Loading...
HomeMy WebLinkAboutContract 47191-FP2 Department of TP&W Const. Services CPN# Date Project anager I Risk Management Canad WORTH D.O.E. Brothertonri-I to I' CITY SECRETARY CFA Westerman/Scanned h i -- .%-- _ Esteban Perez/Scanned l7r' b a CONTRACT NO. The Proceeding people have been Contacted i concerning the request for final payment& have TION AND PUBLIC WORKS released this project for such payment. PROJECT COMPLETION //�� J Clearance Conducted By P/u��ne�ao C D.O.E. Ns: 7524 eO?G,L G Regarding contract 117524 for LCG CENTREPORT PHASE III as required by the 094ey-7/r/ TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION&PUBLIC WORKS upon die recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Prices: $56,282.79 Amount of Approved Change Orders: Ns Revised Contract Amount: Total Cost Work Completed: $56,282.79 Less Deductions: Liquidated Damages: Days @$210.00/Day Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: $56,282.79 Less Previous Payments: $0.00 Final Payment Due $56,282.79 Recommed d for Acceptance Date Asst. Dire for TPW - Infrastructure Design and Construction V j 4-J Accepted , Date Director, TR NSPORTATION & P ;BLIC WORKS City Manager Date EMAILE13 y .IAN 17 2017 UOFFICIAt IteCORD SeC�ARit Yoi .I. s 11'x" � Project Name: LCG CENTREPORT PHASE III D.O.E. Ns: 7524 Comments: FORT W0 RT H CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name LCG CENTREPORT PHASE III Contract Limits Project Type PAVING STREETS&SIDEWALKS City Project Numbers 02666 DOE Number 7524 Estimate Number 1 Payment Number 1 For Period Ending 9/2/2016 W City Secretary Contract Number 117524 Contract Time 2W Contract Date Days Charged to Date 213 Project Manager Jaafari Contract is 100.00 Complete Contractor JLB CONTRACTING,L.L.C. PO BOX 24131 FORT WORTH, TX 76124-1131 Inspectors GREGORY / MILLER,T Friday,September 02,2016 Page 1 of 4 City Project Numbers 02666 DOE Number 7524 Contract Name LCG CENTREPORT PHASE III Estimate Number I Contract Limits Payment Number I Project Type PAVING STREETS&SIDEWALKS For Period Ending 9/2/2016 Project Funding UNIT III:PAVING STREET AND SIDEWALKS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total I REMOVE EXIST CONCRETE CURB AND 288 LF $1.80 $518.40 288 $518.40 GUTTER 2 8"(4,000PSI)REINFORCED CONCRETE 256 SY $127.66 $32,680.96 256 $32,680.96 PAVEMENT 3 4"ASPHALT STABLIZIED BASE(TYPE D) 256 SY $42.37 $10,846.72 256 $10,846.72 4 8"LIME STABILIZED SUBGRADE 256 SY $10.37 $2,654.72 256 $2,654.72 5 HYDRATED LIME FOR STABILIZED SUBGRADE 7 TN $126.17 $883.19 7 $883.19 6 6"MONOLITHIC INTEGRAL CURB 425 LF $3.04 $1,292.00 425 $1,292.00 7 BARRIER FREE SIDEWALK RAMPS-TXDOT 2 EA $1,136.16 $2,272.32 2 $2,272.32 TYPE 7 8 8"THERMOPLASTIC 285 LF $2.75 $783.75 285 $783.75 9 4"THERMOPLASTIC 400 LF $1.11 $444.00 400 $444.00 10 THERMOPLASTIC ONLY 1 EA $310.00 $310.00 1 $310.00 11 THERMOPLASTIC ARROW 3 EA $256.00 $768.00 3 $768.00 12 THERMOPLASTIC STOP BAR 1 EA $243.13 $243.13 1 $243.13 13 INSTALL STOP SIGN PER TXDOT STANDARDS I EA $460.00 $460.00 1 $460.00 14 INSTALL ONE WAY SIGN PER TXDOT 1 EA $460.00 $460.00 1 $460.00 STANDARDS 15 BUTTONS 20 EA $4.01 $80.20 20 $80.20 16 TRAFFIC CONTROL 1 MO $1,585.40 $1,585.40 1 $1,585.40 17 EROSION CONTROL 1 LS $0.00 $0.00 1 $0.00 18 RELOCATE AND ADJUST IRRIGATION 1 EA $0.00 $0.00 1 $0.00 CONTROL Sub-Total of Previous Unit $56,282.79 $56,282.79 Friday,September 02,2016 Page 2 of 4 City Project Numbers 02666 DOE Number 7524 Contract Name LCG CENTREPORT PHASE III Estimate Number 1 Contract Limits Payment Number I Project Type PAVING STREETS&SIDEWALKS For Period Ending 9/2/2016 Project Funding Contract Information Summary Original Contract Amount $56,282.79 Chance Orders Total Contract Price $56,282.79 ' Date //O/1 to Total Cost of Work Completed $56,282.79 Less %Retained $0.00 Date G-l Net Earned $56,282.79 Inspection Supervisor Earned This Period $56,282.79 Retainage This Period $0.00 L. a V Date q �7 Less Liquidated Damages Pro' Manager r Days @ /Day $0.00 Date t f LessPavement Deficiency $0.00 As4i� t�cting . re tor/"IPW(-In/frras�tructure Design and Construction Less Penalty $0.00 Date 1 7 Less Previous Payment $0.00 Departure Plus Material on Hand Less 15% $0.00 TC,, Balance Due This Payment $56,282.79 Friday,September 02,2016 Page 3 of 4 City Project Numbers 02666 DOE Number 7524 Contract Name LCG CENTREPORT PHASE III Estimate Number I Contract Limits Payment Number I Project Type PAVING STREETS&SIDEWALKS For Period Ending 9/2/2016 Project Funding Project Manager Jaafari City Secretary Contract Number 117524 Inspectors GREGORY / MILLER,T Contract Date Contractor JLB CONTRACTING,L.L.C. Contract Time 20 W PO BOX 24131 Days Charged to Date 213 W FORT WORTH, TX 76124-1131 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $56,282.79 Less %Retained $0.00 Net Earned $56,282.79 Earned This Period $56,282.79 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $56,282.79 Friday,September 02,2016 Page 4 of 4 FORT W rev 03/05/07 TRANSPORTATION &PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:I NAME OF PROJECT: LCG Centerport Phase III PROJECT NO.: 02666 CONTRACTOR: JLB DOE NO.: 7524 PERIOD FROM 01/05/16 TO: 08/05/16 FINAL INSPECTION DATE: 5-Aug-16 WORK ORDER EFFECTIVE: CONTRACT TIME: QQ W[C) CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED DURING CREDITED MONTH CHARGED DURING CREDITED 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS PERIOD PREVIOUS PERIOD TOTALS 213 TO DATE *REMARKS: S q r CONTRACTOR / DATE ANSPECTOIC DATE _ ENGINEERING DEPARTMENT s° The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 FORTWORTHREV:8/20/16 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR&PROJECT DATA Name of Contractor Project Name JLB LCG Centerport Phase III Inspector City Project Number Thomas Miller 02666 Cominlctjon Components Project Manager ❑ Water❑ Waste Water❑ Storm Drainage-[A Pavement Khal Jaafari Initial Contract Amount Project Dififtulty $56,282.79 O Simple Routine Q Complex Final Contract Amount Date $56,282.79 9/7/2016 H)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 3 8 6 2 Public Notifications 5 Y 3 20 15 3 Plans on Site 5 Y 3 20 15 4 Field Supervision 15 Y 3 60 45 5 Work Performed 15 Y 3 60 45 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 3 60 45 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 3 20 15 11 Property Restoration 5 Y 3 20 15 12 After Hours Response 5 Y 3 20 15 13 Project Completion 5 Y 3 20 15 TOTAL ELEMENT SCORE(A) 336 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 336 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating([TS/MS] * 100%) 336 / 448 = 75% Performance Category Good <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signature Cretractor Signature Inspector's Supervisor Signature CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•8851 Camp Bowie West Blvd. •Fort Worth,TX 76116• (817)392-8306 6350 Overton Ridge Blvd. Phone:817-989-7800 FortWorth,TX 76132 Fax:817-989-7801 JL LodgeStar Investments , Ltd . September 7, 2016 Thomas Miller City of Fort Worth Transportation and Public Works Department Construction Inspector Infrastructure Design and Construction 8851 Camp Bowie West Fort Worth,Tx 76116 RE: Centreport LCG Phase III Infrastructure I CFA Number: 2015-092 Mr. Miller, This letter is to inform the City of Fort Worth that Lodgestar Investments is waiving any Contractor's Liquidated Damages on the CentrePort LCG Phase III Infrastructure project in reference to the time it took to complete the job. This waiver is specially to cover the time frame it took for the contractors to complete the job description they agreed upon. A list of companies this waiver encompasses are listed below. Bear Creek Site Utilities&Construction 4950 Hanson Drive Irving,TX 75038 C &S Utility Contractors, Inc. 6705 Highway 287 Arlington,TX 76001 JLB Contracting,LLC PO Box 24131 Fort Worth,TX 76124 Thank you, Rakesh Patel CEO AFFIDAVIT STATE OF TEXAS COUNTY OFTARRANT Before me, the undersigned authority, a Notary Public in the state aforesaid, on this day personally appeared SAM DAVIS, PRESIDENT OF JLB CONTRACTING, LLC, known to me to be a credible person, who being by me duly sworn, upon his oath disposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That there are no claims pending for personal injury and/or property damages; On contract described as LCG Centerport Phase III, Project No. 02666, DOE No. 7524 located in the City of Fort Worth. JLB CONTRACTING, LLC BY President Subscribed and sworn before me on this ? -7� tday of 2016. JAMIE GREENWAY ` S. Notary Public, State of Texas My Commission Expires September 25, 2016 NOTARY PUBLIC N AND FbR T//�FZ '/NT COUNTY, TEXAS U My commission expire o2?, �« CONSENT OF OWNER ❑ SURETY COMPANY ARCHTECT Q CONTRACTOR TOR ❑ TO FINAL PAYMENT SURETY ❑ OTHER (SIMILAR TO AIA DOCUMENT G707) Bond No. 4075951 PROJECT: Water, Storm Drain, Pavement and Street Light Improvements for LCG Centreport Phase III, (name,address)City Projct No. 02666 TO (Owner) Fort Worth, Texas ARCHITECT'S PROJECT NO: F—City of Fort Worth CONTRACT FOR: Above Project 1000 Throclanorton Street Fort Worth, Texas 76102 CONTRACT PATE: CONTRACTOR: JLB Contracting, LLC In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the(here insert name and address of Surety Company) Westfield Insurance Company 555 Republic Drive, Suite 450 Plano, Texas 75074 ,SURETY COMPANY, on bond of(here insert name and address of Contractor) JLB Contracting, LLC P.O. Box 24131 ,CONTRACTOR, Fort Worth, Texas 76124 hereby approves of the final payment to the Contractor, and agrees that the final payment to the Contractor shall not relieve the Surety Company of any of its obligations to(here insert name and address of Owner) City of Fort Worth 1000 Throel morton Street Fort Worth, Texas 76102 ,OWNER, as set forth in the said Surety Company's bond. IN WITNESS WHEREOF, The Surety Company has hereunto set its hand this 17th day of August 2016 WESTFIELD INSURANCE COMPANY Surety Comp YY // By ✓�oC�>C�- Signature o Authorized-Representative Attest: (Seal): Kyle W. Sweeney Attorney-in-Fact Title Note:This form is intended to be used as a companion document to the Contractor's Affidavit of Payment of Debts and Claims,Current Edition THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME POWER#AND ISSUED PRIOR TO 04/20/11, FOR ANY PERSON OR PERSONS NAMED BELOW. POWER NO. 4220052 06 General Westfield Insurance Co. Power of Attorney Westfield National Insurance Co. Ohio Farmers Insurance Co. CERTIFIED COPY Westfield Center, Ohio Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a "Company" and collectively as "Companies," duly organized and existing under the laws of the State of Ohio, and having its principal office in Westfield Center, Medina County, Ohio, do by these presents make,constitute and appoint CHARLES D. SWEENEY, MICHAEL A.SWEENEY, KYLE W.SWEENEY, ELIZABETH GRAY,JOINTLY OR SEVERALLY of FORT WORTH and State of TX its true and lawful Attorneys)-in-Fact,with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments-or contracts of suretyship- - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - -- - - LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE GUARANTEE, OR BANK DEPOSITORY BONDS. and to bind any of the Companies.thereby as fully and to the same extent as if such bonds were signed by the President,sealed with the corporate seal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s)-in-Fact may do in the_premises. Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY: "Be It Resolved,that the President,any Senior Executive,any Secretary or any Fidelity&Surety Operations Executive or other Executive shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: The Attorney-in-Fact. may be given full power and authority for and in the name of and on behalf of the Company,to execute,acknowledge and deliver, any and all bonds, recognizances, contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney-in-Fact shall be as binding upon the Company as if signed by the President and sealed and attested by the Corporate Secretary." 'Be it Further Resolved,that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signatures or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached.' (Each adopted at a meeting held on February 8,2000). -In Witness Whereof,WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY have caused these presents to be signed by their Senior Executive and their corporate seals to be hereto affixed this 20th day of APRIL A.D.,2011 . Corporate sp���w ,•�,%0 ALrti•., ' r "ENSU WESTFIELD INSURANCE COMPANY Seals frQ�, •••••••.,�`� , `r;,.•'' sG, ••• � WESTFIELD NATIONAL INSURANCE COMPANY Affixed `v; •sa. •syp o: v; =��:'' T .<^ OHIO FARMERS INSURANCE COMPANY .�. �eti4 ;;l�fffflttaa � SEAL anfffftn"- ` •,,,,•��'�•*•••�,��.•`,• ''�'�.,,,,,i,uf•„fff•,.•`' By: State of Ohio ” Richard L. Kinnaird,Jr., National Surety Leader and County of Medina ss.: Senior Executive On this 20th day of APRIL A.D.,2011 , before me personally came Richard L. Kinnaird, Jr. to me known,who, being by me duly sworn, did depose and say,that he resides-in.Medina, Ohio;that he is Senior Executive of WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which executed the above instrument;that he knows the seals of said Companies;that the seals affixed to said instrument are such corporate seals;that they were so affixed by order of the Boards of Directors of said Companies;and that he signed his name thereto by like order. Notarial �NI'"ff""'�a,y ,► 4 ' Seal PFi1 A I- s w Affixed William J. Kahelin,A rney at Law, Notary Public State of Ohio s,N� J0 My Commission Does Not Expire(Sec. 147.03 Ohio Revised Code) County of Medina ss.: I,Frank A..Carrino,Secretary of WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, do hereby-certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies,which is still in full force and effect;and furthermore,the resolutions of the Boards of Directors, set out in the Power of Attorney are in full force and effect. In Witness Whereof, I have hereunto set my hand and'affixed the seals of said Companies at Westfield Center, Ohio, this 17thday of August, °;;,,,, 2016 eqN r•'•�y''•Cid'k�?< ;ttt,� Ncl • SG., :"��`��_-���� ` m: SE �- :as Secr¢tary s� = 6`}8 : Frank A. Carrino, Secretary ��'•''�... ,,��'•fa ':moi`•,•, �s ., + ♦ � - BPOAC2 (combined) (06-02) FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY n PROJECT INFORMATION Date: 9/7/2016 Name of Contractor Project Name JLB LCG Centerport Phase III DOE Inspector Project Manager Thomas Miller Khal Jaafari DOE Number Project D -ltp Type of Contract 7524 O Simple QQ Routine Q Complex ❑ water[–] wastewater[:] Storm DrainageF] Pavement Initial Contract Amount Final Contract Amount $56,282.79 1$56,282.79 M PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 Applicability of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 3 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 3 Communication 2 Timliness of Contractor Payments 14 Resolution of Utility Conflicts 3 3 Bid Opening to Pre-Con Meeting Timeframe IIn COMMENTS&SIGNATURES COMMENTS Signature Contractor - Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS 10 The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845