1 INTENT OF CONTRACT DOCUMENTS : It is the definite intention of these Contract Documents to provide for a r complete, useful 'project -which the "Contractor undertakes to. construct or- furnish ,- all in f-ull compliance with the requirements and intent of the Contract Documents . It is definitely understood that the Contractor shall, do all work as provided -for in the Contract Documents, shall *do all extra or special work as may considered by the Owner as necessary tot complete the project in a satisfactory and acceptable manner.: The Contractor shall, unless Otherwise' specifically stated in these Contract Documents, furnish all labor, tools, materials, machinery, equipment, special services , and incidentals necessary to the prosecution and, completion of the project. C4-4 . 2 SPECIAL" PROVISIONS : Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General• or _Special` Condition's of these Contract. Documents be anticipated, ' or should there be any additional proposed work which is• not covered by, these ' Contract Document's, then "Special Provision's. " .covering all ' such work will b'e prepared by the Owner previous to th'e time of receiving bids or proposals for such work and furnishe& to the Bidder in the form of Addenda. All such "Special. Provisions" shall be considered to be a part of. the Con tract .Documen°ts just as though they were originally written therein. C4-4. 3 INCREASED OR DECREASED QUANTITIES: The Owner reserves the right to alter ° the quantities of_ the work to be performed or to extend or shorten •the •improvements at any time when and as found to be necessary, and the Contractor shall perform the . work as 'altered, increased or decreased at, the unit prices. Such increased or decreased quantity shall not be more than 25 percent of the contemplated quanti_ty.' of "such item or items. When - such changes increase or decrease. the original quantity of any item. or items of work to be done or materials to be furnished, by the 25 percent or More, then either party to the contract shall upon written request to the other party be entitled to a •revised"consideration upon that portion of the work above or, below `the-'25 percent of the original quantity- stated in the proposal; such revised .consideration to be determined by special agreement or as hereinafter provided "for "Extra Work. " No allowance will be made for any changes in anticipated profits nor shall such changes be considered as C4-4 (1) waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes -in depth categories , shall be interpreted herein as applying to the• overall quantities or sanitary sewer pipe in each pipe size',,-,.but not to the various depth categories.. C4-4 . 4 ALTERATION OF CONTRACT DOCUMENTS: By. Change Order, they �. Owner reserves the, right to make such changes in the Contract. Documents and in 'the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner, provided such changes. do not materially 4_ alter the original Contract. Documents or change the general nature, of the project as. a whole. Such changes shall not be considered, as waiving or . inval•_idating any condition , or provision of the ..Contract-Documents. C4-4 :5 EXTRA_ WORK: Additional work. made necessary by changes and alterations of the Contract' Documents or of quantities or for other reasons - for which no prices are provided i.0 the Contract Documents, shall 'be, defined as "Extra Work" and shall". J be , performed by the Contractor in accor` dance tith these Contract Documents or approved additions thereto;., provided,, ,. however, that before any' extra work is begun a "Change Order" shall .`be executed or written order issued by, .the. Owner -to do,,; the work for. payments or_ credits as shall be determined .by one or' more combination of the following methods: a. Unit bid price previously approved. b. An agreed lump sum. C. The actual reasonable cost of. (1). labor, (2) rental. of equipment used on the 'extra' work. for the time, so used at Associated General .Contractors of AinErica current equipment rental rates ; `( 3 ) materials entering permanently ` i.n,to the project, and .(4) actual cost ''of insurance`, bonds , and 'aoc `al security as determined •bi , tie Owner, plus a .fixed fee to be agreed upon but.not to exceed 10% of the actual cost_. of such, extra work. The .fixed fee is not to include any additional profit to ' t.he Contractor for rental of equipment owned by him, and used for the extra work. The fee shall be full and, complete compensation to cover the cost - of superintendence, overhead, F other profit, general•' and all other expense not included. in (1) , (2 ) ; l (3 ) , and (4 ) above. The Contractor shall keep J accurate cost records on the form and in the method C4-4 (2) !� suggested by the Owner and shall give the Owner � �� access to all accounts , bills , vouchers , and records relating to the Extra Work. No "Change Order" shall become effective until it has been approved- and signed by each of the Contracting parties. No claim for Extra Work of any kind will be allowed unless ordered in writing by the Owner . In case any orders or instructions , either oral or written, appear to the Contractor -t_ to involve Extra Work for which he should .. r'ecei've compensation, he shall make written request to the Engineer for written orders authorizing such Extra Work, prior to beginning -work eg g suc h fShould a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof , and the Engineer insists upon its performance, the Contractor shall ' r t . proceed with the work after making. written request for written orders and shall keep an accurate account of the actual. reasonable cost thereof as provided under method ( Item C ) . Claims. for extra work will not be paid unless the Contractor , shall file his claim with the Owner within five ('5 ) day.s before the time for making the first estimate after such work is done and unless the claim is supported by satisfactory vouchers and certified payrolls covering all labor and materials expended upon the said Extra Work. The Contractor shall furnish the Owner such installation records of all deviations from the original Contract Documents as may be necessary to enable the Owner to prepare for lpermanent record a cbrrected set of plans showing the actual JJ installation. The compensation agreed upon for 'extra work' whether or not iniitiated by a 'change order ' shall be a full, complete and final payment for all costs Contractor incurs as a result or. relating to the change or extra work, whether said costs are 1 known, unknown., foreseen or unforeseen at that time, including without limitation, - any costs for delay, extended overhead, ripple or . impact cost, or any other effect on changed or lunchanged work as a result or the change or extra work. J . C4-4 . 6 SCHEDULE OF OPERATIONS: Before commencing any work under this contract, the Contractor shall submit to the Owner and receive the Owner 's approval thereof, a "Schedule of Operations ; " showing by a straight line method the date of J commencing and . finishing each of the major elements of the contract. There shall be also shown the estimated monthly cost of work for which estimates are to be expected. There J C4--4 (3) � a shall be presented also a composite graph showing the anticipated progress of construction with the time being plotted horizontally and the percentage of completion plotted vertically. Theiprogress charts shall be prepared on 8-1/2" x 11" sheets and at least five black or blue line prints shall be furnished td the Owner. C4-4 . 7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES: Within ten (10 ) days prior to -submission of first - monthly progress payment , the Contractor shall prepare and submit to the Owner for approval six copies of the schedule in which the Contractor proposes to °carry on the work, the- date of which he will start the several major activities (including procurement of materials, plans, and equipment). and the contemplated dates for completing the same. The schedule shall be in the. form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses, the Contractor shall enter on the diagram the actual progress at the end of each partial payment period or at such intervals as directed by the Engineer. The Contractor shall also revise the schedule to reflect any adjustments in contract time approved by. the Engineer. Three copies of the updated schedule. shall . be delivered at such intervals as directed by the 'Owner. As a minimum, the construction.°schedule shall '-incorporate. all work elements and activities indicated in the proposal and in the .technical 'specifications. Prior to the final drafting of the detailed construction schedule, � the Contractor shall review the draft schedule with the Engineer to ensure the Contractor's understanding of the contract requirements. The following guidelines shall be adhered to in preparing the construction schedule: a. Milestone dates and final project completion dates shall be developed to conform to. time constraints , sequencing requirements and completion time. b. The construction process shall be divided into activities with time durations of approximately fourteen (14 ) days and construction values not to exceed $50 ,, 000 . - Fabrication , delivery and submittal activities are exceptions to this guideline. J C4-4 ( 4) • r C. Durations shall be in calendar days and normal k holidays and weather conditions over the duration of the contract shall be accounted for within the duration of each activity. d. One , critical path, -shall be shown on the construction schedule. e. Float time is defined` as the amount of time between the earliest start date and the latest, start , date of a chain of activities of the CPM construction schedule. Float time is not for the exclusive use. or, benefit of either the Contractor or the Owner. f. Thirty days shall be used for submittal review unless otherwise specified. The construction schedule shall as a minimum be.'divided into general categories as indicated in the Proposal .and Technical Specifications and each general category shall be broken down into activities in enough detail to achieve activities of approximately fourteen (14) days duration. For each general category, the construction schedule shall identify all trades or subcontracts whose work is represented by activities that follow the guidelines of this Section. For each of the trades or subcontracts , the construction schedule shall indicate the following procurements , construction and preacceptance activities and events in their logical sequence for equipment and materials. 1. Preparation and transmittal of submittals. 2. Submittal review periods. 3. Shop fabrication and delivery. 4. -Erection or installation. 5. Transmittal of manufacturer ' s operation an.d maintenance instructions. 6. installed equipment and materials testing. 7. Owner's operator instruction (if applicable) . 8. : Final inspection. C4-4 (5) 9 . Operational testing. p , 10. Final inspection.. If , in the opinion of the Owner , work accomplished falls , behind that scheduled, the Contractor shall take such action as necessary to improve his progress. In addition, L the Owner may require the Contractor to submit a revised,, schedule demonstrating his program and proposed plan to make up lag in scheduled progress and to °insure completion of the .work within the contract time. If the Owner finds the proposed plan not acceptable , he may require the Contractor to increase the work force, the construction plant and equipment, the number of work shifts or, the overtime operations without additional cost to the Owner. Failure of the Contractor to comply with these requirements shall be considered grounds for determination by the Owner that the Contractor is failing to prosecute the work with such diligence as will insure' its ' completion within the. T. time specified. • I C4-4 (6) fp • PART C - GENERAL CONDITIONS C5-5 CONTROL OF WORK AND MATERIALS SECTION C5-5 CONTROL OF WORK AND MATERIALS C5-5:1 AUTHORITY..OF ENGINEER: The work shall be performed to the satisfaction of the Engineer and in strict with ' g. P the'. Contract Documents. He shall decide all questions- which a ii:se 'as to the quality and acceptability of materials furnished , work performed, rate of progress of the work, overall sequence of the construction,' interpretation- of the -•Contract Documents., acbeptable fulfillment of the contract, compensation, mutual rights between Contractor and owner under these Contract Documents-, 'supervision of `the'=work, . resumption of operations, and all other questions or disputes which may arise . Engineer will not be responsible for Contractor's :means , methods, techniques , sequences or procedures-•.*:of , construction ,: or the .safety precaution and prbgrams incident thereto, and he will not be responsible for Contractor '°s °�: failure to perform the work in accordance with the contract 1 documents. He 'shall. determine the amount and quality of the work coinpleted and materials furnished, and his decisions and estimates shall be final. His estimates in such event shall be 'a condition to the right of the Contractor to receive money due him under the Contract. The Owner shall 'have executive authority to 'enforde" and make effective; such necessary decisions and orders as the Contractor fails;,.to carry out promptly. In the event of any dispute 'between the Engineer and Contractor over the decision of the Engineer on any such matters, the Engineer must, within a reasonable time, upon written request- of the Contractor, render and deliver to both the owner and Contractor, a written decision on the matter in controversy. C5-5. 2 CONFORMITY WITH PLANS: The finished project in all cases shall conform with lines , grades , cross-sections , .:, finish , and dimensions shown on the plans or any other requirements otherwise described in the Contract Documents. Any deviation from the approved Contract Documents requiredaby the Engineer during construction will in all cases be d•etermin'ed by the' Engineer and authorized by the Owner' by Change Order. C5-5 (1) C5-5 . 3 COORDINATION OF CONTRACT DOCUMENTS: The Contract Documents are made up of several sections , which , taken ' together , are intended to describe and provide for a complete and useful -project, and any requirements appearing in one of the sections is as binding as though it occurred in all �. sections. In case of discrepancies ,, figured dimension, shall govern over scaled dimensions , plans shall- gover.n over specifications, special conditions shall govern over general �. 'condt,tions and standard specifications, and quantities shown od t" plans shall govern' over , those shown in _the proposal . The contractor shall not .take advantage of any apparent, error or omission in the Contract Documents, and the Owner shall be permitted to make such corrections or interpretations, as may be deemed necessary for the fulfillment of the intent of the -R Con-tract Documents . .In the event the.¢Contractor discovers an apparent error or discrepancy, he shall, immediately ca11 th-is condition to the attention of the Engineer. In the. event o . a conflict in the drawings, specifications;. or other portions of th.e. contract. Documents 'wh'ich ,were `not .reported prior to the award. -of Contract, the Contractor shall be deemed to have quoted tfie most expensive resolution of the conflict. C5=5. 4 . COOPERATION bt CONTRACTOR: The Contractor will. be _ furnished with -three sets of the Contract Documents • and shall have-avAilable on the site of the project at all. times one set, of such Contract'Documents. r The, Contract shall give to the work tie constant: atten.tionr neaes,sary to .Iacilitate the progress thereof 'and shall caoger,ate with the Engineer , his inspector,, and other Contractors iw ever - ossible way. The Contractor shall at all times have competent personnel available to the .project site for proper, performance of. the -� work, The Contractor shall .provide and .maintain -at all . times at the site of the project . a compe.tent ;,,,Engl.i,sh-speaking superintendent and an assistant wha aXe -fully authorized' to ac , as the Contractor ' s agent on the. work ., such superintendent and his assistant shall"be capable of reading and understanding the Contract Documents and shall receive and' fulfill ins.truc.tions from_ the Owner, the Engineer, or his M authorized- representatives. Pursuant to' this re' sponsihili.ty of the Contractor,, the Contractor shall designate in writing. to ttie.,project ,super:intefident, to act'.as the Contractor ' s agent on the work. Such assistant project superintendent shi.�l be a resident of Tarrant County, Texas and shall. be ' subJect'. to .call, as ' is the project Superintendent, at any time of the day or night on any 'day of the week on which,- the Engineer determines that circumstances require the presence on the project site of a representative of the Contractor to C5-5 (2) r adequately provide for the safety or convenience of the traveling public or the owners of property across which the project extends or the safety of property contiguous to the project routing. . The Contractor shall provide al_I facilities to ,enable the Engineer and his inspector to examine and inspect the workmanship and materials entering into the work. C5-5 . 5 EMERGENCY AND/OR RECTIFICATION MORE: When , in the opinion of the Owner or Engineer, a condition of emergency exists related to any part of the work, the Contractor, or the Contractor through his desi.gnated :- representative , shall i = respond with dispatch to a verbal request.made by the Owner' or Engineer to alleviate the emergency conditi.on . Such a° re-sponse shall occur day or night, whether the project is scheduled on, a calendar-day or on a working-day basis. lY ri Should• the Contractor fail to respond to a request from .the P q Engineer to rectify any discrepancies , omissions , or- corrections .necessary to conform with the requirements of the project specifications or -plans , the Engineer, shall give the Contractor written notice that such work or changes are to be performed. The .`written notice shall direct. attention to the discrepant condition and request the. Contractor to take remedial action to correct the condition. In the event the, Contractor does not take positive steps to 'fulfill this written request, or does not show just cause for n-ot taking the*_proper action, within •24 hours , the City .may -take such remedial action with City forces or by contract. The City shall then deduct an. amount equal to the entire costs for such remedial action, plus 25% , from any funds due the "Contractor on the project. C5-5 . 6 FIELD OFFICE: . The `Contractor shall provide, at no extra compensation, an adequate field 'office for .use of the" Engineer, if specifically called for. The field office shall lbe not less than 10 by 14 . feet in floor area, substantially J constructed, well heated , air `- conditioned, lighted, ' and. weather-proof, so that documents will not be damaged by the elements. C5-5 . 7 CONSTRUCTION STAKES: The City; through its Engineer, will furnish t:he Contractor with all lines , grades , and measurements necessary to the proper prosecution and control of the work contracted for under these Contract Documents , and lines, grades and measurements will be established by means of stakes or other customary method of marking as may be found consistent with good practice. C5-5 (3 ) These stakes. or markings shall be set sufficiently in advance of construction operations to avoid delay . Such stakes or markings as may be established for the Contractor' s use or guidance shall be preserved by the Contractor until he is authorized by the Engineer to remove them. Whenever, in the opinion of he Engineer, any stakes or markings have been carelessly tr - willfully destroyed, disturbed, or removed by the Contractor or any of his employees , the full cost of, 4 . replacing such stakes or marks plus 25% will be charged . against the Contractor, and the full amount will be deducted- from payment due the contractor. C5-5 . 8. AUTHORITY AND DUTIES OF CITY INSPECTORS : . City-. Inspectors will be authorized to inspect all work done and to be done and all materials. furnished.- - .Such inspection may extend to all. or any part of the work., and the preparation or manufacturing of the materials to be used or equipment:- to be installed. A City Inspector may be stationed on the work to report to the Engineer as to the progress of the work and ,.the manner in which it is being performed, to report any evidence that the ,materials being furnished or the .work being performed.. by thy. C_o'tractor fails to fulfill the requirements:,.of the Contract, Documents , and to call the attention o f , th.e, Contractor to any :such failure or other infringements.. .Su&h' inspection .'or- lack of inspection will not relieve,-the Contractor_ from any obligation to perform , the .-work,• . in.- , - accordarce with the requirements of the Contract Documents. In case of any dispute arising between the Contractor and the City `Inspector _as -to the .materials or equipment furnished or the mann"er of performing the `work, the City Inspector will have authority to reject ; i u mater -als or equipment to suspend. work _until .the question at. issue can be referred to 'and. . be- decided' .by the Engineer . The City Inspector will not., - however, be authorized to revoke, alter, enlarge, or release any requirement of these Contract Documents, nor to approve or accept any portion of section of ,the, work, nor to issue any instructions- contrary to the requirements of the -Contract Document -s .., He will in no -case ac-t as superintendent , or foreman or perfor� any other duties for the Contractor, or interfere-.. "iith the management or operation of the work. He will not accept. from the Contractor any compensation in .any form' for performing any duties . The Contractor shall regard and obey the .directions., and instructions of the City .Inspector or Engineer `when the 'same are consistent with the obligations of the Contract, 'Documents , provided, however, should th.e Contractor object to any orders or instructions of the City Inspector,, the Contractor .may within six days - matke written appeal to the Engineer for his decision on the matter -fn controversy. J E � C5-5 (4) �( C5-5 . 9 INSPECTION: The Contractor shall furnish the Engineer with every reasonable facility for ascertaining'whether or not the work as performed is in accordance with the requirements of the ,Contract Documents . If the Engineer., so requests, the Contractor , shall, at any time before acceptance of the work, remove or 'uncover such; portion of the finished work as may be directed. After examination, the Contractor shall restore said portions of the work to the standard required by the 1 Contract •Documents. Should the work exposed or examined prove acceptable, the uncovering or removing and replacing of the covering or making good of the parts removed shall be paid for as extra work, but should be work so exposed- or examined prove to be unacceptable, the uncovering or removing and the replacing of all adjacent defective or damaged parts shall be at the Contractor ' s expense. No work shall, be done or materials used without suitable supervision or inspection. C5-5 . 10 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK: All work materials; or equipment which has been rejected shall be � ^ remedied or removed and replaced in an. 'oaccep table manner by the Contractor at his own ex ers e. Work dn a b eyond the lines (( _ and grades given or as shown . on the' plans,. except' as herein L specifically provided, or any Extra Work done without written authority,, will be consideredAas unauthorized and done at the expgrfse of the' Contractor and`,will not be paid for •by tie' Owner . .-Work so -done may -be• ordered removed at the Contractor 's expense. Upon the failure on the part of the Contractor to comply• with any„order of the Engineer made under the” provisions. of this paragraph., • the Engineer will have the authority to cause defectivp,'_work t,o,., be remedied or removed and replaced and unauthorized work to be removed, and the cost thereof may be deducted. 'from any money due or to become due to the Contractor . Failure to require the removal of any defective or unauthorized work shall- not constitute acceptance of such works. C5 - 5 . 11 S_U.HSTITUTE MATERIALS OR EQUIPM,E:NT:.i If the Specifications, law, ordinance, codes or regulations perzait Contractor :to furnish ,or use a substitute. that is equal to- any material or' equipment specified, and if Contractor wishes to furnish or use a proposed substitute,, he' shall, prior to the preconstruction conference , make written application t.o t ENGINEER for approval of such substitute certifying in writing that the proposed substitute . will perform adequately .the functions called for by the general *design, be ;similar and of equal substance to that specified and, be suited to the same use And capable of performing the same function `as that specified; and identifying all variations of the proposed 1 • C5-5 (5 ) '-i gyp]qf� s�t�•,r1�G�] FIX, j. I substitute from. that specified and indicating `availabl-e maintenance service . No substitute shall be ordered or installed 'without the written approval of Engineer who Vill be the judge of th-e equality and may require Contractor to urnish such -other data about the proposed substitute as he onsiders pertinent . No 'substitute shall be ordered or a installed without such performance guarantee and bonds as owner may require which shall be furnished at Contractor ' s expense.- Contractor- shall indemnify and hold harmless owner and Engineer and anyone directly or indirectly employed by either• of them from and against the,. claims , damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. C5-5. 12 SAMPLES AND TESTS OR MATERIALS: Where, `in the opinion a of the Engineer, or a,s called for in'. the Contract Documents , tests 'of materials or equipment. 'are necessary, such tests will be made at the expense of and paid for direct to the ' testing agency by the Owner uanl-ess otherwise specifically provided.. The failure of the Owner' to make any tests of materials stall be- in noway relieve the Contractor of his responsibility.-of furnishing znater.ials and equipment ,fully conforming to �th•e. requirements of the Contract Documents. Tests and sampling of materials , unless otherwise specif ied, ..will' be made i-n' ■. accordance with the latest iaethods 'prescribed by the American' Society for Testing Materials of specific requirements of the Owner. The Contractor shall provide such` facilities as the Engineer' may require for _.collectifzg and forwarding samples and s.hall not , without specific *ritten permission of the Engineer, use the materials .represented by the samples ;until tests have been made and the materials approved fo.V use. The Contractor will furnish adequate samples 'iiithout, `charga. to the Owner, , in case of concrete, the aggregates , design minimum, and the mixing and transporting equipment shall be approved by the Engineer before any concrete is placed, and the Contactor shall be ,responsible for replacing. any concrete which does not meet the-° requIresments of the--Contract* Documents.. 'Tests shall be made it fiast 9 days pr'i'or *to tlie, placing of• concrete, using samples from the ' same aggregate, cement, and mortar which are to be used' later 'in t21e concrete. Should the source of supply _ change, 5new tests shall be made prior to the- `use of 'the new materials C5-5 .13 STORAGE OF MATERIALS: All materials which are to be used in the construction- operation shall be stored so as to insure the preservation of the quality and fitness' of the work. J When. directed, by .the Engineer ", they shall be placed on wooden platforms' or other 'h_ ard, clean durable surfaces and not on the C5-5 (6) ground, and shall be placed under cover when directed. Stored materials shall be placed and located so as to facilitate prompt inspection. C5-5 .14 EXISTING STRUCTURES AND UTILITIES: The location and dimensions -shown on the Plans relative to existing utilities are based on the best information available. Omission from, or the inclusion of utility locations on the Plans is not to be considered as the nonexistence of, or a definite location of, existing .underground utilities . The location of many gas r.. mains, water mains, conduits , sewer lines and service lines 4 for all utilities , etc . , is unknown to the Owner , and the Owner assumes no responsibility for failure to show any or all such structures and utilities on the .plans or to show them in their exact location. It is mutually agreed that such failure will not be considered sufficient basis for claims for additional compensation for Extra Work or for increasing the pay quantities in any manner whatsoever, unless an obstruction encountered is such as to necessitate changes in the 'lines and grades of considerable magnitude or requires the building of K special works, provision for which is* not made in the" Contract t Documents , in which. case the provision in these Contract Documents for Extra Work shall apply. It shall be the Contractors responsibility to verify locations of adjacent. and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such local adjustments as necessary in the construction process to provide, adequate clearances. The Contractor shall take all necessary precautions in order to protect all existing utilities , structures and. service lines. Verification of existing utilities, structures and service lines shall include notification of all utility companies at least forty eight (48) hours in" advance of construction including exploratory excavation if necessary. All verification of existing utilities and their adjustment shall be considered as subsidiary work. C5-5.15 INTERRUPTION OF SERVICE: a. Normal Prosecution: In the normal prosectuion of work where the interruption of service is necessary, the Contractor , at least 24 hours in advance, shall be required to: 1:`'� Notify the Water Department ' s Distribution Division as to location, time, and schedule of service interruption. C5-5 (7) i 2. Notify each customer personally -through responsible personnel as to time and schedule of .the interruption of their service, or 3 . In the event that personal notification of a ' r� customer cannot be made,. a prepared tag foam shall be attached to the customer ' s entrance door knob . The ta'g shall be durable in composition, and in large bold type shall say: "NOTICE" Due to' Utility Improvement in your neighborhood, your (water) (sewer) service will be inter- rupted on between the hours of and This inconvenience will be as short as possible. Thank you, Contractor, n Addre ss Pho e . b. Emergency: In the event that art unforeseen' -service interruption occurs, notice shall be as above,but -? .immediate. C5-5 .16 MUTUAL RESPONSIBILITY OF CONTRACTORS: ` If , through acts or neglect on the part of the Contractor , any other Contractor or ariy sub-con tractor shall suffer loss or -damage on the work, the Contractor agrees. to settle with such other Contractor or sub-contractor by agreement or arbitra .I tion. f such other Contractor or sub-contractor shall assert any claim against the Owner on account of any damage alleged to' have been sustained, the Owner will notify the Contractor , who shall indemnify and save harmless the Owner against_ any such claim. C5-5 . 17 CLEAN-UP: Clean-up 'of surplus and/or ,waste materials accumulated on, the job site during the prosecution of the work under these Contract Documents shall be accomplished in keeping with a daily routine established to the the satisfaction of the Engineer . Twenty-fours' fours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the Engineer , if the Contractor fails to correct the I — C5-5 (8) i - a unsatisfactory procedure, the City may take such direct action as the Engineer deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice, and the costs of such direct action, plus 25% of such costs , shall be deducted from monies due or to become due to the Contractor. . 7 Upon the completion of the project as a whole as covered by these Contract Documents , and before final acceptance and final payment will be made, the Contractor shall clean and remove from the site of the project all surplus and discarded .461 materials, temporary structures, and debris of every kind. He shall leave the site 'of all work in a neat and orderly condition equal to that which originally existed. Surplus and waste materials removed from the site of the work shall be disposed of at locations satisfactory to the Engineer. The Contractor shall thoroughly clean all equipment: anal materials installed by him and shall deliver over such materials and equipment in a bright, clean , polished and new appearing condition . No extra compensation will be made to - th-e- contractor for any clean-up required on the project. C5-5. 18 FINAL INSPECTION: Whenever the work provided for in and contemplated under the Contract Documents has been satisfactorily completed and final cleanup performed, the Engineer will notify the proper officials of the owner 'and request that the .Final inspection be made. Such inspection will be made within 10 days after such notification. After such final inspection, if the work and materials and equipment are found satisfactory, the Contractor will be notified in writing of the acceptance of the same::"..after the proper resolution has been -passed by the City Council . No time charge will be made against the Contractor between said date of notification of the Engineer and the date of final inspection of the*work. JJ C5-5 (9) 7� 71 71 � 1 �1 71 71 11 71 J1 ] ,� ] 1 _ � � ] 1 J ' �I, J ' J ' Vii, J • PART C - GENERAL CONDITIONS C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY � g SECTION C6-6 LEGAL RELATIONS AND PUBLIC ESPONSIBILITY C6-6.1 LAWS TO BE OBSERVED: The Contractor shall at all times observe and comply with all Federal. and State Laws and City ordinances and regulations which in any way affect the conduct. of the work or his operations , and shall observe and comply with all orders, laws, ordinances and regulations.. which exist or which may be enacted later by bodies having -jurisdiction or authority for such enactment .: No plea of misunderstanding or ignorance the-reof will be considered. The Contractor and his ' Sureties shall indemnify and save harmless the City and all of its officers , agents, and employees I against any and all claims or liability arising from or based on the violation of any such law, ordinance, regulation, or order, whether it be by himself or his employees. C6-6 . 2- PERMITS AND LICENSES: The Contractor slIall. procure all permits and- licenses , pay all charges, costs and fees, and give all notices necessary and incident to. the due and lawful prosecution of the work. C6-6 . 3 PATENTED DLVICES , MATERIALS AND PROCESSES: If the Contractor is required or 'desires to use any design, device, material, or process I covered-by letter, patents or copyright, he shall provide for such -use by suitable legal agreement with the patentee or owner bf ' such patent, "lette , or copyrighted design. , It is mutually agreed and under*tood that without exception the contract prices shall include all royalties or cost arising from patents, �trade-marks, and copy rights in any way .involved in the_ work. ' The Contractor and his sureties shall indemnify and. save harmless° the Ownggr from any and all claims for infringement by reason. of the use of any such patented design , device , 'material process , or any trade-mark or copy right in connection with the work agreed to ' be performed under these Contract Documents , and ,shall indemnify the Owner for any cost, expense,• or damage which it may be obliged to pay by reason of - such,,infr.ingement at any time during the prosecution of the work or`' after completion of till the work,. provided, however, that 'the Owner. will assume the k responsibility to defend any and all. sbits-; brought for the infringement of any patent claimed to be infringed upon by the design , type of construction or material or equipment specified in the. Contract. Documents f urnished the Contractor by the Owner, and, to hold the Contractor, harmless. on account of such suits. r C6-6 (1) C6-6 . 4 SANITARY PROVISIONS: The Contractor shall establish �` and enforce among his employees such regulations in regard to cleanliness and disposal of garbage and waste as will tend to prevent the inception and spread of infectious or contagious diseases and to effectively prevent the creation of a nuisance about the work -on any property, eithek public or- private, and such regulati'o' ns as are required by Law shall be put into . immediate force and effect by the Contractor . The necessary sanitary conveniences for use of laborers on the work , properly, secluded from public observation , shall be r , constructed and maintained by the Contractor and their use 1 - shall be strictly enforced by the Contractor . All such facilities shall be kept in, a clean and sanitary, condition, free from objectionable odors so as not to. cause a nuisance. All sanitary laws and. .r.egq�ations_. of: the State of Texas and the City shall be 'strictly complied with. C6-6 . 5 PUBLIC SAFETY AND CONVENIENCE: Materials or equipment stored about the work shall be so placed and used, and the work shall at all times be so conducted , as to cause ..no greater obstruction or inconvenience, to the public than..' no considered .to 'be absolutely necessary by the Engineer. The Contractor is required 'to maintain at' all times all phases of his work in such a manner as not to impair the safety or convenience of the public, including, but not Ximited to, safe and convenient ingress and egress to property contiguous to the work area: The Contractor shall make adequate provisions , 4 to render. reasonable, ingress and' .egress for normal vehicular traffic, except during` actual trenching or pipe installation operations, at. All driveway crossings, Such provisions may � include bridging, placement of cxushed stone or gravel or such other means of .providing proper ingress and egress for the property served. by the- driveway as the Engineer may approve as appropriate. Such other_ means may `,include the diversion- of driveway traffic, `with specific approval by the Engineer. If diversion of traffic is approved �by the Engineer at any location, the Contractor shall make a. Xangements satisfactory �. to . the Engineer , atk''any'p location, the' Contractor shall make arrangements satisfactory- to the Engineer. for the diversion of traffic, and shall,,,. 'at' his own .ekpense, provide all materials` and perform all work necessary., for the construction and maintenance of `roadways .and bridges for such diversion of traffic. Sidewalks must not be obstructed except by special. permission of the Engineer. The materials excavated and the construction materials such as pipe used in the construction of 'the -work shall be placed so "( as not to endanger the work or prevent free access to all fire J hydrants, fire alarm boxes, police call boxes, water valves , C6-6 (2) gas valves , or manholes in the vicinity. The Owner reserves the right to remedy any neglect on the part of the Contractor as regards to public convenience and safety which may come to its' attention, after twenty-four hours notice in writing to the Contractor, save in cases of emergency when it shall have c the right -to remedy any neglect without notice and in either case, the cost of such work done or materials (furnished by the r Owner or by the City shall be deducted from monies due or to become due to the Contractor. The Contractor, after approval of- the Engineer, shall-notify the Fire Department Headquarters, Traffic Engineer , and Police Department, when any street or alley is requested to be closed or obstructed or any fire hydrant is to be made inaccessible, and, when so directed by the Engineer, shall keep any street, streets, or highways in condition for unobstructed use by fire apparatus . The Contractor .shall promptly notify the Fire Department Headquarters when all such obstructed streets , alleys, or hydrants are again placed back in service. Where the Contractor is required to construct temporary Ir bridges or make other arrangements for crossing over ditches or streams, his responsibility for accidents .in connection with such crossings shall include the roadway approaches as well as the structures of such crossings. The Contractor shall at all times conduct his 'operation and the use of construction machinery so as not- to damage or destroy trees and shrubs located in close proximity to or on the site of the work. Wherever any such damagef 'may be done, the Contractor shall immediately satisfy a-1.1 claims of property owners, and rio payment will be made by the Owner in settlement 'of such claims. The Contractor shall file with the Engineer a written statement showing all such claims adjusted. C6-6 . 6 PRIVILEGES OF CONTRACTOR IN STREETS, ALLEYS, AND RIGHT-OF-WAY: For the performance of the contract , the Contractor will be permitted to use and occupy such portions of the public streets and alleys , or other public places dr other rights-of-way as provided for in the ordinances of the City, as. shown in the Contract Documents , or as may be specifically authorized in writing by the Engineer . A reasonable amount of tools, materials , and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. Excavated and waste materials *shall be piled or stacked in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. If the street is occupied by railway tracks, the work shall be C6-6 (3 ) �� r carried on in such manner as not to interfere with the operation of trains, loading or ,unloading of cars, etc. Other . contractors of the Owner may, for all purposes required by the contract , enter upon the work and premises used by the Contractor and shall be provided all reasonable facilities and assistance. for the completion of adjoining work . Any additional grounds_ desired by the Contractor for his use shall be provided by him at his own cost and expense. C6-6 . 7 RAILWAY CROSSINGS:' When the work encroaches upon any right-of-way of any railway, the City will secur.e the necessary easement for the work. Where the railway tracks are to be crossed , the Contractor shall obser-ve. all the regulations, and instructions of the. r_aklway company as to the 1 methods of performing the work and,take all precautions for safety of property and the public. Negotiations with the railway companies for permits shall be .done by and through the City. The Contractor shall give the City notice not less than five days prior to the time of his intentions to begin work on that portion ,of the project which is • related to the railway properties . The Contractor will not be given extra or additiona 1 compensation for such railway crossings unless specifically set forth in the Contract Documents. C6-6 . 8 BARRICADES, WARNINGS AND WATCHMEN: Where the work is carried on in or .adjacent to any street, alley, or.- public glace, the Contractor shall at his own expense furnish, erect,. and maintain such barricades , fences , lights and danger signals , ' s hall provide such-watchmen, and. shall. take all -such other precautionary; measures for the protection of persons or o property and of thewok as are necessary. Barricades and fences- shall be painted -in-.-a color that will be visible, at night. From- sunset -to sunrise. the Contractor shall furnish and maintain at least one easily visible .burning light at each barricade. A sufficient number of barricades shall be erected and maintained to .,keep pedestrians away from, and vehicles from being driven on or into, any work under_ construction or F being maintained. The Contractor shall furnish watchmen and keep them at their respective' assignments in sufficient numbers to protect the work and prevent accident or damage.. . � 1 All installations and procedures shall be consistent with the provisions set forth in the "1980 .Texas Manual on Uniform. Traffic Control. Devices for Streets and Highways" issued under the authority of the "State of Texas .Uniform Act Regulating Traff is on Highways codified' as Article 670 Id. Veron's Civil Statutes, pertinent sections being Section Nos. 27, 29 , 30 and 31. J C6-6 (4) The Contractor will not remove any regulatory sign , instructional sign, street name sign, or other sign which has been erected by the City. If it is determined that a sign• must be removed to permit required construction , the Contractor shall contact the Transportation and Public Works= department , Signs and Markings Division- ( phone number. 8780-8075 ) , to remove the sign. In the case of- regulatory signs, the. Contractor must replace the permanent sign with a ri temporary- sign meeting the requirements of the above referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met . When construction. work is completed to the extent that the permanent sign can be re-installed, the Contractor shall again contact the Signs and Markings Division to re-install the permanent sign and shall leave his temporary sign in place [ until such re-installation is completed. The Contractor will be held responsible for all damage to the ` work or the public due to failure of barricades , - signs , ` fences , lights, dr watchmen to protect them. -Whenever evidence is found of such damage to the work the Engineer may order 'the damaged portion' -immediately removed and replaced- by the Contractor at the Contractor ' s own -expense . Th'e Contractor ' s responsibility for •the maintenance of barricades. signs,t•fences and lights,, and for providing watchmen shall not cease until the project shall have been completed and accepted by the Owner. No compensation , except as specifically provided In these Contract Documents,- will be paid to the Contractor for the work and materials involved -in the constructing, providing, and maintaining of barricades', signs , fences, and lights. or for salaries of watchmen , for the subsequent removal and disposal of such barricades , sign's , or for any other incidentals necessary for the proper protection, safety, 'and convenience of the public during the contract period, as this work is considered 'to be subsidiary to the several items for which unit or lump sum prices are requested in the Proposal. C6-6 . 9 USE OF EXPLOSIVESr DROP WEIGHT ETC. : Should the Contractor elect to use explosives, drop weight, etc. , in the prosecution of the work, the utmost care shall be exercised at all times so as not to endanger life or property . Th 4 Contractor shall notify the proper representative of any public service corporation , any company, individual , or utility, and the Owner, not less than twenty-four hours in C5-6 (5) e advance of the use of any activity which might damage or endanger their or his property along or adjacent to the work. Where the use of explosives is toabe permitted on the project, i as specified- in the Special Contract Documents , or the. use of j explosives is requested, the Contractor shall submi't' notice 'to. the Engineer in writing twenty-four hours prior to commencing and shall furnish evidence that - he has insurance coverage. '-to protect against any damages, and/or injuries arising out of such use of explosives. A-11 claims arising out of the use of explosives. shall be investigated and a written report made by the Contractor ' s insurers to the Engineer within ten (10) days after receipt of - written notice of the claim 'to the Contractor from either the City or the claimant. The City shall proceed to give notice to the Contractor of any such claim. The use of explosives .. may be suspended by the Engineer if any complaint is received and such use shall not be resumed until the cause of the complaint has been addressed. , Whenever explosives are stored or .kept, they shall -°bd- stored in a safe and secure manner and all storage places shall.:be plainly marked "DANGEROUS EXPLOSIVES" and shall be �under the care of a competent watchman at all times. All vehicles in which explosives are being transported shall be plainly marked as mentioned above. and shall, insofar as possible, not use heavy traffic routes. C6-6 .10* WORK WITHIN EASEMENTS: Where the work passes over, through, or into private property,, the Owner will provide- such right-of-way or easement privileges as the City..,may deem necessary for the prosecution of the work: Any additional rights-of-way or work area considered necessary by the Contractor , shall be provided by him at his own expense. -Such additional rights-of-way or work area shall be ..acquired for the benefit of the City. The City shall -be notified. in ,writing as to the rights so acquired before work begins in the affected area. The, Contractor shall not enter- upon private property for, any purpose without having previously obtained - permission from the owner of such property. The Contractor will not be allowed to store equipment or material on private property unless and Until the specified 'approval of the property owner has been secured in writing by the Contractor and a copy furnished to the.. Engineer . Unless sp ecificall y provided otherwise , the Co.nt.ractor shall clear all rights-of-way or easements of obstructions which must be removed to make possible proper prosecution of the work as a part of the project construction operations . The Contractor shall be responsible for the preservation of and shall use w C6-6 (6) every precaution to prevent damage to all trees shrubbery, plants, lawns, fences, culverts curbing, p , g, and all other .types of structures or improvements , to all water , sewer, and gales lines, to all conduits, overhead pole lines , or appurtenances thereof , including the construction of temporary fences, and to all other public or .private property .along adjacent to the work. 1 The Contractor shall notify the proper representatives of owners or, occupants of public or private lands `or interest in lands which might be affected by the work. Such notice shall be made at least 48 hours in advance of the 'beginning of the work. Notices shall be applicable to both public and private utility companies or any corporation, company, individual, or . other , either as owners or occupants , whose land or interest inland might affected by the work. The Contractor shall be- responsible for all damage or injury to.-property of any character resulting from any act, omission ; .n:eglec.t, or misconduct in the manner or method or execution- of the-,work, ° or at any time due to defective work, material, or equipment 5- ... When and where any direct or indirect or injury is done to k"- = public or private property , on account of any act, omission, ` _' ° neglect, or misconduct in- the execution of the work, or in consequence of- the non-execution thereof on .the part of the Contractor, hle , shall restore or have restored at his own .cost and expense such property to. a• ,condition at least equal, ,to that existing before such damage or injury was done,.,''by , repairing, rebuilding, or otherwise replacing and restoring ` as may be directed by the Owner , or he shall make good such damages or injury in a manner acceptable 'tcA the owner of the property and the Engineer. All fences encountered and removed during construction of this project shall .be restored to the original or a better. than original condition upon completion of this project. When wire fencing, either wire mesh or barbed wire is to be crossed, the Contractor shall set cross braced posts on either side of permanent easement before the fence is cut. Should additional fence cuts be necessary, the Contractor shall provide cross braced posts at point of, the proposed cut in, addition to the cross braced posts provided at the permanent easements limits, before the fence is cut. Temporary. fencing . shall be erected in place of the fencing removed whenever the work is not in progress and when the site is: vacated overnight, - and/or at all times to prevent livestock from entering the construction area., The cost for fence removal, temporary closures and replacement shall, be subsidiary to the various items bid. in the project C6-6 (7) proposal . Therefore, no separate payment shall be allowed for any service associated with this work. , In case of failure on the part of the Contractor to restore such p roperty to make good such damage or injury, the Owner' may,.. upon 48 hour written notice under ordinary circumstances ' and without notice when a nuisance or, hazardous condition � • results , proceed to repair,- rebuild, or otherwise restore such , `r property 'as may be determined by the Owner -to be necessary, and the 'cost thereby will be deducted from any monies due or to become due to the Contractor under this Contract. C6-6 . 11 INDEPENDENT CONTRACTOR: It is understood and agreed by the parties hereto that Contractor shall perform all work and services hereunder as an independent contractor, and not as an officer, agent , servant or employee of the Owner . Contractor shall have exclusive control of and the exclusive right- to control the details of all the work and services j performed hereunder,° and all persons performing same, and shall be solely responsible for the acts and omissions of its officers , agents , servants , 'employees , contractors , ° subcontractors, licensees and invitees . The doctrine o,f, , respondeat superior shall not apply as between Owner -and Contractor, its officers, agents , employees, contractors and subcontractors , and nothing .herein shall be construed as creating a partnership or joint enterprise between Owner and Contractor. C6-6 .-12 CONTRACTOR -S RESPONSIBILITY FOR DAMAGE CLAIMS : Contractor covenants and agrees to, and' does hereby .indemnify, hold harmless ands -defend Owner , its officers, agents', servants, and employees from and against any an all claims or L.., suits for -property damage or loss and/or personal injury, including death, to any and all persons, of whatsoever kind or character , whether' -real or asserted, arising out of or In connection with, directly or indirectly, the work and services to be performed hereunder by Contractor, its officers, agents, employees, contractors; subcontractors, licensees or •invitees , J whether or not caused, in whole or in part, by al.l`eged negligence on the part of. officers , agents , servants , employees, contractors, subcontractors, licensees and invitees of the Owner; and said Contractor does hereby covenant and agree to assume all liability and responsibility of Owner, its officers agents, servants and employees for property damage or loss , and/or personal injuries , including death, to any 'and all per of whatsoever kind or character, whether real or asserted, arising out of or in' connection with, directly or :. indirectly, the work and services to be performed hereunder by Contractor , its officers , agents employees, contractors , subcontractors, licensees and invitees, whether or not caused, ' I C6-6 (8 ) i 1 in whole or ,in part, by alleged negligence of officers , agents , servants , employees , contractors , subcontractors , licensees or invitees of the Owner. Contractor likewise covenants and agrees to, and does hereby, indemnify and hold 6 harmless Owner from and against any and all injuries,loss 'or damages to property of the Owner during the performance of any of the terms and conditions ,pf this Contract, whether arising Lout of or in connection with or resulting from, in whole or in part, any and all alleged acts or omissions of officers , agents , servants , employees , contractors , subcontractors , licenses, or invitees of the Owner. In the event a written claim for damages against the contractor or its subcontractors remains unsettled at the time . all work on the project has been completed to the satisfaction' of :the Director of the Water Department, as evidenced by .'a final inspection, final payment' to the Contractor shall not be recommended by the Director of the Water Department for a period of 30 days after the date of such final inspection, unless the Contractor shall submit written evidence satisfactory to the 'Director that the claiin has been settled and a release has been obtained from the claimant involved. If the claim concerned remains unsettled as of the expiration of the above 30-day period, the Contractor may be deemed to be entitled to a semi-final payment for work completed, 'such semi-final payment to be in an amount equal to the total ? dollar amount then due less the dollar value of any written claims pending against. the Contractor 'arising 'out of the performance of such work, and such semi-final payment may then , be recommended by the,,Director. The Director shall not recommend final payment to a Contractor against whom such a claim for damages is outstanding for a period of six months following the date of the acceptance of the work performed unless the Contractor submits evidence in. writing satisfactory to the Director that: 1. The claim has been settled ' and a release has been obtained from the claimant° involved, or 2. Good faith efforts have been made to settle such outstanding claims , and such' good. faith efforts have failed. If condition (1) above is met at any time -within the six month period, the Director shall recommend that the final payment to the Contractor be made. If condition (2) above is met at any time within the six month period, the Director may recommend that the final payment to the Contractor be made. At the- C6_6 (9) expiration of the six month period the Director may recommend that final payment be made if all other work has been ' performed and all other obligations of the Contractor have been met to the satisfaction of the Director. The Director may, if heldeems it appropriate, refuse to accept bids on other Water Department Contract work from a Contractor against whom a claim for damages is outstanding as a result of work performed under ,a City contract. C6-6 . 13 CONTRACTOR'S CLAIM FOR DAMAGES: Should the Contractor s claim compensation...for, .any alleged damage by reason of the acts. or omissions of the Owner , he shall within three days after the actual sustaining ,of such alleged damage, make a written statement too the Engineer, setting out ,in detail, the nature of the alleged damage, and .on or before the 25th day of the month succeeding that -in which any such damage is claimed to have been sustained, the, Contractor shall file with the Engineer an itemized statement of the details and amount of such alleged damage and, upon request, shall give the Engineer access to all. books of account, receipts, vouchers, bills of lading, and other books or papers containing any evidence as to the amount of such alleged damage. . Unless such statements shall be 'filed as hereinabo_ve required, the Contractor ' s claim for compensation shall be waived, and he shall not be entitled t to payment on account of. such damages. C6-6 .14 ADJUSTMENT OR .RELOCATION 2F PUBLIC UTILITIESR ETC. : In case it is necessary .to ..change, move, or alter in any manner the property , of 'a public utility or_ others, the said property shall not be moved or interfered with until orders thereupon have been -1ssu.ed by: the Engineer. The right is • t reserved to the .owners of public utilities to enter the . geographical limits of ,the Contract for the purpose of making, + such changes or . rep.air.s to 'their property that may be necessary by the performance of this contract. C6-6 . 15 TEMPORARY SEWER AND DRAIN CONNECTIONS: When existing sewer lines have to be, take_n up or removed, the Contractor shall , at his own expense and cost, provide and maintain temporary outlets and connections for all private or public drains and sewers. The Contractor shall also take care of all sewage and drainage which will be received from these drains and sewers , and for this purpose he shall provide and maintain, at his own cost and expense, adequate pumping facilities and temporary outlets or diversions. The Contractor, at his own cost and expense, shall construct such troughs , pipes, or other structures necessary, and be prepared at all times to dispose of drainage and sewage C6-6 (10) i received from these temporary connections until such times as the permanent connections are built and are in service. The existing sewers and connections shall be kept in service and: maintained under the Contract, except when specified or ordered to be abandoned by the Engineer.. All water, sewage, it and other waste shall be disposed of in a satisfactory manner so that no nuisfnce is created and so that the work under construction will be adequately protected. C6-6 .16 ARRANGEMENT AND CHARGES FOR WATER FURNISHED BY THE CITY: . When the Contractor desires to use City water. in ` connection with any construction work, he shall make complete and satisfactory arrangements with the Fort Worth City Water 1 Department for so doing. City water furnished to the Contractor shall be delivered to the Contractor from.' a connection on an existing City main . All piping required beyond the point of; delivery shall. be L installed by the Contractor at his own expense. I The Contractor ' s responsibility in, the` use of all existing fire .hydrant and/or valves is detailed. in Section E2-1. 2 USE OF, FIRE HYDRANTS AND VALVES in these General Contract.. Documents. When meters are used to measure the •water, the charges, if any, for water will be at the regular established rates. When meters are not used , the charges ,, if any, will be as presc'iibed by the City Ordinance, or where no ordinance applies , payment shall be made on estimates and rates established by the Director of the. Fort Worth Water Department. C6-6 .17 USE OF A SECTION OR PORTION OF THE WORK: Whenever, In the opinion of 'the Engineer, any section or- portion of the work or any structure is in suitable condition, it may be put into use .upon the written order of the Engineer , and such usage shall not be held to be In any way an acceptance of said work or structure or any part thereof or as a waiver--of any of the provisions of. 'these Contract Documents . All necessary repairs and removals 'Of. *any section of - the work so put into, use, due to defective materials or workmanship, equipment, or to deficient operations on the part of -the Contractor, shall be performed by the Contractor at his own expense. C6-6 . 18 CONTRACTOR ' S RESPONSIBILITY FOR - THE WORK: Until written acceptance by., the Owner as provided for in these Contract Documents,- . the work shall be under the charge and care of the Contractor, and he- shall take every necessary precaution to prevent injury or damage to the work or any part C6-6 (11) thereof by action of the elements or from any cause whatsoever, whether arising from the execution or nonexecution° of the work. ' The Contractor shall rebuild, repair, restore, and make good at his own expense all injuries or damage to any portion of the work occasioned by any of the hereinabove causes. ... C6-6. 19 NO WAIVER OF LEGAL RIGHTS: Inspection by the Engineer ' or any order by the Owner by payment of money or any payment for or acceptance of any work, or any extension of time, or any possession taken by the City shall not 'operate as a waiver of any provision 'of the Contract Documents. Any waiver of any breach or Contract shall not be held to be a- waiver of 'any . other or subsequent breach. The Owner reserves the right to correct any error that may be discovered in 'any estimate that • may 'have been paid and to adjust the same to meet the requirements of the Contract Documents. C6-6 . 20 PERSONAL LIABILITY OF PUBLIC OFFICIALS: In carrying out the provisions of these Contract Documents. or in ;] exercising any power of authority granted thereunder, there shall be no liability upon the authorized representatives of the Owner, either -personally or otherwise as ,they are agents and representatives of °the City. C6-6. 2.1 STATE SALES TAX: On a contract awarded by the City of Fort Worth, an organization which qualifies for exemption pursuant the --provisions of Article 20. 04 CIP 'of the Texas Limited Sales , excise, and Use Tax Act, the Contractor may purchase, rent or lease all materials, ' supplies and equipment used or consumed in the performance of this contract by issuing to his" supplier an exemption certlficate in lieu of - the tax, said exemption certificate to comply with State - J Comptroller ' s Ruling' .007. Any 'such exemption certificate issued by the Contractor in lieu of the tax shall be subject to and shall 'comply. with the provisions of State Comptroller's I . Ruling . 011, and any other applicable State Comptroller J rulings pertaining to the--Texas Limited Sales, Excise; and Use Tax Act. On a contract awarded by a developer for the construction of a publicly-owned improvement 'in a street right-of-way or' °other easement which has been dedicated to the public and the City of Fort Worth,, an organization which qualifies for exemption pursuant to the provisions of Article 20:04 (El'of. the Texas limited Sales, Excise , and Use Tax Act, the Contractor can probably be exempted in the same manner stated above. C6-6 '(12) ' I Limited Sale, Excise and Use Tax permits and information can be obtained from: Comptroller of Public Accounts Sale Tax Division Capitol Station Alstin,-. TX C6-6 (13) � i ' ij � i � i 7i � i ji i ] 1 � i � i � 1 J1 � 1 � 1 J1 PART C - GENERAL CONDITIONS -C7=7 PROSECUTION AND PROGRESS SECTION C7-7 PROSECUTION AND PROGRESS: . C7-7. 1 SUBLETTING: ,The Contractor shall perform with his .own organization, and with the -assistance of workman 'under his . immediate super intendance, work of a value of_ not less than fifty d50%) percent of the- value embraced in the contract. if the Contractor sublets any part of the work to be done under these Contract Documents, he will not under any circumstances be relieved of the responsibility and obligation assumed under these Contract Documents . All transactions of .the. Engineer will be with the 'Contractor . Subcontractors will 'be considered' only in the capacity of employees- or• workmen of the Contractor and shall be subject to the same regiAiements as to character and competency. The Owner will not _ recogniz.e:-kan_y subcontractor on the work. The Contractor shall at all' tunes;:;.:, when the work is in operation, be represented either in person. r� or by a superintendent or other designated representatives. C7-7. 2 ASSIGNMENT OF CONTRACT: The Contractor shall not assign, transfer; sublet, convey, or .otherwise dispose of the contract or his rights , title, or interest in or to the 'same or any part thereof without the previous consent of the Owner expressed by resolution. of the City Council and concurred in by the Sureties. If the' :Contractor does, without such previous consent, assign, transfer, sublet, convey, br ' otherwise dispose*-of the contract or his right, title; - or interest therein or any,part thereof, -to any person or persons , partnership , company,'`'fi m., or• corporation, or does by bankruptcy, voluntary' or involuntary, or by assignment under the insolvency laws of any - state , attempt to dispose of the contract may, at the option of the Owner be revoked and annulled, unless the Sure ties shall successfully complete-' said contract, and in the •event 'of any such revocation or annulment, any monies due or to become due under or by virtue of said• contract shall be retained .by the Owner as liquidated damages for the reason that it would be impracticable and extremely diff icult, to f ix -the actual damages. C7-7 . 3 PROSECU-TION OF THE WORK: Prior to beginning any construction operation, the Contractor shall submit to the. Engineer in five or more copies, if requested by the 'Engineer, a progress schedule preferably -in chart or diagram form, or' a brief outlining in detail and. step by step the manner of C7-7 (1) prosecuting the work and ordering materials and equipment which he expects to follow in order to complete the project in the scheduled time. There shall also be submitted a table of estimated amounts to be earned by the Contractor during each .4 monthly estimate period. The Contractor shall., commence the work to be performed undL �. 4"this contract within the time limit stated in these Contract Documents and shall conduct the work in a continuous manner and with sufficient equipment, materials , and labor as is necessary to insure its completion within the time limit. The' sequence requested of , all construction operations shall be at all times as specified in the Special Contract Documents . Any deviation from scuh sequencing shall be submitted to the Engineer for his approval. Contractor shall not proceed with any deviation until h.e' has received written approval from the Engineer . Such specification or approval by the Engineer shall not relieve the Contractor from the full responsibility of the complete performance of the Contract. o The contract- time may changed only as set forth in Section C7-7.8 "Extensi.on of Time of Completion" of. this Agreement , and a progress ' schedule shall not constitute •a change in the contract °time. C7-7 . 4. LIMITATIONS OF OPERATIONS: The working operations shall at a times be- conducted by the Contractor so as to create a minimum amount of inconvenience to the public. At any time when, in the judgment of the Engineer, the Contractor has obstructed or cl'osed or is carrying on operations in a portion of'a street . oV public way greater than= is' necessary .IF . for th a proper ` Sexedution of the work, the Engineer may require the Contractor to finish the section on which operations are in progress before the work is commenced on any additional section or street. C7-7. 5 CHARACTER OF WORKMEN AND EQUIPMENT: Local labor shall be used by the„ Contractor is available. The Contractor may bring in from "oiftside the City- of Fort Worth his key men and his superintendent. -.All other workmen, including equipment , operators , may be imported only after the- local supply is exhausted . The Contractor shall employ only such superintendents , foremen , and workmen who are careful , competent, 'and fully qualified to- perform the duties or tasks assigned to them, and the Engineer may demand and secure the summary dismissal of any person or persons employed �by the Contractor in or about or on the work who, -in the opinion of the Owner , shall misconduct himself or :be found to be incompetent , disrespectful , intemperate, dishonest, or C7-7 (2 ) ,� 7 otherwise objectionable or neglectful in the proper performance of his or their duties, or who neglects or refuses to comply with or carry out the directions of the Owner, and such person or persons shall not be employed again thereon without written consent of the Engineer. All workmen shall have sufficient skill , ability,. and experience to properly perform the work assigned to them - and operate -any equipment necessary to properly carry out the performance of the .assigned duties. The Contractor shall furnish and maintain on the work all. such equipment as is considered to be necessary for prosecution of the work in an acceptable manner and at a satisfactory rate of progress . All equipment, tools , , and machinery used for handling materials and executing any part of the work shall be subject to the approval• of the . Engineer and shall be" mainta•i:ned in a *satisfactory,. safe and efficient working conditi.on. - Equipment on any portion of the work shall be such that no, injury to the work, workmen or adjacent property will result from its use. C7-7. 6 WORK SCHEDULE: Elapsed working days shall be computed . starting with the .first day of work completed as defined An C1-1 . 23 "WORKING DAY" or the date stipulated in the "WORK ORDER" for beginning. work, whichever comes first. Nothing in these_ Contract Documents shall be construed as.- prohibiting the Contractor from working on Saturday, Sunday or Legal Holidays , providing that the following requirements are met: a. A request t.o work on a specific Saturday, Sunday or Legal -Holiday must be made to the Engineer no later than the proceeding Thursday. b. Any work to be done on the project on such a 4 specific Saturday, Sunday or Legal Holiday must be, in -the opinion of the Engineer, essential to the timely -completion of the project. The Engineer ' s decision shall be final in response to such a request for approval to work on a specific Saturday, Sunday or Legal Holiday, and no extra compensation shall be allowed to the Contractor for any work performed on such a specific Saturday, Sunday or Legal Holiday. Calendar Days shall be defined .in C1-1.24 and the :Contractor. may work as he so. desires. C7-7 (3 ) C7-7 .7 TIME OF COMMENCEMENT AND COMPLETION: - The Contractor shall commence the. working operations within the time specified in the Contract Documents and set forth in the Work - order. Failure to do so shall be -considered by the Owner as abandonment of the Contract by the Contractor and the Owner may proceed as - he sees fit. The Contractor shall maintain a rate of progress such as will insure that the whole work will be -performed and the premises cleaned up in accordance with the Contract Documents and within the time established in such documents and such extension of time as may be properly authorized by the Owner. C7-7. 8 EXTENSION OF TIME COMPLETION: The Contractor' s request for an extension of time of completion shall be considered only when the request for such extension is submitted in writing to the Engineer within seven days from and after the time 'alleged cause of delay shall have occurred. Should an _ extension of the time of completion be requested such request w will be' forwarded to the City Council for approval In adjusting the contract time for completion of work, consideration will be given to `unforseeable causes beyond the control of and without the' -fault or negligence of the Contractor, including but limited 'to acts of the public enemy, acts of the Owner , fire, flood , tornadoes , epidemics , quarantine restrictions, strikes, freight `embargoes , or delays of sub-contractors -due. to such -causes. When the date of completion is based on a calendar day bid, a request for extension of time because of inclement weather will 'not be considered. A request for extension of time due to -inability to obtain supplies and materials will be considered only when a review of the C'ontractor ' s purchase " order dates and other pertinent data as requested by the Engineer indicates that the Contractor has made a bonafide attempt- to 'secure delivery on schedule. This" shall include - efforts to obtain the supplies and materials from' elternate sources in case the first source cannot make. delivery. If satisfactory execution and completion ` of the contract should require work and materials in greater amounts or quantities than those set forth in the approved Contract Documents , then the contract time may be increased by Change e Order. C7-7. 9 DELAYS:- The Contractor shall receive no compensation for delays or hindrances to the work, except when - direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if C7-7 (4) -, any, which is to be furnished by the City. When such extra compensation is claimed . a written statement thereof shall be presented by the Contractor , to the Engineer and if by him' found correct shall be approved and referred by him to the Council for final approval or disapproval; and the action thereon by the Council shall be final and binding. If delay is caused by specific orders given by thefEng'ineers to stop F- work, or by the performance of extra work, or by the. failure of the City to provide material or necessary instructions for carry. ing. on the work , then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall , however, be subject to the approval of the City Council; and no such extension of time shall release the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. C7-7 . 10 TIME OF COMPLETLON; The time of completion is an essential element of the contract. Each bidder shall indicate in the appropriate place on the last page of the Proposal the number of working days or calendar days that he will require to fully complete this contract or. the time of .completion will be specified' by the "City in the Proposal section of the contract documents The number of days indicated shall. be a realistic estimate of the time- required, to complete the work covered .by the .specific contract being bid upon. The amount of time so stated .by the successful bidder -or' the City will become the * time of completion specified in the Contract Documents. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, or the increased time .granted by the Owner , or as automatically 11 r increased' by additional work. or materials ordered after the contract' is signed, the sum per day given in the following schedule, unless otherwise specified in other .parts of the t Contract Documents , will be deducted from monies due the Contractor, not as a penalty, . but as liquidated damages suffered by the Owner. AMOUNT OF CONTRACT Less than: $ 5,000 inclusive $ 35.00 $ 5,001 to $ 15,000 inclusive. $ 45.00 $ 15,001 to $ 25,000 inclusive $ 63.00 $ 25,061 to $ 50,000 inclusive $ 105.00 $ 50,001 to $- .100,000 inclusive $ 154.00 $ 100,001 to $ 500,000 inclusive $ 210.00 C7-7 (5) $ 500, 001 to $1, 000,000 inclusive $ 315. 00 $1, 000, 001 to $2, 000,000 inclusive $ 420. 00 $2,000, 001 and over $ 630.00 The parties hereto understand and agree. that any harm to' the City caused by the Contractor ' s delay in completing the work hereunder in the time specified by the Contract Documents would be incapable or very difficult -of accurate estimation; and that- the "Amount of Liquidated Damages Per Day", as set out above, is .a "reasonable forecast of .just compensation due ° the City for harm caused by any delay. C7-7 . 11 -SUSPENSION BY COURT 'ORDER.: The Contractor shall suspend. operations on such part or parts of the work ordered by any , court , and will not be entitled to additional compensation by virtue of such court order. Neither will he be liable to the City in the event the work is,, suspended by a Court- Order . Neither will the Owner be liable to the Contractor 'by. virtue of any Court Order or action for which the Owner is not solely responsible. C7-7 . 12 TEMPORARY SUSPENSION: The Owner shall have :the" right to suspend the work operation wholly or in- part° for period or periods of time as he may deem necessary due to , unsuitable weather conditions or any 'other unfavorable conditions which in the opinion of the Owner or Engineer cause further* prosecution of the work to be unsatisfactory or detrimental to the interest of the project. During temporary, suspension of work covered. by this contract,` for any reason, the Owner- will make no extra payment for stand-by time of construction equipment and/or construction crews. If it should become necessary, to suspend work for. an indefinite period, the Contractor shall store all. materials in such manner that. they will not obstruct or, impede the public, 1C P. unnecessarily nor become damaged in "any way, and he shall' take every`. precaution to prevent - damage or deterioration of the work performed; he shall provide suitable drainage about 'the work, and erect temporary structures where necessary. - Should the Contractor not be able to complete a portion of the project due to causes beyond the control of and without the fault or negligence of the Contractor as set forth in 7. Paragraph C77 . 8 EXTENSION OF THE TIME OF COMPLETION , and should it be determined by mutual consent of the Contractor and the Engineer that a solution to allow construction to proceed is not available within a reasonable period of .time, then the Contractor may be reimbursed for the cost of moving J his equipment off the -job and returning the necessary equipment- to the job when it is determined by the Engineer C7-7 (6) -� that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment .R and no profit will be allowed. No, reimbursement shall be allowed,'if the equipment ,is moved to another construction project for the City of Fort Worth.' The Contractor shall not suspend work without written notice Ir from the Engineer and shall proceed with the work operations promptly when notified by the Engineer to so resume operations. ,r C7-7. 13 TERMINATION OF CONTRACT DUE TO NATIONAL EMERGENCY: Whenever, because of National Emergency, so declared by the President of the United States or other lawful authority, it becomes -impossible for the Contractor to obtain all of the necessary labor , materials, and equipment for the prosecution of the- work with reasonable continuity for a period of two months , -the Contractor shall within seven days notify the City in writing, giving a detailed statement of the efforts which have been made and listing all necessary items of labor, materials , and equipment not obtainable . If , after investigations, the Owner finds that such conditions existing and that. the inability of the Contractor to proceed is not attributable in whole or, in part to the fault or neglect of the Contract, then if the Owner cannot after reasonable effort assist the Contractor in procuring and making available the necessary .labor, materials and equipment within_ thirty days, the' Contractor may requests the Owner to terminate the contract and the Owner may comply with the request, and the termination shall be conditioned and based upon a final settlement mutually acceptable to both the Owner and the Contractor and final payment shall be made in accordance with the terms of the agreed settlement, which shall include, but not be limited to , the payment for all work executed but no anticipated profits on work which has not been performed. C7-7.14 SUSPENSION OR ABANDONMENT OF THE WORK AND ANNULMENT OF CONTRACT: The work operations on all or any portion or section of the work under Contract shall be suspended immediately on written order of the Engineer or the Contract may be declared cancelled by the City Council for any good and sufficient cause. The following , by way of example, but not of limitation, may be considered grounds 'for suspension or cancellation: a. Failure of the Contractor to commence work operations within the time specified in the Work Order issued by the Owner. s C7-7 (7) b. Substantial evidence that progress of the work - operations by Contractor is insufficient to complete the work within the specified time. C. Failure of the Contractor to provide and maintain sufficient labor And equipment to properly execute the working operations. d. Substantial evidence that the Contractor has abandoned the work. e. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the work satisfactorily. f. Failure on the part of the Contractor to observe any requirements of` the Contract Documents or to comply with any orders given by the Engineer or Owner provided for in these Contract Documents. g. Failure of the Contractor promptly to. make good any defect in materials or'workmanship, or any defects of an-y' nature the 'correction of which has been directed iY writing by the Engineer or the Owner: h. Substantial evidence of collusion for the purpose of illegally procuring aF contract or perpetrating fraud on the `City in -the construction of work under contract. i. A substantial indication that the Contractor has r made an unauthorized assignment --of the contract or any funds due therefrom -for the benefit of any cred=itor or for any -other purpose. j. If the Contractor shall for any cause whatsoever not car'ry' on the working tpeXtion in an acceptable manner. k. If the -Contractor commences legal action against the Owner. A copy "of the suspension order or action of the City Council shall be served on the Contractor ' s Sureties. When work is suspended for any cause or causes, or when the contract is cancelled, the Contractor shall discontinue the work or such part thereof as the Owner shall designate, whereupon the �. Sureties may, at their option, assume the contract or that portion thereof which the Owner has ordered the Contractor to discontinue, and may perform the same or may, with the written C7-7 (8) .) consent of the Owner , sublet the work or that portion of the work as taken over, provided however, that the Sureties shall exercise their option, if at all, within two weeks after the written notice to discontinue the work has been served upon -� the. Contractor and � upon the Sureties or their authorized agents . The Sureties , in such event shall, assume the Contractor ' s place in all respects , and- shall- be paid -by the Owner for all work �erformed by them in accordance with the terms of . the Contract Documents. All monies remaining due the Contractor at the time of this default shall thereupon become due and payable to the Sureties as the work 'progresses , subject to all of the terms of the. Contract Documents. In case the Sureties do not, within the hereinabove specified Z time, exercise their right and option to assume the contract [ responsibilities , or that portion thereof which the Owner has ordered by the Contractor to discontinue, then:.-the Owner shall have the power to complete, by contract or'•otherwise, as it l may determine, the work herein described or such•-part:.'thereof t as it may deem necessary, _ and the Contractor hereto'=agrees, %r- that the Owner shall have the right- to tape posses ion of °and,'°` use any materials , plants, ools, equipment, supplies ; and property of any kind provided by the Contractor for the purpose- of carrying on the work and to procure other tools, equipment, materials, labor and -property 'for the completion of the work, and ..to charge to the account of the Contractor of said contract expense for labor, materials, tools, equipment, and all expenses incidental thereto. The expense so charged shall be deducted by the Owner from such monies as may be due or. may become due at any ti-me thereafter to the Contractor under and by virtue of the Contract or any,, part thereof. The Owner shall not be required to obtain thg lowest bid for the work completing the contract, but. the expense 'to,, be deducted shall be the actual cost of the owner of such work.'' In case such expenses shall exceed the amount which would have been payable under the Contract if the same had been completed • by the, Contractor, then the Contractor and his Sureties shall pay the amount of such excess to the City on notice f rom the Owner of the excess due. When any particular part of the work is being carried on by the Owner by contract or otherwise under the provisions of this section, the Contractor shall continue the remainder of the work in conformity with the terms of the Contract Documents and in such a manner as to not hinder or interfere with- performance of the work by the Owner. - C7-7 . 15 FULFILLMENT OF CONTRACT:. The Contract will be considered as having been fulfilled, save as provided in any bond or bonds or by law, when all the work and all sections or parts of the project covered by the Contract Documents have C7-7 (9) b,een finished and completed, the final inspection made by the C' r Engineer, and the final acceptance and final payment made by the Owner. • I C7-7:-16 TERMINATXON FOR CONVENIENCE OF THE OWNER: r A. NOTICE OF TERMINATION: The performance of the work under this contract may be terminated by the Owner ' in whole , or from time" to time in part , in accordance with this section, whenever the Owner shall determine that such termination is in the t best interest of the Owner . Any such termination shall be effected by mailing a notice of termination to the Contractor -specifying the extent to which performance of 'work under the contract is terminated', and the date upon which such termination becomes effective. Receipt o-f the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Mail .by the Owner. Further , it shall 'be deemed conclusively presamed� and established -that such termination is made with' �ust• cause as therein stated; and no proof in ;any "cla-im, -demand or suit shall be required of the Owner regarding such discretionary action. B. CONTRACTOR ACTION:- After receipt of a notice of termination, anid except a's otherwise directed by the Engineer, the Contractor shall: 1. Stop work under the contract on the date and to the extent specified in th-e notice of termination; . s 2. place no further orders 'or subcontracts for materialsy services or f acIlities"except as - may be- necessary for comp.Ietidn of -such portion of the work under the contract. as is not terminated, 3. .terminate all orders and subcontracts to the extent that they� relat'e to the performance of work terminated by the hotic® of termin4tion; - 4. transfer title to the Qwner anc� deliver to the manner, at the times, and to- the extent , if any, directed by the Engineer: a C7-7 (10) , a. the fabricated or unfabricated parts , work in process , completed work , supplies and other material produced as a part of, or acquired in connection �. with the performance of , the work terminated by the notice of termination; and b. the completed, or partially completed — plans, drawings , information and other, property which , if the contract had been completed , would have been required to be furnished to the Owner. 7 5. complete performance of such part of the work as shall not have been terminated by the -notice of termination; and 6: take such action as may be necessary, or as the Engineer may direct, for the protection and preservation of the property related to Z its contract which 'is in the possession of the Contractor and in which the Owner has or may acquire the rest. At - a time not later than 30 days after the termination date specified in the notice of termination., the Contractor may submit to the En ggineer.: a list, certified as to quantity and guality-, of any or all items of termination inventory not previously _disposed.. of , exclusive of , items the disposition .of which has been directed or authorized by the Engineer. Not later than 15 days thereafter, the Owner shall accept title to such items- provided, that the list submitted shall be subject to verification by the Engineer upon removal of the items or, if the -items are stored, within; 45 days from the date of submission of the list, and any necessary adjustments to ,correct the list as* .submitted, shall be made prior to final settlement. C. TERMINATION CLAIM: Within 60 days after notice of termination , the Contractor shall submit his, termination claim to the Engineer in the form and with the certification prescribed by the Engineer. Unless one or more extensions in writing are granted by the Owner upon request of the Contractor , .made in writing within- such 60-day period or authorized- extension thereof, any and all such claims shall be conclusively deemed waived. C7-7 (11) D. AMOUNTS : Subject to the provisions of Item �I C7-7.16 (C) , the Contractor and Owner may agree upon the whole - or any part of the amount or amounts to be paid to the Contractor by reason of the total or partial termination of work pursuant hereto ; provided, that such agreed 'amount or amounts shall never exceed the total contract price as reduced by the amount of .payments otherwise made and as further reduced by the contract price of work not terminated . The contract shall be amended ' accordingly,, and the Contractor shall be paid the agreed amount. No amount shall be due for lost or anticipated profits . Nothing in C7-7 . 16 (E ) hereafter, prescribing the. amount to be paid to the Contractor in the event of failure of the Contractor by reason of the termination of work pursuant to. this, section, shall be deemed to limit, restrict or otherwise determine or affect the amount or amounts which may be agreed upon to be paid to the Contractor pursuant to this paragraph. E. FAILURE TO AGREE: In the event of the failure of the Contractor and the ' Owner to agree as provided in C7-7. 16 •(D) upon 'the whole - amount to be paid to. the, Contractur by reason of the termination of work , pursuant to this. section the -Owner shall determine, on the basis of information available. to it, the amount, if .any, due to the Contractor by reason of the termination and shall pay to the. 'Contractor the amounts determined. ` No 'amount shall be due for lost ,or anticipated profits. F. DEDUCTIONS : In arriving at the amount due the contractor under this section , there shall be j `' deducted {a) all` unliquidated advance' or other payments on account theretofore' made -to the Contractor, applicable to the terminated portion of this contract; (b) any claim which the Owner may have against the Contractor in connection with this contract; and (c) the 'agreed price for , or the proceeds of sale of, any materials , ' supplies or other things kept by the Contractor or sold , pursuant. to. the provisions of this clause, and not otherwise recovered by or credited to the Owner. G. ADJUSTMENT : If the termination- hereunder be partial, prior to the settlement of the terminated portion of this contract, the Contractor may file .with the Engineer a request in writing for an C7-7 (12) equitable adjustment of the price or prices specified in the contract relating to the continued portion of the contract (the portion not terminated by the notice of termination ) , such equitable adjustment as may be agreed upon shall be made in such price or prices; nothing contained herein , however, shall limit the right of the Owner and the Contractor to agree upon the amount or amounts to k be paid to the Contractor for the completion of the continued portion of the contract when said contract does not contain an established contract price for such continued portion. H. NO LIMITATION OF RIGHTS: Nothing contained in this section shall limit or alter the rights which the -owner may have for' .termination of this contract under C7-7 . 14 hereof entitled " Suspension of I ` Abandonment of the work and Amendment of Contract" or any other right which Owner may have for default or breach of contract by Contractor. C7-7.17 SAFETY METHODS AND PRACTICES: The Contractor shall be responsible for initiating , maintaining, and supervising all safety precautions and. programs in connection with the work at all times and shall assume all responsibilities for their enforcement. The Contractor shall comply with federal, state, and local laws, ordinances, and regulations so as to protect person and property from injury, including death, or damage in connection with the work. C7-7 (13) � i � i ? i � i ] i 7i � i a � 7i � i � i Ji � i 7i Ji � i -1i � i ai PART C - GENERAL CONDITIONS C8-8 .MEASUREMENT AND.PAYMENT- j SECTION C8-8 MEASUREMENT AND PAYMENT 1. , ' • � 4 C8-8. 1 MEASUREMENT OF QUANTITIES : The determination of quantities of work performed .by- the Contractor and authorized by the Contract Documents acceptably completed under the terms of the Contract Documents shall be made by the Engineer , based on measurements made by the Engineer. These measurements will be made according to the United.. States Standard. 'Measurements used in common practice, and will be the actual length, area, solid contents, numbers , and weights of -the materials and items installed. C8-8. 2 UNLT PRICES: When in the Proposal, a "Unit Price" is set forth, the said "Unit Price" shall -include 'the furnishing by, the Contractor of all labor, tools, materials, machinery, equipment-, appliances and appurtenances necessary for the construction of and the .completion in a manner acceptable to the Engineer of all work to be done under these Contract Documents. The "Unit Price" shall include all permanent and temporary protection of overhead, surface, and underground structures, cleanup, finished, overhead expense, bond, insurance, patent fees, royalties, risk due to the elements and other causes, delays , profits , injuries, ,.damages claims, . taxes , and all. other items not specifically mentioned that may be required to fully construct each .item of the work complete in place and in a satisfactory condition for operation. C8-8. 3 LUMP SUM:' When in ..the .Proposal a "'Lump Sum" is set forth, the said "Lump Sum" shall represent the total cost for the Contractor to - furnish all .labor , tool8 , 'materials ,• machinery, equipment, appurtenances, and all subsidary .work necessary for the. construction and completion of all the work to. provide, a complete and functional item as -detailed in the Special Contract Documents and/or Plans. C8-8. 4 SCOPE OF PAYMENT: The Contractor shall receive and accept the. compensation, as herein provided, in full payment for furnishing all labor - . tools , materials, and incidentals, for performing all work .contemplated and embraced under these Contract Documents, for all loss and damage arising out` of the nature of the work or from the action of the elements , for any ' unforeseen defects or, obstruction's which may arise or be encountered during the prosecution of the work at any time C8-8 (1) .�i 1 � i before 'its final acceptance by the Owner, (except as provided in paragraph C5-5. 14 ) for all risks of whatever description connected with the prosecution of the work, for all expense incurred by or in. consequence of suspension or discontinuance of such prosecution of the working operations as herein specified , or any and all infringements of1patents , trademarks , copyrig-hts , or other legal °reservations, and for completeing the work in an acceptable manner according to the terms of -the Contract. Documents.:'. The payment of any ;current or partial estimate prior to final n acceptance of the work by the Owner shall in no way constitute an acknowledgment of the. acceptance of the work, materials, or equipment, nor in any way prejudice or affect the -obligations -_ of the Contractor to repair, correct, renew, or replace.at his own and proper expense any defects or imperfections in the construction or in the strength or quality of the ma-terial used or equipment or. machinery furnished, 4n or about the construction of the work under contract and its appurtenances, or any damage due. or attributed to such defects , which defects , imperfection, or damage shall have been discovered on or -bef.ore'the final inspectaio.n. and acceptance of work or during the one year guaranty period after final acceptance. The Owner shall be the sole judge of such defects , imperf ect,kons, or . damage, and the - Contiactor shall be liable to the -Owner for failure to correct the same as provided, herein. -° C8-8 . 5 PARTIAL ESTIMATES AND, RETAINAGE: Between the 1st and 5th day of each month the Contractor shall submit to the Engineer a statement :thowing an estimate of the value of the work done during 'the 'previous monthi or estimate period under the Contract Documents . Not later than the 10th day of the month the Engineer shall verify such estimate, and if -it is found to be, acceptable and the value of work performed since the last partial,, payment was made exceeds 'one hundred dollars ( $100. 00 ) in amount, 90% of such estimated sum will be .paid to the Contractor if the total contract amount is less` than $400, 000 , or .95% of such. estimated sum will be paid to the Contractor if the total contract amount Is $400,000 or greater within twenty-five (25) days after the regular estimate period. The City will have the..option of preparing estimates on--forms furnished by the City . The partial estimate may include acceptable nonperishable materials delivered.to the work which are to' be incorporated, into the work as, a permanent part thereof, but which. at the the time of the estimate have not been installed. (.such payment will be allowed on a basis of 85% of the net invoice value thereof. ) The Contractor shall f urnish the Engineer such information as he may request to aid C8-8 (2) him as a guide in the verification or the preparation of partial estimates. It is understood that the partial estimate from month to month -, will be approximate only, and all partial monthly estimates . and payment will be subject to' correction- i%n the estimate rendered following the discovery of an error in ' any previous estimate, and such estimate shall not, in any kespect; be taken as an admission of the Owner of 'the amount of work done or of its quality of sufficiency, or as an acceptance of the work done _or *the release of the Contractor of any of his responsibilities under the Contract Documents. The City- reserves the right to withhold the paymeht of any monthly estimate if the contractor fails to perform the work strictly in accordance with the specifications or provisions of this contract. C8-8 . 6 WITHHOLDING PAYMENT: Payment on any.�estimate:. or- estimates, may be held -in abeyance if the performance.-0 construction operations is not in accordance witA %1. requirements of the Contract Documents. C8-8 . 7 FINAL ACCEPTANCE: Whenever the improvements provided for by the Contract Documents shall have been completed and all requirements of the Contract Documents shall have* beet fulfilled on the part of the Contractor, the Contractor shall` notify the Engineer in writing that the improvements are ready for the final inspection . The Engineer shall `ndti€y the appropriate officials of the Owner, will within a reasonable time make such final inspection., and i-f the work is satisfactory, in an acceptable condit-i;.on, and has been completed in accordance with the terms '&f!.;;Fthe-' Contract Documents and all approved modifications thereof',"°the Engineer will initiate the processing of the 'final estimate and recommend final acceptance of the project and final "payment therefor as outlined in C8-8.8 below. C8-8 . 8 FINAL PAYMENT:. Whenever all the improvements 'provided for by the Contract Documents and all approved modif ic-ations �� thereof shall have been completed and all r ee equirmnts of th_e Contract Documents have been fulfilled on the part"" of. the Contractor, a final' estimate showing the value of the work will be prepared by the Engineer as soon as the necessary measurements, computations, and checks can be made. _ All . prior estimates upon which payment has been `made are subject to necessary corrections or revisions in'- the final payment. C8-8 (3 ) E The amount of the final estimate, less previous payments and any sum that have been deducted or retained under the provisions of the Contract Documents , will be paid to the Contractor within 60 days after final acceptance by the Owner Owner a proper resolution of the City Council, provided the Contractor has furnished to the Owner sa�is.factory - evidence of payment as follows: Prior to submission of .the final estimate for payment, the Contractor shall execute an affidavit, as furnished by the City, certifying that all persons, firms , associations, corporations, or other organizations furnishing labor and/or materials have been paid in full, that the wage scale established by the City Council in the City of Fort Worth has been paid, and that there are' no claims pending for personal injury and/or property damages. The acceptance by the Contractor of the last or final payment as aforesaid shall operate as and shall release, the Owner from, all claims or liabilities under the•••Contract for anything done or furnished or relating to the work under. Contract Documents or any -act or neglect of said City relating. to or connected with the Contract. The making, -of the final payment by the Owner shall not relieve the contractor of any guarantees or .other requirements of the Contract• Documents which specifically continue thereafter. C8-8 . 9 ADEQUACY OF DESIGN: It is understood that the .Owner �. believes it has employed competent Engineers and designers to prepare the Contract Documents and all modifications of the approved, C6 tract Documents . It is , therefore, agreed that, - the Owner shall be ,responsible for the adequacy of its own design features, .sufficiency of. the Contract Documents, a the y safet -of; the` structure ,* and the practicability of the operations of the completed project, provided the Contractor has complied with the requirements of the said Contract Documents., all approved modifications thereof, and additions and alterations. thereto approved in writing by the Owner,: The 1 burden of proof of such. compliance : shall be upon the ContractoY to show that he has,., complied with. the said requirements. of the Contract Documents, approved modifications . thereof, and all approved additions and alterations thereto. C8-8 .10` GENERAL GUARANTY: Neither the final certificate of payment nor any provision in the Contract Documents nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of .work not done in accordance with the Contract Documents or relieve the -' .Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The .Contractor shall remedy any, defects or damages in the work and C8-8 (4 ) r pay for any damage to other work resulting therefrom which shall appear within a period of one year from the date of final acceptance of the work unless a longer period is specified andshall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the general guaranty as above outline . Toe Owner will give notice of observed defects with reasonable promptness. C8-8 . 11 .SUBSIDIARY WORK: Any and all work, specifically governed by documentary requirements for the project, such as conditions imposed by the Plans , the General Contract Documents or these Special Contract Documents , in which no specific- item for bid has been provided for in the Proposal, shall be considered as a subsidiary item of work, the cost of which shall. be included 'in the price bid in the Proposal, for each bid. item. Surface restoration , rock excavation and cleanup are general items of work which fall in the category of zubsidiary work. C8-8 . 12 MISCELLANEOUS PLACEMENT OF MATERIAL: Material may be allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These _ materials shall be used only when directed by the Engineer, depending on field conditions . Payment for miscellaneous placement of material will- be made for only that amount of material used, measured to the nearest one-tenth unit. Payment for miscellaneous placement of material shall , be in accordance with the General Contract Documents regardless of the actual amount used for the project. l` C8-8 . 13 RECORD DOCUMENTS: Contractor shall keep on record a copy of all specifications , plans, addenda, modifications , shop drawings and samples at the site, in good order and annotated to show all changes made during the construction process . These shall be delivered to Engineer upon completion of the work. C8-8 (5) 1vls-: r:`hR . Np' R =� �1 °. � � .� j � . + � I; '� . . ��'� (. � . ► :� �. .,.. �. • r s 1 e f ,. i ' ,. r � i 1 ' � � r - � e +�• ' 7; . � Section Cl Supplementary Conditions i L J J ow M SECTION Cl: SUPPLEMENTARY CONDITIONS TO PART C-GENERAL CONDITIONS .� A. General These Supplementary Conditions amend or supplement the General Conditions of the Contract and other provisions of the Contract Documents as indicated below. Provisions which are not so amended or supplemented remain in full force and affect. r B. C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Page C8-8 (2), should be deleted in its entirety and replaced with the following: Partial pay estimates shall be submitted by the Contractor or prepared by the City on the 5th day and 20th day of each month that the work is in progress. The estimate shall be „ proceeded by the City on the 10th day and 25th day respectively. Estimates will be paid within 25 days following the end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to be incorporated into the work as a permanent part thereof, but which at the time of the pay estimate have not been so installed. If such materials are included within a pay estimate,payment shall be based upon 85% of the net P- voice value thereof. The Contractor will furnish the Engineer such information as may be reasonably requested to aid in the verification or the preparation of the pay estimate. For contracts of less than $400,000 at the time of execution, retainage shall be ten per cent(10%). For contracts of$400,000 or more at the time of execution,retainage shall be five percent(5%). Contractor shall pay subcontractors in accord with the subcontract agreement within five (5) business days after receipt by Contractor of the payment by City. Contractor's failure to make the required payments to subcontractors will authorize the City to withhold future payments from the Contractor until compliance with this paragraph is accomplished. It is understood that the partial pay estimates will be approximate only, and all partial pay estimates and payment of same will be subject to correction in the estimate rendered following the discovery of the mistake in any previous estimate. Partial payment by- Owner for the amount of work done or of its quality or sufficiency or acceptance of the work done; shall not release the Contractor of any of its responsibilities under the Contract Documents. The City reserves the right to withhold the payment of any partial estimate if the Contractor fails to perform the work in strict accordance with the specifications or other provisions of this contract. C. Part C - General Conditions: Paragraph C3-3.11 of the General Conditions is deleted and replaced with D-3 of Part D - Special Conditions. D. C3-3.11 INSURANCE: Page C3-3 (6): Delete subparagraph "g. LOCAL AGENT FOR INSURANCE AND BONDING" l Revised Pg. 1 10/24/02 E. C6-6.12 CONTRACTOR'S RESPONSIBLITY FOR DAMAGE CLAIMS: Page C6-6 (8),is deleted in its entirety and replaced with the following: Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of,the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not an such iniury, damage or death is caused, in whole or in part, by the negligence or alleged negligence of Owner, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and R conditions of this Contract, whether or not any such injury or damage is caused in whole or in part by the negligence or alleged negligence of Owner, its officers. servants or employees. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor 7 either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or(b)provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort . Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. F. INCREASED OR DECREASED QUANTITIES: Part C-General Conditions, Section C4-4 SCOPE OF WORK,Page C 4-4(1),revise paragraph 04-4.3 INCREASED OR DECREASED QUANTITIES to read as follows: The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found'to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices as established in the contract documents. No allowance will be made for any changes in `t lost or anticipated profits nor shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes in depth categories shall be interpreted herein as applying to the overall quantities of sanitary sewer pipe in each pipe size but not to the various depth categories. Revised Pg. 2 10/24/02 , G. C3-3.11 INSURANCE: Page C3-3 (7): Add subparagraph"h. ADDITIONAL INSURANCE REQUIREMENTS" a. The City, its officers, employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers''compensation insurance policy. 9 b. Certificates of insurance shall be delivered to the City of Fort Worth, contract administrator in the respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on the contracted project. c. Any failure on part of the City to request required insurance documentation shall not constitute a waiver of the insurance requirements specified herein. d. Each insurance policy shall be endorsed to provide the City a minimum thirty days notice of cancellation, non-renewal, and/or material change in policy terms or coverage. A ten days notice shall be,acceptable in the event of non-payment of premium. e. Insurers must be authorized to do business in the State of Texas and have a current A.M. Best rating of A: VII or equivalent measure of financial strength and solvency. f. Deductible limits, or self-funded retention limits, on each policy must not exceed IF $10,000.00 per occurrence unless otherwise approved by the City. � g. Other than worker's r compensation insurance, in lieu of traditional insurance, City may consider alternative coverage or risk treatment measures through insurance pools or risk C retention groups. The City must approve in writing any alternative coverage. h. Workers' compensation insurance policy(s) covering employees employed on the project:shall be endorsed with,a waiver of subrogation providing rights of recovery in favor of the City. i. City shall not be responsible for the direct payment of insurance premium costs for contractor's insurance. j. Contractor's insurance policies shall each be endorsed to provide that such insurance is primary protection and any self-funded or commercial coverage maintained by City shall not be called upon to contribute to loss recovery. k. In the course of the project, Contractor shall report, in a timely manner,to City's officially designated contract administrator any known loss occurrence which could give rise to a liability claim or lawsuit or which could result in a property loss. Revised Pg. 3 10/24/02 1. Contractor's liability shall not be limited to the specified amounts of insurance required herein. m. Upon the request of City, Contractor shall provide complete copies of all insurance policies required by these contract documents. H. C8-8.4 SCOPE OF PAYMENT: Delete.C8-8.4, Scope of Payment at page C8-8(1) is deleted in its entirety and replaced with the following: The Contractor shall receive and accept the compensation as herein provided, in full payment for finnishing all labor, tools, materials, and incidentals for performing all work - contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from the action of the elements, for any unforeseen defects or obstructions which may arise or be encountered during the prosecution which may arise or be encountered during the prosecution of the work at any time before its final acceptance by the Owner, (except as provided in paragraph C5-5.14) for all risks of whatever description connected with the prosecution of the work, for all expenses incurred by or in consequence of the suspension or discontinuance of such prosecution of the working operations as herein specified, or any and all infringements of patents, trademarks, copyrights, or other legal reservations, and for completing the work in an acceptable manner according to the terms of the Contract Documents. The payment of any current or partial estimate prior to the final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or equipment, nor in any way prejudice or affect the obligations of the Contractor to repair, correct,renew, or replace at his own and proper expense any defects or imperfections in the construction or in the strength'6r quality of the material used or equipment or machinery finnished in or about the construction of the work under contract _ and its appurtenances, or any damage due or attributed to such defects,'which defects, imperfections, or damage shall have been discovered on or before the final inspection and acceptance of the work or during the two (2) year guaranty period after the final acceptance. The Owner shall be the sole judge of such defects, imperfections, or damage, and the Contractor shall be liable to the Owner for failure to correct the same as provided herein. I. C8-8.10 GENERAL GUARANTY:Delete C8-8.10,General Guaranty at page C8-8(4)is deleted in its entirety and replaced with the following: Neither the final certificate of payment nor any provision in the Contmt Documents,nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects or damages in the work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two(2)years from the date of final acceptance of the work unless a longer period is specified and shall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract Revised Pg.4 10/24/02 which shall assure the performance of the general guaranty as above outlined. The Owner will give notice of observed defects with reasonable promptness. Any reference to any shorter.period of time of warranty contained elsewhere within the specifications shall be resolved in favor of this,specifications, it being the City's intent that the Contractor guarantee its work for a period of two (2) years following the date of acceptance of the project. In the Special Instructions to Bidders, TPW contracts place the following in lieu of the existing paragraph 2. J. Part C - General Conditions, Section C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL, Page C2-2 (4) exchange paragraphs C2-2.7, C2-2.8 and C2-2.9 with the following: irC2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security,to the Purchasing Manager or his representative at the official location and stated time set forth in the "Notice to Bidders." Ir It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be-in a sealed envelope plainly marked with the word"PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to the Purchasing Manager, City of Fort Worth Purchasing Division,P.O. Box 17027,Fort Worth; Texas 76102. C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the time set for opening proposals. 'A request for non-consideration of a proposal must be made in writing, addressed to the City Manager, IF and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud,,thcproposals for which non-consideration requests have been properly filed may, at the option of the Owner,be returned unopened. C2-2:9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify l his proposal by telegraphic communication at any time prior to the time'set for opening proposals, provided such telegraphic communication is received,-by the Purchasing Manager prior to'the said-, proposal= opening time;`and .provided farther, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic `communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight(48)hours after the proposal opening time, no further consideration will be given to the proposal K. C3-3.7 BONDS (CITY LET PROJECTS): Reference Part C, General Conditions, dated November 1, 1987; (City let projects)make the following revisions: Revised Pg. 5 10/24/02 1.Page C3-3(3);the paragraph after paragraph C3-3.7d Other Bonds should be revised to read: In order for a surety to be acceptable to the City, the surety must(1) hold a certificate of authority from the United States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or(2) have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or .� required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. INV 2. Pg. C3-3(5)Paragraph C3-3.11 INSURANCE delete subparagraph"a, COMPENSATION INSURANCE". Md 3. Pg. C3-3(6),Paragraph C3-3.11_INSURANCE delete subparagraph"g. LOCAL AGENT FOR INSURANCE AND BONDING". L. RIGHT TO AUDIT: Part C - General Conditions, Section C8-8 MEASUREMENT AND PAYMENT,Page C8-8 (5),.add the following: C8-8.14 RIGHT TO AUDIT: F (a)Contractor agrees that the City shall,until the expiration of three(3)years after final payment under this contract,have access to and the right to examine and photocopy any directly pertinent books,documents,papers and records of the Contractor,involving transactions relating to this contract. Contractor agrees that the City-shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The City shall give contractor reasonable advance notice of intended audits. (b) Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall,until the expirations of three(3) years after final payment under the subcontract,have access to and the right-to examine and photocopy any directly pertinent books,documents,papers and records of such subcontractor,involving transactions to the subcontract;and further,that City shall -r have access during normal working hours to all subcontractor:facilities,.and shall be provided adequate and appropriate work space,in order to conduct audits ln.compliance with the provisions of this article. City shall give subcontractor reasonable advance notice of intended audits. (c)Contractor and subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse the Contractor for the cost of copies as follows: Revised Pg. 6 10/24/02 I. 50 copies and under- 10 cents per page 2,More than 50 copies- 85 cents for the first page plus fifteen cents for each page thereafter M. SITE PREPARATION: The Contractor shall clear rights-of-way or easem;nts of obstruction which must be removed to make possible proper prosecution of the work as a part of this project construction operations. The contractor's attention is directed to paragraph C6-6.10 work within easements,page C6-6(4),part C -General Conditions of the Water Department General Contract Document and General Specifications. Clearing and restoration shall be considered as incidental to construction and all costs incurred will be considered to be included in the Linear Foot price of the pipe.. N. Reference Part C -General Conditions, Section C6-6.8 BARRICADES,WARNINGS AND WATCHMEN: 1. Wherever the word Watchmen appears in this paragraph, it shall be changed to*the word flagmen. Ir2. In the first paragraph, lines five(5) and six(6),change the phrase take all such other precautionary measures to take all reasonable necessary measures. IrO. MINORITY/WOMEN BUSINESS ENTERPRISE COMPLIANCE: Reference Part C (General Conditions), Section C3-3.2 Entitled "MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE" shall be deleted in its entirety and replaced with the following: Upon request, Contractor agrees to provide to Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise(MBE) and/or a Woman Business Enterprise(WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or,examination of any books,records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation(other than negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than thee (3)years. Revised Pg. 7 10/24/02 MR MR P. WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with the following: (a)The contractor shall comply with all requirements of Chapter 2258,Texas Government Code,including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258,Texas Government Code. Such prevailing wage rates are included in these contract documents. (b)The contractor shall,for a period of three(3)years following the date of acceptance of the work,maintain records that show(i)the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and(ii)the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of Section C-1,L. Right to -- Audit(Rev. 9/30/02)pertain to this inspection. (c)The contractor shall include in its subcontracts and/or shall otherwise require,all of its d- `subcontractors to comply with paragraphs(a)and(b)above. (d)With each partial payment estimate or payroll period,whichever is less, an affidavit stating that the contractor has complied with the requirements of Chapter 2258,Texas Government Code. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times: �r 0 Revised Pg. 8 10/24/02 , Section D Special Conditions PF r PE to PP P PART D - SPECIAL CONDITIONS DD=1 GENERAL........................................................................................................................3 DD=2 COORDINATION MEETING............................................................................................4 DD=3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW...................5 D-4 COORDINATION WITH FORT WORTH WATER DEPARTMENT..................................7 D-5 CROSSING OF EXISTING UTILITIES.............................................................................7 EXISTING UTILITIES AND IMPROVEMENTS ................................................................7 D-7 CONSTRUCTION TRAFFIC OVER PIPELINES..............................................................8 D-8 TRAFFIC CONTROL ..........•- .....,,,........................................ 9 D-9 DETOURS......................................................... ,g D- 10 EXAMINATION OF SITE. ........................................................................................9 - 11 ZONING COMPLIANCE.............................................................................................10 D- 12 WATER FOR CONSTRUCTION................... ............................................................. - 13 WASTE MATERIAL................................................................................................... 10 - 14 PROJECT CLEANUP AND FINAL ACCEPTANCE.....................................................10 - 15 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK...............................10 - 16 SAFETY RESTRICTIONS -WORK NEAR HIGH VOLTAGE LINES..........................11 D- 17 BID QUANTITIES.......................................................................................................11 6---18 CUTTING OF CONCRETE........................................................................................11 D- 19 PROJECT DESIGNATION SIGN...............................................................................11 D-20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT....................................12 D-21 MISCELLANEOUS PLACEMENT OF MATERIAL......................................................12 I D-22 CRUSHED LIMESTONE BACKFILL..........................................................................12 D-23 2:27 CONCRETE................................................................................................ ...12 D-24 TRENCH EXCAVATION, BACKFILL. AND COMPACTION.......................................12 D-25 PAVEMENT REPAIR (E2-19) ....................................................................................14 D-26 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS)..............15 5-27 SANITARY SEWER MANHOLES..............................................................................15 D-28 SANITARY SEWER SERVICES................................................................................18 D-29 REMOVAL, SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES..............20 5-30, DETECTABLE WARNING TAPES.............................................................................22 D-31 PIPE CLEANING........................................................................................................22 D-32 DISPOSAL OF SPOIL/FILL MATERIAL.....................................................................22 D-33 MECHANICS AND MATERIALMEN'S LIEN...............................................................23 D- 34 SUBSTITUTIONS ......................................................................................................23 D- 35 PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER...........23 D- 36 VACUUM TESTING OF SANITARY SEWER MANHOLES........................................26 D-37 BYPASS PUMPING...................................................................................................27 D-38 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER........27 6-39 SAMPLES AND QUALITY CONTROL TESTING.......................................................29 D-40 TEMPORARY EROSION SEDIMENT AND WATER POLLUTION CONTROL........30 D-41 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES ......................31 D-42 PROTEQjION OF TREES, PLANTS AND SOIL......................... D-43 SITE RESTORATION ................................................................................................31 D-44 CITY OF FORT WORTH STANDARD PRODUCT LIST............................................31 5---45 TOPSOIL, SODDING. SEEDING & HYDROMULCHING...........................................32 D-46 CONFINED SPACE ENTRY PROGRAM...................................................................37 D-47 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION..........................37 p D-48 EXCAVATION NEAR TREES ....................................................................................37 9--49 CONCRETE ENCASEMENT OF SEWER PIPE ........................................................38 D-50 CLAY DAM.................................................................................................................38 D-51 EXPLORATORY EXCAVATION (D-HOU................................................................38 D-52 INSTALLATION OF WATER FACILITIES..................................................................39 05106104 SC-1 DART Q - SPECIAL CONDITIONS 52.1 Polyvinyl Chloride (PVC)Water Pipe..........................................................................39 52.2 Blocking .....................................................................................................................39 52.3 Tyne of Casing PiM. ........................................................................................:........39 52.4 T _Ins. ..........................®...............................,,........................... ..............................40 52.5 Connection of Existing Mains.....................................................................................40 --. 52.6 Valve Cut-Ins..............................................................................................................40 52.7 Water Services...........................................................................................................40 52.8 2-Inch Temporary Service Line ..................................................................................42 52.9 Purging and Sterilization of Water Lines....................................................................43 52.10 Work Near Pressure Plane Boundaries......................................................................44 52.11 Water Sample Station................................................................................................44 52.12 Ductile Iron and Gray Iron Fittings.:............................................................................44 D- 53 SPRINKLING FOR DUST CONTROL........................................................................45 D-54 DEWATERING...........................................................................................................45 - 55 TRENCH EXCAVATION ON DEEP TRENCHES.......................................................45 D-56 TREE PRUNING........................................................................................................45 D- 57 TREE REMOVAL.......................................................................................................46 E-_5_8 TEST HOLES. ..................... ..................................................................................46 6- 59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION......................................................................................................................47 D-60 TRAFFIC BUTTONS..................................................................................................47 D-61 SANITARY SEWER SERVICE CLEANOUTS............................................................48 D-62 TEMPORARY PAVEMENT REPAIR..........................................................................48 D-63 CONSTRUCTIQN STAKES ....................................................... ...............................48 D-64 EASEMENTS AND PERMITS....................................................................................48 D-65 PRE-CONSTRUCTION NEIGHBORHOOD MEETING..............................................49 D-66 WAGE RATES..........................................................................................................49 D-67 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE...................................49 D-68 STORM WATER POLLUTION PREVENTION...............................................................50 D--69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF EXISTING WATER SYSTEMS..................................................................................................52 D-70 ADDITIONAL SUBMITTALS FOR CONTRACT AWARD...............................................52 D-71 EARLY WARNING SYSTEM FOR CONSTRUCTION 52 ................................................... D-72 AIR POLLUTION WATCH DAYS...................................................................................53 D-73 FEE FOR STREET USE PERMITS AND RE-INSPECTIONS........................................54 7 05106104 SC-2 •r� PART Q - SPECIAL CONDITIONS D. Part D shall This Part D—Special Conditions is complimentary to Part C—General Conditions and Part C1 — Supplementary Conditions to Part C of the Contract. Anything contained in this Part D that is additive to any provision in Part C — General Conditions and part C1 — Supplementary Conditions to Part C of the Contract are to be read together. Any conflict between Part C — General Conditions and Part C1 — Supplementary Conditions of the Contract and this Part D, Part D shall control. FOR: PROJECT DESCRIPTION , SANITARY SEWER REHABILITATION CONTRACT 67 PART 1 FORT WORTH, TEXAS DOE PROJECT NO. 4144 WATER DEPARTMENT PROJECTS NO. PW53-060530177970 & PS58-070580175790 D-1 GENERAL The order or precedence in case of conflicts or discrepancies between various parts of the Contract Documents subject to the ruling of the Engineer shall generally, but not necessarily, follow the guidelines listed below: 1. Plans 2. Contract Documents 3. Special Conditions The following Special Conditions shall be applicable to this project and shall govern over any conflicts with the General Contract Documents under the provisions stated above. The Contractor shall be responsible for defects in this project due to faulty materials and workmanship, or both, for a period of two (2)years from date of final acceptance of this project by the City of Fort Worth and will be required to replace at his expense any part or all of this project which becomes defective due to these causes. Subject to modifications as herein contained, the Fort Worth Water Department's General Contract Documents and General Specifications, with latest revisions, are made a part of the General Contract Documents for this project. The Plans, these Special Contract Documents and the rules, regulations, requirements, instructions, drawings or details referred to by manufacturers name, or identification include therein as specifying, referring or implying product control, performance, quality, or other shall be binding upon the contractor. The specifications and drawings shall be considered cooperative; therefore, work or material called for by one and not shown or mentioned in the other shall be accomplished or furnished in a faithful manner as though required by all. Any Contractor performing any work on Fort Worth water or sanitary sewer facilities must be pre- qualified with the Water Department to perform such work in accordance with procedures described in the current Fort Worth Water Department General Specifications, which general specifications shall govern performance of all such work. This contract and project, where applicable, may also be governed by the two following published specifications, except as modified by these Special Provisions: 1. STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - CITY OF FORT WORTH 0&0&04 SC-3 r FA '� RT Q - SPECIAL CONDITIONS 2. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH CENTRAL TEXAS Any conflict between these contract documents and the above 2 publications shall be resolved in favor of these contract documents. A copy of either of these specifications may be purchased at the office of the Transportation and Public Works Director, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort Worth, -- Texas •76102. The specifications applicable to each pay item are indicated by the call-out for the pay item by the designer. If not shown, then applicable published specifications in either of these documents may be followed at the discretion of the Contractor. General Provisions shall be those of the Fort Worth document rather than Division 1 of the North Central Texas document. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Failure to bid or fully execute contract without retaining contract documents intact may be grounds for designating bids as "non-responsive" and rejecting bids or voiding contract as appropriate as determined by the City Engineer. INTERPRETATION AND PREPARATION OF PROPOSAL: A. DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the Purchasing Manager or his representative at the official location and stated time set forth in the "Notice to Bidders". It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL", and the name or description of the project as designated in the "Notice to Bidders". The envelope shall be addressed to the Purchasing Manager, City of Fort Worth Purchasing Division, PO Box 17027, Fort Worth, Texas 76102. B. WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the time set for opening proposals. A request for non-consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non- consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C. TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received -� within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. D-2 COORDINATION MEETING For coordination purposes, weekly meetings at the job site may be required to maintain the project on the desired schedule. The contractor shall be present at all meetings. -� 05106104 SC-4 PART D - SPEC[AL CONDITIONS D-3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW A. Definitions: 1. Certification of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity`s employees providing services on a project, for the duration of the project. l 2. Duration of the project- includes the time from the beginning of the work on the project until the contractors/person's work on the project has been completed and accepted by the governmental entity. 3. Persons providing services on the project ("subcontractor" in §406.096)- includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other services related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) or all employees of the Contractor providing services on the project, for the duration of the project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project, and provide the governmental entity: 1. A certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and 2. No later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. F. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. 0&106104 SC-5 PART D - SPECIAL CONDITIONS W. G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known„ of any change that materially affects the provision of coverage of any person providing services on the project. H. The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Worker's Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. I. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: 1. Provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; 2. Provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; 3. Provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; 4. Obtain from each other person with whom it contracts, and provide to the Contractor: a.) A certificate of coverage, prior to the other person beginning work on the project; and b.) A new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 5. Retain all required certificates of coverage on file for the duration of the project and for one year thereafter. 6. Notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and 7. Contractually require each person with whom it contracts, to perform as required by paragraphs (1)-(7), with the certificates of coverage to be provided to the person for whom they are providing services. 8. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self- insured, with the commission's Division of Self-Insurance Regulation. Providing false or 050"4 SC-6 PART D - SPECIAL CONDITIONS misleading information may subject the contractor to administrative, criminal, civil penalties or other civil actions. 9. The contractors failure to comply with any of these provisions is a breach of contract by the contractor which entities the governmental entity to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. J. The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: "REQUIRED WORKER'S COMPENSATION COVERAGE The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." Call the Texas Worker's Compensation Commission at (512)440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the rt required coverage, or to report an employer's failure to provide coverage". D-4 COORDINATION WITH FORT WORTH WATER DEPARTMENT rDuring the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to r determine the best times for deactivating and activating those lines. D-5 CROSSING OF EXISTING UTILITIES pa Where a proposed water line crosses over a sanitary sewer or sanitary sewer service line and/or proposed sewer line crosses over a water line and the clear vertical distance is less than 9 feet barrel to barrel, the sanitary sewer or sanitary sewer service line shall be made watertight or be constructed of ductile iron pipe. The Engineer shall determine the required length of replacement. The material for sanitary sewer mains and sanitary sewer laterals shall be Class 51 Ductile Iron Pipe with polyethylene wrapping. The material for sanitary sewer service lines shall be extra strength cast iron soil pipe with polyethylene wrapping. Adapter fittings shall be a urethane or neoprene coupling ASTM C-425 with series 300 stainless steel compression straps. Backfill, fittings, tie-ins and all other associated appurtenances required are deemed subsidiary work, the cost of which shall be included in the price bid in the Proposal for each bid item. D-6 EXISTING UTILITIES AND IMPROVEMENTS The plans show the locations of all known surface and subsurface structures. However, the Owner assumes no responsibility for failure to show any or all of these structures on the Plans, or to show them in their exact location. It is mutually agreed that such failure shall not be 05106104 SC-7 PART D - SPECIAL CONDITIONS considered sufficient basis for claims for additional compensation for extra work or for increasing the pay quantities in any manner whatsoever. The Contractor shall be responsible for verifying the locations of and protecting all existing utilities, service lines, or other property exposed by his construction operations. Contractor shall -� make all necessary provisions for the support, protection, relocation, and/or temporary relocation of all utility poles, gas lines, telephone cables, utility services, water mains, sanitary sewer lines, electrical.cables, drainage pipes, and all other utilities and structures both above and below ground during construction. The Contractor is liable for all -damages done to such existing facilities as a result of his operations and any and all cost incurred for the protection and/or temporary relocation of such facilities are deemed subsidiary work and the cost of same and shall be included in the cost bid per linear foot of pipe installed. NO ADDITIONAL COMPENSATION WILL BE ALLOWED. Where existing utilities or service lines are cut, broken or damaged the Contractor shall replace or repair the utilities or service lines with the same type of original material and construction, or better, unless otherwise shown or noted on the plans, at his own cost and expense. The Contractor shall immediately notify the Owner of the damaged utility or service line. He shall cooperate with the Owners of all utilities to locate existing underground facilities and notify the Engineer of any conflicts in grades and alignment. Any and all permanent structures such as parking lot surface, fencing, and like structures on either public or private property shall be replaced at no cost to the City by material of equal value and quality as that damaged. + In case it is necessary to change or move the property of any owner of a public utility, such property shall not be moved or interfered with until ordered to do so by the Engineer. The right is reserved to the owner of public utilities to enter upon the limits of the project for the purpose of making such changes or repairs of their property that may be made necessary by performance of this contract. The utility lines and conduits shown on the plans are for information only and are not guaranteed by the City of the Engineer to be accurate as to extent, location, and depth; they are shown on the plans as the best information available at the time of design, from the owners of the utilities involved and from evidences found on the ground. D-7 CONSTRUCTION TRAFFIC OVER PIPELINES — It is apparent that certain construction vehicles could exceed the load bearing capacity of the pipe under shallow bury conditions. It will be the responsibility of the Contractor to protect both the _ new line and the existing lines from these possibly excessive loads. The Contractor shall not, at any time, cross the existing or new pipe with a truck delivering new pipe to the site. Any damage to the existing or new pipe will be repaired or replaced by the Contractor, at the Contractor's expense, to the satisfaction of the City. In locations where it is not permissible to cross the existing or proposed pipes without additional protection the Contractor may elect to provide additional protection of the pipes so that more frequent crossings of the pipes are allowed. It still is, however, the responsibility of the Contractor to repair any damage to the existing or proposed lines, if the damage results from any phase of his construction operation. 0&0&04 SC-8 PART D - SPEC .. CONDITIONS D-8 TRAFFIC CONTROL The contractor will be required to obtain a "Street Use Permit" prior to starting work. As part of the "Street Use Permit" a traffic control plan is required. The Contractor shall be responsible for PM providing traffic control during the construction of this project consistent with the provisions set forth in the "Latest Edition Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways," codified as Article 6701 d Vernon's Civil Statutes, pertinent sections being Section PW Nos. 27, 29, 30 and 31. A traffic control plan shall be submitted for review to Mr. Charles R. Burkett, City Traffic Engineer at 817) 871-8770 at least 10 working days prior to the pre-construction conference. Although work will not begin until the traffic control plan has been reviewed. the Contractor's time will begin in accordance with the time frame established in the Notice to the Contractor. The Contractor will not remove any regulatory sign, instructional sign, street name sign or other sign, which has been erected by the City. If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works Department, Signs and Markings Division, (Phone Number 871-7738) to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above-referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the permanent sign and shall leave his temporary sign in place until such reinstallation is completed. The Contractor shall limit his work within one continuous lane of traffic at a time to minimize interruption to the flow of traffic. Work shall not be performed on certain locations/streets during "peak traffic periods" as determination by the City Traffic Engineer and in accordance with the applicable provision of the "City of Fort Worth Traffic Control Handbook for Construction and Maintenance Work Areas." The cost of the traffic control is subsidiary work and the cost of same shall be included in the price bid for pipe complete in place as bid in the Proposal, and no other compensation will be allowed. D- 9 DETOURS The contractor shall prosecute his work in such a manner as to create a minimum of intermption to p traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the project area. = D- 10 EXAMINATION OF SITE It shall be the responsibility of the prospective bidder to visit the project site and make such examinations and explorations as may be necessary to determine all conditions, which may affect *" construction of this project. Particular attention should be given to methods of providing ingress and egress to adjacent private and public properties, procedures for protecting existing improvements and disposition of all materials to be removed. Proper consideration should be VL 05106104 SC-9 on PART D - SPECIAL CONDITIONS given to these details during the preparation of the Proposal and all unusual conditions, which may give, rise to later contingencies should be brought to the attention of the Owner prior to the submission of the Proposal. D- 11 ZONING COMPLIANCE During the construction of this project, the Contractor shall comply with present zoning requirements of the City of Fort Worth in the use of vacant property for storage purposes. D- 12 WATER FOR CONSTRUCTION The Contractor at his own expense will furnish water for construction. D- 13 WASTE MATERIAL All waste material shall become the property of the Contractor and shall be disposed of by the -° Contractor at locations approved by the Engineer. All material shall be disposed of in such a manner as to present a neat appearance and to not obstruct proper drainage or to cause injury to street improvements or to abutting property. D- 14 PROJECT CLEANUP AND FINAL ACCEPTANCE The Contractor shall be aware that keeping the project site in a neat and orderly condition is considered an integral part of the contracted work and as such shall be considered subsidiary to the appropriate bid items. Clean up work shall be done as directed by the Engineer as the work progresses or as needed. If, in the opinion of the Engineer it is necessary, clean-up shall be done on a daily basis. Clean up work shall include,but not be limited to: • Sweeping the street clean of dirt or debris 0 Storing excess material in appropriate and organized manner • Keeping trash of any kind off of residents' property If the Engineer does not feel that the jobsite has been kept in an orderly condition, on the next estimate payment(and all subsequent payments until completed) of the appropriate bid item(s) will be reduced by 25%. Final cleanup work shall be done for this project as soon as all construction has been completed. No more than seven days shall elapse after completion of construction before the roadway, right- of-way, or easement is cleaned up to the satisfaction of the Engineer. The Contractor shall make a final cleanup of all parts of the work before acceptance by the City of Fort Worth or its representative. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrete and other construction materials, and in general preparing the site of the work in an orderly manner and appearance. The City of Fort Worth Department of Engineering shall give �. final acceptance of the completed project work. D- 15 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK Prior to executing the Contract, it shall be the responsibility of the Contractor to furnish a schedule outlining the anticipated time for each phase of construction with starting and completion dates, including sufficient time being allowed for cleanup TIle Contractor shallnot commence w ith waterand/or sanitarj+sewer installatior�'uttl such lrre that the survey`cut-sheets have been received from the'City inspector. SC-10 PART D - SPECIAL. CONDITIONS D- 16 SAFETY RESTRICTIONS -WORK NEAR HIGH VOLTAGE LINES The following procedures will be followed regarding the subject item on this contract: 1. A warning sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet shall be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. The warning sign shall read as follows: "WARNING - UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES." 2. Equipment that may be operated within ten feet of high voltage lines shall have insulating cage-type of guard about the boom or arm, except back hoes or dippers, and insulator links on the lift hook connections. 3. When necessary to work within six feet of high voltage electric lines, notification shall be given the power company (ONCORE) who will erect temporary mechanical barriers, de- energize the lines, or raise or lower the lines. The work done by the power company shall not be at the expense of the City of Fort Worth. The notifying department shall maintain an accurate log of all such calls to ONCORE, and shall record action taken in each case. 4. The Contractor is required to make arrangements with the ONCORE company for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and expense. 5. No person shall work within six feet of a high voltage line without protection having been taken as outlined in Paragraph (3). D- 17 BID QUANTITIES " Bid quantities of the various items in the proposal are for comparison only and may not reflect the actual quantities. There is no limit to which a bid item can be increased or decreased. Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities. To the extent that C4-4.3 conflicts with this provision, this provision controls. No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities. D- 18 CUTTING OF CONCRETE When existing concrete is cut, such cuts shall be made with a concrete saw. All sawing shall be subsidiary to the unit cost of the respective item. D- 19 PROJECT DESIGNATION SIGN �. Project signs are required at all locations. It shall be in accordance with the attached Figure 30 (dated 9-18-96). The signs may be mounted on skids or posts. The Engineer shall approve the exact locations and methods of mounting. In addition to the 4' x 8' project signs, project signs shall be attached to barricades used where manhole rehabilitation or replacement is being conducted. Signs suspended from barricading shall be placed in such a way that signs do not interfere with reflective paint or coloring on the barricades. Barricade signs shall be in accordance with Figure 30, except that they shall be V-0" by 2'-0' in size. The information box shall have the following information: For Questions on this Project Call: 05106104 SC-11 PAIN D - SPECIAL CONDITIONS (817)871-8306 M-F 7:30 am to 4:30 p.m. or (817)871-8300 Nights and Weekends Any and all cost for the required materials, labor, and equipment necessary for the furnishing of -� Project Signs shall be considered as a subsidiary cost of the project and no additional compensation will be allowed. D-20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT At locations in the project where mains are required to be placed under existing sidewalks and/or driveways, such sidewalks and/or driveways shall be completely replaced for the full existing width, between existing construction or expansion joints with 3000 psi concrete with reinforcing steel on a sand cushion in accordance with City of Fort Worth Transportation/Public Works Department Standard Specifications for Construction, Item 504. * At locations where mains are required to be placed under existing curb and gutter, such curb and gutter shall be replaced to match type and geometry of the removed curb and gutter shall be installed in accordance with City of Fort Worth Public Works Department Standard Specification for Construction, Item 502. Payment for cutting, backfill, concrete, forming materials and all other associated appurtenances required, shall be included in the square yard price of the bid item for concrete sidewalk or driveway repair. D-21 MISCELLANEOUS PLACEMENT OF MATERIAL Material has been allocated under various bid items in the Proposal to establish unit prices for =� miscellaneous placement of material. These materials shall be used only when directed by the Engineer, depending on field conditions. Payment for miscellaneous placement of material will be made for only that amount of material used, measured to the nearest one-tenth unit. Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. D-22 CRUSHED LIMESTONE BACKFILL Where specified on the plans or directed by the Engineer, Crushed Limestone shall be used for trench backfill on this project. The material shall conform to Public Works Standard Specifications for Street and Storm Drain Construction Division 2 Item 208.2- Materials and Division 2 Item 208.3- Materials Sources. Trench backfill and compaction shall meet the requirements of E2-2 Excavation and Backfill, Construction Specifications, General Contract Documents. Payment for crushed limestone backfill in place shall be made at the unit price bid in the Proposal multiplied by the quantity of material used measured in accordance with E2-2.16 Measurement of Backfill Materials, Construction Specifications, and General Contract Documents. D-23 2:27 CONCRETE Transportation and Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts Figures 1 through 5 refer to using 2:27 Concrete as base repair. Since this call- out includes the word "concrete", the consistent interpretation of the Transportation and Public Works Department is that this ratio specifies two (2)sacks of cement per cubic yard of concrete. D-24 TRENCH EXCAVATION, BACKFILL, AND COMPACTION ,. 05106104 SC-12 PM PART Q - SPECIAL CONDITIONS Trench excavation and backfill under parking lots, driveways, gravel surfaced roads, within easements, and within existing or future R.O.W. shall be in accordance with Sections E1-2 d. Backfill and E2-2 Excavation and Backfill of the General Contract Documents and Specifications except as specified herein. VP 1. TRENCH EXCAVATION: In accordance with Section E2-2 Excavation and Backfill, if the stated maximum trench widths are exceeded, either through accident or otherwise, and if the o„ Engineer determines that the design loadings of the pipe will be exceeded, the Contractor will be required to Support the pipe with an improved trench bottom. The expense of such remedial measures shall be entirely the Contractor's own. All trenching operations shall be confined to the width of permanent rights-of-way, permanent easements, and any temporary construction easements. All excavation shall be in strict compliance with the Trench Safety Systems Special Condition of this document. 2. TRENCH BACKFILL: Trenches which lie outside of existing or future pavement shall be backfilled above the top of the embedment material with Type"C" Backfill material. Excavated material used for Type"C" backfill must be mechanically compacted unless the Contractor can FEE furnish the Engineer with satisfactory evidence that the P.I. of the excavated material is less than 8. Such evidence shall be a test report from an independent testing laboratory and must include representative samples of soils in all involved areas, with a map showing the location and depth q. of the various test holes. If excavated material is obviously granular in nature, containing little or no plastic material, the Engineer may waive the test report requirement. See E1-2.3, Type "C" or "D" Backfill, and E2-2.11 Trench Backfill for additional requirements. When Type"C" back-fill material is not suitable, at the direction of the Engineer, Type"B" backfill material shall be used. i In general, all backfill material for trenches in existing paved streets shall be in accordance with Figure A. Sand material specified in Figure A shall be obtained from an approved source and rt, shall consist of durable particles free of thin or elongated pieces, lumps of clay, soil, loam or vegetable matter and shall meet the following gradation: • Less than 10% passing the#200 sieve • P.1. = 10 or less Additionally, the crushed limestone embedment gradation specified in Section E1-3 Crushed Limestone for Embedment of the General Contract Documents and Specifications shall be replaced with the following: Sieve Size % Retained 1" 0-10 1/2" 40-75 3/8" 55-90 #4 90-100 po #8 95-100 All other provisions of this section shall remain the same. 3. TRENCH COMPACTION: All trench backfill shall be placed in lifts per E2-2.9 Backfill. Trenches which lie outside existing or future pavements shall be compacted to a minimum of 90% Standard Proctor Density (A.S.T.M. D698) by mechanical devices specifically designed for compaction or a combination of methods subject to approval by the Engineer. d d l� 05106104 SC-13 PART Q - SPECIAL CONDITIONS Trenches which lie under existing or future pavement shall be backfilled per Figure A with 95% Standard Proctor Density by mechanical devices specifically designed for compaction or a combination of methods subject to approval by the Engineer. Backfill material to be compacted as described above must be within +-4% of its optimum moisture content. The top two (2)feet of sewer line trenches and the top eighteen (18)inches of water line may be rolled in with heavy equipment tires, provided it is placed in lifts appropriate to the material being used and the operation can be performed without damage to the installed pipe. The City, at its own expense, will perform trench compaction tests per A.S.T.M. standards on all trench backfill. Any retesting required as a result of failure to compact the backfill material to meet the standards will be at the expense of the Contractor and will be billed at the commercial rates as determined by the City. These soil density tests shall be performed at two (2)foot vertical intervals beginning at a level two (2)feet above the top of the installed pipe and continuing to the top of the completed backfill at intervals along the trench not to exceed 300 , linear feet. The Contractor will be responsible for providing access and trench safety system to the level of trench backfill to be tested. No extra compensation will be allowed for exposing the backfill layer to be tested or providing trench safety system for tests conducted by the City. 4. MEASUREMENT AND PAYMENT: All material, including any and all Type "B" backfill, and labor costs of excavation and backfill will be included in the price bid per linear foot of water and sewer pipe. D-25 PAVEMENT REPAIR (E2-19) The unit price bid under the appropriate bid item of the proposal shall cover all cost for providing MR pavement repair equal to or superior in composition, thickness, etc., to existing pavement as detailed in the Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts, Figures 1 through 5. All required paving cuts shall be made with a concrete saw in a true and straight line on both sides of the trench, a minimum of twelve (12) inches outside the trench walls. The trench shall be backfilled and the top nine (9) inches shall be filled with required materials as shown on paving details, compacted and level with the finished street surface. This finished grade shall be maintained in a serviceable condition until the paving has been replaced. All residential driveways shall be accessible at night and over weekends. It has been determined by the Transportation and Public Works Department that the strip of existing HMAC pavement between the existing gutter and the edge of the trench pavement repair will not hold up if such strip of existing pavement is two (2)feet or less in width. Therefore, at the locations in the project where the trench wall is three (3)feet or less from the lip of the existing gutter, the Contractor shall be required to remove the existing paving to such gutter. The pavement repair shall then be made from a minimum distance of twelve (12) inches outside the trench wall nearest the center of the street to the gutter line. The pavement shall be replaced within a maximum of five (5) working days, providing job placement conditions will permit repaving. If paving conditions are not suitable for repaving, in the opinion of the Owner, the repaving shall be done at the earliest possible date. A permit must be obtained from the Department of Engineering Construction Services Section by -; the Contractor in conformance with Ordinance No. 3449 and/or Ordinance No. 792 to make utility cuts in the street. The Department of Engineering will inspect the paving repair after construction. 05106104 SC-14 +� PART Q - SPECIAL CONDITIONS This permit requirement may be waived if work is being done under a Performance Bond and inspected by the Department of Engineering. D-26 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS) A. GENERAL: This specification covers the trench safety requirements for all trench excavations exceeding depth of five (5) feet in order to protect workers from cave-ins. The requirements of this item govern all trenches for mains, manholes, vaults, service lines, and On all other appurtenances. The design for the trench safety shall be signed and sealed by a Registered Professional Engineer licensed in Texas. The trench safety plan shall be spealfic for each water and/or sanitary sewer line included in the project. PP B. STANDARDS: The latest version of the U.S. Department of Labor, Occupational Safety and Health Administration Standards, 29 CFR Part 1926, Sub-Part P - Excavations, are hereby „P made a part of this specification and shall be the minimum governing requirements for trench safety. on C. DEFINITIONS: 1. TRENCHES - A trench is referred to as a narrow excavation made below the surface of the ground in which the depth is greater than the width, where the width measured at the 40 bottom is not greater than fifteen (15)feet. 2. BENCHING SYSTEM - Benching means excavating the sides of a trench to form one or a '� series of horizontal level or steps, usually with vertical or near-vertical surfaces between levels. 3. SLOPING SYSTEM- Sloping means excavating to form sides of a trench that are inclined away from the excavation. �r 4. SHIELD SYSTEM - Shields used in trenches are generally referred to as 'trench boxes" or "trench shields". Shield means a structure that is able to withstand the forces imposed on it by a cave-in and protect workers within the structure. Shields can be permanent P101 structures or can be designed to be portable and move along as the work progresses. w Shields can be either pre-manufactured or job-built in accordance with OSHA standards. P" 5. SHORING SYSTEM - Shoring means a structure such as a metal hydraulic, mechanical or timber system that supports the sides of a trench and which is designed to prevent cave-ins. Shoring systems are generally comprised of cross-braces, vertical rails, (uprights), horizontal rails(wales)and/or sheeting. D. MEASUREMENT - Trench depth is the vertical measurement from the top of the existing ground to the bottom of the pipe or structures. The quantity of trench safety systems shall be based on the linear foot amount of trench depth greater than five (5)feet. E. PAYMENT - Payment shall be full compensation for safety system design, labor, tools, materials, equipment and incidentals necessary for the installation and removal of trench safety systems. D-27 SANITARY SEWER MANHOLES A. GENERAL: The installation, replacement, and/or rehabilitation of sanitary sewer manholes will be required as shown on the plans, and/or as described in these Special Contract 05 06104 SC-15 PART D - SPECIAL CONDITIONS ` Documents in addition to those located in the field and identified by the Engineer. All manholes shall be in accordance with sections E1-14 Materials for Sanitary Sewer Manholes, Valve Vaults, Etc., and E2-14 Vault and Manhole Construction of the General Contract Documents and Specifications, unless amended or superseded by requirements of this Special Condition. For new sewer line installations, the Contractor shall temporarily plug all lines at every open manhole under construction in order to keep debris out of the dry sewer lines. The plugs shall not be removed until the applicable manhole complete with cone section has been constructed and the lid installed to keep out debris as a result of additional -� construction. I 1. CONCRETE COLLARS: Concrete collars will be required on all manholes specified as per Figure 121. 2. WATERTIGHT MANHOLE INSERTS: Watertight gasket manhole inserts shall be installed in all sanitary sewer manholes. Inserts shall be constructed in accordance with Fort Worth Water Department Standard E100-4 and shall be fitted and installed according to the manufacturer's recommendations. Stainless Steel manhole inserts shall be required for all pipe diameters 18" and greater. 3. LIFT HOLES: All lift holes shall be plugged with a pre-cast concrete plug. The lift hole shall be sealed on the outside of the manhole with Ram-Nek or an approved equal ,* sealant. The lift hole shall be sealed on the inside of the manhole with quick setting cement grout. 4. FINAL RIM ELEVATIONS: Manhole rims in parkways, lawns and other improved lands shall be at an elevation not more than one (1) nor less than one-half(1/2) inch above the surrounding ground. Backfill shall provide a uniform slope from the top of manhole casting for not less than three (3)feet each direction to existing finish grade of the ground. The grade of all surfaces shall be checked for proper slope and grade by string lining the entire area regarded near the manhole. Manholes in open fields, unimproved land, or drainage courses shall be at an elevation shown on the drawings or minimum of 6 inches above grade. 5. MANHOLE COVERS: All lids shall have pick slots in lieu of pick holes. Manhole frames and covers shall be McKinley, Type N, with indented top design, or equal, with pick slots. Covers shall set flush with the rim of the frame and shall have no larger than 1/8-inch gap between the frame and cover. Bearing surfaces shall be machine finished. Locking manhole lids and frames will be restricted to locations within the 100-year floodplain and areas specifically designated on the plans. Certain teed Ductile Iron Manhole Lids and Frames are acceptable for use where locking lids are specified. 6. SHALLOW CONE MANHOLES: Shallow manhole construction will be used when - manhole depth is four (4) feet or less. All shallow cone manholes shall be built in accordance with Figure 105. All shallow cone manholes shall have a cast iron lid and frame with pick slots. NOTE: MANHOLES PER FIGURE 106 WILL NOT BE ALLOWED. 7. MANHOLE STEPS: No manhole steps are to be installed on any sanitary sewer manhole. 8. EXTERIOR SURFACE COATING: Exterior surfaces of all manholes shall be coated with two mop coats of coal tar epoxy, Koppers "Bitumastic Super Service Black" Tnemec "46- 450 Heavy Tnemecol," or equal to, a minimum or 14 mils dry film thickness. OW6104 SC-16 PART D - SPECIAL CONDITIONS FN 9. MANHOLE JOINT SEALING: All interior and/or exterior joints on concrete manhole sections constructed for the City of Fort Worth Water Department, excluding only the joints using a trapped type performed O-ring rubber gasket shall require Bitumastic joint sealants as per Figure M. This sealant shall be pre-formed and trowelable Bitumastic as manufactured by Kent- Sea[, Ram-Nek, E-Z Stick, or equal. The joint sealer shall be'supplied in either extruded pipe form or suitable cross-sectional area or flat-tape and shy ll be sized as recommended by the manufacturer and approved by the Engineer. The point sealer shall be protected by PW a suitable removable wrapper and shall not in any way depend on oxidation, evaporation, or any other chemical action for either its adhesive properties or cohesive strength. The Joint sealer shall remain totally flexible without shrinking, hardening, or oxidizing regardless of the length of time it is exposed to the elements. The manufacturer shall furnish an affidavit attesting to the successful use of the product as a pre-formed flexible joint sealant on concrete pipe and manhole sections for a period of at least five years. B. EXECUTION: 1. INSTALLATION OF JOINT SEALANT: Each grade adjustment ring and manhole frame �. shall be sealed with the above-specified materials. All surfaces to be in contact with the joint sealant shall be thoroughly cleaned of dirt, sand, mud, or other foreign matter. The manufacturer shall apply a primer to all surfaces prior to installing the joint sealant in �.. accordance with the recommendations. The protective wrapper shall remain on the joint sealant until immediately prior to the placement of the pipe in the trench. After removal of the protective wrapper, the joint sealant shall be kept clean. Install frames and cover over manhole opening with the bottom of the rings resting on Bitumastic joint sealer. Frames and grade rings shall rest on two (2) rows (inside and outside)of Bitumastic joint sealer. 2. SEALING AND/OR ADJUSTING EXISTING MANHOLES: Excavate (rectangular full depth saw cut if in pavement) adjacent to the manhole to expose the entire manhole w frame and a minimum of 6 inches of the manhole wall keeping the sides of the trench nearly vertical. rt Remove manhole frame from the manhole structure and observe the condition of the frame and grade rings. Any frame or grade ring that is not suitable for use as determined PW by the Engineer shall be replaced. Grade rings that are constructed of brick, block materials other than pre-cast concrete rings, or where necessary and approved by the Engineer, shall be replaced with a pre-cast flattop section. Pre-cast concrete rings, or a ,. pre-cast concrete flattop section will be the only adjustments allowed. In brick or block manholes, replace the upper portion of the manhole to a point 24 inches below the frame. If the walls or cone section below this level are structurally unsound, notify the Engineer prior to replacement of the grade rings and manhole frame. Existing brickwork, if damaged by the Contractor, shall be replaced at the Contractor's expense. Wire brush manhole frame and exposed manhole surfaces to remove dirt and loose debris. Coat exposed manhole surfaces with an approved bonding agent followed by an application of quick setting hydraulic cement to provide a smooth working surface. If the inside diameter of the manhole is too large to safely support new adjustment rings or frames, a flat top section shall be installed. 05106104 SC-17 PART D - SPECIAL CONDITIONS Joint surfaces between the frames, adjustment rings, and cone section shall be free of dirt, stones, debris and voids to ensure a watertight seal. Place flexible gasket joint material along the inside and outside edge of each joint, or use trowelable material in lieu of pre-formed gasket material. Position the butt joint of each length of joint material on opposite sides of the manhole. No steel shims, wood, stones, or any material not specifically accepted by the Engineer may be used to obtain final surface elevation of the manhole frame. In paved areas or future paved areas, castings shall be installed by using a straight edge not less than ten (10)feet long so that the top of the casting will conform to the slope and finish elevation of the paved surface. The top of the casting shall be 1/8 inch below"the finished elevation. Allowances for the compression of the joint material shall be made to assure a proper final grade elevation. _ 3. EXPOSED EXTERIOR SURFACES: All exposed exterior surfaces shall be coated with two mop coats of coal tar epoxy. Kopper°Bitumastic Super Service Black"; Tnemec "46- 450 Heavy Tnemecol", or equal, to a minimum of 14 mils dry film thickness. 4. The exterior surface of all pre-cast section joints shall be thoroughly cleaned with a wire brush and then waterproofed with a 1/2-inch thick coat of trowelable bitumastic joint sealant from 6-inches below to 6-inches above the joint. The coated joint shall then be wrapped with 6 mil plastic to protect the sealant from damage during backflling. C. MEASUREMENT AND PAYMENT: The price bid for new manhole installations shall include all labor, equipment, and materials necessary for construction of the manhole including, but not limited to, joint sealing, lift hole sealing and exterior surface coating. Payment shall not include pavement replacement, which if required, shall be paid separately. The price bid for reconstruction of existing manholes shall include all labor equipment and materials necessary for construction of new manhole, including, but not limited to, excavation, backfill, disposal of materials, joint sealing, lift hole sealing and exterior surface coating. Payment shall not include pavement replacement, which if required, shall be paid separately. The price bid for adjusting and/or sealing of existing manholes shall include all labor, equipment and materials necessary for adjusting and/or sealing the manhole, including but not limited to,joint sealing, lift hole sealing, and exterior surface coating. Payment for concrete collars will be made per each. Payment for manhole inserts will be made per each. D-28 SANITARY SEWER SERVICES Any reconnection, relocation, re-routes, replacement, or new sanitary sewer service shall be required as shown on the plans, and/or as described in these Special Contact Documents in addition to those located in the field and identified by the Engineer as active sewer taps. The service connections shall be constructed by the Contractor utilizing standard factory manufactured tees. City approved factory manufactured saddle taps may be used, but only as directed by the Engineer. The decision to use saddle taps as opposed to tees shall be made on a case-by-case basis. The Contractor shall be responsible for coordinating the scheduling of tapping crews with building owners and the Engineer in order that the work be performed in an 05106104 SCA 8 PART D - SPECIAL CONDITIONS expeditious manner. A minimum of 24 hours advance notice shall be given when taps will be required. Severed service connections shall be maintained as specified in section C6-6.15. D. SEWER SERVICE RECONNECTION: When sewer service reconnection is called for the Contractor shall vertically adjust the existing sewer service line as required for reconnection and fumish a new tap. The fittings used for vertical adjustment shall consist of a maximum bend of 45 degrees. The tap shall be located so as to line up with the service line and avoid any horizontal adjustment. For open cut applications, all sanitary sewer service lines shall be replaced to the property or easement/ line, or as directed by the Engineer. Sanitary sewer services on sewers being rehabilitated using pipe enlargement methods shall be replaced to PP the property or easement line or as directed by the Engineer. Procedures listed below for Sewer Service Replacement shall be adhered to for the installation of any sewer service line including the incidental four (4) feet of service line which is included in the price bid for Sanitary Sewer Taps. Payment for work such as backfill, saddles, tees, fittings incidental four (4) feet of service line and all other associated appurtenances required shall be included in the price bid for Sanitary Sewer Taps. E. SEWER SERVICE REPLACEMENT: All building sewer services encountered during construction shall be adjusted and/or replaced by the Contractor as directed by the Engineer as required for the connection of the sewer service line. If the sewer service line is in such condition or adjustment necessitates the replacement of the sewer service line, all work shall be performed by a licensed plumber. The Engineer shall determine the length of the replacement. All sewer services shall be installed at a minimum of two (2)percent slope or as approved by the Engineer. For situations involving sewer service re-routing, whether on public or private property, the City shall provide line and grade for the sewer service lines as shown on the project plans. Prior to installing the applicable sewer main or lateral and the necessary service lines, the Contractor shall verify (by de-holing at the building clean-out) the elevations (shown on the plans) at the building clean-out and compare the data with the elevation at the proposed connection point on the sewer main, in order to ensure that the two (2) percent minimum slope (or as specified by the Engineer) requirement is satisfied. ° Elevations shall also be verified at all bend locations on the service re-route. All applicable sewer mains, laterals and affected service lines that are installed without pre-construction de- holing at the affected residences (to verify design elevations) shall be removed and replaced as necessary at the Contractor's expense in the event grade conflicts are brought to light after de-holing is conducted. All elevation information obtained by the Contractor shall be submitted to the Inspector. The Engineer shall be immediately notified in the event that the *� two (2) percent minimum slope is not satisfied. If the Contractor determines that a different alignment for the re-route is more beneficial than shown on the plans, the Contractor shall obtain and submit all relevant elevation information for the new alignment to the Inspector and shall be responsible for ensuring that the two (2) percent minimum grade (or as approved by the Engineer) is satisfied. Prior to backfilling, the Contractor shall double check the grade of the installed service line and submit signed documentation verifying that the line has been installed as designed to the Engineer. The Contractor, at its sole expense, shall be required to uncover any sewer service for which no grade verification has been submitted. All re- routes that are not installed as designed or fail to meet the City code shall be reinstalled at the Contractor's expense. The Contractor shall ensure that the service line is backfilled and compacted in accordance with the City Plumbing Code. Connection to the existing sewer service line shall be made with appropriate adapter fittings. The fitting shall be a urethane or neoprene coupling A.S.T.M. C-425 with series 300 stainless steel compression straps. The Contractor shall remove the existing clean-out and plug the abandoned sewer service line. 05106104 SC-19 PART D - SPECIAL CONDITIONS The contractor shall utilize schedule 40 PVC for all sanitary sewer service re-routes or relocations located on private property. Furthermore, the contractor shall utilize the services of a licensed plumber for all service line work on private property. Permit(s) must be obtained from the City of Fort Worth Development Department for all service line work on private property and all work related to the service line must be approved by a City of Fort Worth �+ Plumbing Inspector. A copy of the plumbing permit shall be provided to the Engineer prior to beginning work on the sanitary sewer service re-route and proof of final acceptance by the Plumbing Inspector shall be provided to the Engineer upon completion of the sanitary sewer re-route. - I Payment for work and materials such as backfill, removal of existing clean-outs, plugging the abandoned sewer service line, double checking the grade of the installed service line, pipe fittings, surface restoration on private property (to match existing), and all other associated work for service replacements in excess of four (4) linear feet shall be included in the linear foot price bid for sanitary sewer service line replacement on private property or public right of way. Payment for all work and material involving the 'tap" shall be included in the price bid for sanitary sewer service taps. D-29 REMOVAL, SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES Any removal, salvaging and/or abandonment of existing facilities will necessarily be required as shown on the plans, and/or described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. This work shall be done in accordance with Section E2-1.5 Salvaging of Material and E2-2.7 Removing Pipe, of the General Contract Documents and Specifications, unless amended or superseded by requirements of this Special Condition. A. SALVAGE OF EXISTING WATER METER AND METER BOX: Existing water meter and meter box shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. B. SALVAGE OF EXISTING WATER METER AND CONCRETE VAULT LID: Existing water meter and concrete vault lid shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The �• concrete vault shall be demolished in place to a point not less than 18 inches below final grade. The concrete vault shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. C. SALVAGE OF EXISTING FIRE HYDRANTS: Existing fire hydrants shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. D. SALVAGE OF EXISTING GATE VALVE: Existing gate valve and valve box and lid shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void area caused by the valve removal shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and 05106104 SC-20 r PART Q - SPECIAL CONDITIONS grade. If the valve is in a concrete vault, the vault shall be demolished in place to a point no less than 18" below final grade. E. ABANDONMENT OF EXISTING GATE VALVE: Existing gate valve and box lid shall be abandoned by first closing the valve to the fully closed position and demolishing the valve box in place to a point not less than 18 inches below final grade. Concrete shall then be used as backfill material to match existing grade. F. ABANDONMENT OF EXISTING VAULTS: Vaults to be demolished in place shall have top slab and lid removed and vault walls demolished to a point not less than 18" below final grade. The void area caused shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with the existing surrounding grade. G. ABANDONMENT OF MANHOLES: Manholes to be abandoned in place shall have all pipes entering or exiting the structure plugged with lean concrete. Manhole top or cone section shall be removed to the top of the full barrel diameter section, or to point not less than 18 inches below final grade. The structure shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be either PS clean washed sand of clean, suitable excavated material approved by the Engineer. Surface restoration shall be compatible with surrounding service surface. Payment for work involved in backfilling, plugging of pipe(s) and all other appurtenances required, shall be included in the appropriate bid item -Abandon Existing Sewer Manhole. H. REMOVAL OF MANHOLES: Manholes to be removed shall have all pipes entering or exiting the structure disconnected. The complete manhole, including top or cone section, all full barrel diameter section, and base section shall be removed. The excavation shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be with Type C Backfill or Type B Backfill, as approved by the FF Engineer. Surface restoration shall be compatible with surrounding surface. i- 1. CUTTING AND PLUGGING EXISTING MAINS: At various locations on this project, it may be required to cut, plug, and block existing water mains/services or sanitary sewer mains/services in order to abandon these lines. Cutting and plugging existing mains and/or services shall be considered as incidental and all costs incurred will be considered to be included in the linear foot bid price of the pipe, unless separate trenching is required. J. REMOVAL OF EXISTING PIPE: Where removal of the existing pipe is required, it shall be the Contractor's responsibility to properly dispose of all removed pipe. All removed valves, fire hydrants and meter boxes shall be delivered to Water Department Field Operation, Storage Yard. C. PAYMENT: Payment for all work and material involved in salvaging, abandoning and/or removing existing facilities shall be included in the linear foot bid price of the pipe, except as follows: separate payment will be made for removal of all fire hydrants, gate valves, 16 inch rand larger, and sanitary sewer manholes, regardless of location. Payment will be made for salvaging, abandoning and/or removing all other existing facilities *'~ when said facility is not being replaced in the same trench (i.e., when removal requires a separate trench). r05106104 SC-21 r PART D - SPECIAL CONDITIONS L. ABANDONMENT OF EXISTING SEWER LINES: Where plans call for abandonment of existing sewer mains after the construction of a new sewer main, the Contractor shall be responsible for TV inspection of 100% of the existing sewer main to be abandoned to make a final determination that all existing service connections have been relocated to the new main. Once this determination has been made, the existing main will be abandoned as indicated above in Item I. D- 30 DETECTABLE WARNING TAPES Detectable underground utility warning tapes which can/be located from the surface by a pipe detector shall be installed directly above non-metallic water and sanitary sewer pipe. The detectable tape shall be "Detect Tape" manufactured by Allen Systems, Inc. or approved equal, '! and shall consist of a minimum thickness 0.35 mils solid aluminum foil encased in a protective inert plastic jacket that is impervious to all known alkalis, acids, chemical reagents and solvents found in the soil. The minimum overall thickness of the tape shall be 5.5 mils, and the width shall -� not be less than two inches with a minimum unit weight of 2'/ pounds/1 inch/100'. The tape shall be color coded and imprinted with the message as follows: Tvae of Utility Color Code Legends Water Safety Blue Caution! Buried Water Line Below Sewer Safety Green Caution! Buried Sewer Line Below Installation of detectable tapes shall be per manufacturers recommendations and shall be as " close to the grade as is practical for optimum protection and detectability. Allow a minimum of 18 inches between the tape and the pipe. Payment for work such as'backfill, bedding, blocking, detectable tapes, and all other associated appurtenances required shall be included in the unit price bid for the appropriate bid item(s). D- 31 PIPE CLEANING Joints shall be wiped and then inspected for proper installation by the inspectors. Each joint shall be swept daily and kept clean during installation. A temporary night plug shall be installed on all exposed pipe ends during any period of work stoppage. D- 32 DISPOSAL OF SPOIL/FILL MATERIAL Prior to the disposing of any spoil/fill material, the Contractor shall advise the Director of dw Engineering Department, acting as the City of Fort Worth's Flood Plain Administrator ("Administrator"), of the location of all sites where the Contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites have been determined by the Administrator to meet the requirements of the Flood Plain Ordinances of the City of Fort Worth (Ordinance No. 10056). All disposal sites must be approved by the Administrator to ensure that filling is not occurring within a floodplain without a permit. A floodplain permit can be issued upon approval of necessary Engineering studies. No fill permit is required if disposal sites are not in a floodplain. Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood . plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit, including any necessary Engineering studies, shall be at the Contractor's expense. In the event that the Contractor disposes of spoil/fill material at a site ., without a fill permit or a letter from the administrator approving the disposal site, upon notification by the Director of Engineering Department, Contractor shall remove the spoil/fill material at its 05106104 SC-22 MM r PART D - SPECIAL CONDITIONS expense and dispose of such materials in accordance with the Ordinances of the City and this section. D- 33 MECHANICS AND MATERIALMEN'S LIEN The Contractor shall be required to execute a release of mechanics and material men's liens upon receipt of payment. D-34 SUBSTITUTIONS The specifications for materials set out the minimum standard of quality, which the City believes l necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received written permission of the Engineer to make a substitution for the material, which has been specified. Where the term 'or equal", or"or approved equal" is used, it is understood that if a material, product, or piece of equipment bearing the name so used is furnished, it will be approvable, as the particular trade name was used for the purpose of establishing a standard of quality acceptable to the City. If a product of any other name is proposed for use, the Engineer's approval thereof must be obtained before the Contractor procures the proposed substitute. Where the term "or equal", or"or approved equal" is not used in the specifications, this does not necessarily exclude alternative items or material or equipment which may accomplish the intended purpose. However, the Contractor shall.have the full responsibility of proving that the proposed substitution is, in fact, equal, and the Engineer, as the representative of the City, shall be the sole judge of the acceptability of substitutions. The provisions of this sub-section as related to°substitutions" shall be applicable to all sections of these specifications. D- 35 PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER A. GENERAL: Prior to the reconstruction, ALL sections of existing sanitary sewer lines to be abandoned, removed (except where being replaced in the same location), or rehabilitated (pipe enlargement, cured-in-place pipe, fold and form pipe, slip-line, etc.), shall be cleaned, and a television inspection performed to identify any active sewer service taps, other sewer laterals and their location. Work shall consist of furnishing all labor, material, and equipment necessary for the cleaning and inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. 1. HIGH VELOCITY JET HYDROCLEANING EQUIPMENT: The high-velocity sewer line ( ) 9 tY cleaning equipment shall be constructed for easy and safe operation. The equipment shall also have a selection of two or more high-velocity nozzles. The nozzles shall be capable of producing a scouring action from 15 to 45 degrees in all size lines designated to be cleaned. Equipment shall also include a high-velocity gun for washing and scouring manhole walls and floor. The gun shall be capable of producing flows from a fine spray to a solid stream. The equipment shall carry its own water tank, auxiliary engines, pumps, and hydraulically driven hose reel. Hydraulically Propelled Equipment shall be of a movable dam type and be constructed in such a way that a portion of the dam may be collapsed at any time during the cleaning operation to protect against flooding of the sewer. The movable dam shall be equal in diameter around the outer periphery to ensure removal of grease. If sewer cleaning balls or other equipment, which cannot be collapsed, is used, special precautions to prevent flooding of the sewers and public or private property shall be taken. The flow of sewage present in the sewer lines shall be utilized to provide necessary fluid for hydraulic cleaning devices whenever possible. 05/06404 SC-23 PART D - SPECIAL CONDITIONS 2. CLEANING PROCEDURES: The designated sewer manholes shall be cleaned using high-velocity jet equipment. The equipment shall be capable of removing dirt, grease, rocks, sand, and other materials and obstructions from the sewer lines and manholes. If cleaning of an entire section cannot be successfully performed from one manhole, the equipment shall be set up on the other manhole and cleaning again attempted. If, again, successful cleaning cannot be performed or equipment fails to traverse the entire manhole section, it will be assumed that a major blockage exists, and the cleaning effort shall be abandoned. When additional quantities of water from fire hydrants are necessary M, to avoid delay in normal working procedures, the water shall be-conserved and not used unnecessarily. No fire hydrant shall be obstructed in case of a fire in the area served by the hydrant. Before using any water from the City Water Distribution System, the Contractor shall apply for and receive permission from the Water Department. The Contractor shall be responsible for the water meter and related charges for the setup, including the water usage bill. All expenses shall be considered incidental to cleaning. 3. DEBRIS REMOVAL AND DISPOSAL: All sludge, dirt, sand, rock, grease, and other solid or semisolid material resulting from the cleaning operation shall be removed at the downstream manhole of the section being cleaned. Passing material from manhole section to manhole section, which could cause line stoppages, accumulations of sand in wet wells, or damage pumping equipment, shall not be permitted. 4. All solids or semisolid resulting from the cleaning operations shall be removed from the site and disposed of at a site designated by the Engineer. All materials shall be removed from the site no less often than at the end of each workday and disposed of at no additional cost to the City. 5. UNDER NO CIRCUMSTANCE SHALL SEWAGE OR SOLIDS REMOVED THEREFROM .� BE DUMPED ONTO STREETS OR INTO DITCHES, CATCH BASINS, STORM DRAINS OR SANITARY SEWER MANHOLES. 6. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe. The camera shall be operative in 100% humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. B. EXECUTION: 1. TELEVISION INSPECTION: The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line. When manually operated winches are used to pull the television camera through the line, telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. 05106104 SC-24 PART D - SPECIAL. CONDITIONS I� The importance of accurate distance measurements is emphasized. All television inspection videotapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of meter device. Marking on the cable, or .. the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. The City makes no guarantee that all of the sanitary sewers to be�entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor. The cost of retrieving the Television camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to fi Television inspection. 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service taps observed during inspection. In addition, other points of significance such as locations of unusual conditions, roots, storm sewer connections, broken pipe, presence of scale and corrosion, and other discernible features will be recorded, and a copy of such records will be supplied to the City. 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes. The Engineer will return tapes to the Contractor upon completion of review. Tapes shall not be erased without the permission of the Engineer. If the tapes are of such poor quality that the Engineer is unable to evaluate the condition of the sewer line or to locate service connections, the Contractor shall be required to re-televise and provide a good tape of the line at no additional cost to the City. If a good tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for-televising this portion shall be made. Also, no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the television camera. THE TAPES SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO CONSTRUCTION FOR REVIEW AND DETERMINATION OF SAGS. Upon completion of review of the tapes by the Engineer, the Contractor will be notified as to which sections of the sanitary sewer are to be corrected. The Engineer will return tapes to the Contractor upon completion of review. All costs associated with this work shall be incidental to unit prices bid for items under Television Inspection of the Proposal. 05106104 SC-25 PAIN D - SPECIAL CONDITIONS C. PAYMENT OF CLEANING AND PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS: The cost for Pre-Construction Cleaning and Television Inspection of sanitary sewers shall be per linear foot of sewer actually televised. The Contractor shall provide the Engineer with tapes of a quality that the particular piece of sewer can be readily evaluated as to existing sewer conditions and for providing appropriate means for review of the tapes by the Engineer including collection and removal, transportation and disposal of sand and debris from the sewers to a legal dump site. Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The primary purpose of cleaning is for television inspection and rehabilitation; when a portion -, of a line is not or cannot be televised or rehabilitated, the cleaning of that portion of line shall be incidental and no payment shall be made. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to beat the option of the Contractor, and the costs must be included in the bid price for TV Inspections. The cost of retrieving the TV Camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to TV Inspection. The item shall also include all costs of installing and maintaining any bypass pumping required to provide reliable, regular sewer service to the area residents. All bypass pumping shall be incidental to the project. D- 36 VACUUM TESTING OF SANITARY SEWER MANHOLES D. GENERAL: This item shall govern the vacuum testing of all newly constructed sanitary sewer manholes. B. EXECUTION: 1. TEST PROCEDURE: Manholes shall be vacuum tested prior to any interior grouting with all connections in place. Lift holes shall be plugged, and all drop-connections and gas sealing connections shall be installed_prior to testing. The sewer lines entering the manhole shall be plugged and braced to prevent the plugs from being drawn into the manhole. The plugs shall be installed in the lines beyond the drop-connections, gas sealing connections, etc. The test head shall be placed inside the frame at the top of the manhole and inflated in accordance with the manufacturer's recommendations. A vacuum of ten inches of mercury (10"Hg) shall be drawn and the vacuum pump will be turned off. With the valve closed, the level of vacuum shall be read after the required test time. The required test time shall be determined from the Table I below in accordance with ASTM C1244-93: Table I MINIMUM TIME REQUIRED FOR VACUUM DROP OF 1" H9 (10"Hg-9"'Hg)(SEC) Depth of MH. 48-Inch Dia. 60-Inch Dia. (FT.) Manhole Manhole 0 to 16' 40 sec. 52 sec. 05106104 SC-26 PART D - SPECIAL CONDITIONS 18' 45 sec. 59 sec. 20' 50 sec. 65 sec. 22' 55 sec. 72 sec. 24' 59 sec. 78 sec. 26' 64 sec. 85 sec. i 28' 69 sect. 91 sec. 30' 74 sec. 98 sec. For Each 5 sec. 6 sec. Additional 2' F0 2. ACCEPTANCE: The manhole shall be considered acceptable, if the drop in the level of vacuum is less than one-inch of mercury (1" Hg) after the required test time. Any manhole, which fails to pass the initial test, must be repaired by either pressure grouting through the manhole wall or digging to expose the exterior wall of the manhole in order to locate the leak and seal it with an epoxy sealant. The manhole shall be retested as described above until it has successfully passed the test. Following completion of a successful test, the manhole shall be restored to its normal condition, all temporary plugs shall be removed, all braces, equipment, and debris shall be removed and disposed of in a manner satisfactory to the Engineer. C. PAYMENT: Payment for vacuum testing of sanitary sewer manholes shall be paid at the contract price per each vacuum test. This price shall include all material, labor, equipment, and all incidentals, including all bypass pumping, required to complete the test as specified herein. D- 37 BYPASS PUMPING The Contractor shall bypass the sewage around the section or sections of sewer to be rehabilitated and/or replaced. The bypass shall be made by plugging existing upstream manhole and pumping the sewage into a downstream manhole or adjacent system or other method as may be approved by the Engineer. The pump and bypass lines shall be of adequate capacity and size to handle the flow without sewage backup occurring to facilities connected to the sewer. Provisions shall be made at driveways and street crossings to permit safe vehicular travel without interrupting flow in the bypass system. Under no circumstances will the Contractor be permitted to discharge sewage into the trenches. Payment shall be incidental to rehabilitation or 0 replacement of the sewer line. D-38 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER A. GENERAL: After construction, ALL sections of sanitary sewer lines shall have a television inspection performed by an independent sub-Contractor hired by the prime Contractor. Work shall consist of furnishing all labor, material, and equipment necessary for inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. it B. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the 05106104 SC-27 1� PART D - SPECIAL CONDITIONS camera shall be operative in 100% humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. C. EXECUTION: 1. TELEVISION INSPECTION: The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line. No more than 2000 linear feet of pipe will be televised at one time for review by the Engineer. When manually operated winches are used to pull the television camera through the line, telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. The importance of accurate distance measurements is emphasized. All television inspection video tapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of meter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor. The cost or retrieving the Television camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to Television inspection. Sanitary sewer mains must be laced with enough water to fill all low pints. The television inspection must be done immediately following the lacing of the main with no water flow. If sewer is active, flow must be restricted to provide a clear image of sewer being inspected. -+ 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service tap observed during inspection. All television logs shall be referenced to stationing as shown on the plans. A copy of these television logs will be supplied to the City. 3. PHOTOGRAPHS. Instant developing, 35 mm, or other standard-size photographs of the television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes 05106104 SC-28 r PART D - SPECIAL CONDITIONS r shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes. Tapes will be returned to the Contractor upon completion of review by the Engineer. Tapes shall not be erased without the permission of the Engineer. If the tapes are of such Door quality that the Engineer is unable to evaluate the condition of the sewer line or to locate service connections. the Contractor shall be required to re- televise and rprovide a good tape of the line at no additional cost to the City. If a good tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for televising this portion shall be made. Also, no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the television camera. D. PAYMENT OF POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS: The cost for post-construction Television Inspection of sanitary sewers shall be per linear foot of sewer televised. The Contractor shall provide the Engineer with tapes of a �^. quality that the particular piece of sewer can be readily evaluated as to sewer conditions and for providing appropriate means for review of the tapes by the Engineer. r Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The quantity of TV inspection shall be measured as the total length of new pipe installed. All costs associated with this work shall be included in the appropriate bid item - Post-Construction Television Inspection. The item shall also include all costs of installing and maintaining any bypass pumping required to provide reliable, regular sewer service to the area residents. All bypass pumping shall be incidental to the project. D-39 SAMPLES AND QUALITY CONTROL TESTING A. The Contractor shall furnish, at its own expense, certifications by a private laboratory for all materials proposed to be used on the project, including a mix design for any asphaltic and/or Portland cement concrete to be used, and gradation analysis for sand and crushed stone to be used along with the name of the pit from which the material was taken. The contractor shall provide manufacturer's certifications for all manufactured items to be used in the project and will bear any expense related thereto. B. Tests of the design concrete mix shall be made by the contractor's laboratory at least nine days prior to the placing of concrete using the same aggregate, cement, and mortar which are to be used later in the concrete. The Contractor shall provide a certified copy of the test results to the City. C. Quality control testing of in-place material on this project will be performed by the city at its own expense. Any retesting required as a result of failure of the material to meet project specifications will be at the expense of the contractor and will be billed at commercial rates as determined by the City. The failure of the City to make any tests of materials shall in no way relieve the contractor of its responsibility to furnish materials and equipment conforming to the requirements of the contract. D. Not less than 24 hours notice shall be provided to the City by the Contractor for operations requiring testing. The Contractor shall provide access and trench safety system (if required) for the site to be tested, and any work effort involved is deemed to be included in the unit price for the item being tested. 05106104 SC-29 PART D - SPECIAL CONDITIONS E. The Contractor shall provide a copy of the trip ticket for each load of fill material delivered to the job site. The ticket shall specify the name of the pit supplying the fill material. D-40 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL A. DESCRIPTION: This item shall consist of temporary soil erosion sediment and water pollution control measures deemed necessary by the Engineer for the duration of the contract. These control measures shall at no time be used as a substitute for the permanent control measures unless otherwise directed by the Engineer and they shall not include measures taken by the CONTRACTOR to control conditions created by his construction operations. The temporary measures shall include dikes, dams, berms, sediment basins, fiber mats, jute netting, temporary seeding, straw mulch, asphalt mulch, plastic liners, rubble liners, baled-hay retards, dikes, slope drains and other devices. B. CONSTRUCTION REQUIREMENTS: The Engineer has the authority to define erodible earth and the authority to limit the surface area of erodible-earth material exposed by preparing right-of-way, clearing and grubbing, the surface area of erodible-earth material exposed by -, excavation, borrow and to direct the CONTRACTOR to provide temporary pollution-control measures to prevent contamination of adjacent streams, other water courses, lakes, ponds or other areas of water impoundment. Such work may involve the construction of temporary berms, dikes, dams, sediment basins, slope drains and use of temporary mulches, mats, seeding, or other control devices or methods directed by the Engineer as necessary to control soil erosion. Temporary pollution-control measures shall be used to prevent or correct erosion that may develop during construction prior to installation of permanent pollution control features, but are not associated with permanent control features on the project. The Engineer will limit the area of preparing right-of-way, clearing and grubbing, excavation and borrow to be proportional to the CONTRACTOR'S capability and progress in keeping the finish grading, mulching, seeding, and other such permanent pollution-control measures current in accordance with the accepted schedule. Should seasonal conditions make such limitations unrealistic, temporary soil-erosion-control measures shall be performed as directed by the Engineer. 1. Waste or disposal areas and construction roads shall be located and constructed in a manner that will minimize the amount of sediment entering streams. 2. Frequent fordings of live streams will not be permitted; therefore, temporary bridges or other structures shall be used wherever an appreciable number of stream crossings are necessary. Unless otherwise approved in writing by the Engineer, mechanized equipment shall not be operated in live streams. 3. When work areas or material sources are located in or adjacent to live streams, such areas shall be separated from the stream by a dike or other barrier to keep sediment from entering a flowing stream. Care shall be taken during the construction and removal of such barriers to minimize the muddying of a stream. 4. All waterways shall be cleared as soon as practicable of false work, piling, debris or other obstructions placed during construction operations that are not a part of the finished work. 5. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes and a reservoirs with fuels, oils, bitumen, calcium chloride or other harmful materials. He shall conduct and schedule his operations so as to avoid or minimize siltation of streams, lakes and reservoirs and to avoid interference with movement of migratory fish. 0510e104 SC-30 r BART D - SPECIAL CONDITIONS C. MEASUREMENT AND PAYMENT: All work, materials and equipment necessary to provide temporary erosion control shall be considered subsidiary to the contract and no extra pay will be given for this work. D-41 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES The Contractor shall provide ingress and egress to the property being crossed by this construction and adjacent property when construction is not in progress and at night. Drives shall be left accessible at night, on weekends, and during holidays. The Contractor shall conduct his activities to minimize obstruction of access to drives and property during the progress of construction. Notification shall be made to an owner prior to his driveway being removed and/or rebuilt. D-42 PROTECTION OF TREES, PLANTS AND SOIL All property along and adjacent to the Contractors' operations including lawns, yards, shrubs, trees, etc., shall be preserved or restored after completion of the work, to a condition equal to or better than existed prior to start of work. Any trees or other landscape features scarred or damaged by the Contractor's operations shall be restored or replaced at the Contractor's expense. Trimming or pruning to facilitate the work will be permitted only by experienced workmen in an approved manner (No trimming or pruning without the property owners' consent). Pruned limbs of 1° diameter or larger shall be thoroughly treated as soon as possible with a tree wound dressing. By ordinance, the Contractor must obtain a permit from the City Forester before any work (trimming, removal, or root pruning) can be done on trees or shrubs growing on public property including street Rights-of-Ways and designated alleys. This permit can be obtained by calling the Forestry Office at 871-5738. All tree work shall be in compliance with pruning standards for Class II Pruning as described by the National Arborist Association. A copy of these standards can be provided by calling the above number. Any damage to public trees due to negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by the International Society of Arboriculture. Payment for negligent damage to public trees shall be made to the City of Fort Worth and may be withheld from funds due the Contractor by the City. To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Red Oak trees shall be immediately sealed using a commercial pruning paint. No separate payment will be made for any of the work involved for this item and all costs incurred will be considered a subsidiary cost of the project. D-43 SITE RESTORATION The contractor shall be responsible for restoring the site to original grade and condition after completion of his operations subject to approval of the Engineer. The basis for approval by the Engineer will be grade restoration to plus minus one-tenth (0.1)of a foot. D-44 CITY OF FORT WORTH STANDARD PRODUCT LIST Proposed products submitted in the bid documents must appear in the latest "City of Fort Worth Standard Product List, for the bid to be considered responsive. Products and processes listed in 0510&V4 SC-31 PART D - SPECIAL CONDITIONS 1. The specified seed shall equal or exceed the following percentages of Purity and germination: Common Name Puri It Germination Common Bermuda Grass 95% 90% Annual Rye Grass. 95% 95% Tall Fescue 95% 90% Western Wheatgrass 95% 90% Buffalo Grass Varieties Top Gun 95% 90% Cody 95% 90% Table 120.2.(2)a. URBAN AREA WARM-SEASON SEEDING RATE (lbs.); Pure Live Seed (PLS) Mixture for Clay or Tight Soils Mixture for Sandy Soils Dates (Eastern Sections) (Western Sections) (All Sections) Feb 1 Bermudagrass 40 Buffalograss 80 Bermudagrass 60 to Buffalograss 60 Bermudagrass 20 Buffalograss 40 May 1 Total: 100 Total: 100 Total: 100 Table, 120.2.(2)b At TEMPORARY COOL-SEASON SEEDING RATE; (lb.) Pure Live Seed (PLS) Dates (All Sections) Aug 15 Tall Fescue 50 to Western Wheatgrass 50 May 1 Annual Rye 50 Total: 100 CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross-sections shown on the Drawings and as provided for in other items of this Contract, seeding of the type specked shall be performed in accordance with the requirements hereinafter described. a. Watering. Seeded areas shall be watered as directed by the Engineer so as to prevent washing of the slopes or dislodgment of the seed. b. Finishing. Where applicable, the shoulders, slopes, and ditches shall be smoothed after seed bed preparation has been completed and shaped to conform to the cross-section previously provided and existing at the time planting operations were begun. +■r IF BROADCAST SEEDING: The seed or seed mixture in the quantity specified shall be uniformly distributed over the areas shown on the Drawings and where directed. If the sowing of seed is by hand, rather than by mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer shall be distributed at the same time provided the specified uniform rate of application for both is obtained. "Finishing" as specified in Section D-45, Construction Methods, is not applicable since no seed bed preparation is required. 05106104 SC-34 PAIN D - SPACIAL CONDITIONS DISCED SEEDING: Soil over the area shown on the Drawings as directed to be seeded shall • be loosened to a minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D-45, Construction Methods. The seed, or seed mixture, specified shall then be planted at the rate required and the application shall be made uniformly. If the sowing of seed is by hand rather than by mechanical methods, seed shall be raked, or harrowed into the soil to a depth of approximately one-eight(1/8) inch. The planted area shall be rolled with a corrugated roller of the "Cultipacker" type. All rolling of the slope areas shall be on the contour. ASPHALT MULCH SEEDING: The soil over the area shown on the Drawings, or as directed to be seeded, shall be loosened to the minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter, or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D- 45, Construction Methods. Water shall then be applied to the cultivated area of the seed bed until a minimum depth of six(6) inches is thoroughly moistened. After the watering, when the ground has become sufficiently dry to be loose and pliable, the seed, or seed mixture specified, shall then be planted at the rate required and the application ,. shall be made uniformly. If the sowing of seed is by hand, rather than mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer may be distributed at the same time, provided the specified uniform rate of application for both is obtained. After planting, the seed shall be raked or harrowed into the soil to a depth of approximately one-quarter (1/4) inch. The planted surface area and giving a smooth surface without ruts or tracks. In between the time compacting is completed and the asphalt is applied, the planted area shall be watered sufficiently to assure uniform moisture from the surface to a minimum of six(6) inches in depth. The application of asphalt shall follow the last watering as rapidly as possible. Asphalt shall be of the type and grade as shown on the Drawings and shall conform to the requirements of the item 300, "Asphalts, Oils and Emulsions". If the type of asphalt to be used is not shown on the Drawings, or if Drawings are not included, then MS-2 shall be used. Applications of the asphalt shall be at a rate of three-tenths (0.3) gallons per square yard. It shall be applied to the area in such a manner so that a complete film is obtained and the finished surface shall be comparatively smooth. r RE-SEEDING OF AREAS PLANTED WITH COOL SEASONS SPECIES: Areas where temporary cool season species have been planted may be replanted beginning February 1 with warm season species as listed in Table 120.2(2)a. The re-seeding will be achieved in the following manner. The cool season species shall be mowed down to a height of one (1) inch to insure that slit-seeding equipment will be able to cut through the turf and achieve adequate soil penetration. Slit-seeding, is achieved through the use of an implement which cuts a furrow (slit) in the soil and places the seed in the slit which is then pressed close with a cult packer wheel. 4. HYDROMULCH SEEDING: 0510604 SC-35 PART D - SPECIAL CONDITIONS If hydro mulch seeding is provided, seed mix shall have 95% purity of Bermuda grass and have a germination rate of 90%. Contractor shall ensure that the grass establishes. 5. CONSTRUCTION WITHIN PARK AREAS TURF RESTORATION OF PARK AREAS: FERTILIZER DESCRIPTION: "Fertilizer" will consist of providing and distributing fertilizer over such areas as are designated on the Drawings and in accordance with these Specifications. 1 MATERIALS: All fertilizer used shall be delivered in bags or containers clearly labeled showing the analysis. The fertilizer is subject to testing by the City of Fort Worth in accordance with the Texas Fertilizer Law. A pelleted or granulated fertilizer shall be used with an analysis of 16-20-0 or 16-5-8 or having the analysis shown on the Drawings. The figures in the analysis represent the percent of nitrogen, phosphoric acid, and potash nutrients respectively as determined by the methods of the Association of Official Agricultural Chemists. In the event it is necessary to substitute a fertilizer of a different analysis, it shall be a pelleted or granulated fertilizer with a lower concentration. Total amount of nutrients furnished and applied per acre shall equal or exceed that specified for each nutrient. CONSTRUCTION METHODS: When an item for fertilizer is included in the Drawings and proposal, pelleted or granulated fertilizer shall be applied uniformly over the area specified to be fertilized and in the manner directed for the particular item of work. Fertilizer shall be dry and in good physical condition. Fertilizer that is powdered to caked will be rejected. Distribution of fertilizer as a particular item of work shall meet the approval of the Engineer. Unless otherwise indicated on the Drawings, fertilizer shall be applied uniformly at the average rate of three hundred (300) pounds per acre for all types of "Sodding" and four hundred (400) pounds per acre for all types of"Seeding". MEASUREMENT: Topsoil secured from borrow sources will be measured by the square yard in place on the project site. Measurement will be made only on topsoils secured from borrow sources. Acceptable material for"Seeding"will be measured by the linear foot, complete in place. Acceptable material for"Sodding" will be measured by the linear foot, complete in place. Acceptable material for"Fertilizer" shall be subsidiary to the price of sodding or seeding. PAYMENT: All work performed as ordered and measured shall be subsidiary to the contract unless and otherwise noted in the plans and bid documents to be paid for at the unit price bid for each item of work. Its price shall be full compensation for excavating (except as noted below), loading, hauling, placing and furnishing all labor, equipment, tools, supplies, and incidentals necessary to complete work. All labor, equipment, tools and incidentals necessary to supply, transport, stockpile and place topsoil or salvage topsoil as specified shall be included in "Seeding" or "Sodding" bid items and will not be paid for directly. 0510604 SC-36 r PART D - SPECIAL CONDITIONS "Spot sodding" or "block sodding" as the case may be, will be paid for at the contract unit !" price per square yard, complete in place, as provided in the proposal and contract. The contract unit price shall be the total compensation for furnishing and placing all sod; for all rolling and tamping; for all watering; for disposal of all surplus materials; and for all materials, r labor, equipment, tools and incidentals necessary to complete the work, all in accordance with the Drawings and these Specifications. The work performed and materials furnished and measured as provided under "Measurement" shal) be paid for at the unit price for "Seeding", or "Sodding", of the type specified, as the case may be, which price shall each be full compensation for furnishing all materials and for performing all operations necessary to complete the work accepted as follows: Fertilizer material and application will not be measured or paid for directly, but is considered subsidiary to Sodding and Seeding. D-46 CONFINED SPACE ENTRY PROGRAM It shall be the responsibility of the contractor to implement and maintain a variable "CONFINED SPACE ENTRY PROGRAM" which must meet OSHA requirements for all its employees and subcontractors at all times during construction. All active sewer manholes, regardless of depth, are defined by OSHA, as "permit required confined spaces". Contractors shall submit an acceptable "CONFINED SPACE ENTRY PROGRAM" for all applicable manholes and maintain an active file for these manholes. The cost of complying with this program shall be subsidiary to the pay items involving work in confined spaces. D-47 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION 1. Prior to the final inspection being conducted for the project, the contractor shall contact the city inspector in writing when the entire project or a designated portion of the project is substantially complete. 2. The inspector along with appropriate City staff and the City's consultant shall make an inspection of the substantially completed work and prepare and submit to the contractor a list of items needing to be completed or corrected. 3. The contractor shall take immediate steps to rectify the listed deficiencies and notify the owner in writing when all the items have been completed or corrected. 4. Payment for substantial completion inspection as well as final inspection shall be subsidiary to the project price. Contractor shall still be required to address all other deficiencies, which are discovered at the time of final inspection. 5. Final inspection shall be in conformance with general condition item "C5-5.18 Final Inspection" of PART C- GENERAL CONDITIONS. - D-48 EXCAVATION NEAR TREES 6. The Contractor shall be responsible for taking measures to minimize damage to tree limbs, tree trunks, and tree roots at each work site. All such measures shall be considered as incidental work included in the Contract Unit Price bid for applicable pipe or structure installation except for short tunneling/tree augering. PW 05106104 SC-37 PART Q - SPECIAL CONDITIONS 7. Any and all trees located within the equipment operating area at each work site shall, at the direction of the Engineer, be protected by erecting a "snow fence" along the drip line or edge of the tree root system between tree and the construction area. 8. Contractor shall inspect each work site in, advance and arrange to have any tree limbs pruned that might be damaged by equipment operations. The Engineer shall be notified at least 24 hours prior to any tree trimming work. No trimming work will be permitted within private property without written permission of the Owner. 9. Nothing shall be stored over the tree root system within the drip line area of any tree. 10. Before excavation (off the roadway)within the drip line area of any tree, the earth shall be sawcut for a minimum depth of 2 feet. 11.At designated locations shown on the drawings, the "short tunnel" method using Class 51 D.I. pipe shall be utilized. 12. Except in areas where clearing is allowed, all trees up to 8" in diameter damaged during construction shall be removed and replaced with the same type and diameter tree at the contractor's expense. 13. Contractor shall employ a qualified landscaper for all the work required for tree care to ensure utilization of the best agricultural practices and procedures. 14. Short tunneling shall consist of power augering or hand excavation. The tunnel diameter shall not be larger than 1-1/2 times the outside pipe diameter. Voids remaining after pipe installation shall be pressure grouted. D-49 CONCRETE ENCASEMENT OF SEWER PIPE Concrete encasement of sewers shall be paid for at the Contract Unit Price per linear foot of concrete encasement as measured in place along the centerline of the pipe for each pipe diameter indicated. The Contract Unit Price shall include all costs associated with installation and reinforcement of the concrete encasement. D- 50 CLAY DAM Clay dam construction shall be performed in accordance with the Wastewater Clay Dam Construction, figure in the Drawings in these Specifications, at locations indicated on the Drawings or as directed by the City. Clay dams shall be keyed into undisturbed soil to make an impervious barrier to reduce groundwater percolation through the pipeline trench. Construction material shall consist of compacted bentonite clay or 2:27 concrete. Payment for work such as forming, placing and finishing shall be subsidiary to the price bid for pipe installation. D- 51 EXPLORATORY EXCAVATION (D-HOLE) The Contractor shall be responsible for verifying the locations of all existing utilities prior to construction, in accordance with item D-6. At locations identified on the drawings, contractor shall conduct an exploratory excavation (D-Hole), to locate and verify the location and elevation of the existing underground utility where it may be in potential conflict with a proposed facility alignment. The exploratory excavation shall be conducted prior to construction of the entire project only at locations denoted on the plans or as directed by the engineer. Contractor shall submit a report of findings (including surveyed elevations of existing conflicting utilities) to the City prior to the 05106104 SC-38 PART D - SPECIAL CONDITIONS start of construction of the entire project. if the contractor determines an existing utility is in conflict with the proposed facility, the contractor shall contact the engineer immediately for appropriate design modifications. The contractor shall make the necessary repairs at the exploratory excavation (D-Hole) to obtain a safe and proper driving surface to ensure the safety of the general public and to meet the approval of the City inspector. The contractor shall be liable for any and all damages incurred due to the exploratory excavation (D-Hole). Payment shall not be made for verification of existing utilities per item D-6. Payment for exploratory excavation (D-Hole), at locations identified on the plans or as directed by the Engineer, shall include full compensation for all materials, excavation, surface restoration, field surveys, and all incidentals necessary to complete the work, shall be the unit price bid. No r payment shall be made for exploratory excavation(s) conducted after construction has begun. A D- 52 INSTALLATION OF WATER FACILITIES 52.1 Polyvinyl Chloride (PVC) Water Pipe POLYVINYL Chloride Plastic Water Pipe and fittings on this Project shall be in accordance with the material standard contained in the General Contract Documents. Payment for work such as backfill, bedding, blocking, detectable tapes and all other associated appurtenant required, shall be included in the linear foot price bid of the appropriate BID ITEM(S). 52.2 Blocking Concrete blocking on this Project will necessarily be required as shown on the Plans and shall be installed in accordance with the General Contract Documents. All valves shall have concrete blocking provided for supporting. No separate payment will be made for any of the work involved for the item and all costs incurred will be considered to be included in the linear foot bid price of the pipe or the bid price of the valve. 52.3 Type of Casing Pipe 1. WATER: The casing pipe for open cut and bored or tunneled section shall be AWWA C-200 Fabricated Electrically Welded Steel Water Pipe, and shall conform to the provisions of E1-15, E1-5 and E1-9 in Material Specifications of General Contract Documents and Specifications for Water Department Projects. The steel casing pipe shall be supplied as follows: For the inside and outside of casing pipe, coal-tar protective coating in accordance with the requirements of Sec. 2.2 and related sections in AWWA C-203. Touch-up after field welds shall provide coating equal to those specified above. C. Minimum thickness for casing pipe used shall be 0.375 inch. Stainless Steel Casing Spacers (centering style) such as manufactured by Cascade Waterworks Manufacturing Company or an approved equal shall be used on all non- concrete pipes when installed in casing. Installation shall be as recommended by the Manufacturer. 2. SEWER: Boring used on this project shall be in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig. 110 of the General Contract Documents. o-5/0&04 SC-39 PART Q - SPECIAL CONDITIONS �. 3. PAYMENT: Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and incidental work shall be included in the unit price bid per foot. 52.4 Tie-Ins The Contractor shall be responsible for making tie-ins to the existing water mains. It shall be the responsibility of the Contractor to verify the exact location and elevation of the existing line tie-ins. And any differences in locations and elevation of existing line tie-ins between the contract drawings and what may be encountered in the field shall be considered as incidental to construction. The cost of making tie-ins to existing water or sanitary sewer mains shall be included in the linear foot bid price of the pipe. MR 52.5 Connection of Existing Mains The Contractor shall determine the exact location, elevation, configuration and angulation of existing water or sanitary sewer lines prior to manufacturing of the connecting piece. Any differences in locations, elevation, configuration, and or angulation of existing lines between the contract drawings and what may be encountered in the said work shall be considered as incidental to construction. Where it is required to shut down existing mains in order to make proposed connections, such down time shall be coordinated with the Engineer, and all efforts shall be made to keep this down time to a minimum. In case of shutting.down an existing main, the Contractor shall notify the Manager, Construction �` Services, Phone 871-7813, at least 48-hours prior to the required shut down time. The Contractor's attention is directed to Paragraph C5-5.15 INTERRUPTION OF SERVICE, Page C5-5(5), PART C - GENERAL CONDITIONS OF THE WATER DEPARTMENT aft GENERAL CONTRACT DOCUMENTS AND GENERAL SPECIFICATIONS. The Contractor shall notify the customer both personally and in writing as to the location, time, and schedule of the service interruption. The cost of removing any existing concrete blocking shall be included in the cost of connection. Unless bid separately all cost incurred shall be included in the linear foot .. price bid for the appropriate pipe size. 52.6 Valve Cut-Ins It may be necessary to cut-in gate valves to isolate the water main from which the extension and/or replacement is to be connected. This may require closing valves in other lines and putting consumers out of service for that period of time necessary to cut in the new valve; the work must be expedited to the utmost and all such cut-ins must be coordinated with the engineer in charge of inspection. All consumers shall be individually advised prior to the shut out and advised of the approximate length of time they may be without service. Payment for work such as backfill, bedding, fittings, blocking and all other associated appurtenants required, shall be included in the price of the appropriate bid items. 52.7 Water Services The relocation, replacement, or reconnection of water services will be required as shown �* on the plans, and/or as described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. All service's shall be constructed by the contractor utilizing approved factory manufactured tap saddles (when required) and corporation stops, type K copper water tubing, curb stops with lock wings, meter boxes, and if required approved manufactured 05106104 SC-40 PART D - SPECIAL CONDITIONS service branches. All materials used shall be as specified in the Material Standards (E1- `� 17 & E1-18)contained in the General Contract Documents. All water services to be replaced shall be installed at a minimum depth of 36 inches below final grade. w All existing 3/4-inch water service lines which are to be replaced shall be replaced with 1- inch Type K copper, 1-inch diameter tap saddle when required, and 1-inch corporation from the main line to the meter box. All services which are to be replaced or relocated shall be installed with the service main tap and service line being in line with the service meter unless otherwise directed by the Engineer. A minimum of 24 hours advance notice shall be given when service interruption will be required as specified in Section C5-5.15 INTERRUPTION OF SERVICE. All water service meters shall be removed, tagged, and collected by the contractor for pickup by the Water Department for reconditioning or replacement. After installation of the water service in the proposed location and receipt of a meter from the project inspector the contractor shall install the meter. The meter box shall be reset as necessary to be flush with existing ground or as otherwise directed by the Engineer. All such work on the outlet side of the service meter shall be performed by a licensed plumber. 15.WATER SERVICE REPLACEMENTS: Water service replacement or relocation is required when the existing service is lead or is too shallow to avoid breakage during street reconstruction. The contractor shall replace the existing service line with Type K copper from the main to the meter, curb stop with lock wings, and corporation stop. Payment for all work and materials such as backfill, fittings, type K copper tubing, curb stop with lock wings, service line adjustment, and any relocation of up to 12-inches from center line existing meter location to center line proposed meter location shall be included in the Linear Foot price bid for Copper Service Line from Main to five (5) feet behind Meter. Any vertical adjustment of customer service line within the 5 foot area shall be subsidiary to the service installation. Payment for all work and materials such as tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. 16. WATER SERVICE RECONNECTION: Water service reconnection is required when the existing service is copper and at adequate depth to avoid breakage during street reconstruction. The contractor shall adjust the existing water service line as required for reconnection and furnish a new tap with corporation stop. The contractor will be paid for one (1) Service Tap to Main for each service reconnected plus for any copper service line used in excess of five (5)feet from Main to five (5)feet behind the Meter. 17.WATER SERVICE METER AND METER BOX RELOCATIONS: When the replacement and relocation of a water service and meter box is required and the location of the meter and meter box is moved more than twelve (12) inches, as measured from the center line of the existing meter to location to the center line of the proposed meter location, separate payment will be allowed for the relocation of service meter and meter box. Centerline is defined by a line extended from the service tap-through the meter. Only relocations made OW6104 SC-41 LLT PART Q - SPECIAL. CONDITIONS perpendicular to this centerline will be paid for separately. Relocations made along the centerline will be paid of in feet of copper service line. — When relocation of service meter and meter box is required, payment for all work and materials such as backfill, fittings, five (5) feet of type K copper service and all materials, MR labor, and equipment used by and for the licensed plumber shall be included in the price bid for the service meter relocation. All other costs will be included in other appropriate bid item(s). This item will also be used to pay for all service meter and meter box relocations as required by the Engineer when the service line is not being replaced. Adjustment of only the meter box and customer service line within 5 feet distance behind the meter will not justify separate payment at any time. Locations with multiple service branches will be paid for as one service meter and meter box relocation. 4. NEW SERVICE: When new services are required the contractor shall install tap saddle (when required), corporation stop, type K copper service line, curb stop with lock wings, and meter box. Reinforced plastic meter boxes with cast iron lid shall be provided for all 2. inch water meters or smaller. The reinforced plastic water meter boxes shall comply with section E1-18A—Reinforced Plastic Water Meter Boxes. Payment for all work and materials such as backfill, fittings, type K copper tubing, and curb stop with lock wings shall be included in the Linear Foot price bid for Service Line from Main to Meter five (5)feet behind the meter. Payment for all work and materials such as tap saddle, corporation stops, and fittings shall be included in the price bid for Service Taps to Mains. Payment for all work and materials such as furnishing and setting new meter box shall be T included in the price bid for furnish and set meter box. 18. MULTIPLE SERVICE BRANCHES: When multiple service branches are required the "r contractor shall furnish approved factory manufactured branches. Payment for multiple service branches will include furnishing and installing the multiple dW service branch only and all other cost will be included in other appropriate bid item(s). 19. MULTIPLE STREET SERVICE LINES TO SINGLE SERVICE METER: Any multiple .. service lines with taps servicing a single service meter encountered during construction shall be replaced with one service line that is applicable for the size of the existing service meter and approved by the Engineer. Payment shall be made at the unit bid price in the appropriate bid item(s). 52.8 2-Inch Temporary Service Line A. The 2-inch temporary service main and 3/4-inch service lines shall be installed to provide temporary water service to all buildings that will necessarily be required to have severed water service during said work. The contractor shall be responsible for coordinating the schedule of the temporary service connections and permanent service reconnections with the building owners and the Engineer in order that the work be performed in an expeditious manner. Severed water service must be reconnected within 2 hours of discontinuance of service. 0506104 SC-42 PARS' D - SPECIAL. CONDITIONS A 2-inch tapping saddle and 2-inch corporation stop or 2-inch gate valve with an appropriate fire hydrant adapter fitting shall be required at the temporary service point of connection to the City water supply. The 2-inch temporary service main and 3/4-inch service lines shall be installed in accordance to the attached figures 1, 2 and 3. 2" 1r temporary service line shall be cleaned and sterilized by using chlorine gas or chlorinated lime(HTH) prior to installation. �• The out-of-service meters shall be removed, tagged and collected by the Contractor for delivery to the Water Department Meter Shog for reconditioning or replacement. Upon restoring permanent service, the Contractor shall re-install the meters at the correct location. The meter box shall be reset as necessary to be flush with the existing ground or as otherwise directed by the Engineer. O, The temporary service layout shall have a minimum available flow rate of 5 GPM at a dynamic pressure of 35 PSI per service tap. This criteria shall be used by the Contractor to determine the length of temporary service allowed, number of service taps and number of feed points. When the temporary service is required for more than one location the 2-inch temporary service pipes, 3/4-inch service lines and the 2-inch meter shall be moved to the next successive project location. Payment for work such as fittings, 3/4-inch service lines, asphalt, barricades, all service connections, removal of temporary services and all other associated appurtenants required, shall be included in the appropriate bid item. r, B. In order to accurately measure the amount of water used during construction, the Contractor will install a fire hydrant meter for all temporary service lines. Water used during construction for flushing new mains that cannot be metered from a hydrant will be estimated as accurately as possible. At the pre-construction conference the contractor will advise the inspector of the number of meters that will be needed along with the locations where they will be used. The inspector will deliver the hydrant meters to the locations. After installation, the contractor will take full responsibility for the meters until such time as the contractor returns those meters to the inspector. Any damage to the meters will be the sole responsibility of the contractor. The Water Department Meter Shop will evaluate the condition of the meters upon return and if repairs are needed the contractor will receive an invoice for those repairs. The issued meter is for this specific project and location only. Any water that the contractor may need for personal use will require a separate hydrant meter obtained by the Contractor, at its cost, from the Water Department. 52.9 Purging and Sterilization of Water Lines Before being placed into service all newly constructed water lines shall be purged and sterilized in accordance with E2-24 of the General Contract Documents and Specifications except as modified herein. The Contractor will furnish all water for INITIAL cleaning and sterilization of water lines. All materials for construction of the project, including appropriately sized "pipe cleaning pigs", chlorine gas or chlorinated lime (HTH) shall be furnished by the Contractor. Chlorinated lime (HTH) shall be used in sufficient quantities to provide a chlorine residual of fifty (50) PPM. The residual of free chlorine shall be measured after 24 hours and shall not be less than 10 parts per million of free chlorine. Chlorinated water shall be disposed of in the sanitary sewer system. Should a sanitary sewer not be available, chlorinated water shall be "de-chlorinated" prior to disposal. The 05106104 SC-43 MART Q - SPECIAL CONDITIONS line may not be placed in service until two successive sets of samples, taken 24 hours apart, have met the established standards of purity. Purging and sterilization of the water lines shall be considered as incidental to the project and all costs incurred will be considered to be included in the linear foot bid price of the F pipe. 52.10 Work Near Pressure Plane Boundaries Contractor shall take-note that the water line to be replaced under this contract may crosp or may be in close proximity to an existing pressure plane boundary. Care shall be taken to ensure all "pressure plane" valves installed are installed closed and no cross connections are made between pressure planes 52.11 Water Sample Station GENERAL: All water sampling station installations will be per attached Figure 34 or as required in large water meter vaults as per Figure 33 unless otherwise directed by the Engineer. ,* The appropriate water sampling station will be furnished to the Contractor free of charge; however, the Contractor will be required to pick up this item at the Field Operations Warehouse. PAYMENT FOR FIGURE 34 INSTALLATIONS: Payment for all work and materials necessary for the installation of the 3/4-inch type K copper service line will be shall be included in the price bid for copper Service Line from Main to Meter. Payment for all work and materials necessary for the installation tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, concrete support block, curb stop, fittings, and an incidental 5-feet of type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. PAYMENT FOR FIGURE 33 INSTALLATIONS: Payment for all work and materials necessary for the installation tap saddle, gate valve, and fittings shall be included in the price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, modification to the vault, fittings, and all type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. 52.12 Ductile Iron and Gray Iron Fittings Reference Part E2 Construction Specifications, Section E2-7 Installing Cast Iron Pipe, fittings, and Specials, Sub section E2-7.11 Cast Iron Fittings: E2-7.11 DUCTILE-IRON AND GRAY-IRON FITTINGS: All ductile-iron and gray-iron fittings shall be furnished with cement mortar lining as stated in Section E1-7. The price bid per ton of fittings shall be payment in full for all fittings, joint accessories, polyethylene wrapping, horizontal concrete blocking, vertical tie-down concrete blocking, and concrete cradle necessary for construction as designed. 05106104 SC-44 O' PART D - SPECIAL. CONDITIONS *' All ductile-iron and gray-iron fittings, valves and specials shall be wrapped with polyethylene wrapping conforming to Material Specification E1-13 and Construction Specification E2-13. Wrapping shall precede horizontal concrete blocking, vertical tie- down concrete blocking, and concrete cradle. Payment for the polyethylene wrapping, horizontal concrete blocking, vertical tie-down concrete blocking, and concrete cradle shall be included in bid items for vales and fittings and no other payments will be allowed. l D- 53 SPRINKLING FOR DUST CONTROL All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shall apply. However, no direct payment will be made for this item and it shall be considered to this contract. D- 54 DEWATERING The Contractor shall be responsible for determining the method of dewatering operation for the water or sewage flows from the existing mains and ground water. The Contractor shall be responsible for damage of any nature resulting from the dewatering operations. The DISCHARGE from any dewatering operation shall be conducted as approved by the Engineer. Ground water shall not be discharged into sanitary sewers. Dewatering shall be considered as incidental to a construction and all costs incurred will be considered to be included in the project price. D. 55 TRENCH EXCAVATION ON DEEP TRENCHES Contractor to prevent any water flowing into open trench during construction. Contractor shall not leave excavated trench open overnight. Contractor shall fill any trench the same day of excavation. No extra payment shall be allowed for this special condition. D. 56 TREE PRUNING A. REFERENCES: National Arborist Association's"Pruning Standards for Shade Trees". B. ROOT PRUNING EQUIPMENT } 1. Vibratory Knife 2. Vermeer V-1550RC Root Pruner C. NATURAL RESOURCES PROTECTION FENCE 3. Steel "T" = Bar stakes, 6 feet long. 4. Smooth Horse-Wire: 14-1/2 gauge (medium gauge)or 12 gauge (heavy gauge). 5. Surveyor's Plastic Flagging: "Tundra" weight, International fluorescent orange or red color. SC-45 r r r PART D — SPECIAL CONDITIONS d" 6. Combination Fence: Commercially manufactured combination soil separator fabric on wire mesh backing as shown on the Drawings. D. ROOT PRUNING MW 7. Survey and stake location of root pruning trenches as shown on drawings. 8. Using the approved specified equipment, make a cut a minimum of 36 inches deep in ON order to minimize damage to the undisturbed root zone. 9. Backfill and compact the trench immediately after trenching. AW 10. Place a 3-foot wide by 4-inch deep cover of mulch over the trench as required by the Engineer. dw 11. Within 24 hours, prune flush with ground and backfill any exposed roots due to construction activity. Cover with wood chips of mulch in order to equalize soil temperature and minimize water loss due to evaporation. 12. Limit any grading work within conservation areas to 3-inch maximum cut or fill, with no roots over 1-inch diameter being cut unless cut by hand or cut by specified methods, equipment and protection. E. MULCHING: Apply 2-inches to 4-inches of wood chips from trimming or clearing operation on areas designated by the Engineer. F. Tree Pruning shall be considered subsidiary to the project contract price. D- 57 TREE REMOVAL Trees to be removed shall be removed using applicable methods, including stump and root ball removal, loading, hauling and dumping. Extra caution shall be taken to not disrupt existing utilities both overhead and buried. The Contractor shall immediately repair or replace any damage to utilities and private property including, but not limited to, water and sewer services, pavement, fences, walls, sprinkler system piping, etc., at no cost to the Owner. All costs for tree removal, including temporary service costs, shall be considered subsidiary to the project contract price and no additional payment will be allowed. D- 58 TEST HOLES The matter of subsurface exploration to ascertain the nature of the soils, including the amount of rock, if any, through which this pipeline installation is to be made is the responsibility of any and all prospective bidders, and any bidder on this project shall submit his bid under this condition. Whether prospective bidders perform this subsurface exploration jointly or independently, and whether they make such determination by the use of test holes or other means, shall be left to the discretion of such prospective bidders. If test borings have been made and are provided for bidder's information, at the locations shown on the logs of borings in the appendix of this specification, it is expressly declared that neither the City nor the Engineer guarantees the accuracy for the information or that the material encountered in excavations is the same, either in character, location, or elevation, as shown on the boring logs. It shall be the responsibility of the bidder to make such subsurface investigations, as he deems necessary to determine the nature of the material to be excavated. 05106104 SC-46 PART D - SPECIAL CONDITIONS The Contractor assumes all responsibility for interpretation of these records and for making and maintaining the required excavation and of doing other work affected by the geology of the site. The cost of all rock removal and other associated appurtenances, if required, shall be included in the linear foot bid price of the pipe. D- 59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION Prior to beginning construction on any block in the project, the contractor shall, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: The notification notice or flyer shall be posted seven (7) days prior to beginning any construction activity on each block in the project area. The flyer shall be prepared on the Contractor's letterhead and shall include the following information: Name of Project, DOE No., Scope of Project (i.e. type of construction activity), actual construction duration within the block, the name of the contractor's foreman and his phone number, the name of the City's inspector and his r, phone number and the City's after-hours phone number. A sample of the 'pre-construction notification'flyer is attached. r, The contractor shall submit a schedule showing the construction start and finish time for each block of the project to the inspector. In addition, a copy of the flyer shall be.delivered to the City Inspector for his review prior to being distributed. The contractor will not be allowed to begin construction on any block until the flyer is delivered to all residents of the block. In the, event it becomes necessary to temporarily shut down water service to residents or businesses during construction, the contractor shall prepare and deliver a notice or flyer of the JW pending interruption to the front door of each affected resident. The notice shall be prepared as follows: The notification or flyer shall be posted twenty-four (24) prior to the temporary interruption. The flyer shall be prepared on the contractor's letterhead and shall include the following information: Name of the project, DOE number, the date of the interruption of service, the period the interruption will take place, the name of the contractor's foreman and his phone number and the name of the City's inspector and his phone number. A sample of the temporary water service interruption notification is attached. A copy of the temporary interruption notification shall be delivered to the inspector for his review prior to being distributed. The contractor shall not be permitted to proceed with interruption of water service until the flyer has been delivered to all affected residents and businesses. Electronic versions of the sample flyers can be obtained from the Construction office at (817) 871-8306. All work involved with the notification flyers shall be considered subsidiary to the contract price and no additional compensation shall be made. D-60 TRAFFIC BUTTONS 05106104 SC-47 BART D - SPECIAL. CONDITIONS The removal and replacement of traffic buttons is the responsibility of the contractor and shall be considered a subsidiary item. In the event that the contractor prefers for the Signals, Signs and Markings Division (SSMD)of the Transportation/Public Works Department to install the markings, the contractor shall contact SSMD at(817)871-8770 and shall reimburse SSMD for all costs incurred, both labor and material. No additional compensation shall be made to the contractor for this reimbursement. D-61 SANITARY SEWER SERVICE CLEA14OUTS Whenever a sanitary sewer service line is installed or replaced, the Contractor shall install a two- way service cleanout as shown in the attached detail. Cleanouts are to be installed out of high traffic areas such as driveways, streets, sidewalks, etc. whenever possible. When it is not possible, the cleanout stack and cap shall be cast iron. Payment for all work and materials necessary for the installation of the two-way service cleanout which are required to provide a complete and functional sanitary sewer cleanout shall be included in the price bid for Sanitary Sewer Service Cieanouts. D- 62 TEMPORARY PAVEMENT REPAIR The Contractor shall provide a temporary pavement repair immediately after trench backfill and compaction using a minimum of 2-inches of hot mix asphalt over a minimum of 6-inches of compacted flex base. The existing as halt shall be saw cut to provide a uniform edge and the temporary repair shall be rolled viijfla _ to provide a smooth transition between the R11 Jf, existing pavement and the temporary repair. The unit price bid under the appropriate bid item of the proposal shall cover all costs for providing temporary pavement repair for all street saw cutting prior to street reconstruction. D-63 CONSTRUCTION STAKES The City, through its Surveyor or agent, will provide to the Contractor construction stakes or other customary method of markings as may be found consistent with professional practice, "1 establishing line and grades for roadway and utility construction, and centerlines and benchmarks for bridgework. These stakes shall be set sufficiently in advance to avoid delay whenever practical. One set of stakes shall be set for all utility construction (water, sanitary sewer, drainage etc.), and one set of excavation/or stabilization stakes, and one set of stakes for curb and gutter/or paving. It shall be the sole responsibility of the Contractor to preserve, maintain, transfer, etc., all stakes furnished until completion of the construction phase of the project for which they were furnished. If the City or its agent determines that a sufficient number of stakes or markings provided by the City, have been lost, destroyed, or disturbed, to prevent the proper prosecution and control of the work contracted for in the Contract Documents, it shall be the Contractor's responsibility, at the Contractor's sole expense, to have such stakes replaced by an individual registered by the Texas Board of Professional Land Surveyor as a Registered Land Surveyor. No claims for delay due to lack of replacement of construction stakes will be accepted, and time will continue to be charged in accordance with the Contract Documents. D-64 EASEMENTS AND PERMITS The performance of this contract requires certain temporary construction, right-cif-entry agreements, and/or permits to perform work on private property. 05A)"4 SC-48 M4 BART O - SPECIAL. CONDITIONS The City has attempted to obtain the temporary construction and/or right-of-entry agreements for properties where construction activity is necessary on City owned facilities, such as sewer lines or manholes. For locations where the City was unable to obtain the easement or right-of-entry, it shall be the Contractor's responsibility to obtain the agreement prior to beginning work on subject property. This shall be subsidiary to the contract. The agreements, which the City has obtained, are available to the Contractor for review by contacting the plans desk at the Department of Engineering, City of Fort Worth. Also, it shall be the responsibility of the Contractor,to obtain PP written permission from property owners to perform such work as cleanout repair and sewer service replacement on private property. Contractor shall adhere to all requirements of Paragraph C6-6.10 of the General Contract Documents. The Contractor's attention is directed to the agreement terms along with any special conditions that may have been imposed on these agreements, by the property owners. The easements and/or private property shall be cleaned up after use and restored to its original condition or better. In event additional work room is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the property owners involved for the use of additional property required. No additional payment will be allowed for this item. The City has obtained the necessary documentation for railroad and/or highway permits required for construction of this project. The Contractor shall be responsible for complying with all provisions of such permits, including obtaining the requisite insurance, and shall pay any and all costs associated with or required by the permit(s). It is the Contractor's responsibility to provide the required flagmen and/or provide payment to the appropriate railroad/agency for all flagmen during construction in railroad/agency right-of-way. Any and all costs associated with compliance with permits(s) including payment for flagmen shall be subsidiary to the project price. No additional payment will be allowed for this item. D-65 PRE-CONSTRUCTION NEIGHBORHOOD MEETING After the pre-construction conference has been held but before construction is allowed to begin on this project a public meeting will be held at a location to be determined by the Engineer. The contractor, inspector, and project manager shall meet with all affected residents and present the projected schedule, including construction start date, and answer any construction related questions. Every effort will be made to schedule the neighborhood meeting within the two weeks following the pre-construction conference but in no case will construction be allowed to begin until this meeting is held. D-66 WAGE RATES The labor classifications and minimum wage rates set forth herein have been predetermined by r the City Council of the City of Fort Worth, Texas, in accordance with statutory requirements, as being the prevailing classifications and rates that shall govern on all work performed by the Contractor or any Subcontractor on the site of the project covered by these Contract Documents. -- In no event shall less than the following rates of wages be paid. (Attached) r D-67 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE A. It is the intent of the City of Fort Worth to comply with the requirements of the Asbestos NESHAP found at 40 CFR Part 61, Subpart M. This specification will establish procedures to be used by all Excavators in the removal and disposal of ACP in compliance with NESHAP. Nothing in this specification shall be construed to void any provision of a OSoe104 SC-49 PART D - SPECLAL CONDITIONS contract or other law, ordinance, regulation or policy whose requirements are more stringent. B. ACP is defined under NESHAP as a Category II, non-friable material in its intact state but which may become friable upon removal, demolition and/or disposal. Consequently, if the removal/ disposal process renders the ACP friable, it is regulated under the disposal requirements of 40 CFR 61.150. A NESHAP notification must be filed with the Texas Department of Health. The notification must be filed at least ten days prior to removal of the material. If it remains in its non - friable state, as defined by the NESHAP, it can be disposed as a conventional construction waste. EPA defines friable as material, when dry, which may be crumbled, pulverized or reduced to powder by hand pressures. _ C. The Generator of the hazardous material is responsible for the identification and proper handling, transportation, and disposal of the material. Therefore, it is the policy of the City of Fort Worth that the Excavator is the Generator regardless of whether the pipe is friable or not. D. It is the intent of the City of Fort Worth that all ACP shall be removed in such careful and prudent manner that it remains intact and does not become friable. The Excavator is responsible to employ those means, methods, techniques and sequences to ensure this result. E. Compliance with all aspects of worker safety and health regulations including but not limited to the OSHA Asbestos Standard is the responsibility of the Excavator. The City of - Fort Worth assumes no responsibility for compliance programs, which are the responsibility of the Excavator. (Copy of forms attached) D-68 STORM WATER POLLUTION PREVENTION PERMIT: As defined by Texas Commission on Environmental Quality(TCEQ) regulations, a Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required for all construction activities that result in the disturbance of one to five acres (Small Construction Activity) or five or more acres of total land (Large Construction Activity). The contractor is defined as an "operator' by state regulations and is required to obtain a permit. Information concerning the permit can be obtained through the Internet at http://www.tnrcc.state.tx.us/permitting/water perm/wwperm/construct.html. Soil stabilization and structural practices have been selected and designed in accordance with North Central Texas Council of Governments Best Management Practices and Erosion Control Manual for Construction Activities (BMP Manual). This manual can be obtained through the Internet at www.dfwstormwater.com/runoff.htmi. Not all of the structural controls discussed in the BMP Manual will necessarily apply to this project. Best Management Practices are construction management techniques that, if properly utilized, can minimize the need for physical controls and possible reduce costs. The methods of control shall result in minimum sediment retention of not less than 70%. NOTICE OF INTENT (NOI): If the project will result in a total land disturbance equal to or greater than 5 acres, the contractor shall sign at the pre-construction meeting a TCEQ Notice of Intent (NOI)form prepared by the engineer. It serves as a notification to the TCEQ of construction activity as well as a commitment that the contractor understands the requirements of the permit for storm water discharges from construction activities and that measures will be taken to implement and maintain storm water pollution prevention at the site. The NOI shall be submitted �8 05(06(04 SC-50 aART Q --SPECLAL COND1TIONs to the TCEQ at least 48 hours prior to the contractor moving on site and shall include the required $100 application fee. The NOI shall be mailed to: Texas Commission on Environmental Quality Storm Water& General Permits Team; MC-228 P.O. Box 13087 Austin, TX 78711-3087 A copy of the NOI shall be sent to: City of Fort Worth Department of Environmental Management 5000 MLK Freeway p, Fort Worth, TX 76119 NOTICE OF TERMINATION (NOD: For all sites that qualify as Large Construction Activity, the contractor shall sign, prior to final payment, a TCEQ Notice of Termination (NOT)form prepared by the engineer. It serves as a notice that the site is no longer subject to the requirement of the permit. The NOT should be mailed to: �. Texas Commission on Environmental Quality Storm Water& General Permits Team; MC-228 P.O. Box 13087 Austin, TX 78711-3087 �. STORM WATER POLLUTION PREVENTION PLAN (SWPPP): A document consisting of an erosion control and toxic waste management plan and a narrative defining site parameters and techniques to be employed to reduce the release of sediment and pollution from the construction site. Five of the project SWPPP's are available for viewing at the plans desk of the Department of Engineering. The selected Contractor shall be provided with three copies of the SWPPP after award of contract, along with unbounded copies of all forms to be submitted to the Texas Commission on Environmental Quality. LARGE CONSTRUCTION ACTIVITY— DISTURBED AREA EQUAL TO OR GREATER THAN 5 ACRES: A Notice of Intent(NOI)form shall be completed and submitted to the TCEQ including payment of the TCEQ required fee. A SWPPP that meets all TCEQ requirements prepared by the Engineer shall be prepared and implemented at least 48 hours before the commencement of construction activities. The SWPPP shall be incorporated into in the contract documents. The contractor shall submit a schedule for implementation of the SWPPP. Deviations from the plan must be submitted to the engineer for approval.'The SWPPP is not warranted to meet all the conditions of the permit since the actual construction activities may vary from those anticipated during the preparation of the SWPPP. Modifications may be required to fully conform to the requirements of the Permit. The contractor must keep a copy of the most current SWPPP at the construction site. Any alterations to the SWPPP proposed by the contractor must be prepared and submitted by the contractor to the engineer for review and approval. A Notice of Termination (NOT)form shall be submitted within 30 days after final stabilization has been achieved on all portions of the site that is the responsibility of the permittee, or, when another permitted operator assumes control over all areas of the site that have not been finally stabilized. SMALL CONSTRUCTION ACTIVITY- DISTURBED AREA EQUAL TO OR GREATER THAN ONE ACRE BUT LESS THAN FIVE ACRES: Submission of a NOI form is not required. However, 05106104 SC-51 PART Q - SPECIAL CONDITIONS a TCEQ Site Notice form must be completed and posted at the site. A copy of the completed Site Notice must be sent to the City of Fort Worth Department of Environmental Management at the address listed above. A SWPPP, prepared as described above, shall be implemented at least 48 hours before the commencement of construction activities. The SWPPP must include descriptions of control measures necessary to prevent and control soil erosion, sedimentation and water pollution and will be included in the contract documents. The control measures shall be installed and maintained throughout the construction to assure effective and continuous water pollution control. The controls may include, but not be limited to, silt fences, straw bale dikes, rock berms, diversion dikes, interceptor swales, sediment traps and basins, pipe slope drain, inlet protection, stabilized construction entrances, seeding, sodding, mulching, soil retention blankets, or other structural or non-structural storm water pollution controls. The method of control shall result in a minimum sediment retention of 70% as defined by the NCTCOG °BMP Manual." Deviations from the proposed control measures must be submitted to the engineer for approval. Oq PAYMENT FOR SWPPP IMPLEMENTATION: Payment shall be made per lump sum as shown on the proposal as full compensation for all items contained in the project SWPPP. FOR DISTURBED AREAS LESS THAN 1 ACRE, SPECIAL CONDITION D- 40 SHALL BE .. APPLICABLE. D-69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF EXISTING WATER SYSTEMS It is the Contractor's responsibility to coordinate any event that will require connecting to or the operation of an existing City water line system with the City's representative. The Contractor may obtain a hydrant water meter from the Water Department for use during the life of named project. In the event the Contractor requires that a water valve on an existing live system be turned off and on to accommodate the construction of the project, the Contractor must coordinate this activity through the appropriate City representative. The Contractor shall not operate water line valves of existing water system. Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief)and the Contractor will be prosecuted to the full extent of the law. In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. D-70 ADDITIONAL SUBMITTALS FOR CONTRACT AWARD The City reserves the right to require any pre-qualified contractor who is the apparent low bidder(s)for a project to submit such additional information as the City, in sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule, to assist the City in evaluating and assessing the ability of the apparent low bidder(s)to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information if requested may be grounds for rejecting the apparent low bidder as non-responsive. Affected contractors will be notified in writing of a recommendation to the City Council. D-71 EARLY WARNING SYSTEM FOR CONSTRUCTION SC-52 PARS' D - SPECLAL CONDITIONS Time is of the essence in the completion of this contract. In order to insure that the contractor is responsive when notified of unsatisfactory performance and/or of failure to maintain the contract schedule, the following process shall be applicable: The work progress on all construction projects will be closely monitored. On a bi-monthly basis the percentage of work completed will be compared to the percentage of time charged to the contract. If the amount of work performed by the contractor is less than the percentage of time allowed by 20% or more (example:'10% of the work completed in 30% of the stated contract time as may be amended by change grder), the following proactive measures will be taken: 1. A letter will be mailed to the contractor by certified mail, return receipt requested demanding that, within 10 days from the date that the letter is received, it provide sufficient equipment, materials and labor to ensure completion of the work within the contract time. In the event the contractor receives such a letter, the contractor shall provide to the City an updated schedule showing how the project will be completed within the contract time. 2. The Project Manager and the Directors of the Department of Engineering, Water Department, and Department of Transportation and Public Works will be made aware of the situation. If necessary, the City Manager's Office and the appropriate city council members may also be informed. 3. Any notice that may, in the City's sole discretion, be required to be provided to op interested individuals will distributed by the Engineering Department's Public Information Officer. 4. Upon receipt of the contractor's response, the appropriate City departments and directors will be notified. The Engineering Department's Public Information Officer will, if necessary, then forward updated notices to the interested individuals. 5. If the contractor fails to provide an acceptable schedule or fails to perform satisfactorily a second time prior to the completion of the contract, the bonding company will be notified appropriately. D-72 AIR POLLUTION WATCH DAYS The Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON, within the Metroplex area, runs from May 1, through OCTOBER 31, with 6:00 a.m. - 10:00 a.m. being critical BECAUSE EMISSIONS FROM THIS TIME PERIOD HAVE ENOUGH TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS TO EARLY AFTERNOON OZONE FORMATION. . The Texas Commission on Environmental Quality(TCEQ), in coordination with the National Weather Service, will issue the Air Pollution Watch by 3:00 p.m. on the afternoon prior to the WATCH day. On designated Air Pollution Watch Days, the Contractor shall bear the responsibility of being aware that such days have been designated Air Pollution Watch Days and as such shall not begin work until 10:00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10:00 a.m. if use of motorized equipment is less than 1 hour, or if equipment is new and 0510sro4 SC-53 PART Q - SPEC At. CONDITIONS certified by EPA as "Low Emitting", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or alternative fuels such as CNG. - If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. -6:00 p.m., on a designated Air Pollution Watch Day, that day will be considered as a weather day and added onto the allowable weather days of a given month. D-73 FEE FOR STREET USE PERMITS AND RE-INSPECTIONS A fee for street use permits is in effect. In addition, a separate fee for re4spections for parkway construction, such as driveways, sidewalks, etc., will be required. The fees are as follows: 1. The street permit fee is $30.00 per permit with payment due at the time of permit application. 2. A re-inspection fee of $25.00 will be assessed when work for which an inspection called for is incomplete. Payment is due prior to the City performing re-inspection. Payment by the contractor for all street use permits and re-inspections shall be considered subsidiary to the contract cost and no additional compensation shall be made. 05106104 SC-54 �• r PART Q — SPECIAL. CONUTIONS r r r r r r r po ow 0.5/0&04 SC-55 �� ,, �: �� . � '� �� �.r Fft PW (To be printed on Contractor's Letterhead) ps Date: Fm DOE 4144 PROJECT NAME: Sanitary Sewer Rehabilitation Contract 67 Part 1 g' MAPSCO LOCATION: 76B and 76C LIMITS OF CONST.: West 7th Street between Stayton and Carroll; Carroll Street between West 7th and West 5th Street; Stayton Street between West 7"' and West 6th "w Street; West 6th Street between Stayton and Harold; Harold Street between West 6th and West 5th Street,West 5th Street between Harold and Greenleaf. Ilk A THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL REHABILITATE SEWER LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY P„ OTHER ISSUE,PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT>AT<TELEPHONE NO.> sm OR oi Mr.<CITY INSPECTOR>AT<TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS,PLEASE CALL 871-7970 Pm PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL. PP PW NE PART D - SPECIAL CONDITIONS CITY OF FORT WORTH HIGHWAY CONSTRUCTION PREVAILING WAGE RATE FOR 2000 CLASSIFICATION HOURLY RATE Asphalt Raker $10.32 Asphalt Shoveler $9.75 Batching Plant Weigher $9.65 OM Carpenter(Rough) $13.64 Concrete Finisher-Paving $10.16 Concrete Finisher Helper(Paving) $9.70 00 Concrete Finisher-Structures $13.44 Flagger $7.00 Form Builder-Structures $13.44 Form Setter-Paving & Curbs $10.25 Form Setter-Structures $9.75 Laborer-Common $7.64 Laborer-Utility $8.64 Mechanic $13.25 Servicer $10.13 Pipe Layer $7.35 Pipe Layer Helper $6.75 Asphalt Distributor Operator $11.45 Asphalt Paving Machine Operator $11.09 Concrete Paving Saw $10.53 Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (< 1 1/2 $10.00 CY) Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (> 1 1/2 $11.52 rCY) Front End Loader(21/2 CY & less) $9.94 Front End Loader(over 2 1/2 CY) $9.32 Milling Machine Operator $8.00 Mixer $11.00 Motor Grader Operator(Fine Grade) $12.31 Motor Grader Operator $13.75 Pavement Marking Machine $11.00 Roller, Steel Wheel Plant-Mix Pavements $9.88 Roller, Steel Wheel Other Flatwheel or Tamping $12.12 Roller, Pneumatic, Self-Propelled Scraper $8.02 Traveling Mixer $10.00 Reinforcing Steel Setter(Paving) $9.75 Truck Driver-Single Axle(Light) $8.00 Truck Driver-Tandem Axle Semi-Trailer $10.22 Truck Driver-Lowboy/Float $10.54 Truck Driver-Transit Mix $10.63 Truck Driver-Winch $9.80 05106104 SC-57 PART Q - SPECIAL. CONDITIONS 05106104 SC-58 r SORT WORTH r DOE Ito. XXXX � wain mane. NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGIiBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT-OUT,PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU m ,CONTRACTOR l PART D - SPECIAL CONDITIONS F TEXAS DEPARTMENT OF HEALTH I WOUT1!41d I RENOVATION ° NOTIFICATION FORM .� r. NOTE:CIRCLE ITEMS THAT ARE AMENDED it T D H NOTIFICATION# 1) Abatement Contractor. MH License Number, i Address• City Slrsbe : c OAS Phone Numtber � t 1 ,lob Phone Number: 9ttpenresor TDHa ipe "idt>rttbar. 3e ndscr. S Train On-Site NESHAP individual TDFi Lioerts NumberL CerpECatron Date: .,_._..._ 12ersnot�iort Cart�or: . ,..Ptlorrr Ntrmberf.1 y 2).Projects or Operator, TONL�p1111iM! t�ttWdM Muffling 0 City. ....__-..._ _ state: Z Office Phone Number 3) Faciffty Owner H Altentio& P Mailing Address: • $late: Owner phone NuUnberf l A ,"NafC The hwoiee fbt aw notllicstion he will be cent to the owrar of dw building and Me billing adds forth*Invoice will be 0 rrtbtained from ttra information that is provided In thls sactlan: E 4) Description or i=amity Name: Physical Address: Ceusuy City Zip: S Facility Rhone Number( Facility Contact Person, H Description of ArealRaam Number. 9" A Prior Use, Futum I.ISe: P Age of 6uildirbglFacility Sim: Number of Floc School(K-12): D YES ❑NO S} Type of Work: D tiamatltt a it Renovation I(Abatement) 17 Annual ,Cartselidilhd Work will be during: 0 Day ❑ Evening 17 Night: 0 Phased t'rgjoct d i] ",000crip4on of work schedula: r. . . 6) is this a Public Building?.D YE$ 0 NO Federal FaoN.liy?13 YES 0 NO Indswrial Site?0 YES ONO El NE5f1AP4)n1y FacitiV? ❑ YES ❑ NO !s Bu&diltgwed*0666�.:p.YEs a:mo L 7y NoWsuation Type CHECK ONLY ONE V 0 Original(10 Worldng Days) D CancoliaiHon 0 AmecO mend ❑ Ernar�Ordered if this is an amendment,which amendment number is lhta?` copy g ) u f;' (Enclose sass of original andfor last rafrreertdanent If an emegiency,who did you talk with at TDH? Emergencyk r a Date and Hour of Emergency(HHlMM/DI)NY): Description of the sudden,unexpected event and explanatim of hose the event caused unsafe conditions or Would cause 4 equipment damage(computers.machinery.etc ri E3 B) Description of procedures to be followed M the event shat unexpected asbestos is found•orprrfanousilynon4ubie asbestos material becomes crumbled,pulvarizad.or reduced to powder: Is: tit) Was an Asbestos survey performed? a YES a NO Date: t '1 k apevkor Llraw m No; ' Q Analytical Method:a PLM ❑TEM❑Assumed Tt*i Laboratory License No: N (For TAHPA(public building)projects:an assumption must be made by a TDH Ucensed Inspector) 10) DewAptiion of planned des ion or moostion work,type of material,and mefhod(s}to be used T: i 1) of wax and engbmritp=*ds to be used lo prrdirbrtt misshoo of-mbeston at to 0506104 SC-60 PAIN D - SPECIAL CONDITIONS 12) ALL appRrahte Items In Vs foilol sing table must be mmpleled: W NO ASBESTOS PRESENT CHECK HERE D Appmxlmste amount of Cheek unit of meavireRma Asbestos-Containing Building Material Asbestos Pipes Surface Area Ln .Ln SO SO Ou Cu Ft M Ft- M Ft M RACM to be removed RACM NOT removed �• Interior Caleciory I non-frfahta removed E ict Caftory Inon-friable removed 1 non friable NOT removed Interior Catecory I non-fciabfe removed Exterior Mlegory 11 non-friable removed Catewry 11 non-drlable NOT removed RACM Off-Facility+Camponent 13):Waste Transporter dame. TM License Number: ,r Address: City. State. __ ; ,__ Contact Person, Number; ( `t 14) Waste DisposatSite Name: Address; City Sta16. Zip: _.,......:.._ Telephone:t. ]__... TNRCC Permit Number, 15) For structuraly unsound facilities,attach a ropy of derrrarrtion order and' Name 0 istrzyfiorT Govermner"Official below. Date of order,(MWDDIYY) . / } Date order to begin(M ). . 16) $Cheduled Dates of Asbestos Abatement(M W DD" Start I _.I C.wq ft: I 17) ScMdulad Dates DemolitioNRenovation(MM(t 1'Y) Start: I. I Complaw. I f "Note,If The sta l date on Ibis nalification can not fro.mt UW IMN ROOMW ar L=ot Program offl"Afust be coulacted by phone prior to the start data. Fallum to do so tF a vlabrdan In 7 1 16 TANPAI Idiot 296A. I hereby cedity that all information l have provided Is cdrmkM Complfe►and tnre to ft bo&' of MY krw iledga. I acknnwmiedge that I am responsible for all aspects of the notificatiort(dir T.inciudatg.but nol t�itlnp;consent and submissim dales. The -4 maxinturn enalty ;?10.00ti p Per day per violation. . {Sionskre or 6allcfing Owned Operator �' :Via) tom}. � (Takowne) or Delegated Consrdtant/Contraclor) NUIRIM MAIL TO: ASBESTOS NOTIFICATION SECTION (I= ) TOXIC SUBSTANCES CONTROL DIVISION ..w TEXAS DEPARTMENT OF HFALTH W&V"am not acegptad" PO BOX 143538 *Fm=ones nu a=~ AUSTIN.TX?e?14.3M PH,612-834-6900.4 gdr72-5fi48 Farrar APE 55 dated 07/M2 f tar es TDH form dated 07/l Far assn mce in maw bjVn 9 Dorn nail I-8 572.5548 Part DA Additional Special Conditions 'CITY PART DA - ADDITIONAL SPECIAL CONDITIONS QA-6 PIPE IN§TALLED BY OTHER THAN OPEN CUT.......................................................2 DA.-7 TYPE QFCASING PIPE..............................................................................................5 DA-8 SERVICE LINE POINT REPAIR t GLEANQUT RE,PAIR. ............................................5 5A=9 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION...................8 DA-14 INTERIOR MANHOLE COATING SPRAY WALL SYSTEM ...................................11 A-15 INTERIOR MANHOLE COATING RAVEN LINING SYSTEM_.................................13 DA-23 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES...................16 D `24 REPLACEMENT OF CONCRETE CURES AND GUTTER..........................................17 DA-25 REPLAQgM9NT OF§!K;ONCR gDRIYMAYS...................................................17 DA-2 6 REPLACEMENT OF H,M.A.C. PAVEMENT AND BASE 18 DA-27 QBANDOUSMED MUE31.... ........................................... t8 DA-30 r H.M.A.C. SURFACE COURSE (IXI!E-D"MUG...................................................18 D A-31 REPLACEMENT OF 7-CONCRETE VALLEY GUTTER...........................................19 DA-32 NEW 7-CONCRETE VALLEY GUTTER...................................................................19 DA-33 NEW 4"STANDARD)WHEELCHAIR RAMP.............................................................20 DA-34 8- PAVEMENT PULVERIZATION ................................................I ........................21 DA37 POTENTIALLY PETROLEUM CONTAMIN TED MATERIAL HANDLING................21 DA-38 LOADING TRANSPORTATION AND DISPOSAL QF CONTAMINATED SOIL.......25 DA-42 CONCRETE PIPE 1 S AND SPECIALS..........................................................266 DA-43 UNCLASSIFIED STREET EXCAVATION.. ...............................................................27 ©.� V PERFORATED PIPE SUBDRAIN .........................................................................27 DA-45 REPLACEMENT OF 4"CONCRETE §I,QDVALKS. .................................................28 12A-48 EASEMENTS AND PERMITS. ..............................................................................28 DA-62 WATER METER AND METER BOX RELOCATION AND ADJUSTMENT.................29 DA-73 RELOCATION OF SPRINKLER SYSTEM BACK FLOW PREVENTER/CONTROL.29 VALVE -D Em.............................................................. DA-76 'I %" &2" COPPER SERVICES.... ................................ ..........................................29 DA-91 ANUST WATER MLVE BOXES HOLES D VAULTS TIL. CU ..........29 »row ASC-1 PART DA- ADDITIONAL SPECIAL CONDITIONS DA-6 PIPE INSTALLED BY OTHER THAN OPEN CUT A. GENERAL: 1. Furnish materials and necessary accessories, with strengths, thickness, coatings, and fittings indicated, specified and/or necessary to complete the work. 2. All excavation shall provide an open area conforming to the outside diameter of the casing and/or carrier conduit. The excavation shall be to an alignment and grade which will allow the carrier conduit to be installed to proper line and grade as shown on the Plans and as established in the Specifications. 3. Work shall be performed in accordance with the requirements of the City of Fort Worth Water Department, the Texas Department of Transportation., or railroad company, as applicable. B. MATERIALS: 1. Casing Pipe: Casing pipe shall be steel conforming to ANSI B36.10 and the following: a. Field Strength: 35,000 psi minimum. MR b. Wall thickness: 0.312 in. minimum(0.5 for railroad crossings). C. Diameter: As shown on the drawings (minimum size requirements). d. Joints: Continuous circumferential weld in accordance with AWS D1.1. 2. Carrier Pipe in Casing: Carrier pipe shall be as shown on drawings and as specified in the General Contract Documents. 3. Sewer Pipe without Casing Pipe: Shall be minimum Class 51 ductile iron pipe, or as designated on the plans. 4. Grout: Grout shall be Portland Cement grout of min. 2000 psi compressive strength at 28 days. Proportioned not less than 1 cu. ft. of cement to 3 cu. ft. of fine sand with sufficient water added to provide a free flowing thick slurry. C. EXECUTION 1. Where sewer pipe is required to be installed under railroad embankments or under highways, streets or other facilities in other than open cut, construction shall be performed in such a,manner so as to not interfere with the operation of the railroad, street, highway, or other facility, and so as not to weaken or damage any embankment or structure. During construction operations, barricades and lights to safeguard traffic and pedestrians shall be furnished and maintained, until such time as the backfill has been completed and then shall be removed from the site. 11102104 ASC-2 PART DA - ADDITIONAL SPECIAL CONDITIONS 2. Pits and Trenches: a. If the grade of the pipe at the end is below the ground surface, suitable pits or trenches shall be excavated for the purpose of conducting the jacking or tunneling operations and for placing end joints of the pipe. Wherever end trenches are cut in the sides of the embankment or beyond it, such work shall be sheeted securely and braced in a manner to prevent earth from caving in. J b. The location of the pit shall meet the approval of the Engineer. C. The pits of trenches excavated to facilitate these operations shall be backfilled immediately after the casing and carrier pipe installation has been completed. 3. Boring and ,lacking Steel Casing Pipe: Steel casing pipe shall be installed by boring hole with the earth auger and simultaneously jacking pipe into place. a. The boring shall proceed from a pit provided for the boring equipment and workmen. The toles are to be bored mechanically. The boring shall be done using a pilot tole. By this method an approximate 2-inch hole shall be bored the entire length of the crossing and shall be checked for line and grade on the opposite end of the bore from the work pit. This pilot hole shall serve as the centerline of the larger diameter hole to be bored. Other methods of maintaining line and grade on the casing may be approved if acceptable to the Engineer. Excavated material shall be placed near the top of the working pit and disposed of as required. The use of water or other fluids in connection with the boring operation will be permitted only to the extent required to lubricate cuttings. .letting or sluicing will not be permitted. b. In unconsolidated soil formations, a gel-forming colloidal drilling fluid consisting of at least 10 percent of high grade carefully processed bentonite may be used to consolidate cuttings of the bit, seal the walls of the hole, and furnish lubrication for subsequent removal of cuttings and installation of the pipe immediately thereafter. Q Allowable variation from the line and grade shall be as specified under paragraph A.2. All voids between bore and outside of casing shall be pressure grouted. 4. Installation of Carrier Pipe in Casing: a. Sanitary sewer pipe located within the encasement pipe shall be supported by "skids" or "bands" to prevent the pipe and bells from snagging on the inside of the casing, and to keep the installed line from resting on the bells. b. All skids shall be treated with a wood preservative. Skids should extend for the full length of the pipe with the exception of the bell area and spigot area necessary for assembly unless otherwise specified. 11102104 ASC-3 PART DA - ADDITIONAL SPECIAL CONDITIONS C. The Contractor shall prevent over-belling the pipe while installing it through the casing. A method of restricting the movement between the assembled bell and spigot where applicable shall be provided. d. At all bored, jacked, or tunneled installations, the annular space between the carrier pipe and casing shall be filled with grout. Care must be taken that not too much water is forced into the casing so as not to float the pipe. The backfill material will�not be required unless specified on the plans and specified by the Engineer. e. Closure of the casing after the pipe has been installed shall be plugged at the ends of the casing as shown on the drawings or as required by the Engineer. 5. Boring and Jacking Ductile Iron Pipe without Casing Pipe: a. As indicated on drawings and as required and directed by the Engineer sewer shall be constructed of bore and jacked ductile iron pipe. b. When a casing pipe is not designated on the drawings, the contractor shall provide a casing pipe if necessary to achieve line and grade. Casing pipe shall be provided at no additional cost and shall be subsidiary to the cost bid for installation By Other than Open Cut. C. Bore and jack in accordance with paragraph C.3. above. d. Short length of sewer consisting of a single pipe section may be installed by jacking without a bore hole if permitted by the Engineer and in soft soil layer. All voids outside of installed pipe shall be pressure grouted. 6. Tunneling: Where the characteristics of the soil, the size of the proposed pipe, or the use of monolithic sewer would make the use of tunneling more satisfactory than jacking or boring, or when shown on the plans, a tunneling method may be used,with the approval of the Engineer or railroad/highway officials. a. When tunneling is permitted, the lining of the tunnel shall be of sufficient strength of support the overburden. The Contractor shall submit the proposed liner method to the Engineer for approval. The tunnel liner design shall bear the seal of a licensed professional engineer in the State of Texas. Approval by the Engineer shall not relieve the Contractor of the responsibility for the adequacy of the liner method. b. The space between the tunnel liner and the limits of excavation shall be pressure grouted or mudiacked. C. Access holes for placing concrete shall be space at maximum intervals of 10 feet. 11102104 ASC-4 �! PART DA - ADDITIONAL SPECIAL CONDITIONS D. MEASUREMENT AND PAYMENT: installation of pipe by other than open cut will be measured by the linear foot of pipe, complete in place. Such measurement will be made between the ends of the pipe along the central axis as installed. The work performed and materials furnished as prescribed by this item will be paid for at the Contract Unit Price bid per linear foot for Pipe Installed by Other Than Open Cut of the type, sine, and lass of pipe specified as shown on plans. The furnishing of all materials, pipe, liner materials required for installation, for all preparation, hauling and installing of same, and for all labor, tools,/ equipment and incidentals necessary- to complete the work, including excavation, backfilling and disposal of surplus material shall be included in the Contract Unit Price as shown in the Bid Proposal. Payment shall not include pavement replacement, which if required, shall be paid separately. a DA-7 TYPE OF CASING PIPE 1.WATER: The casing pipe for open cut and bored or tunneled section shall be AWWA C-200 Fabricated Electrically Welded Steel Water Pipe, and shall conform to the provisions of E1-15. E1-5 and E1-9 in Material Specifications of General Contract Documents and Specifications for Water Department Projects. The steel casing pipe shall be supplied as follows: A. For the inside and outside of casing g p pe, coal-tar protective coating in accordance with the requirements of Sec. 2.2 and related sections in AWWA C-203. B. Touch-up after field welds shall provide coating equal those g eq to specified above. C. Minimum thickness for casing pipe used shall be 0.375 inch. Casing Spacers(centering style)such as manufactured by Cascade Waterworks Manufacturing Company,Advanced Products and Systems, Inc., or an approved equal shall be used on all non- concrete pipes when installed in casing. Installation shall be as recommended by the manufacturer. 2. SEWER: Boring used on this project shall be in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig. 110 of the General Contract Documents. 3. PAYMENT: PF Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and incidental work shall be included in the unit price bid per foot. DA-8 SERVICE LINE POINT REPAIR/CLEANOUT REPAIR A. GENERAL: The work covered by this item consists of furnishing all labor, material, equipment, supervision, etc. necessary to construct a point repair on the portion of a service line located within a utility easement, street right-of-way or on private property. Points repairs on private pLp2dy shall only be addressed after the Contractor has received "� 11102IN4 ASC-5 PART DA- ADDITIONAL SPECIAL CONDITIONS written permission from the a pg*r downer to do the work. A blank Right-of-Enter Agreement form to be completed by the Contractor and the individual property owners is included at the end of this section. The Contractor shall keep a record copy of all Right- of-Entry forms obtained and have it on hand at all times during construction. The street addresses and approximate location of service line repairs are shown in Table_ and the Field Survey Forms in Attachment . It shall be the Contractors `{ responsibility to accurately field locate the exact pant of repair, B. MATERIALS: The pipe replacement material shall be gasketed joint, gravity PVC sewer pipe (ASTM D- 3034, SDR 26) and have a minimum cell classification of 12454 A or B as defined in ASTM D-1784. Installation shall be in strict compliance with the manufacturer. recommendations and the Uni-Bell Plastic Pipe Association. The method of jointing the ends of the replaced pipe with the existing pipe shall be water tight. C. EXECUTION: 1. After the location of the point repair is determined. the Contractor shall excavate and remove the damaged pipe and replace with new pipe. The minimum length of pipe replaced shall be three (3) feet. All work shall be performed by licensed Of= Determine whether additional lengths of line beyond "minimum length" criteria need replacement. Report need for additional replacement to City and obtain approval before proceeding. 2. The Contractor shall excavate, shape the bottom of the trench and place the required pipe bedding so that the grade of the replaced pipe matches the existing service line grade. •� 3. Numerous service line point repairs along with lateral line point repairs and obstruction removals are located in areas which in many instances will require the removal of existing landscaping, structures, sidewalks, driveways, etc. Items removed or disturbed shall replaced or restored to original conditions or better. 4. Removal of Debris: Excess excavated material and debris are to be removed from the work site daily. Cost of hauling excess excavation and debris is to be included in the price bid for"Service Line Point Repair'. 5. Roof and Yard Drains: At the locations indicated in Table_of the Attachments. The Contractor shall disconnect roof and yard drains from the sanitary sewer service line. For yard drains, the Contractor shall excavate and remove the drain ^� from the yard and plug the line at the property line. For roof drains, the Contractor shall remove the downspout from the drain line and plug the line to prevent inflow. In addition, the Contractor shall install an elbow fitting at the bottom of the downspout to direct runoff, away from the building, and a concrete splash pad to prevent erosion. I71OVO4 � ASC-6 PART DA - ADDITIONAL SPECIAL CONDITIONS 6. Disconnected Service Lines: At the locations indicated in Table of Attachments to the Special Contract Documents, the Contractor shall remove the service line no longer in use by excavating at the property line and plugging the service line. 7. Abandonment of Point Repair. If a pipe is exposed and found in good condition, not requiring a point repair, notify City Engineer who will record abandonment of point repair. Backfill the excavation, replace pavement or sidewalk and repair and seed or sod unpaved areas. 8. Cieanout Repair: The Contractor shall make appropriate repairs to cleanouts as indicated in Table _and as shown on the PLANS. All cleanout repair work shall be performed by a licensed plumber. O` a. General This special condition describes the repair of sanitary sewer cleanouts P" located on private property as designated on the 1/1 Elimination Repair plans. Repair of the cleanouts shall consist of replacing defective cleanout caps or installing new.caps where none exist, such that inflow is eliminated. There will be no repairs made to the existing cleanouts that require excavation, other than what is required to expose the top of the cleanout so that the new caps can be installed. b. Materials Replacement cleanout caps shall be Dal-Caps as manufactured by Dallas Specialty & Mfg. Company, or equal. The rubber caps are held down by stainless steel clamps. C. Excavation 1) The Contractor shall submit shop drawings on all materials and equipment to be installed. 2) The Contractor is responsible for obtaining right of entry from the *F property owners prior to performing any work. Property owners should be notified 48 hours in advance of any work on their property. • 3) The Contractor shall restore any disturbed surface to its original or better condition at no separate pay. D. MEASUREMENT AND PAYMENT: 1. Payment for service line point repair shall be on a unit price basis for each repair performed on all sizes of service lines for the respective depths. The minimum length of service line point repair shall be three (3) feet. No separate pay if the 11102104 ASC-7 MR PART DA - ADDITIONAL SPECIAL CONDITIONS work is done within the limits of a service line reconnect as defined in Special Condition, D-28, "Sanitary Sewer Services". 2. Measurements for extra length repair is on a linear foot basis for repairs in excess of the minimum 3 foot replacement length. _ a 3. All pipe fittings, adapters, concrete collars, bedding, and removal and replacements of grass godding required shall be considered incidental to service line point repair. 3. If no pay item is included for any work required to properly complete a service line point repair as specified, the cost to perform said work, including any required removal and replacement of materials, shall be considered incidental to the service d line point repair. 5. Depth of Bury is to be measured from Natural Ground Level to the Flow Line of the Sanitary Sewer Service Line at the Point of Replacement. The minimum trench width shall be X-O". 6. All excavation, backfill, removal and replacement of grass sodding and landscaping, plugs, fittings, and splash pads shall be considered incidental to removal of yard drains, disconnecting roof drains and plugging disconnected service lines. T. No separate payment will be made for the Contractor to obtain written permission to enter private property. 8. Payment will be made for Abandonment of Point Repairs at the Contract Unit Price for Excavation and Backfill Abandoned Point Repairs. 9. Payment shall be made at the Contract Unit Price for each sanitary sewer cleanout successfully repaired. Payment shall be full compensation for all materials, equipment, and labor required to perform the wont. DA-9 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION A. GENERAL: 1. Scope: This section governs all work, materials and testing required for the application of interior protective coating. Structures designated to received interior coating are listed on the construction drawings. The structures are to be coated, including interior wall, top and bench surfaces. Protective coating for corrosion protection shall meet the requirements of this Specification (and items DA-14 and DA-15)and the Manufacturers recommendations and specifications. 2. Description: The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of protective coating of structures in accordance with manufacturer's recommendations. 114 ASC-$ �"' r PANT DA - ADDITIONAL SPECIAL CONDITIONS 3. Manufacturers Recommendations: Materials and procedures utilized for the lining process shall be in strict accordance with manufacturers recommendations. 4. Corrosion Protection: Corrosion protection may be required on all structures where high turbulence or high H2S content is expected. B. MATERIALS: 1. Scope: This section governs the materials required for completion of protective dating of designated structures. 2. Protective Coating: The protective coating shall be a proprietary two component, PP 100 percent solids, rigid polyurethane system designated as Spray Wall as manufactured by Sprayroq, Inc. or a two-part epoxy resin system using 100% solids based epoxy binder with fibrous and flake fillers, is manufactured by Raven Lining �,. systems and designated as Raven 405. 3. Specialty Cement (If required for leveling or filling): The specialty cement-based crating material shall be either Quadex QM-1s as manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard Cement Materials. LIM 4. Material Identification: The protective dating material sprayed onto the surface of the structure shall be a urethane or epoxy resin system formulated for the application to a sanitary sewer environment. The spray system shall exhibit the minimum physical properties as follows: Property Standard Loam Terra Value Tensile Strength ASTM D-638 5,000 psi Flexural Stress ASTM D-790 10,000 psi Flexural Modulus ASTM D-790 550,000 psi 5. Mixing and Handling: Mixing and Handling of specialty cement material and protective coating material, which may be toxic under certain conditions shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel, It is the responsibility of the Contractor to provide appropriate protective measures to ensure that materials are under control at all times and are not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Only personnel thoroughly familiar with the handling of the crating material shall perform the spray coating operations and coating installations. C. EXECUTION: 1. General: Protective coating shall not be installed until the structure is complete and in place. 11102104 ASG9 PART DA b- ADDITIONAL SPECIAL CONDITIONS 2. Preliminary Repairs: a. All foreign materials shall be removed from the interior of the structure using high pressure water spray(3500 psi to 4000 psi at spray tip). b. All unsealed lifting holes, unsealed step holes, and voids larger than approximately one-half (1t2) inch in thickness shall be filled with patching compound as recommended by the material supplier for this application. C. After all repairs have been completed, remove all lose material, 3.- Protective Coating: a. The protective coating shall be applied to the structure from the bottom of the frame to the bend, down to the top of the trough. The top of the structure shall also be coated. b. The protective dating shall be installed in accordance with the manufacturer's recommendations and the following procedure. 1) The surface shall be thoroughly cleaned of all foreign materials and matter. 2) Place covers over the invert to prevent extraneous material from entering the sewers. 3) If required for filling or leveling, apply specialty cement product to provide a smooth surface for the coasting material. 4) Spray the urethane or epoxy onto the structure wall and bench/trough to a minimum uniform thickness of 125 mils (0.125 inches). Thickness to be verifiable through the use of methods .� acceptable to the Engineer. After the walls are coated, the wooden bench covers shall be removed. 5) The final application shall have a minimum of three (3) hours cure time or be set hard to the touch, before being subjected to active flow. 6) No applications shall be made to frozen surfaces or if freezing is expected to occur inside the structure within 24 hours after application. ' 4. Testing of Rehabilitated Manholes: Testing of rehabilitated manholes for watertightness shall be performed by the Contractor after operations are complete in accordance with the Section D-36 - VACUUM TESTING OF SANITARY SEWER MANHOLES. I MAW ASC-10 _ �' s PART DA - ADDITIONAL SPECIAL CONDITIONS D. MEASUREMENT AND PAYMENT: Payment shall be based on the Contract Unit Price Bid per vertical foot, measured from the bottom of the flame to the top of the bench. The Contract Unit Price shall be payment in full for performing the work and for furnishing all PF labor. supervision, materials, equipment and material testing required to complete the work. Pressure grouting, if necessary to stop active infiltration prior to application of the protective coating, shall be included in the above unit price. Grouting of the pipe seals, a• bench and trough, and lower portion of a particular structure, if required by the Engineer, shall be paid for separately,as specified in Section DA-10, MANHOLE,IREHABILITATION. DA-14 INTERIOR MANHOLE COATING - SPRAY WALL SYSTEM A. GENERAL 1. Scope This section governs all work, materials and testing required for the application of interior manhole coating. Manholes designated for interior coating are fisted on the Manhole Rehabilitation Schedule. Interior manhole coating shall meet the requirements of this Section or of Section DA-12, DA-13, DA-15, DA-16 or DA-17. i 2. Description The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of interior coating of manholes in accordance with the Contract Documents. r3. Manufacturers Recommendations Materials, mixture ratios, and procedures utilized for,the coating process shall be in accordance with manufacturers recommendations. 4. Manholes rManholes to be coated are of brick, flock, or concrete construction. All manholes shall have a minimum of one-half(112)inch specialty cement-based coating material (Quadex QM-1s or Reliner MSP) sprayed or trowelled on coating over the original interior surface. rB. MATERIALS 1. scope This section governs the materials required for completion of interior coating of manholes. 2. Interior Coating The interior dating shall be a proprietary two component, 100 percent solids, rigid polyurethane system designated as Spray Wail as manufactured by Sprayroq, Inc. 11102104 ASC-11 OR PART DA - ADDITIONAL SPECIAL CONDITIONS 3. Specialty Cement The specialty cement-based coating material shall be either Quadex QM-is as manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard Cement Materials. 4. Material Identification The interior manhole coating mate I sprayed onto the surface of the manhole shall be a urethane resin system formulated for the application to a sanitary sewer environment. The spray system shall exhibit the physical properties as follows: ESE Standard Log Term Vatug Tensile Strength ASTM D-638 5,000 psi Flexural Stress ASTM D-790 10,000 psi Flexural Modulus ASTM D-790 550,000 psl 5. Mixing and Handling Mixing and handling of specialty cement material and interior coating material,which may be toxic under certain conditions shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel. It is the responsibillity of the Contractor to provide appropriate protective measures to ensure that materials are under control at all times and are not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Only personnel thoroughly familiar with the handling of the coating material shall perform the spray coating operations and coating installations. C. EXECUTION 1. General Manhole coating shall not be installed until sealing of manhole frame and grade adjustments, or partial mangle replacement when required for the manhole per the Manhole Rehabilitation Schedule, is complete. 2. Temperature Normal interior coating operation shall be performed at temperatures of 40°F or greater. No application shall be made when freezing is expected within 24 hours. 3. Interior Manhole Coating -* a. The interior coating shall be applied to the manhole from the bottom of the frame to the bench,down to the top of the trough. , b. The interior coating shall be installed in accordance with the manufacturer's recommendations and the following procedure. 1110"4 ASC-12 PP PART DA - ADDITIONAL SPECIAL CONDITIONS FM 1) The surface shall be thoroughly cleaned of all foreign materials and matter. Cleaning shall be accomplished by using high pressure water spray (minimum 3500 psi at spray tip), cleaning with muriatic acid, degreaser, or other solvents as needed in order to remove any film or residue on the surface. 2) Place covers over the invert to prevent extraneous material from entering the sewers. 3) Apply a minimum of one-half (1/2) inch specialty cement product w (Quadex QM-1s or Reliner MSP) smooth surface for the urethane coating material. 4) Spray the urethane onto the manhole wall and bench/trough with a minimum thickness of 125 mils (0.125 inches). Thickness to be verifiable through the use of methods acceptable to the Engineer. 5) Coat trough area with specialty cement product (Quadex QM-1s or Refiner MSP). P 1. Testing of Rehabilitated Manholes a. Testing of rehabilitated manholes for watertightness shall be performed by the Contractor after operations are complete in accordance with Section DA- 21. D. MEASUREMENT AND PAYMENT Payment shall be based on the Contract Unit Price per vertical foot. measured from the bottom of the frame to the top of the bench. The Contract Unit Price shall be payment in full for performing the work and for furnishing all labor, supervision, materials, equipment and material testing required to complete the work. Grouting, if necessary, shall be included in the above unit price. Grouting of the pipe seals, bench and trough, and lower portion of a particular manhole, if required by Manhole Rehabilitation Work Schedule or required to be done by the Engineer,shall be paid for separately at the Contract Unit Price. DA-15 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM A. GENERAL 1. Scope This section governs all work, materials and testing required for the application of interior manhole coating. Manholes designated for interior coating are listed of the Manhole Rehabilitation Schedule, listed in Section 1. Interior manhole coating shall meet the requirements of this Section, or of Section DA-12, DA-1 3, DA-1 4, DA-16 or DA-17. 11102104 ASC-13 PART DA - ADDITIONAL SPECIAL CONDITIONS 2. Description The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of interior coating of manholes in accordance with the Contract Documents. 3. hftnufacturees Recommendation Materials, mixture ratios, and procedures utilized for the coating process shall be in accordance with manufacturer's recommendations. �. 4. Manholes Manholes to be coated are of brick, block, or concrete construction. All manholes shall have a minimum of one-half (112) specialty cement-based coating material (Quadex QM-1 s or Reliner MSP) sprayed or trowelled on coating over the original ON interior surface. B. MATERIALS .ft 1. Scope This section governs the materials required for completion of interior crating of manholes. 2. Interior Coating Raven Ultra High-Build epoxy Coating, a two-part epoxy resin system using 100% solids based epoxy binder with fibrous and flake fillers, is manufactured by Raven Lining systems and designated as Raven 405. 3. Specialty Cement The specialty cement-based coating material shall be either Quadex QM-1s as manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard Cement Materials. 4. Material Identification Contractors will completely identify the types of grout, mortar, sealant, and root control chemicals proposed and provide case histories of successful use or defend the choice of grouting materials based on chemical and physical properties, ease of application, and expected performanoe. These grouting materials shah be compatible with Raven 405 interior mating. The contractor shall be responsible for -W getting approval from Raven Lining systems and/or the grout manufacturers for the use of these grouting materials. 5. Mixing and Handling Mixing and handling of interior coating, which may be toxic under certain conditions shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel. it is the responsibility of the Contractor 11102104 ASC-14 PART DA- ADDITIONAL SPECIAL CONDITIONS to provide appropriate protective measures to ensure that materials are under control at all times and are not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Coating shall be performed only by certified applicators approved by the manufacturers. C. EXECUTION 1. General J Manhole coating shall not be performed until sealing of mangle from frame and grade adjustments, partial manhole replacement, manhole grouting or sewer replacement/repairs are complete. 2. Temperatures Normal interior coating operation shall be performed at temperatures of 40°F or greater. No application shall be made when freezing is expected within 24 hours. 3. Interior Manhole Coating a. Manholes scheduled for interior coating are shown on the Manhole Rehabilitation Sdiedule. The interior coating shall be applied to the manhole from the bottom of the manhole frame to the benchttrough, including the bencahttrough. b. The interior crating shall be installed in accordance with the manufacturer's recommendations and the following procedure. 1') The surface preparation shall comply with the requirements of Section DA-11. SURFACE PREPARATION FOR MANHOLE RESTORATION. 2) Apply a minimum of ore-half (1/2) inch specialty cement-based product (Quadex QM-1s or Reliner MSP) smooth surface for the urethane coating material. 3) The surface prior to application may be damp but shall not have noticeable free water droplets seeping or running water. Material shall be spray applied per manufacturer's recommendations with a minimum thickness of 125 mils(0.125 inch). 4) After the walls are coated, the wooden bench covers shell be removed and the bench sprayed to the same average and minimum thickness as required for the walls. 5) The final application shall have a minimum of three (3) hours cure time or be set hard to the touch, before being subjected to active flow. 11102104 ASC-15 PART DA - ADDITIONAL SPECIAL CONDITIONS 6) No applications shall be made to frozen surfaces or if freezing is expected to occur in side the manhole within 24 hers after application. 4. Testing of Rehabilitated Manholes i a. After the epoxy liner has set (hard to touch), all visible pinholes shall be repaired. Repairs shall be made by lightly abradippg the surface and brushing the fining material over the area. All blisters and evidence of uneven cover shall be repaired according to the manufacturer's recommendations. Spot MW check of coating thickness may be made by Owner's Representative,and the contractor shall repair these areas as required, at no additional cost to the Owner. b. Testing of rehabilitated manholes for watertightness shall be performed by the Contractor after operations are complete in accordance with Section DA- 21 —VACUUM TESTING OF REHABILITATED MANHOLES. D. MEASUREMENT AND PAYMENT Payment shall be based on the Contract Unit Price per vertical foot, measured from the bottom of the frame to the top of the bench. The Contract Unit Price shall be payment in full for performing the work and for furnishing all labor, supervision, materials, equipment all testing necessary to complete the work. Payment for grouting of pipe seals, bench and though and manhole walls shall be based on the Contract Unit Price for each manhole actually grouted. DA-23 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES The contractor shall be responsible for locating and marking all previously exposed manholes and water valves in each street of this contract before the resurfacing process commences for a particular street. The contractor shall attempt to include the Construction Engineer (if he is available) in the observation and marking activity. In any event a street shall be completely marked a minimum of two (2) working days before resurfacing begins on any street. Marking the curbs with paint is a recommended procedure. It shall be the contractors responsibility to notify the utility companies that he has commenced work on the project. As the resurfacing is completed (within same day)the contractor shall locate the covered manholes and valves and expose them for later adjustment. Upon completion of a street the contractor shall notify the utilities of this completion and indicate the start of the next one in order for the utilities to adjust facilities accordingly. The following are utility contact persons: Co any Telephone Number Conlagt Person Southwestern Bell Telephone 338-6275 "Hot Line" Texas Utilities 336-9411 Mr. Roy Kruger "~ ExL 2121 11102104 ASC-16 -' PART DA - ADDITIONAL SPECIAL CONDITIONS Lone Star 336-8381 Mr.Jim Bennett Ext. 6982 City of Fort Worth, 871-8100 Mr. Jim Bob Wakefield Street Light and Signal Of course. under the terms of this contract, the contractor shall complete adjustment of the storm drain and Water Department facilities, one traffic lane at a time within five (5)working days after completing the laying of proposed H.M.A.C. gwerlay adjacent to said facilities. Any deviation from the above procedure and allotted working days may result in the shut down of the resurfacing operation by the Construction Engineer. The contractor shall be responsible for all materials, equipment and labor to perform a most accurate job and all coasts to the contractor shall be figured subsidiary to this contract. DA-24 REPLACEMENT OF CONCRETE CURB AND GUTTER These provisions require the contractor to remove all failed existing curb and gutter, as designated by the Construction Engineer, and replace with standard concrete curb and gutter, laydown curb and gutter, or in like kind, as governed by the standard City Specifications, Item No. 104"Removing Old Concrete', Item No. 502 "Concrete Curb and Gutter", and Drawing Nos..S-S2 through S-S4. Pay limits for laydown curb and gutter are shown in Drawing No. S-S5 of the Standard Specifications. Contractor shall saw cut the curb and gutter and pavement prior to re moval. Included, and figured subsidiary to this unit price,will be the required sawcut excavation, as per specification Item No. 106 "Unclassified Street Excavation", into the street to aid in the construction of the curb and gutter. The pay limit will be 9" out from the gutter lip, with same day haul-off of the removed material to a suitable dump site. The street void shall be filled with H.M.A.C. 'Type D" mix as per specification No. 300"Asphalts, Oils and Emulsions", Item No. 304 "Prime Coat" and Item No. 312 "Hot Mix Asphaltic Concrete" and compacted to standard City densities and top soil as per specification item No. 116 "Top Soil°, if needed, shall be added and leveled to grade behind the curb. Existing improvements within the parkway such as water meters, sprinkler system, etc. damaged during construction shall be replaced with same or better at no cost to the City. Backfill for curb and gutter shall be completed within fourteen (14) calendar days from the day of demolition to date of completion. If the contractor fails to complete the work within fourteen (14) calendar days, a $100 dollar liquidated damage will be assessed per block per day. The unit price bid per linear foot shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-25 REPLACEMENT OF 6" CONCRETE DRIVEWAYS This item shall include the removal and replacement of existing concrete driveways, due to deterioration or in situations where curb and gutter is replaced to adjust grades to eliminate ponding water with same day haul-off of the removed material to a suitable dump site. For specifications governing this item see Item No. 104 "Removing Old Concrete", Item No. 504" Concrete Sidewalk and Driveways Pay limits for concrete driveway are as shown in Drawing No. S-S5 of the Standard Specifications. !� 11102104 ASC-17 a PART DA - ADDITIONAL SPECIAL CONDITIONS The unit price bid per square yard shall be full compensation for all labor, material, equipment, supplies, and incidentals necessary to complete the work. DA-26 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE The contractor shall remove all existing deformed H.M.A.C. pavement and/or bad base material that shows surface deterioration and/or complete failure. The Engineer will identify these areas upon which time toe contractor will begin work. The failed area shall be saw cut, or other similar means, out of the existing pavement in square or rectangular fashion. The side faces shall be cut vertically and all failed and loose material excavated. As a part of the excavation process, all unsatisfactory base material shall be removed, if required, to a depth sufficient to obtain stable sub-base. The total depth of excavation could range from a couple of inches to include the surface-base-some sub-base removal for which the Engineer will select the necessary depth. The remaining good material shall be leveled and uniformly made ready to accept the fill material. All excavated material shall be hauled off site,the same day as excavated, to a suitable dump site. After satisfactory completion of removal as outlined above, the contractor shall place the permanent pavement patch, with "Type D" surface mix. This item will always be used even if no base improvements are required. The proposed H.M.A.C. repair shall match the existing pavement section or the depth of the failed material, whichever is greater. However, the patch ' thickness shall be a minimum of 2 inches. Generally the existing H.M.A.C. pavement thickness will not exceed 6". Before the patch layers are applied, any loose material, mud and/or water shall be removed. A liquid asphalt tack coat shall be applied to all exposed surfaces. Placement of the surface mix lifts shall not exceed 3 inches with vibrator compactions to follow each lift. Compactions of the mix shall be to standard densities of the City of Fort Worth, made in preparation to accept the recycling process. All applicable provisions of Standard Specification Item Nos. 300"Asphalts, Oils, and Emulsions", 304"Prime Coat", and 312"Hot-Mix Asphaltic Concrete"shall govern work. The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-27 GRADED CRUSHED STONES This item shall be used to repair the failed base material in areas exceed 8" deep as directed by the Engineer. The material shall be graded crushed stones. For specifications governing this item see Item No. 208"Flexible Base". The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-30 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX) All applicable provisions of Standard Specifications, item Nos. 312 "Hot-Mix Asphaltic Concrete", 300 "Asphalts, Oils and Emulsions", 304 "Prime Coat", and 313 "Central Plant Recycling-Asphalt Concrete" shall apply to the construction methods for this portion of the project. -. 11102104 ASCA 8 ' r PART DA - ADDITIONAL SPECIAL CONDITIONS P' Standard Specification 312.5 (1) shall be revised as follows. The prime coat, tack coat, or the asphaltic mixture shall not be placed unless the air temperature is fifty (50) degrees Fahrenheit and rising, the temperature being taken in the shade and away from artificial heat. Asphaltic material shall also not be placed when the wind conditions are unsuitable in the opinion of the Engineer. The contractor shall fumish batch design of the proposed hot mix asphaltic concrete for City approval 48 hours prior to placing the H.M.A.C. overlay. The City will provide laboratory control as necessary. The unit price bid per square yard of H.M.A.C. complete and in place, shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. DA-31 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER This item shall include the removal and reconstruction of existing concrete valley gutters at locations to be determined in field: Removal of existing concrete valley, asphalt pavement, concrete.base, curb and gutter, and necessary excavation to install the concrete valley gutters all shall be subsidiary to this pay item. Fumishing and placing of 2:27 concrete base and crushed limestone to a depth as directed by the Engineer and necessary asphalt transitions as shown in the concrete valley gutter details, shall be subsidiary to this Pay Item. See standard specification Item No. 314, "Concrete Pavement", Item 312 "Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete% Item No. 106, "Unclassified Street Excavation" Item No. 208"Flexible Base." Measurement for final quantities of valley gutter will be by the square yard of concrete pavement and the curb and gutter section will be included. rContractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu of Crushed Stone at no additional cost. See Item 314" Concrete Pavement". Asphalt base material may be required at times as directed by the Engineer to expedite the work at locations identified in the field. The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch. Contractor shall work on one-half of Valley Gutter at a time, and the other half shall be open to traffic. Work shall be completed on each half within seven (7)calendar days. If the contractor fails to complete the work on each half within seven (7) calendar days, a $100 dollars liquidated damage will be assessed per each half of valley gutter per day. rThe unit price bid per square yard for Concrete Valley as shown on the proposal will be full compensation for materials, labor, equipment, tools and incidentals necessary to complete the r work. DA-32 NEW 7" CONCRETE VALLEY GUTTER This item shall include the construction of concrete valley gutters at various locations to be determined in field. r11102104 ASC-19 r PART DA - ADDITIONAL SPECIAL CONDITIONS Removal of existing:, asphalt pavement, concrete base, curb and gutter, and necessary excavation to install the concrete valley gutters all shall be subsidiary to this pay item. Fumishing and placing of 2:27 concrete base and crushed limestone to a depth as directed by the Engineer and necessary asphalt transitions as shown in the concrete valley gutter details shall be subsidiary to this Pay Item. : See standard specification Item No. 311", Concrete Pavement", Item 312 "Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete% Item No. 106, "Unclassified Street Excavation" Item No. 203"Flexible Base." Measurement for final quantities of valley gutter will be .. by the square yard of concrete pavement and the curb and gutter section will be included. Contractor may substitute 5" non-reinforced (2:27)Concrete Base in lieu of Crushed Stone at no additional cost. See Item 314" Concrete Pavement". The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch. Contractor shall work on one-half of Valley gutter at a time, and the other half shall be open to traffic. Work shall be completed on each half within seven(7)calendar days. If the Contractor fails to complete the work on each half within seven (7) calendar days, a $100 dollars liquidated damage will be assessed per each half of valley gutter per day. The unit price bid per square yard for Concrete Valley as shown on the proposal will be full compensation for materials, labor, equipment, tools and incidentals necessary to complete the work. fta DA-33 NEW 4" STANDARD WHEELCHAIR RAMP The Contractor shall construct standard concrete wheelchair ramps as shown on the enclosed details, or as directed by the Engineer. The removal of existing substandard wheelchair ramps and sidewalk as required for the installation of new wheelchair ramps shall be subsidiary to this pay item. The removal and replacement of existing curb and gutter as required for the installation of new wheelchair ramps shall be included in Pay Item 5 (Removal and Replacement of Curb and Gutter). Pay limits for laydown curb and gutter are as shown in the Standard Pay Limit Detail (WR-1). The pay limit will extend from 9" outside the lip of gutter to 15" back from the face of curb. Any asphalt tie--in shall be subsidiary to the curb and gutter pay item. Pay limits for "Standard Wheelchair Ramp" will start 15" back from the face of curb and encompass the remainder of the ramp and sidewalk. All applicable provision of standard Specifications Item 104 "Removing Old Concrete" and Item 504"Concrete Sidewalk Driveways" shall apply except as herein modified. All concrete flared surface shall be colored with LITHOCHROME color hardener as manufactured by L.M. Scofield Company or equal. The color hardener shall be brick red color and dry-shake type, and shall be used in accordance with manufactures instructions:. Concrete stain may be applied after concrete is poured (Product sold by BAER).. �rroasoa ASC-20 "g i f� PART DA - ADDITIONAL SPECIAL CONDITIONS "Contractor shall provide a colored sample concrete panel of one foot by one foot by three inches dimension, or other dimension approved by the Engineer, meeting the aforementioned specification. The sample, upon approval by the Engineer, shall be the acceptable standard to be applied for all construction covered in the scope of this pay item. The method of application shall be by screen, sifter, sieve or other means in order to provide for a uniform color distribution." J The unit price bid per square yard for 4" standard w oelchair ramp as shown on the proposal will be full compensations for materials, labor, equipment, tools and incidentals necessary to oompete the work. DA-34 8" PAVEMENT PULVERIZATION Contractor shall pulverize the existing pavement to a depth of 8". After Pu lverization is completed, contractor shall temporarily remove and store the 8" deep pulverized material, then cut the base 2" to provide place for the new 2" H.M.A.C. surface. The 2" base cut shall start at a depth of 8" from the existing pulverized surface. After the undercut operation Is completed, contractor shall spread, mix, and compact the pulverized material to a 95% compaction per City"s Standard Specifications or as directed by the Engineer in the field. A 3.5% portland cement shall be used to mix the pulverized material. If the existing pavement has a combination of 10° H.M.A.C. and crushed stone/gravel, undercut will not be required, the contractor will pulverize 10" inches, the 2" inch cut will be taken from the 10"pulverized material. (see soil test report) Pulverization shall start within ten (10) calendar days after all concrete work has been completed on a street. If the contractor fails to begin the work within ten (10) calendar days, a $200 dollars liquidated damage will be assessed per block per day. After the pulverization material is cured, the contractor shall overlay it with 2" H.M.A.C. surface within five(5)calendar days. If the contractor fails to begin the work within five(5)calendar days, a $200 dollars liquidated damage will be assessed per block per day. The unit price bid per sq. yd. shall be full compensation for all labor, material, equipment, tools, and incidentals necessary to pulverize, remove and store the pulverized material, undercut the base, mixing, compaction, haul off, sweep, and dispose of the undercut material. The 2" H.M.A.C. surface will be paid by separate item. DA-37 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING A. GENERAL: Where known by the design engineer, the locations of potentially petroleum contaminated material (soil) that may be encountered during excavation and/or construction activities will be shown on the plans. For all locations where material is excavated and suspected of being contaminated with petroleum products, whether known or not, these special conditions are to be followed. The contractor is also to follow all applicable Federal. State and Local regulations when handling known or suspect contaminated materials(soils). 11102104 ASC-21 r PART DA- ADDITIONAL SPECIAL CONDITIONS 1. WORK INCLUDED a. Excavation, stockpiling and testing of Potentially Petroleum Contaminated Material. b. Removal, testing, and disposal of petroleum contaminated groundwater. c. Obtaining and paying for required permits. d. Hiring of qualified environmental professional consultant(s). Contractor will be required to submit the environmental consultant's experience and qualifications to the City prior to beginning work in areas of Potentially Petroleum Contaminated Material. e. Hiring"of qualified environmental sampling professionals that will oopect and submit samples to the applicable City of Fort Worth testing laboratory. The City of Fort Worth's Department of Environmental Management for coordination of laboratory d* testing. 2. REFERENCES a. All applicable OSHA regulatory requirements. b. All applicable Environmental Protection Agency(EPA)regulatory requirements. c. All applicable State of Texas regulatory requirements. d. All applicable City of Fort Worth(City)regulatory requirements. e. All applicable NIOSH standards. f. All applicable TNRCC requirements. 3. SUBMITTALS a. The contractor shall prepare and submit to the City's Department of Environmental Management, Senior Specialist in Compliance, plans for handling Potentially Petroleum Contaminated Material (PPCM) not less than 30 days prior to commencing excavation. lot b. The Contractor shall take necessary precautions while performing this project. Contractor shall not commence PPCM work (1) Contractor's submittal for dealing d" with PPCM is reviewed by the City and (2) the plans (i.e., drawing and description) for discharging any treated liquid into the storm sewer or sanitary sewer are reviewed by the City(3)and acceptable stockpile area is identified by the Contractor. c. Contractor shall submit the name of his proposed qualified environmental professional consultant(s) and proposed PPCM Handling Plan to the City. The PPCM Handling Plan shall include the detailed sequence of construction including proposed excavation and handling methods, proposed carriers for contaminated materials, waste disposal site, and a list of any permits that may be required for PPCM handling or contaminated materials disposal. The above data must be compiled and arranged in a format that is acceptable to the Texas Natural Resource Conservation Commission nROC). t retina ASC-22 '� PART DA - ADDITIONAL SPECIAL CONDITIONS I 1P d. Contractor shall submit actual limits of PPCM excavation, as prepared by his qualified environmental consultant(s)and testing lab. e. Contractor shall submit for review the proposed carrier pipe material to be used with the actual limits of PPCM excavation, including pipe gasket and carrier pipe coating or liner. B. PRODUCTS: 1. PIPE GASKET MATERIAL. Materials used within the actual limits of PPCM excavation, including pipe gaskets, shall be resistant to petroleum hydrocarbon deterioration. C. EXECUTION: 1. POTENTIALLY PETROLEUM CONTAMINATED AREAS a. Areas suspected of having petroleum contaminated material (soils) are shown in on the engineering drawings. b. In areas other than those noted on the plans and where potentially petroleum contaminated materials are either detected or suspected, the City of Fort Worth and the Engineer should be notified immediately and the worts should proceed in accordance with this section. 2. SCREENING POTENTIALLY PETROLEUM CONTAMINATED AREAS a. Care should be taken during all excavation and dewatering activities to identify areas potentially contaminated by petroleum. b. When a petroleum odor is encountered during excavation or when there is visual evidence of tential po (Y petroleum contaminated soil, the Contractor shall notify the Engineer without delay. c. The Contractor shall have retained the services of an environmental consultant who shall be present at the site to screen suspect soil with a photo-ionization detector r (PID) or a flame ionization detector (FID). A reading of 20 ppm above ambient conditions or greater on PID or FID tested soil sample will be considered potentially petroleum contaminated. The soul sample should be a recent sample from the excavation face. The sample should be stored in a laboratory supplied glass jar with a tef on gasket lined lid. The City of Fort Worth Department of Environmental Management will be notified prior to all sample collection and submittal to the current testing laboratory identified by the City. The PID or FID tests should be performed in a confined location. Soils producing a reading of less than 20 ppm above ambient will not be considered potentially petroleum contaminated. The PID or FID shall be calibrated according to manufactures instructions. d. Water encountered during excavation or dewatering shall be considered to be potentially contaminated if there is a visible sheen, a hydrocarbon odor, adjacent soil that appears visually to be contaminated by hydrocarbons or at any time the Contractor has reason to believe that hydrocarbon contamination may have 11102104 ASC-23 fto PART DA — ADDITIONAL SPECIAL CONDITIONS occurred, The Contractor shall immediately notify the City and the TNRCC whenever contaminated water is encountered. a. The Contractor shall contact the City whenever contamination from any source is suspected. a 3. HANDLING POTENTIALLY PETROLEUM CONTAMINATED SOIL(PPCS) a. Contractor shall coordinate with the City to determine a suitable location for the stockpiling of a contaminated soil. The following procedure shall be f olloo ed in preparing the chosen site: 1. Provide a diked enclosure large enough to hold all material and prevent runoff. M, 2. The diked area shall be lined with 20-30 mil plastic tp prevent seepage into the existing soil. 3, At the end of each work day, Contractor shall completely cover stockpile with 20 mil plastic. During the day, the Contractor shall keep the stockpile covered, as necessary,to prevent release of contaminated materials due to rain or wind. 4. Sampling and evaluation of materials will be performed at the Contractor's expense. (The City of Fort Worth will provide laboratory services) b. PPCS shall be handled, tested, observing all standard chain-of-custody procedures and sampling preservation and analyses shall conform to published and recognized standards. c. The stockpiled PPCS shall be sampled and tested every 50 cubic yards for Total Petroleum Hydrocarbons(TPH)(TX1005)and Benzene, Toulene, Ethylbenzene and Xylene (BTEX) (EPA 8020). All test results will be forwarded to the City of Fort Worth Department of Environmental Management. d. Contaminated soil identified by test results will be disposed of according to DA-36, Loading,Transportation, and Disposal of Contaminated Soil. e. It is the intent of the City of Fort Worth that uncontaminated soils be utilized as backfill material, if the soils also meet the Type C or B backfrll classifications. 4. HANDLING POTENTIALLY PETROLEUM CONTAMINATED WATER(PPCW) a. Water pumped from the excavation or from dewatering activities that has an oily sheen, a hydrocarbon odor, or is otherwise suspect, shall be considered potentially petroleum contaminated. low b. PPCW shall be handled, tested, and discharged in accordance with the TNRCC's appropriate state regulation. PPCW shall be tested no later than 15 days prior to extraction. PPCW shall, if necessary, be treated in an appropriately sized oibWater �• separator, air stripper or GAC canisters. Contractor shall have his testing laboratory determine that the oillwater separator treated discharge is within the limits established by the TNRCC's regulations before being allowed to discharge ,.. (discharge to sanitary sewer). Contractor shall be responsible for furnishing the effluent test reports to the City. 11102104 ASC-24 I' PART DA - ADDITIONAL SPECIAL CONDITIONS Q Alternatively, the Contractor may dispose of contaminated water, after appropriate pretreatment, into the sanitary sewer collection system. It shall be the resportsUlity of the Contractor to obtain the necessary permit(s) and to perform all testing required by the City of Fort Worth Pretreatment Services Division. d. All treated water shall be discharged into a Contractor supplied Frac Tank, sampled, and analyzed before discharge into the sewer system. e. The product that is recovered shall be disposed of in accordance with all applicable regulations. Any phase separate product recovered from the oiltwater separator and air stripper shall be transported in accordance with Department of Transportation rules and regulations for flammable products. When transporting product for disposal, transportation shall also be performed by a licensed carrier. The Contractor is responsible for proper manifesting of the material from the site to the waste disposal facility. Completed Manifests shall be returned to the City Department of Environmental Management within 90 days of shipment. 5. HANDLING VAPOR CONCENTRATIONS a. In order to maintain safe working conditions, the vapor concentrations should not exceed 20 percent of the Lower Explosive Limit (LEL). During construction, measures should be taken to maintain LEL levels below 20 percent in all working areas. b. To monitor vapor levels and oxygen levels a combustible gas indicator(CGI)with a LE110 meter should continuously operate in the working area. The CGI should be properly calibrated and should have an alarm that sounds if 20 percent LEL is reached. Monitoring data from the GCI should be recorded periodically to determine if ventilation or other methods are effective. In the event local health and safety agencies require more stringent monitoring, the local regulations must be implemented. D. MEASUREMENT AND PAYMENT: Payment for handling PPCS, PPCW and Vapor Concentrations, obtaining and paying for any permits required, hiring the services of a qualified professional environmental consuttant(s), environmental issues, stockpiling and all issues included and incidental to this section will be full compensation for all tabor, equipment, materials, and supervision. Measurement and Payment for this section will be per linear foot of trench excavated where the excavated material is handled as a contaminated material. No separate payment will be made for handling of contaminated water, vapor concentrations,sampling, stockpiling, etc. DA-38 LOADING, TRANSPORTATION, AND DISPOSAL OF CONTAMINATED SOIL r., A. GENERAL: This item has been established for the loading, transportation and disposal of contaminated soils in a State of Texas approved disposal site (landfill) to handle special wastes (petroleum contaminated soils). A bid item has been established in the proposal for the proper loading, transportation and disposal of the material to a designated site and the quantity established is 11102104 ASC-25 r. PART DA - ADDITIONAL SPECIAL CONDITIONS the engineers best estimate of the quantity that may be removed. This quantity may vary depending upon actual conditions and testing results. The unit price bid will not be increased regardless of the actual amount of material disposed and may be decreased if a larger volume of material,than that listed in the bid proposal, results in a unit cost reduction for disposal. B. WASTE MANIFESTS: Any and all non-hazardous liquid and pe"eum substance waste removed from the site of generation and transported for treatment and/or disposal must be accompanied by a waste shipment record/manifest detailing required generator, transported, destination and waste description information. These results may not be uniform throughout the entire site. For all petroleum substance waste, the waste shiprent record utilized shall be the TNRCC PETROLEUM-SUBSTANCE WASTE AFFIDAVIT (Form TWC-0332). The Contractor shall be responsible for obtaining, originating and maintaining manifests in accordance with federal and state laws. The Contractor shall sign the manifests forms as Independent Contractor to the Owner. AUTHORIZATION OF PAYMENT FOR REMOVAL TRANSPORT AND TREATMENT/ DISPOSAL OF WASTES IN CONTINGENT UPON RECEIPT BY THE ENGINEER OF FULLY " COMPLETED AND SIGNED MANIFEST FORMS that are in agreement with regard to the type and amount of waste removed from the site and received by the treatment/disposal facility. The Contractor shall immediately resolve any manifest discrepancies. Completed Manifests shall be returned to the City Department of Environmental Management within 90 days of shipment. C. MEASUREMENT AND PAYMENT: -t Payment for this item shall be made per in place cubic yard of contaminated sons that are loaded,transported and disposed of in an approved special disposal site. No separate payment will be made for loading, transportation and disposal of contaminated ground waters collected; these costs considered subsidiary to DA-37, POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING. The proposed landfill shall be included in the Contractor's bid submittal , and approved by the City of Fort Worth Department of Environmental Management prior to contract award. Contractor shall be responsible for all landfill costs, including, but not limited to landfill fees, transportation costs and landfill operator requested analytical testing and waste characterization. DA-42 CONCRETE PIPE FITTINGS AND SPECIALS Bidders shall submit the following for C-303 pretensioned concrete cylinder pipe to be installed on this project: 1. A complete list of fittings and specials upon which the lump sum is bid. 2. Provide a unit price indicating the cost for furnishing and installing each of the various items of fittings and specials. The lump sum as bid in the Proposal shall be payment in full for all fittings and specials necessary for the construction of the project as designed. Payment for the installation of the pipe fittings, specials, and random lengths shall be included. Should the Engineer approve any changes to the fittings, specials or random pipe lengths listed as justifying the amount bid in the Proposal, the price submitted with the Proposal shall be used to determine the increase or decrease in the value of the lump sum of the Proposal, and the Contractor shall be paid on the basis of this adjusted value under that bid item. 11102104 ASC-26 �' PART DA - ADDITIONAL SPECIAL CONDITIONS DA-43 UNCLASSIFIED STREET EXCAVATION This item will be used if additional excavation is needed that is not covered by "8' PAVEMENT PULVERIZATION". Additional Excavation is the removal of the excessive crown and base to bring the new base to proper grade and City standard specifications for street reconstruction:. All applicable provisions of:Item No. 106 "Unclassified Street Excavation" shall apply, work shall be paid per cubic yard. DA-44 6" PERFORATED PIPE SUBDRAIN This item shall consist of fumishing and installing 6" perforated subdrain and filter material all as shown on the enclosed details, or as directed by the Engineer. P All applicable provision of standard Specifications Item 500 "SUBDRAINS° shall apply except as herein modified. The pipe material shalt be poly vinyl chloride (PVC) with the standard dimensional ratio of 35 (SDR35) and meet the ASTM D 1784. Filter shall have the capability of PW passing ground water without transporting the soil placed around the filter fabric. The fabric shall be constructed exclusively of synthetic thermoplastic fibers and may be either woven or non- woven to form a mat of uniform quality. Fabric fiber may be either continuous or discontinuous 016 and oriented in either a random or an aligned pattern throughout the fabric. The fabric shall be mildew resistant, rot proof, shall be satisfactory for use in a wet soil and aggregate environment, contain ultraviolet stabilizers and have nonravelling edges. rThe fabric shall meet the following requirements when sampled and tested in accordance with the methods indicated. Test Original Physical Properties .Method Requirements Fabric weight, on an ambient SDHPT Test Method 4.0 minimum for under drains Temperature air-dried tension Tex-616-J and Slope Stabilization, 6.0 free sample, expressed 'Testing of Construction Fibers' minimum for Gabions in ozlsq.yd. Revetment Water flow rate by falling head Tex-616-J 80 minimum method, 7.9 inches (20 cm) to 3.9 inches (10 cm) on 2 inch ID cylinder with 1 inch diameter orifice, with flow rate expressed in gal/sq.ft/minute. Breaking load in either machine or ASTM Designation: 100 minimum cross-machine direction, expressed D 1682 grab method G as in pounds. modified by Tex-616-J 11102104 ASC-27 PART DA - ADDITIONAL SPECIAL CONDITIONS Equivalent opening size (US CW-02215, US Army Corps of 70 to 100 Standard sieve no.) Engineers, Civil Works Construction Guide Specification. "Plastic Filter Fabric: November, 4 1977. a "Apparent elongation' at breaking AST, Designation: 100 maximum load in either machine or cross- D 1682 grab method G as machine direction, expressed as modified by Tex-6161 percent. The "Filter Fabric° shall be installed in accordance with the manufacturer's recommendations, as indicated or as directed by the Engineer. When lapping is required, it shall be in accordance with the manufacturer's recommendations. Backfilling around the Filter Fabric shall be done such a way as not to damage the Filter Fabric material during the placement. The unit price bid per L.F. shall be full compensation for all labor, materials, equipments, foots, d4 and incidentals necessary to complete the work. DA-45 REPLACEMENT OF 4" CONCRETE SIDEWALKS �' This item shall include the removal and replacement of existing concrete sidewalk due to failure or in situation where curb and gutter is replaced to adjust grades to eliminate ponding water with on same day haul-off of the removed material to a suitable dumpsite, For specifications governing this item see item No. 104'Removing Old Concrete', and Item No. 504 "Concrete Sidewalk and Driveways'. The unit price bid per square yard shall be full compensation for all labor, material, equipment, supplies, and incidentals necessary to complete the removal and replacement work. DA-48 EASEMENTS AND PERMITS Easements and permits, both temporary and permanent, have been secured for this project at this time and made a part thereto. Any easements andfor permits, both temporary and permanent, that have not been obtained by the time of publication shall be secured before construction starts. No work is to be done in areas requiring easements and/or permits until the necessary easements are obtained. The Contractor's attention is directed to the easement description and permit requirements, as contained herein, along with any special conditions that may have been imposed on these easements and permits. Where the pipeline crosses privately owned property, the easements and construction areas are shown on the plans. The easements shalt be cleaned up after use and restored to their original - conditions or better. In the event additional work room or access is required by the Contractor, it shall be the Contractor`s responsibility to obtain written permission from the property owners involved for the use of additional property required. No additional payment will be allowed for this item. 11102104 ASC-28 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-62 WATER METER AND METER BOX RELOCATION AND ADJUSTMENT H This item shall include raising or towering an existing meter box to the parkway grade specified No payment will be made for adjusting existing boxes which are within 0.001 feet of specified parkway grade. The unit price bid shall be full and sufficient payment for all labor,equipment and materials used in the adjustment of the meter box. PM DA-73 RELOCATION OF SPRINKLER SYSTEM BACK-FLOW PREVENTER/CONTROL VALVE AND BOX The relocation and reconnection of sprinkler system control valve and box will be required as shown on the plans, and/or as described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. A minimum of twenty-four(24) hours advance notice shall be given when service interruption will be required. When the relocation is required, separate payment will be allowed for the relocation of sprinkler back-flow preventer or control valve and box. Payment for all work and material such as back-fill, fittings, five (5)feet of PVC Schedule 40 and all material labor, and equipment used by and for the licensed plumber shall be'included in the price bid for the relocation of sprinkler W back-flow preventer or control valve and box. All other casts will be included in other appropriate bid items). -- DA-76 1 %11 &2" COPPER SERVICES The following is an addendum to E1-17, Copper Water Service Lines and Copper Alloy Couplings: All fittings used for i W and 2" water services lines shall be compression fittings of the type produced with an internal "gripper ring" as manufactured by the Ford Meter Box Co., Inc., Mueller Company, or approved equal. Approved equal products shall submit shop drawings and manufacturer's catalog information for approval. Contractor shall make all cuts to the copper tubing with a copper tubing cutter tool specifically designed for this purpose in order to provide a clean, square cut. The use of hacksaws or any other type of cutter will not be allowed. Prior to installing the compression fittings, the copper tubing will be made round by the use of a "rounding tube"specifically made for that purpose. Payment for all work and materials associated with 1 and 2'copper services shall be included in the price of the appropriate bid item. DA-91 ADJUST WATER VALVE BOXES, MANHOLES, AND VAULTS (UTIL. CUT) �. Contractor will be responsible for adjusting water valve boxes, manholes and vaults to match new pavement grade. The unit price bid will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. r r 11102104 ASC-29 Part F Bonds NOTICE The following blank spaces in the Certificate of Insurance, Performance, Payment and Maintenance Bonds, and Contract are not to be filled in by the Bidder at the time of submitting his proposal. These forms are included herein to familiarize the Bidder with such forms which the successful Bidder will be required to execute. CERTIFICATE OF INSURANCE TO: CITY OF FORT WORTH Date: NAME.OF PROJECT: Sanitary Sewer Rehabilitation Contract LXV11 (67),Part 1. PROJECT NUMBER: Water Proiect#PS53-060530177970 Sewer Proiect#PS58-070580175790 IS TO CERTIFY THAT: Conatser Construction Tx,LP is,at the date of this certificate,Insured by this Company with respect to the business operations hereinafter described,for the type of insurance and accordance with provisions of the standard policies used by this Company,and further hereinafter described. Exceptions to standard policy noted on reverse side hereof. TYPE OF INSURANCE Policy Effective Expires Limits of Liabilit Worker's Compensation Comprehensive General Bodily Injury: Liability Insurance(Public Ea.Occurrence: $ Liability) Property Damage: Ea.Occurrence: $ Blasting Ea.Occurrence: $ Collapse of Building or structures adjacent to Ea.Occurrence: $ excavations Damage to Underground Utilities Ea.Occurrence: $ Builder's Risk Comprehensive Bodily Injury: Automobile Liability Ea.Person: $ Ea.Occurrence:$ Property Damage: Ea.Occurrence:$ Bodily Injury: Contractual Liability Ea.Occurrence: $ Property Damage: Ea.Occurrence: $ Other Locations covered: Description of operations covered: The above policies either in the body thereof or by appropriate endorsement provided that they may not be changed or canceled by the insurer in less than five(5)days after the insured has received written notice of such change/or cancellation. t Where applicable local laws or regulations require more than five(5)days actual notice of change or cancellation to be assured,the above policies contain such special requirements,either in the body thereof or by appropriate endorsement thereto attached. The City,its officers,employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's worker's compensation insurance policy. Agency Insurance Co.: Fort Worth Agent By Address Title ACORDM CERTIFICATE OF LIABILITY INSURANCE 02/04//z 0' PRODUCER (817)457-6700 FAX (817)457-7246 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION THE SWEENEY COMPANY ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 1121 E. Loo 820 South HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR Loop ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P 0 Box 8720 Fort Worth, TX 76124-0720 INSURERS AFFORDING COVERAGE NAIC# INSURED Conatser Construction TX, LP INSURERA: Bituminous Casualty Corp P.O.Box 15448 INSURERB: Bituminous Fire & Marine Ins Co Fort Worth, TX 76119 INSURER C: INSURER D: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADD'l TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS GENERAL LIABILITY CLP 3 194 055 08/01/2004 08/01/2005 EACH OCCURRENCE $ 1,000,000. X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED $ 100,000 CLAIMS MADE FY]OCCUR MED EXP(Any one person) $ 5,00 A X CONTRACTUAL, XCU PERSONAL&ADV INJURY $ 1,000,00 X INDEP CONTRACTORS GENERAL AGGREGATE $ 2,000,00 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMPIOP AGG $ 2,000,00 POLICY X PRO LOC JECT AUTOMOBILE LIABILITY CAP 3 194 060 08/01/2004 08/01/2005 COMBINED SINGLE LIMIT X ANY AUTO (Ea accident) $ 1,000,000 X ALL OWNED AUTOS BODILY INJURY X SCHEDULEDAUTOS (Per person) $ B X HIRED AUTOS BODILY INJURY X NON-OWNED AUTOS (Per accident) $ PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILITY CUP 2 573 926 08/01/2004 08/01/2005 EACH OCCURRENCE $ 5,000,000 X OCCUR F-I CLAIMS MADE UMBRELLA AGGREGATE $ 5,000,000 A $ DEDUCTIBLE $ X RETENTION $ 10,000 $ WORKERS COMPENSATION AND WC 3 194 062 08/01/2004 08/01/2005 X 1 WC STATU- OTH- EMPLOYERS'LIABILITY E.L.EACH ACCIDENT $ 1,000,00 A ANY PROPRIEI'OWPARTNER[EXECUTNE OFFICER/MEMBER EXCLUDED? E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under SPECIAL PROVISIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,00 OTHER DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS ANITARY SEWER REHABILITATION FOR CONTRACT LXVII, PART 1 - 7TH ST CITY OF FT WORTH ERT HOLDER NAMED ADLN INSURED EXCEPT ON WORKERS COMP WITH GENL LIAB BEING PRIMARY & NON-CONTRIBUTORY ITH WAIVER OF SUBROGATION ALL POLICIES AS REQUIRED BY WRITTEN CONTRACT. 30 DAY CANC NOTICE AMENDED TO 0 DAY FOR NON-PAY OF PREMIUM CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL XIMXXI MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, CITY OF FORT WORTH XXXXR� XXXXi�IXd(n?fK>XIX�QXD011XIX�(XX 1000 THROCKMORTON ST "AHfrx*xx1>s;*d(xwd xiw)txXafa('xmK mmXXXXXXXXX FT WORTH, TX 76102 [AUTHORIZED REPRESENTATIVE ACORD 25(2001/08) @ACOFOORPORATION 1988 CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW Pursuant to V.T.C.A Labor Code Section 406.096(2000),as amended,Contractor certifies that it provides workers' compensation insurance coverage for all its employees employed on city of Fort Worth Department of Engineering No. 4144 and City of Fort Worth Project Number Water Proiect#PS53-060530177970 Sewer Proiect#PS58-070580175790 Conatser Construction Tx,LP CONTRACTO By: Jerry Conatser,President of Conatser Management Group,Inc,G.P. Title AMOS Date STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME,the undersigned authority,on this day personally appeared �, c ,iA�, ,. known to me be the person whose name is subscribed to the foregoing instrument,and acknowledge to me that he executed the same as the act and deed of Conatser Construction Tx,LP the purpose and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this.,6ay of .2005. Notary Frublic ' a for the State of Texas SYDNEY JONES Notary Public,State of Texas My Commission Expires May 09,2006 .w Bond No: S329065 PERFORMANCE BOND THE STATE OF TEXAS § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § Fuployers Mutual Casualty and That we(1)Conatser Construction Tx,LP as Principal herein,and(21JnJ co TncurnnrP C ap of , corporation organized under the laws of the State of(3) Iowa Providence , and who is authorized to issue surety bonds in the State of Texas, Surety herein, are held and firmly bound unto the City of Fort Worth,a municipal corporation located in Tarrant and Denton Counties,Texas,Obligee herein,in the sum of One Million,One Hundred EiehtNine Thousand,Seven Hundred NinetyNine 00/100 Dollars.............................................................................. ($1,189,799.00)for the payment of which sum we bind ourselves,our heirs,executors,administrators,successors and assigns,jointly and severally,firmly by these present. FEB 17 2005 WHEREAS, Principal has entered into a certain written contract with the Obligee dated the of 2005 a copy of which is hereto attached and made a part hereof for all purposes, for the construction of Sanitary Sewer Rehabilitation Contract LXVII (67),Part 1. NOW THEREFORE, the condition of this obligation is such, if the said Principal shall faithfully perform the work in accordance with the plans, specifications, and contract documents and shall fully indemnify and hold harmless the Obligee from all costs and damages which Obligee may suffer by reason of Principal's default, and reimburse and repay Obligee for all outlay and expense that Obligee may incur in making good such default, then this obligation shall be void;otherwise,to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of such statute,to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument. SIGNED AND SEALED this day of ,2005. FEB 17 2005 ATTEST: Conatser Construction Tx,LP (Principal) Secretary PRINCIPAL BY: tser, esi ent o tser (SEAL) e: gement Group, Inc., GP P.O.Bog 15448 Fort Worth,TX 76119 Witness as tArilfcllipal Employers Mutual Casualty Company and Union Insurance Company of Providence Surety B Name: 1 S. Davis ATTEST: (Attorney-in-fact) Address. p. 0. Box 712 Secretary nQs MninPC, Tara 50V3 EAL) Telephone Number: 1-803-725-0802, Ext. 4252 Witness as iA Surety Carolyn Mapl s NOTE: (1) Correct name of Principal(Contractor). r (2) Correct name of Surety. (3) State of incorporation of Surety Telephone number of surety must be stated. In addition,an original copy of Power of Attorney shall be attached to Bond by the Attorney-in-Fact. The date of the bond shall not be prior to date of Contract. Bond No: S329065 PAYMENT BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § Employers Mutual Casualty Company and That we (1) Conatser Construction Tx, LP rural -ni ouu a corporation organized and existing under the laws of the State of(3) Iowa , as surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties,Texas, Obligee herein, in the amount of One Million, One Hundred EightNine Thousand,Seven Hundred NinetvNine 00/100.. ..Dollars ($1,189,799.001 for ........................................... ................................................... the payment whereof, the said Principal and Surety bind themselves and their heirs, executors, administrators, +r successors and assigns,jointly and severally,firmly by these presents: 'EB 17 200 WHEREAS,the Principal has entered into a certain written contract with the Obligee dated the day of A.D. , 2005, which contract is hereby referred to and made a part hereof as if fully and to the same extent as if copied at length,for the following project: Sanitary Sewer Rehabilitation Contract LXV11 (67),Part 1. .� NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully make payment to each and every claimant(as defined in Chapter 2253,Texas Government Code,as amended)supplying labor or materials in the prosecution of the work under the contract,then this obligation shall be void;otherwise,to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said .. statute,to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument. SIGNED AND SEALED this day of 2005. FEB 17 2005 Conatser Construct' n Tx LP ATTEST: PRINCIPAL BY: (Principal)Secretary ame: errs Conatser President of Title: Conatser Management Group, Inc., GP (SEAL) P.O.Box 15448 Fort Worth,TX 76119 Witnesvis to Prigllciyral Employers Mutual Casualty Company and Union Insurance Company ofFrowi0ence S ATTEST: B . Name: Glenna S. Davis Secretary Attorney in Fact (SEAL) Address:P, 0. Box 712 aArl Des Moines, Iowa 50303 Witness as Surety Carolyn Ma es Telephone Number: 1-800-725-0802. Ext. 4252 NOTE: 1. Correct name of Principal(Contractor). 2. Correct name of Surety. 3. State of incorporation of Surety. Telephone number of surety must be stated. In addition,an original copy of Power of Attorney shall be attached to Bond by the Attorney-in-Fact. The date of bond shall not be prior to date of Contract. Bond No: S329065 and S329066 MAINTENANCE BOND THE STATE OF TEXAS § COUNTY OF TARRANT § KNOW ALL MEN BY THESE PRESENTS: Employers Mutual Casualty Company and That Conatser Construction Tx, LP(Contractor), as principal, andUnlon Insurance Comoar�r of 2Providence corporation organized under the laws of the State of Towa_, (Surety), do hereby acknowledge themselves to be held and bound to pay unto the City of Fort Worth, a Municipal Corporation chartered by virtue of Constitution and laws of the State of Texas, ("City") in Tarrant County, Texas the sum of One Million, One Hundred EiehtNine Thousand,Seven Hundred NinetyNine 00/100.......................... ......Dollars ($1,189,799.00) lawful money of the United States, for payment of which sum well and truly be made unto said City and its successors, said Contractor and Surety do hereby bind themselves,their heirs,executors, administrators, assigns and successors,jointly and severally. This obligation is conditioned,however;that, WHEREAS,said Contractor has entered into a written Contract with the City of Fort Worth,dated the day of 2005copy of which is hereto attached and made a part hereof,the performance of the following described public improvements: Sanitary Sewer Rehabilitation Contract LXV11 (67),Part 1. the same being referred to herein and in said contract as the Work and being designated as project Water Proiect# PS53-060530177970 Sewer Proiect # PS58-070580175790and said contract, including all of the specifications, conditions, addenda, change orders and written instruments referred to therein as Contract Documents being incorporated herein and made a part hereof,and, WHEREAS,in said Contract,Contractor binds itself to use such materials and to so construct the work that it will remain in good repair and condition for and during a period of after the date of Two (2)Years after the date of the final acceptance of the work by the City;and WHEREAS,said Contractor binds itself to maintain said work in good repair and condition for said term of Two(2)Years; and, WHEREAS, said Contractor binds itself to repair or reconstruct the work in whole or in part at any time within said period, if in the opinion of the Director of the Water Department of the City of Fort Worth, it be necessary;and, WHEREAS, said Contractor binds itself, upon receiving notice of the need therefore to repair or reconstruct said work as herein provided. NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or reconstruct said work in accordance with all the terms and conditions of said Contract, these_presents shall be null and void, and have no force or effect. Otherwise this Bond shall be and remain in full force and effect, and the City shall have and recover from the Contractor and Surety damages in the premises prescribed by said Contract. This obligation shall be continuing one and successive recoveries may be had hereon for successive breaches until the full amount hereof is exhausted. IN WITNESS WHEREOF, this instrument is executed in 3 counterparts, each one of which shall be deemed an original,this—TE9 ofA.D. 2005. ATTEST: B (SEAL) Conatser Construction Tx,LP ontracti r By. Secretary e: erry tonaeser Title: President of Conatser MMagement Group Inc., GP ATTEST: Employers Mutual Casualty Company and (SEAL) Union Insurance Caaman= of Prcnri_denyP dP Surety BY Secretary Name:Glenna S. Davis Title: Attg1mgy-irr-Fact PP P. 0. Box 712 Des 'Moines, Iowa 50303 Address i AFEMChisurance Con4mmks GO P.O. Box 712•Des Moines,IA 50303-0712 ' ` 7 CERTIFICATE OF AUTHORITY INDIVIDUAL ATTORNEY-IN-FACT KNOW ALL MEN BY THESE PRESENTS,that: i. Employers Mutual Casualty Company,an Iowa Corporation 5. Dakota Fire Insurance Company,a North Dakota Corporation 2. EMCASCO Insurance Company,an Iowa Corporation &. EMC Property&Casualty Company,an Iowa Corporation 3. Union.Insurance Company of Providence,an Iowa Corporation 7 The Hamilton Mutual Insurance Company,an Ohre oorporation 4. Illinois EMCASOO Insurance Company,an Iowa Corporation 7 hereinaftQr referred to severally as"Company"and collectively as"Companies",each does,by these presents,make,constitute and appoint::. CATHY VINSON,VICKIE A.ROSS, MICHAEL A.DELABANO,JACK R.BARBER,GLENNA S.DAVIS, INDIVIDUALLY, FORTWORTH,TEXAS :.......... ___.............................:...............................____.......................................................... 7 its true and lawful attorney-in-fact,with full power and authority conferred to sign,seal,and execute its lawful bonds,undertakings,and other obligatory instruments of a similar nature as follows: N AOUNTNQT XEpING TEN MILLION DOLLARS.:....,IN AM ($1O,oQ0 QOt}QQ),; Ind to btttd each Company thereby as fully and to the same extent as Ef such instruments were signed by the duly authorized officers of each such Company and all of tl a41s;'of said attprney pursuant to the'authority hereby given are hereby ratified and confirmed. The authority hereby granted shall expire April 1, 2005 unless sooner revoked. AUTHORITY FOR POWER OF ATTORNEY This Power-of-Attorney is..made and executed pursuant to and by the authority of the foitawing resolution of the Boards of Directors of each of„the Companies at a ;regularly sc heduled meeting of each do mpany duly called and held in 1999: RESOLVED,The President arid Chief: xecutive Officer,any Vice President,the Treasurer and the Secretary of Employers Mutual;9*Sualty Cornpanj shall have power . and authonty to(1)::appoint attoineys`*in-fact and authorize them to execute on behalf of.each Company and attach the seal of: Company thereto Dnds and,<` undertakings recognizances,contracts of indemnity and other writings obligatory in the nature thereof,and(2)to remove any such attomey-in-fact at any time and revoke the power and authority given to him or her.Attomeys-in-fact shall have power and authority,subject to the terms and limitations of the power-of-adomey issued to them, to execute and deliver on behalf of the Company,and to attach the seal of the Company thereto, bonds and undertakings,recognizances,contracts of indemnity and other writings obligatory in the nature thereof,and any such instrument executed by any such attorney-in-fact shall be fully and in all respects binding upon the Company. Certification as to the validity of any power-of-attorney authorized herein made by an officer of Employers Mutual Casualty Company shall be fully and in all respects binding upon this.Company. The facsimile or mechanically reproduced signature:of such officer, whether made heretofore or hereafter,wherever appearing upon,a certified copy of any;:powei af-attomey of the Company,shall be valid and binding upon the Company with the same force and affecfas though manually affixed.:. A:%WIESS WHEREOF,the Cc� have caused these nts to be signed for each by their officers as shown,and the Co poste seals to to hereto affixed this:. day of tyDV.rrr r Seats Bruce G.Kelley,Chairman JeTfrey S.Birdsley .•' ,cb„"s�Rgy, ,••�a?';;�w4,r a•�a�;;,",�as', of Companies 2,3,4,5 K 6; resident Assistant Secretary 3 �OpP041,: �PO O e•`�PPORq� of Company 1;Vice Chairman and SEAL a 1863 _ _ ;�; 1953 CEO of Company 7 r .� A0 0 19th November 2004 .•,, .,* On this dlvf AD before me a ,l guH NrF �r stregN�F.. S0%� �A cq`; Notary Public in and for the State of Iowa,personally appeared Bruce G 'Kelley aridJeffrey S PPORgI Birdsley,who,being by me duly swom,did say that they are and are known to me to be the W Chairman, President, Vice Chairman and CEO, and/or Assistant Secretary, respectively, of zy"s, SEAL ;? Yd SEAL ?: SEAL o each of The Companies above;that the seals affixed to this instrument are the seals of said *`•.,,,,,,,,•'*; °.'' ,°x''• . Q: corporations;that said instrument was signed and sealed on behalf of each of the Companies p ©WA •"'•;"grNUtat; '•.�,M .••'` by authority of their respective Boards of Directors; and that the said Bruce G. Kelley and f "' •,,,,�•.,`' Jeffrey S. Birdsley,as such officers,acknowledge the q of said:inSkumerttto be the UT voluntary act and deed of each of the Companies. My Commission Expires September 30,2006. ROTA KRUMINS ` Commission Number 176255 ''' ^^" MV Comm.Exp.Igo.30.2006 Nota ry Public in and for the State of Iowa CERTIFICATE I,David I.,Hixenbaugh,Vice President of the Companies,do hereby certify that the foregoing resolution of the Boards of Directors by each of the Companies November 19 2004 0 orrbehfafvi� `n;fe !�#�rs?W ' ,�atkt9 S.Davis are true anst correct:and are still in full fiorce and effect. F E S 1 Irt Tes6ntony whereof f/have subscribed my name and alhxed:ftra simile soal of eac r 1hIs day of Vice-President 11111111116- A . r .t • IMPORTANT NOTICE TO OBTAIN INFORMATION OR MAKE A COMPLAINT: You may contact Employers Mutual Casualty Company, Union Insurance of Providence, and/or EMCASCO Insurance Company for information or to make a complaint at: Employers Mutual Casualty Company Attn: Surety Claims P.O. Box 712 Des Moines, IA 50303 (515) 280-2689 (515) 280-2994 Fax You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: Texas Department of Insurance P.O. Box 149104 Austin, TX 78714-9104 (800) 252-3439 ATTACH THIS NOTICE TO YOUR BOND. This notice is for information only and does not become a part or a condition of the attached document and is given to comply with Section 2253-048, Government Code, and Section 53.202, Property Code, effective September 1, 2001. .A 7209 t PART G-CONTRACT THE STATE OF TEXAS § COUNTY OF TARRANT § FEB 17 2005 THIS CONTRACT, made and entered into the day of ,2005and between the City of Fort Worth, a home-rule municipal corporation located in Tarrant County, Texas, acting through its City Manager thereunto duly authorized so to do, Party of the First Part, hereinafter termed "OWNER", and Conatser ,., Construction Tx, LPthe City of Fort Worth County of TARRANT and State of TEXAS, Party of the Second Part, hereinafter termed "CONTRACTOR". WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the Party of the First Part (Owner), said Party of the Second Part (Contractor) hereby agrees with the said party of the First Part(Owner) to commence and complete certain improvements described as follows: Sanitary Sewer Rehabilitation Contract LXVll (67),Part 1. And all extra work connected therewith, under the terms as stated in the Contract Documents, and at his (their)own proper cost and expense to furnish all the materials, supplies, machinery, equipment, tools, superintendent, labor, bonds, insurance, and other accessories and services necessary to complete the said construction, in accordance with all the requirements of the Contract Documents, which include all maps, plats, blueprints and other drawings and printed or written explanatory matter thereof, and the specifications thereof, as prepared by the Engineers employed by the Owner, each of which has been identified by the endorsement of the Contractor and the Engineers thereon, together with the Contractor's Written Proposal and the other parts of the Contract Documents hereto attached, including the Fort Worth Water Department General Contractor Documents and General Specifications, all of which are made a part hereof and collectively and constitute the entire contract. — The Contractor hereby agrees to commence work within ten(10) days after the date written notice to do so shall have been given to him,and to substantially complete same within the time stated in the proposal. MR The Owner agrees to pay the contractor in current funds for the performance of the contract in accordance with the Proposal submitted therefore, subject to additions and deductions, as provided in the Contract Documents and all approved modifications thereof,and to make payment on account thereof as provided therein. IN WITNESS WHEREOF,the Parties to these presents have executed this Contract in 3 counterparts in the year and say first above written. City of Fort Worth Texas Owne ATTEST: Party of the F. st part r BY: .- I Marc A.Ott,Assistant ity Manager City Secretary (Seal) WITNESSES: Conatser Construction Tx,LP P.O.Box 15448 Fort Worth,TX 76119 Contractor Srdr►e,� , By: itl . Jerry Conatser,President of Conatser Management Group,Inc,G.P. APPROVED: Approved as to Form and Legality: A.Douglas Rademaker,P.E.Director Asst.City o y ,. Department of Engineering Contract Authorization Date rn WORTH, TEK. LA Part H Permanent Easement, Test Hole Reports Levee Crossing Permit, Railroad Permit Street Repair Details r r r r r r r r r r r r f r SANITARY SEWER EASEMENT MONTGOMERY PLAZA ADDITION Sanitary Sewer Easement having a width of 20-feet along the south and a portion of the west side of the Montgomery Plaza Addition property as conveyed through Replat of Lot 1R&Lots 2-7, Block 1 of Montgomery Plaza Addition as filed in Vol. , Page of the Tarrant County Deed Records. • t CITY OF FORT WORTH CONSTRUCTION SERVICES LABORATORY RESULTS FOR TEST HOLE AND PLASTICITY INDEX PRQ, CT; SEWER REHAB CONTRACT 67-507 PHASE 1 & 2 DOF* 14C�: : 4144 FUM i ODE: 02 '.r.r•.-..�.m.ii..w�.:.y��.4..•�..ww,..rr+... �`� an5ves.a....a.aw..—+.rw..e.�++•..+'w._,++ #. 1 LAB. N0: 35454 P dd, o m: 2404 W. 7" ST. N/4 HMAC RED BRICK '.13`1.50"' COSCAETE (COMPRESSIVE STRENGTH 50$6 PSI) a 50" AROWN CLAY •W/GRAVEL 3tIf�G LIMIT -S: • LL: 35.3 PL: 16.7 " PI: 18. 6 SHRKG: 10.0% l'#U SELI, COLOR CHART: 5/3 BROWN CLAY T:_WE•IGHT:. N/A #/.CFT # 2 LAB NO: 35455 ION: .2501 W. 7'tu_ST. CL HKAC ,2.5fl° RED BRICK CONCRETE (COMPRESSIVE STRENGTH 6268 PSI) 0". DARK .BROWN CLAY W/GORVEL RSURG Lxt�TTS: LL: 26.0 PL 14.3 PI: 11.,7 SHRKG: 5.0� Q'_ LL.•COLOR, CHART: 4/2 DARK GRAYISH BROWN SANDY CLAY WE.IGIix:: N/A #%CPT �.•.t 3 � LAB NO: 35456������� ICON 70. 0 CARROLL ST. E/4 :3 H.MAC . CONCRETE (COMPRESSIVE STRENGTH 5146 PST) 11.. 50" REDDISH BROWN SAND _ P:Rk�L1RG LIMITS: LL: 25.4 PL: 15.2 PI: 10.2 SHRKG: 8.C� ' 6ELL COLOR CHART: 5/6 STRONG BROWN-SANDY CLAY A.7 WEIGHt^:: N/A #'I.CFT .. a # 9 LAB NO: 35457 -CATION: 814. OF 6!e$ ST. 75' EAST OF ST'AYTON ST. -2:40" HMAC _ 1. 50" DARK :GRAY CLAY LIMITS: LL: 40.3 PL: 20.6 PI: 19.7 SHRKG: 13.Ox s92� SELL ,COLOR CHART: 5/2 GRAYISH BROWN. CLAY ,. ;.-T WEIGHT: 135.0 #/CFT wr.:+.1.+.�raas...c-..::•.ersc mart<..a....r-..+.e.��....r_�...�- .a.�..��e........ee�Qa.�•.am,...am.�-a.®....-.ser,...�..-+.,.............. r Z '� 56SL ILS LIS N %Vi HEMMED a 0 Q NJ me Ru to-IZ-3ga W1.t- 4.44 5 LA$ N0: 35458 Z�'"ATIOU'. HARROLD ST. 40' SOUTH OF W. 5� ST. -----_.... 3 .50" HMAC ti 0.50- LIGHT GRAY CLAY W/GRAVEL 1 1.0.00" GRAY CLAY r -URG LIMITS: LL: 40.1 PL: 20.2 PI: 20.5 SHRKG: 13.0$ -LgLgN5-ELL COLOR CHART: 5/2 GRAYISH BROWN CLAY t: 'r 'WEIGHT: 142.0 #/CFT _,,.. .a�.._....r...,...� 6 LAB NO: 35459 1709 WHITE SETTLEMENT RD. S/4 4.F Q" HMAC 0.00" TAN SANDY CLAY W/GRAVEL pQG"w TAN SANDY CLAY W/GRAVEL A,,, BU1RG LIMITS: LL: 32.4 PL: 16.8 PI: 15.6 SHRKG: 9. 0% i";f lq_'aELL COLOR CHART: 5/2 GRAYISH BROWN CLAY +3#y WEIGHT: 146.0 #/CFT 7 LAB NO: 35460 ...-ION: 2017 WHITE SHTTLE 4ENT RD. CL - 6. 00- HMAC $.00" TAN SANDY CLAY W/GRAVEL 8.0.0" TAN SANDY CLAY W/GRAVEL _ .�" BRBURG LIMITS: LL: 30.9 PL: 22.0 PI: 8.9 SHRKG: 5.0 A� -iNgs-LL COLOR CHART: 7/2 LIGHT GRAY SANDY CLAY �3NJT WEIGHT: 146._0 #/CFT :i. 8 � LAB NO: 35461 J4+_:cM.ATION: 2500 WHITE SETTLFNT RD. N/4 5-.50" HMAC 6.50" CONCRETE (SAMPLE DAMAGED NO PSI) kf.(?:0" DARK BROWN CLAY At"TMURG LIMITS: LI : 28.2 PL: 14.5 PI: 13.7 SHRKG: MUNSELL COLOR CHART: 814 VERY PALE BROWN SANDY CLAY i�EIGHT: N/A #/CFT ara�s.sw.+..wiii LAB NO: 35462 _Q�. �...�.,..�.... - 14,:.P.AT I ON: 272:& US ITR $ETTIMNT M. HMAC 6.50." TAN SANDY CLAY W/GRAVEL 7,00" GRAYISH BROWN CLAY W/GRAVEL t3URG LIMITS: LL: 28.5 PL: 15.2 PI: 13.3 SHRKG: 8.0E ,wa.16S. .U. COLOR CHART: 6/3 PALE BROWN SANDY CLAY WEIGHT: 146.0 #/CFT E 'd 968L ILB LIB 'ON XVd H0I1MISHO) d 0 a wd SI:E 3ai to-2-3ga r ' 3 DOE ' 4144 -•^-�°"" °°"' LAB N0: 35463 10 JZ:,�-AI:TION: 2841C ANNIE ST. CL HMAC 6.50 TAN CLAY W/GRAVEL i .Go" DARK BROWN CLAY RT £ BORG LIMITS: LL: 49.5 PL: 25.1 PI: 24.4 SHRKG: 15.O�s w.b;9ELL COLOR CHART: 5/2 GRAYISH BROWN CLAY try IWEIGHT: 135:0 #/CFT -'"— LAB NO: 35464 - •iA'.'ION: 8/4 OF WNITS •SZT%%=MT RD. 50' WEST OF ADRIAN DR. _-.. _ 6,FU" TAN SANDY CLAY W/GRAVEL 10.04" TAN SANDY CLAY — .•-. -- •9,r.,RB RG LIMITS: LL: 29.4 PL: 16.1 PI: 13.3 SHRKG: 7.0$ ?l1t,NS F;LL COLOR CHART: 7/3 VERY PALE BROWN SANDY CLAY Cif 'T -WEIGHT: 1_46.0 #/CFT # ?2 — LAB NO: 35465 L:'-:AT ION: 200 ADOLPH ST. CL HKAC LIGHT TAN CLAY W/GRAVEL •:,.?:J" TAN CLAY W/GRAVEL _ X*'4ERHURG LIMITS: LL: 64.3 PL: 27.5 PI: 36.8 SHRKG: 18.0* M'JNSS'LL COLOR CHART: 4/1 DARK GRAY CLAY WEIGHT: 142.0 #/CFT # 13 LAB NO: 35466 Lt>i:kTION: W/4 OF WIM=RLY ST. 501 NORTH OF WINGATE ST. . -'50" HMAC .._ �.— _ .. ....... 'J.50" LIGHT TAN CLAY W/GRAVEL 1'�.13.0" DARK GRAY CLAY pi-IT tBURG LIMITS: LL: 32.0 PL: 16. 9 PI: 15.1 SHRKG: 8.0% Wj*jSELL COLOR CHART: 5/3 BROWN CLAY 'Xfi T WEIGHT: 132.0 #/CFT APPT-RUVAL- x ' ' RYAN J RE I^ ROUTING A DA:�. I-ESTED: 04-23-04 ABE CALDERON DAZF. R .PORTED: 05-05-04 MIKE DOMENECH TEZ"-k P BY: HERNANDEZ FILE a 969L 1L8 L18 'ON XY9 NollonalsN00 d 0 a wd 91:E ani to-1Z-)aa TA.RRANT REGIONAL WATER DISTRICT 800 East North Side Drive Fort Worth,Texas 76102-1097 BOARD OF DIRECTORS 9F George W.Shannon,President Q C'0y P.O.Box 4508 Victor W.Henderson,Vice President �P 9 Fort Worth,Texas 76164-0508 Hal S.Sparks III,Secretary Telephone 817-335-2491 Brian C.Newby FAX 817-877-5137 Jack R.Stevens a James M.Oliver General Manager Mr. Craig P. Schellbach, PE Civil Team Manager Lockwood, Andrews &Newnam, Inc. 307 West 7th Street, Suite 1250 Fort Worth Texas 76102 Re: City of Fort Worth Contract 67 Sanitary Sewer Rehabilitation Thank you for submitting plans for the installation of the 30-inch sanitary sewer line crossing under the Levee of the Clear Fork Trinity River south of 7th Street and a 24-inch sanitary sewer line located on the back side of the Levee on the Clear Fork Trinity River east of the White Settlement Rd. and Jacksboro Highway Intersection. The Tarrant Regional Water District [TRWD] along with the U.S. Army Corps of Engineers [USACOE] have reviewed the plans and hereby give authorization for the construction of the project. Our authorization should not be considered as an approval of the engineered design. The contractor shall adhere to the following: • The contractor is responsible for installing and maintaining adequate safety fences surrounding the construction site • A silt barrier must be installed to contain any loose spoil material. • Compact all backfill in 6-inch lifts to 95 percent modified density and provide the compaction test to the TRWD. • All Manhole Covers to be water tight. t • All disturbed areas must be returned to their original grades. • Reestablish grass to its original condition or better. • Contractor is to notify the TRWD for a final site inspection. I have also enclosed a copy of the USACOE approval letter along with Pamphlet No. 1150-2-1, Criteria for Construction Within the Limits of Existing Federal Flood Protection Project. Please provide our office with at least 48 hours notice prior to starting construction. If you have any question feel free to call me at 817-335-2491 ext. 302 or Cell Phone at 817-229- 2565. Sincerely, Dean Kuhn Operations l . r DEPARTMENT OF THE ARMY SWFP 1150-2-1 U.S Army Corps of Engineers,Fort Worth District P.O. Box 17300 Fort Worth,Texas 76102-0300 Pamphlet No. 1150-2-1 31 October 2003 Local Cooperation CRITERIA FOR CONSTRUCTION WITHIN THE LIMITS OF EXISTING FEDERAL FLOOD PROTECTION PROJECTS 1. Pamphlet Purpose. This pamphlet provides guidance to individuals, developers, architect-engineering firms, local project sponsors, and local governmental agencies for the construction of new facilities or the modification of existing facilities within the limits of an existing Federal flood protection project constructed by the U.S. Army Corps of Engineers, Fort Worth District (CESWF) and for which local project sponsors and/or local governmental agencies have the responsibilities for operation and maintenance. The CESWF, in accordance with Title 33 CFR, Section 208.10, retains the right of review and approval on all proposed improvements and/or modifications that are passed over, under, or through the walls, levees, improved channels, or floodways of such projects. The guidance contained in this pamphlet applies to the activities ® described herein in most cases; however CESWF reserves the right to reconsider this guidance at any time due to unknown or unforeseen circumstances,technological advances,additional information,etc. 2. Applicability. This pamphlet applies to all Federal flood protection projects constructed by CESWF, and for which a letter of assurance agreeing to the operation and maintenance of the flood protection project has been furnished CESWF by the project's local sponsor. i 3. Project Purpose. A Federal flood control project is designed to safely carry floodwater within the project and through a developed area. As such,any proposed developments within the project must keep the safe passage of floodwater as the first priority. The roles of the CESWF and the project local sponsor are to maintain the integrity of the project while preventing negative impacts to,the passage of the project design flood. The CESWF will not allow the safety of the project to be compromised or the required design carrying capacity of the project reduced. 4. General Criteria for Construction Within a Floodway. a. As early as possible during the planning process, discuss preliminary proposals with the CESWF and the local sponsor to avoid major revisions or project delay. The local sponsor may make any requirements of this Pamphlet more stringent than those contained herein. Concept proposals may be submitted for review. Submit the proposed construction starting date and the detailed project construction schedule,including sequence of construction prior to initiation of work. b. Construction may not start until final written contract drawings and plans have been reviewed and approved in writing by both the CESWF and the local sponsor. t c. Furnish five (5) sets of plans and specifications for the proposed work to the CESWF, Operations Division, ATTN: CESWF-OD-M, via the local sponsor sufficiently in advance of proposed construction to allow adequate time for review and approval. A vicinity map shall be included in the plans showing the right-of-way boundaries of the flood protection project with specific levee toe and channel slope limits in the portion of the project being crossed, if applicable. This pamphlet suaersedes SWFP 1150-2-1 dated 15 October 1985. d. If boring, jacking, or tunneling operations are planned; detailed designs, calculations, and construction procedures must be provided for review. See subsequent paragraphs for additional details and required procedures. e. Practice approved construction methods and best management practices to minimize erosion at the construction site. All work shall be performed in such a manner as to be as environmentally friendly as possible. This includes making every effort to reduce the turbidity of the water at the site, such as by limiting the amount of time construction equipment is in the water. A storm water pollution prevention plan (SWPPP) must be included in the final project submittal. f. When construction work is in progress in a project located downstream of a Federal dam, a request from the contractor for changes in regulated releases will be considered on individual cases only. Normally, regulated releases from upstream lakes for evacuation of floodwaters, water supply, recreation, or other purposes considered to be in the best interest of the public will have first consideration. A flood event could occur at any time during construction activities and could affect these activities. g. Construction equipment, spoil material,supplies,forms,buildings for inspectors,labs,or equipment _ and supply storage buildings,etc.,shall not be placed or stored in the floodway during construction activities. Any item that may be transported by flood flows shall not be stored within the project. Locations of construction trailers and stockpile areas shall be included on project plans and approved by the CESWF and the local sponsor. h. In addition to other requirements set forth in this Pamphlet, permits may be required under Section 10 and Section 404 for the desired work. These permits require a minimum of 90 days to process. It is recommended that contact with the CESWF Regulatory Branch be initiated in the early planning stages to prevent delays. i. Repair or replace any maintenance and operation roads disturbed during construction to a condition equal to or better than their condition before construction. All roads must be inspected by the local sponsor prior to completion of the project. j. Compact all fill and backfill in 6-inch lifts as specified in job specifications approved by the CESWF. Compaction shall be to at least 95 percent of modified density as specified in ASTM D-1557. All backfill shall consist of impervious materials. Reestablish vegetation to its original condition or better. Remove all excess material from the limits of the floodway. k. Provide scour protection consisting of articulating revetment system protection capable of being re- vegetated at the outfall of stilling basins designed according to the issuing jet velocity. If approved by the local sponsor,riprap,gabions,or concrete paving may be substituted for the revetments. 1. The crown or crest of the levee referred to in this pamphlet is the original or design levee crest elevation. This may or may not be the same as the current levee crest elevation. All modifications shall be based on the higher of the two elevations. m. Upon request, the CESWF Hydrology and Hydraulics Section may provide applicable hydraulic models to be used for design. n. Any permanent disturbance of existing recreation facilities must be mitigated. o. Sump areas adjacent to federal projects are considered an integral part of the federal project and any modifications to them will be reviewed and approved in accordance with this Pamphlet. SWFP 1150-2-1 2 5. Crossing Over Existing Levees At Grade. a. The local sponsor may decide to not allow any proposed crossing over existing levees at grade. b. No excavation or notching will be performed into or on the levee,or within the levee template. c. Strip topsoil from the levee and place the line up and over the levee template slopes at grade. This will require rather abrupt line grade changes at the levee crest Cover the new line by placing new fill uniformly on the slopes and top of the levee to slope away from the line and parallel to the longitudinal axis of the levee. Provide a minimum of 2 feet of cover over the new line. The slope of the fill shall be 1 vertical on 20 horizontal or flatter. Replace the topsoil, reestablish grass on all disturbed areas, and restore any roadways. d. All valves located within 15 feet of either side of the projected toe of the levee shall be provided in a concrete box enclosure with a manhole type cover. Valve boxes located within the floodway shall be underground and flush with the surface. If the valve box is placed in the levee crest, the bottom of the excavation shall be not lower than one foot above the design water surface elevation. Fill shall be uniformly placed to slope away from the top of the valve box. If possible all valves shall be placed on the landside of levees a minimum of 15 feet from the projected levee toe. e. Provide water-tight sealed manhole covers for all manholes within the floodway having tops below design water surface elevation. Fasten manhole covers to the manhole structures. 6. Crossing Under Levees with Open Excavation. a. Provide a temporary ring levee(cofferdam) on the riverside of the existing levee at the location of the subject crossing to the same top elevation as the existing levee. This ring levee shall have a minimum crest width of 10 feet and sides slopes of 1 vertical on 3 horizontal or flatter. Construct the levee of impervious materials according to the provisions specified in Paragraph 4j. b. When the temporary ring levee is complete, excavate through the existing levee using one vertical on.three horizontal cut slopes. The toe of the levee and ring levee shall be a minimum of 20 feet(measured horizontally)from the top edge of the excavation. c. Generally, sources for borrow materials shall not be located within the limits of the floodway right-of-ways. In addition, depending on the type of soil and whether or not pervious materials or unstable materials exist in the foundation of the existing levee, it may be desirable to limit the depth of excavation or specify a minimum distance from the land-side toe of the levee. All excavated slopes shall be properly designed and the drawings sealed by a registered professional engineer. d. After the line has been placed,the open excavation will be compacted in accordance with Paragraph - 4j. When backfill operations are completed,the entire foundation area to be occupied by the replaced levee fill shall be scarified, plowed, and/or harrowed to a depth of 6 inches, and then compacted by at least 16 complete passes of the tamping roller or 95 percent modified density,whichever is more rigorous. e. Accomplish levee replacement by placing fill in 6-inch lifts and compacting by not less than eight t complete passes of a tamping roller or at least 95 percent modified density. After compaction,the moisture content shall be within the limits of 3 percentage points above optimum to 2 percentage points below optimum moisture content. SWFP 1150-2-1 3 f. Determine the in-place moisture content and density of the levee fill on a frequency of about one sample for each 2500 cubic yards of backfill placed in the levee. g. When the breached levee has been reconstructed to its original grade, remove the temporary ring y levee and dress and turf the surface areas of the plugged section. h. Provide water-tight sealed manhole covers for all manholes within the flood protection project having tops below design water surface elevation. Fasten manhole covers to the manhole structures. i. For pipelines, install a positive cut-off structure to prevent water from the riverside flowing through the pipeline to the landside. If located on the riverside of a levee, extend the cut-off structure-to the levee crown elevation by bridge. This structure must be accessible no matter what flood condition may exist. The closure device must be operational by manpower,if necessary. j. Provide gravity storm drains discharging into the floodway with automatic flap gate(s) at the discharge end of the line and energy dissipaters, as required. The owner or local sponsor, as per written agreement, shall be responsible for inspection and maintenance to ensure proper operation of the flap gates. F" k. Use monolithic conduits or conduits with water-tight joints under the levee and levee template. 7. Crossing Under Levees with Boring or Jacking of Sleeves. The sequence of work shall be as follows: a. Excavate the boring and jacking pit(must be on the land side outside the projected toe of the levee template slope). b. Bore and jack the sleeve to a point beyond the projected riverside toe of the levee template slope. c. If the difference in the diameters of the bore and sleeve exceeds 3 inches,the annular space shall be €� pressure grouted with bentonite slurry. d. Place the product line in the sleeve. e. Pressure grout the product line in sleeve with bentonite slurry. f. Excavate the pit on the riverside and construct a manhole with gate valve placed on inside face of manhole away from channel. Tie line from sleeve under levee into manhole with gate valve. g. Tie line from sleeve under levee into a manhole on landside. h. During work on items a through h, a plug will be required to be placed and braced at the open end of the sleeve and pipe located in the jacking pit at the close of work each day. This plug must remain in place until the gate valve is installed and connections made to ensure protection from flooding from the river. 8. Horizontal Directional Drilling Under Levees and Channels. a. Detailed contractual drawings, plans,procedures, and engLering calculations shall be provided to CESWF for review. These must include all the requirements of Paragraph 4 above and the following additional items: (1) Inside diameter of the final bore hole and outside diameter of the product casing. SWFP 1150-2-1 4 r (2) Detailed description of construction and horizontal boring methods to be utilized. (3) If the difference in the diameters of the final bore and product casing exceeds 3 inches, provide the method of pressure grouting the annular space between the outside of the product casing and the inside of the bore to prevent seepage under the levee template during maximum river stages. (4) A profile of the proposed line showing 'alignment (including location of the river and levees). (5) Location of entry and exit points, location,elevations and proposed clearances for all utility crossings and structures (6) Right-of-way lines,property,and other utility right-of-way or easement lines (7) Depth under the base of the levee, depth of the line under the river channel, and location of both ends of the string. If the proposed depth of the string directly below the base of the levee is less than 30 feet,then detailed engineering calculations sealed by a registered professional engineer shall be provided for review. These calculations must show a minimum 1.5 factor of safety against hydro-fracturing to be acceptable. b. Develop and provide a quality control plan for the project that includes the maximum allowable drilling pressure,gage calibration method,and responsibility for assuring that the pressure is not exceeded. c. The minimum clearance distance from the top of the pipe encasement to the original design river bottom elevation shall be 7 feet. Should the existing channel bottom elevation be lower than original design grade,the new line shall be the discussed depth below the existing bottom elevation. d. Develop and provide a quality control plan for the project that includes the maximum allowable drilling pressure, gage calibration method, and specific responsibility for assuring that the pressure is not exceeded. During the drilling process, the pressure in the borehole must be monitored to ensure that the operational drilling pressures remain within the safe limits to prevent soil fracturing. The name of the party responsible for monitoring the work must be specified. 9. Bridges Crossing Levees. a. The bottom of low steel of the bridge shall be above the design crest elevation of the levee. No notching into the levee will be allowed. b. All bents should be located to minimize the number of bents located within the template of the levee. Driving of piles within the template of the levee will not be allowed. Bents at these locations should only be designed as drilled piers. c. Bridges will not be located where their construction will block maintenance access roads presently located within the floodway. d. All stord water runoff from bridge decks must be piped to grade to prevent erosion within the floodway. e. Re-vegetated mat type slope protection must be provided from the top of the levee to the floodway bottom under the shadowline of the bridge. SWFP 1150-2-1 5 f. The bridge must be designed to minimize the number of pier bents. If the new bridge is within 500 feet of an existing bridge the new pier bents must be in alignment with the adjacent bridge. 10. Buried Lines Parallel to Levees and Channels. a. Buried lines parallel with a levee(either on the river side or land side)will not be allowed where the buried lines final location will be within the extended template of the levee. For example,a line buried 5 feel deep must be at least 15 feet away from the toe of a levee with a 1 vertical on 3 horizontal slope. b. Sumps,ditches,swales, or other project features crossed by the buried line shall be restored to their pre construction condition. c. Buried lines parallel with the channel bank must be at least 25 feet from the projected river channel slope template. d. When a buried line crosses a discharge channel,place the line on piers with the piers aligned so as to provide minimal obstruction to flow in the discharge channel and designed so as to catch minimal debris. The preferred alternative would be to place the line under the discharge channel and encase it with concrete. Extend the encasement a minimum of 5 feet beyond the top of the channel side slopes. 11. River and Channel Crossing Criteria. a. Crossings Under Rivers and Channels by Open Excavation: (1) Bury the line a minimum of 7 feet below the original design river bottom elevation. Should the existing channel bottom elevation be lower than original design grade,the new line shall be the discussed depth below the existing bottom elevation. (2) Sufficiently anchor or encase the line to prevent floatation. (3) Backfill the excavation with material similar to that excavated. If soil is excavated, backfill with compacted impervious fill material and if rock is excavated,backfill with concrete. (4) No cofferdam fill type crossings shall be allowed in water greater than six (6) feet in depth, ,.„ and will then only be allowed if geotechnical and structural designs prove that sheet piling would not be.a viable method. b. Crossings Over Rivers and Channels. (1) Provide a minimum freeboard between the low point of the crossing and the design water surface elevation of three feet or to the top of any levee,whichever is higher. (2) The obstruction caused by the supporting bridge and its piers shall not significantly reduce the carrying capacity of the floodway. No longitudinal cross bracing will be used. Opp (3) Submit final plans and hydraulic-computations to indicate that the proposed project would not reduce the floodway.capacity. (4) Projects crossing navigable waterways (Trinity River downstream from Riverside Drive in Fort Worth, Texas) shall require a United States Coast Guard permit. Clearances and requirements shall be as directed by the Coast Guard. SWFP 1150-2-1 6 rw 12. Roadway or Railroad Crossings. a. The low steel of a bridge shall have an elevation not lower than the crown of the levee or top of bank or 3 feet above the design water surface, whichever is higher. Contact CESWF for the current design water surface at the location of the proposed roadway crossing. Additional clearances shall be required for fixed spans over navigable waterways. b. Submit final plans and hydraulic computations to indicate the proposed roadway or bridge would not reduce flows or project capacity. Projects will not be approved that reduce the carrying capacity of the project. c. Any roadway over a navigable waterway will require a permit from the United States Coast Guard. d. See Paragraph 9 for special requirements for crossing levees. e. Hold temporary roadway fill to a minimum to prevent increasing the water surface elevation should a flood occur during the construction period. Construct all temporary ramps from levees going in a downstream direction. This will prevent flows from being directed into the face of the levees. 13. Headwall, Chutes,Gate Valves,Flap(Automatic)Gates,etc. a. Install headwall,gate valve structures, flap(automatic)gates, and other types of outfall structures in such a manner to prevent obstruction of flow or creation of scouring conditions within the project. All headwalls must transition with the slope and flow discharge points must be at an elevation equal to the bottom of the slope or at the normal water surface. Chutes will not be allowed unless they are the only viable alternative. b. All structures shall be installed in such a manner so as to not create maintenance problems. 14. Pump Discharge Pipelines Over Levees. a The invert of the discharge shall be at the toe of the protective works (levee) and shall be free-vented at the highest point. For very large lines deviation from this criteria may be considered, but under no condition shall excavation be permitted into the levee. See Paragraph 5 for requirements for crossing over a levee on grade. b. Flap(automatic)gates are not required at the outfall of the discharge lines. 15. Electrical and Telephone Criteria for Overhead Wire Crossings. a. The local sponsor may require directional boring under the levee as opposed to an overhead crossing. b. No structure(poles or otherwise)shall be located closer than 15 feet from the toe of any levee. c. No structure (poles or otherwise) shall ge located closer than 15 feet from the top of any channel slope. d. Provide a minimum vertical clearance of 28 feet between the crown of the levee and the low wire at the low point of the wire at the levee crossing computed under the most adverse conditions (temperature, wind,load,etc.). SWFP 1150-2-1 7 e. Provide a minimum vertical clearance of 28 feet between the natural ground and the low wire at the low point of the sag in the area of the project channel, or three feet above the project design water surface level, whichever is higher.(Check Electrical Code for minimum clearance of high voltage lines.) f. Locate guy wires and anchors in such a manner that they do not interfere with the operation and/or maintenance of the channel, levees,or related structures. No anchors may be placed on the levee. 16. Low Dams or Diversion of Flows. a. Submit plans, hydraulic and structural computations, and specifications for low dams or other obstructions for review and comments prior to the construction of any type dam structure in a project area. These plans will be reviewed to determine if adverse hydraulic or structural effects would occur within the project as a result of the proposed construction. Prior to an extensive engineering study for any type of water barrier in a project, the CESWF and the local sponsor will review the concept plan, proposed location, and purpose. b. Diversion of flows into or out of a project area shall be reviewed as to possible adverse hydraulic or structural effects. 17. Process for Abandoning Existing Pipelines. a. Requests to abandon existing buried pipelines within a project shall be submitted in writing to CESWF and the local sponsor. No buried line within a floodway may be abandoned without the review and approval of CESWF and the local sponsor. b. As a minimum, the portion of the abandoned pipeline under a levee shall be completely filled with concrete or grout to prevent seepage through the abandoned line during flood conditions. c. Abandoned buried pipelines that are located on floodway property, but are not located under a levee shall be plugged at each end with concrete or grout. 1 d. Any structures associated with abandoned buried pipelines, for example, manholes, shall be removed and the resulting hole filled and compacted in accordance with the provisions in paragraph 4j. e. Above-ground abandoned pipelines shall be removed from floodway right-of-way, including any associated structures. 18. Construction of Recreation Facilities. Submit plans to the CESWF for review and approval on any PF` proposed recreation type facilities to be constructed in an existing or approved Federal project area. Each plan shall include hydraulic computations and will be reviewed for individual and cumulative effects to determine if the proposed construction would produce adverse effects on an existing or approved project area. if adverse effects on the carrying capacity of the project are determined, the project will be disapproved. The local sponsor may construct minor recreation improvements as needed so long as final as- built plans are provided to CESWF. P, 19. Planting of Trees Within a Floodway. a. The purpose of a Federal flood protection project is to carry floodwater through an urban area. �. Anything in the floodway that restricts flow or can catch floating debris will reduce the carrying capacity below its design limits and will not be allowed. The local sponsor is directed to remove all trees on the SWFP 1150-2-1 8 levees or adjacent to the channel and also as many other trees and obstructions within the floodway as reasonably possible. b. Planting of trees on the levees will not be allowed nor approved. c. Planting of additional trees within existing flood protection projects or adjacent to channels is not encouraged and will be evaluated only on a case-by-case basis. Only trees with deep-type root systems and high canopies may be planted in selected areas of existing flood protection projects. The plantings shall be a minimum of 50 feet away from the toe of the levee or the top of the channel bank. Trees may be placed no closer than at an average spacing of 100 feet, center-to-center. Prune trees to permit mowing immediately adjacent with tractor type mowers. No bush or vine type plants will be permitted. Minimum application of ground cover plants for slope protection will be allowed,subject to approval by the local sponsor. d. Submit a coordinated planting plan with hydraulic computations for review and approval. This plan must also show all existing trees within 1000 feet of the proposed new trees. CES W F-EC-DG CAROL J. SHEAD Publications Control Officer DISTRIBUTION: op f SWFP 1150-2-1 9 / / i � � ( " � | i IiEid_ lIE:I L&I Ell ml[ V TYPE -C- BACKFILL MINIMUM 6" INITI BACKFILL COVER SAND MATERIAL EMBEDMENT de INITIAL BACKFILL MINIMU EMBED ENT WATER: SIZES UP TO AND INCLUDING 12" liallEEI La TYPE -C- BACKFILL SEE SPEC. EI-2.4 MINIMUM INITIAL BACKFILL COVER: WEIR 60 _ . STORM DRAIN 12" SEE SPEt E11-2-41(b) OR | i U ' � Wag . MINIM BAB ENT CRUSHED STONE : ' ' , ' � ' WATER: SIZES 16" AND LARGER SEWER: ALL SIZES STORM DRAIN: ALL SIZES MATERIAL SPECIFICATIONS SAND GRADATION 9LESS THAN 10% PASSING #200 SIEVE THE EMBEDMENT AND BACKFILL DETAILS PROVIDED ON THIS P.I. - 10 OR LESS SHEET SHALL REPLACE APPROPRIATE PROVISIONS OF BOTH ITEM 402 OF THE TPW STANDARD 'S.PECIFICATION' FOR STREET & STORM DRAIN CONSTRUCTION. ALL OTHER CRUSHED STONE GRADATION PROVISIONS OF THESE ITEMS SHALL APPLY. x ' � < � � ' ' ' � � ' c � _ / IN 0-10 1112" 40-75 WATER, SEWER & STORM DRAIN 3/8* 55-90 EMBEDMENT AND BACKFILL DETAILS #4 90-100 #8 95-100 CITY OF FORT WORTH-CONSTRUCTION STANDARD FIGURE A DATE:2-1 9—n9 � . _ ALL -CONSTRUCTION MUST BE IN ACCORDANCE WITH THE CITY OF FORT WORTH STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION EXISTING CURB NEW HMAC SURFACE EXI&TGUTTER CURB & GUTTER (2" MIN.) WEDGE MILL 5 FEET WEDGE MILL 5 FEET FOR OVERLAY FOR OVERLAY 2"-0" 2"_0" //////////////�/H///////orlY///// i::$s�M(�':;.'.�'�T;�tV17tiY1�C;��•F`:t,r :i EXISTING BASE (IF ANY) 12" 12" DITCH WALL - 5.FLOWABLE FILL IS REQUIRED TO --- BACKFILL ALL TRENCHES IN NOTES DOWNTOWN STREETS,AND 1.MATCH EXISTING HMAC PAVEMENT r OPTIONAL IN OTHER AREAS. BACKFILL SHALL MEET SPECIFIED 2.PLACE 8" OF 2:27 CONCRETE AS SHOWN. ITEM 402 OF THE STANDARD SPECIFICATIONS 3.WEDGE MILL 5 FEET (2" DEEP AT THE LIP OF FOR STREET AND STORM THE GUTTER TO 0") PRIOR TO RESURFACING DRAIN CONSTRUCTION, AS SHOWN.RESURFACE WITH A MINIMUM CITY OF FORT WORTH 2" OF TYPE 0 HMAC. 4.IF EXISTING BASE IS CONCRETE,USE PIPE REINFORCED CONCRETE,AND PROPERLY TIE IN. TYPICAL SECTION - TRENCH REPAIR HMAC PAVEMENT RECOMMENDED BY\—Jj,A DATE 0+ FORT WORT H APPROVED BY rL'L�`-� DATE GEORGE A.BEHMANESH, HUGO MALANGA ASSISTANT DIRECTOR,TPW DIRECTOR,TPW CITY OF FORT WORTH,TEXAS Rev. TRANSPORTATION/PUBLIC WORKS ENGINEERING DIVISION FIG 2000-1 RO S OARS Or' 24'CENTSNS SOT, VATS WITH No 1 PARS LONAITUSINAL w 011CM 1111 8T. Ct1RS O"TTaN 911181 AOPNALT ASPNALT SURFACE KPLAC9W1Nt IAIST ASPHALT EXIST1119 Cp1OFAtt (1V#' WI■1 SURFACE CNRS A&UTTER TACK C w an ow EuT •• 44i �-� � oef1 � j 9111 Of lE- 11• MK tt►OT.CAC OAS[ � COWOR[TE St1OT Sus SAW CLASS'A°RE.IFOACEO • ALL tR(NCM NACRFILL SHALL 099T SPOT &we Wt (IF AN,1 COWCM TE OAK ~, REOUMINt NTS POO GRADATION Ay (IF ANTI C01lACT1ON AS 8009CrIto Is IVES) • �,`. 407 OF flat STAN"" SP9CKICA_ uomis•ti loft$ O�T•OC 1 C ITO 00 FONT WSOTN T911A9 oN OACKftL AS SPECIP190 IN ° MECT109 91.[ ANO 91-r OF THE DITCH WALL • SPECIFICAT/ON0 Pon NT9N "Pan?- WENT PROJECT[,FORT VONTN IAT[R KPT,CITT OF FORT VOOTN.Tt It". �� •, IOOPM[S IWtKITT NfeLlATMO PIPE ••ti,�� �`•;lr••t 110T�t I ° » SSI0F1• 000M Ot0t0ETE OAS[ WILL 04LI-V 91E9L EXISTS IN COKOET9 M.!•OEUFORCES CONCRETE SAO[ WRO-ALL 9111OT AtPOALT Ch0S1 ON"L R 011PLA000"M1010AL OlPTW YS9 TO K CUT. TOE STEEL WILL 99 NSPLACtO AS SHOWN, K OIIPLAC9O TO TNS ARIMWAL an T♦A S lEPTW OF 9•. SMALL K CUT AXIS 8ALTA0t3 AS OVEN T1/NCN RI TOR [VENT NON- 09PTW.MlN PAV9SIER7 ON ALL pROWI"M 10"R OSEATtR. PO85IOLE.A(MINIMUM LAP NLRB OA39 18 ASPHALT OTO99T4 SMALL 89 &y2_ OISTA C9 OF 18'WILL K P[WV00S� R9W0V90. M PIVt 0Y048 WMKt COWA. JIMS-0908RN OF PIP_TO WATCH ADJACENT ATMS MRENO e-2197 CONCRETE MAT It DELETED IF KCTIOHS M SPECIFIC HALF THE SPECIFIED TIf 'tN[SS OF 2,97 IS It WOVE STRmKw ADDED TO THE CLASS'A CONCRETE. TYPICAL SECTION TRENCH REPAIR ASPHALT SURFACE, 8t REINFORCE' CONCRETE BASE cirr of four r°ORTM S9v-S-1-Ts REV..-O. fWR TRAM SPORTATION/PUB41C WORKS DEPT. R:V-11-I-79 3tt7 REV-1r-1l-le f/i. 1. J _ Rry-P X36-St