HomeMy WebLinkAboutContract 48582 CITY sECRETARY CONTRACT N0. COMMUNITY FACILITIES AGREEMENT WITH CITY OVERSIZING PARTICIPATION Developer Company Name: Bailey Boswell Marketplace,LP Address, State,Zip Code: 7001 Preston Road,Suite 410,Dallas,TX 75205 Phone&Email: 214-224-4644 Authorized Signatory,Title: Robert Dorazil,Manager of UCD Bailey Boswell GP LLC,general partner Project Name and Brief Roadway Improvements to Bailey Boswell Road from Wind River Drive and Description: Old Decatur Road Project Location: Bailey Boswell Road between Wind River Drive and Old Decatur Road Plat Case Number: N/A Plat Name: N/A Mapsco: 33K Council District: 7 City Project Number: 02621 CFA Number: TBD DOE Number: N/A To be completed by gaff.• Com' Received by: L Date: 7 ILI l/1- .� SA 11 12 q� .off a 1C-4 �� � w Cl \`, co� l RL 0 OFFICIAL RECORD City of Fort Worth,Texas CITY 8ECRETARY Standard Community Facilities Agreement with City Participation FT.WORTHY TX CFA Official Release Date:07.30.2015 Page 1 of 13 _r_s_ COMMUNITY FACILITIES AGREEMENT WITH CITY OVERSIZING PARTICIPATION THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Bailey Boswell t jgketntace, LP, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Roadwu Improvements to Bailey Boswell Road from Wind River Drive and Old Decatur Road ("Project") within the City of Fort Worth, Texas("City"); and WHEREAS, the City has reviewed the proposed Improvements and desires to have the Developer oversize the proposed Improvements to provide capacity for future development in the area("Oversized Improvements"); and WHEREAS,the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or"Agreement") in connection with the collective Improvements for the Project; and WHEREAS,the City has reviewed the Project and desires to participate in the Project in accordance with this Agreement as presented by the Cost Summary Table and Exhibits attached hereto and authorized by City Council via M&C G27494 on Se tem 29,201 ;and WHEREAS, The City's cost participation shall be in an amount not to exceed $t 342 SSfi38 ("Participation"); and WHEREAS,the City has requested the Developer to cause, and the Developer agrees to cause,the design,permitting and construction of the Project for which the City will, subject to City Council approval, reimburse the Developer for the City's portion of those costs after City's final acceptance of the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim.Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 Page 2 of 13 and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) to submit a signed affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub- contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) { Sewer (A-1) 0 Paving (B) �, Storm Drain (B-1) I�', Street Lights & Signs (C) ®'. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section 11,paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent(1001/o) of City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 Page 3 of 13 the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance(ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements under this Agreement. City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 Page 4 of 13 H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City will be responsible for the costs of utility relocation necessitated by the City's participation in this Agreement. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby,fully indemnify,hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries(including death) or damages sustained by any persons or to any property, resulting from or in connection with the construction, design,performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees- M. mployeesM. The Developer will further require its contractors to indemnify, defend and hold harmless the City,its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from or in any way connected with the construction of the infrastructure contemplated herein, whether or not such iniuries, death or damages are caused in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees Further,Developer will require its contractors to indemnify and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 Page 5 of 13 improvements in a good and workmanlike manner,free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows and further apportioned in the Cost Summary Table below L Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%)for a total of 4%of the Developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent(4%)and material testing fees equal to two percent(2%)for a total of 6% of the Developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the City is not installing the streetlights, inspection fees equal to four percent (4%) of the Developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs necessary for Developer's portion of the Project. P. COMPLETION WITHIN 2 YEARS L The City's obligation to participate (exclusive of front foot charges) in this Agreement shall terminate if the Improvements are not completed within two (2) years; provided, however, if construction of the Improvements has started within the two year period,the Developer may request that the CFA be extended for one (1) additional year. If the Improvements are not completed within such extension period, there will be no further obligation of the City to participate. City participation in this CFA shall be subject to the annual availability of City funds as approved by the City Council. City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 Page 6 of 13 ii. Subject to paragraph i, above,the City shall reimburse Developer for the City's costs upon presentation of proper documentation of completion of installation of the Oversized Improvements. iii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iv. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2)years from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. V. The City may utilize the Developer's financial guarantee to cause the payment of costs for construction of the Improvements before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 Page 7of13 COST SUMMARY TABLE Developer's Cost City's Cost Total Cost A.Water and Sewer Construction 1. Water $ 10,715.00 $ 10,715.00 $ 21,430.00 2. Sewer $ 4,350.00 $ 4,350.00 $ 8,700.00 Water Construction Cost Sub-Total $ 15,065.00 $ 15,065.00 $ 30,130.00 B. TPW Construction 1. Paving $ 638,893.20 $ 638,893.20 $ 1,277,786.40 2. Storm Drain $ 333,310.00 $ 333,310.00 $ 666,620.00 3. Street Lights $ 38,391.43 $ 38,391.43 $ 76,782.86 4. Traffic Signal $ 205,000.00 $ 25,000.00 $ 230,000.00 TPW Construction Cost Sub-Total $ 1,215,594.63 $ 1,035,594.63 $ 2,251,189.26 Total Construction Cost $ 1,230,659.63 $ 1,050,659.63 $ 2,281,319.26 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ 301.30 $ 301.30 $ 602.60 D. Water/Sewer Material Testing Fee (2%) $ 301.30 $ 301.30 $ 602.60 Water Construction Fees Sub-Total $ 602.60 $ 602.60 $ 1,205.20 E. TPW Inspection Fee $ 38,888.13 $ - $ 38,888.13 F. TPW Material Testing Fee $ 19,444.06 $ - $ 19,444.06 G. Street Light Inspection Fee $ 1,535.66 $ - $ 1,535.66 H. Traffic Signal Inspection Fee $ 8,200.00 $ - $ 8,200.00 I. Street Signs Installation Cost $ - $ - $ - J.Civil/Geotechnical Engineering &Survey $ 87,830.79 $ 87,830.79 $ 175,661.58 TPW Construction Fees Subtotal $ 155,898.64 $ 87,830.79 $ 243,729.43 Total Construction Fees $ 156,501.24 $ 88,433.39 $ 244,934.63 TOTAL PROJECT COST $ 1,387,160.87 $ 1,139,093.02 $ 2,526,253.89 Financial Guarantee Options, choose one Amount Choice Mark one Bond = 100% $ 1,230,659.63 Completion Agreement= 100%/ Holds Plat $ 1,230,659.63 Cash Escrow Water/Sanitary Sewer= 125% $ 18,831.25 Cash Escrow Paving/Storm Drain = 125% $ 1,519,493.29 Letter of Credit= 125%w/2yr expiration period $ 1,538,324.54 Escrow Pledge Agreement= 125% $ 1,538,324.54 X The costs stated herein may be based upon construction estimates rather than actual costs. The City's portion of inspection and material testing fees are directly allocated to the City's accounts for charges and does not reimburse the Inspection and Material Testing Fees to the Developer.The City's participation estimate shall be limited to the unit prices contained in City of Fort Worth Ordinance No. 19192-06-2010, as amended,("Unit Price Ordinance") or as determined by public competitive bid. The City's cost participation(excluding inspection and material testing fees)is not a lump sum amount and may be less than stated above depending upon actual quantities as shown on the Notice of Final Completion package (`Green sheet')and based on unit prices from the construction contract documents. In no event shall the City pay more per unit than as determined pursuant to the Unit Price Ordinance or public competitive bid. City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date: 07.30.2015 Page 8 of 13 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 -Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvements Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements / Paving Cost Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate �( Exhibit C: Street Lights and Signs Improvements l� Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 Page 9 of 13 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No.02621; The following WHEREAS clause is hereby included: WHEREAS,the City recognizes that Developer has collaterally assigned Developer's rights, titles and interests under this Agreement to PlainsCapital Bank ("Lender") in connection with the development of the Project; Paragraphs L and M are hereby revised to read as follows: L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify,hold harmless and defend the City,its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries (including death) or damages sustained by any persons or to any property, resulting from or in connection with any negligence or willful misconduct in the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees,or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors,sub-contractors, officers, agents or employees. M. The Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from or in any way connected with the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees Further, Developer will require its contractors to indemnift and hold harmless the City for any losses, damages, costs or expenses for damage or repairs to the Improvements or damage to other Property suffered by the City or caused as a result of said contractor's failure to complete the work and construct the Improvements in a good and workmanlike manner,free from City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 Page 10 of 13 defects, in conformance with the Policy, and in accordance with all plans and specifications Paragraph P. Section v. is hereby revised to read as follows: v. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. The following Paragraph Q. is hereby added: Q. In the event of any breach of this Agreement by Developer, the City agrees to give written notice to Developer and Lender and reasonable opportunity to cure such breach (at least seven(7) days after such written notice) before a default shall occur under this Agreement. Notwithstanding the foregoing, the City acknowledges and agrees that Lender shall have the right, but not the obligation,to cure any breach. City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 Page 11 of 13 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, effective as of the date subscribed by the City's designated City Manager. CITY OF FORT WORTH DEVELOPER Bailey Boswell Marketplace LP, a Texas limited partnership By: UCD Bailey Boswell GP LLC, a Texas limited liability company, Jesus J. Chapa its ge I partner Assistant City Manager Date: Name: Robert .Domzil Recommended by: Title: Manager \ � Date: ATTEST: (Only if required by Wendy Chi abulal, EMBA, P.E. Developer) Development Engineering Manager Water Department (� Signature Name: <Name> Douglas . Wiersig, P.E. Director Transportation&Public Works Department LOFFICIAL ECORD ETARY Approved as to Form &Legality: H,TX ` ATTEST: Richard A. McCracken Assistant City Attorney M&C No. Date: 927 r5 . row%&. !LIS.' 2-01 -17-5y" Mary J. Kayser City of Fort Worth,Texas 1. r Standard Community Facilities Agreement with City Participation * ;i CFA Official Release Date: 07.30.2015 Page 12 of 13 � AS City Secretary C OTV-A i- CcwG mWOE� M e A&W6WL 6-t --rte I " p M�g�'1�• City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 Page 13 of 13 H`oa wi Oo Thornbush Carawo D a Threshin P ' ' Cre a Molasses Cedor Sprin s So r hum Flat Creek Wheat Sheaf Mill Creek � � 3 m NV Y 3 tom- N 3 D D D = D N W E Creek s map N.T.S. MAPSCO NO. 33K COUNCIL DISTRICT #7 CFA VICINITY MAP Il�3I�C�Il�1ffiffiffZ1 BAILEY BOSWELL WIND RIVER TO OLD DECATUR wC-NSULTING FORT WORTH, TARRANT COUNTY, TX SHEET CIVIL ENGINEERS . SURVEYORS HEIRS OF BENJAMIN THOMAS SURVEY, ABSTRACT NO. 149772)490-7090 FAX(972)490-7099 CITY OF FORT WORTH TARRANT COUNTY, TEXAS of Scale Date :04/20/2016 UCD Dwg. File : 19999.OA — CFA — COV.DWG 7001 PRESTON ROAD, SUITE 410 a Pro'ect No. : 19999.OA DALLAS. \ \ N \ \ W E S F O8 \ S`5 \ \ P A� \ m m o n \ i A op \ \ DQ \ % v LEGEND 1 ®°�O PROPOSED WATER LINE PROPOSED FIRE M-11— PROPOSED DANPROPOSED GATE VALVE CONNECT TO EX. \ _ ess F 8" WATER LINE W. BAILEY SOS LLl ROAD (CO.ROAD D,0 CONNEC T TO EX. \ (VARIABLE MOTH R1G T- -WAY) — — — — 8" WATER LINE f 3o CONNECT TO EX. I I — 8" WA TER LINE INSTALL. 1 e I i 8" WA TER LINE CONNEC T TO EX. m 8" WA TER LINE f CFA Il£o Jk s R I m m m BAILEY BOSWELL EXHIBWIND,RIVER TO OLD DECATUR wc.NSULTING (a Agneefiffittmo, Hme. FORT WORTH, TARRANT COUNTY, TX SHEETCIVIL ENGINEERS - SURVEYORS HEIRS OF BENJAMIN THOMAS SURVEY, ABSTRACT NO. 1497 2 72) 490-7090 FAX (972) 490-7099 CITY OF FORT WORTH Scale TARRANT COUNTY, TEXAS OF 1" = 300' Date :04/20/2016 UCD Dwg. File : 19999.OA — CFA — WTR.DWG 7001 PRESTON ROAD, SUITE 410 6 Project No. : 19999.OA DALLAS TEXAS 75205 Bailey Boswell Wind River to Old Decatur Quantity Matrix EXHIBIT A-1 -SANITARY SEWER ITEM UNIT ITEM TOTAL SHEET NO. TOTAL PRICE COST ITEM NO. BID ITEM UNIT 1 21314 5 6 SANITARY SEWER I Manhole Adjustment,Major EA 1xi 2 $4,985.00 1 $9,970.00 SUBTOTAL 1 $9,970.00 \ \ N \ \ LEGEND \ \ W E A� EX. MANHOLE \ \ S x \ \ F8 \ S 0 \ \ PS, \ �8 A m \ �v \ A C W. BAILEY BOS LLl ROAD (CO.ROAD 040) \ (VA Me VRD7H RIG T- -WAY) �I I I ADJUST SANITARY I J ILI - - Lid MANHOLE g �o CO m CFA EXHIBIT A-1 —SANITARY SEWER Il mo TI-K a R M-01 m i4 m0 BAILEY BOSWELL WIND RIVER TO OLD DECATUR Amac ktao, Hme. FORT WORTH, TARRANT COUNTY, TX SHEET CONSULTING CIVIL ENGINEERS • SURVEYORS HEIRS OF BENJAMIN THOMAS SURVEY, ABSTRACT NO. 1497 s (972) 490-7090 FAX(972) 490-7099 CITY OF FORT WORTH TARRANT COUNTY, TEXAS OF Scale 1" = 300' Date :04/20/2076 UCD 9 7001 PRESTON ROAD, SUITE 410 6 Dw File 19999.OA - CFA - SWR.DWG Project No. : 19999.OA DALLAS TEXAS 75205 Bailey Boswell Wind River to Old Decatur Quantity Matrix EXHIBIT A -WATER ITEM UNIT ITEM TOTAL SHEET NO. TOTAL PRICE COST ITEM NO. BID ITEM UNIT 1121314 5 6 WATER 1 Salvage Fire Hydrant EA X1 1 1 $500.00 $500.00 2 Valve Box Adjustment EA X1 1 5 $540.00 $2,700.00 3 Ductile Iron Water Fittings w/Restraint TON X 1 $8,125.00 $8,125.00 4 6"PVC Water Pipe LF X 25 $53.00 $1,325.00 5 8"PVC Water Pipe LF X 970 $64.00 $62,080.00 6 Fire Hydrant EA X 1 $6,070.00 $6,070.00 7 Connection to Existing 4"-12"Water Main EA X 3 $4,335.00 $13,005.00 8 8"Gate Valve EA X 1 $1,515.00 $1,515.00 9 8"x 6"Tapping Sleeve and Valve EA X 1 $3,250.00 $3,250.00 10 Concrete Encasement for Water Pipe CY X 0.1 $3,250.00 $325.00 11 999.0021 Concrete Cap 30"Water Line EA X 3 $1,085.00 $3,255.00 12 Trench Safety LF X 890 $0.05 1 $44.50 SUBTOTAL $102,194.50 N W 3 Q �r Z U B Y(EY BOSM040) �� S — — 'j OAOVAR LE TH Rf LEGEND 0 BAILEY BOSWELL PAVEMENT SECTION BLUE TOP DRIVE 0 TRANSITION SECTION Rg"°'ite� — — SIDEWALK IL I A SPHA L T PA VEMEN T REPA IR FOR S TORM SEWER i OLD DECA TUR PA VEMEN T SECTION �m �D I I I I W. BAILET'I BOSWELL ROAD (co. 7H r4o4o) \ (VARIABLE DTH RIGHT—OF—WAY) a o e I � e I I m — m CFA EXHIBIT B —PAVING IL a Tmo m m m1 BAILEY BOSWELL WIND RIVER TO OLD DECATUR `�• FORT WORTH, TARRANT COUNTY, TX SHEET CONSULTING CIVIL ENGINEERS - SURVEYORS HEIRS OF BENJAMIN THOMAS SURVEY, ABSTRACT NO. 1497 (972) 490-7090 FAX (972) 490-7099 CITY OF FORT WORTH 4 TARRANT COUNTY, TEXAS - OF Scale : 1" = 250' Date :04/20/2016 UCD Dwg. File : 19999.0A — CFA — PAV.DWG 7001 PRESTON ROAD, SUITE 410 6 Project No. : 19999.OA DALLAS, TEXAS 75205 Bailey Boswell Wind River to Old Decatur Quantity Matrix EXHIBIT B- PAVING ITEM UNIT ITEM TOTAL SHEET NO. TOTAL PRICE COST ITEM NO. BID ITEM UNIT 1 2 3 4 5 6 PAVING 1 Remove Asphalt Drive SF X 2773 $0.81 $2,246.13 2 Remove Mailbox EA X 1 $57.00 $57.00 3 Remove 8"Water Line LF X 911 $7.60 $6,923.60 4 Remove Asphalt Pvmt SY X 10520 $6.50 $68,380.00 5 Site Clearing LS X 1 $90,180.00 $90,180.00 6 Unclassified Excavation by Plan CY X 7300 $15.55 $113,515.00 7 10'Wide Asphalt Pvmt Repair,Arterial LF X 1115 $101.00 $112,615.00 8 6"Flexible Base,Type A,GR-2 SY X 1530 $6.80 $10,404.00 9 8"Flexible Base,Type A,GR-2 SY 1XI 1 347 $9.50 $3,296.50 10 Hydrated Lime TN X 302 $160.00 $48,320.00 11 8"Lime Treatment SY X 12563 $2.73 $34,296.99 12 8"CTB for Temporary Asphalt SY X 957 $36.30 $34,739.10 13 2"Asphalt Pvmt Type D SY X 1530 $11.26 $17,227.80 14 3"Asphalt Pvmt Type D SY X 2193 $15.04 $32,982.72 15 4"Asphalt Pvmt Type D SY X 957 $23.79 $22,767.03 16 4"Asphalt Base Type B SY X 1530 $20.04 $30,661.20 17 10"Cone Pvmt SY X 11806 $61.61 $727,367.66 18 4"Cone Sidewalk SF X 14607 $4.75 $69,383.25 19 Barrier Free Ramp,Type P-I EA IX 11 $885.00 $9,735.00 20 6"Cone Curb and Gutter LF ix 6205 $2.85 $17,684.25 21 6"SLD Pvmt Marking HAS(W) LF ix 1419 $1.90 $2,696.10 22 6"BRK Pvmt Marking HAS(W) LF I X 3692 $1.90 $7,014.80 23 18"SLD Pvmt Marking Tape(W) LF X 297 $14.90 $4,425.30 24 24"SLD Pvmt Marking HAE(W) LF X 107 $15.45 $1,653.15 25 Lane Legend Arrow EA X 3 $230.00 $690.00 26 Topsoil CY Ix 250 $16.40 $4,100.00 27 Block Sod Placement SY Ix 839 $3.58 $3,003.62 28 seeding,Hydromulch SY X 1496 $1.73 $2,588.08 29 Traffic Control MO X 1 $2,840.00 $2,840.00 30 6"Compacted Subgrade(Old Decatur) SY X 345 $6.00 $2,070.00 31 Median Concrete SF X 4479 $4.03 $18,050.37 32 I'Retaining Wall adjacent 10'walk LF X 1 65 $87.85 $5,710.25 33 3"Binder for Trench Repair LS ix 1 $1.08 $1.08 SUBTOTAL $1,507,624.98 I N W B YLEY BOS LL OA (C0. ?OA O) S — — L (VAR LE 7N R/ T- WAY) — — — — CONNECT TO EX. INSTALL JUNCTION HEADWAL71 L CONNECT TOBEX. STORM SEWER BLUE TOP DRIVE ' Right;� I LEGEND PROPOSED STORM SEWER - STMI I x_00 x \ \ I O IG mC' I INSTALL 10 I \ INSTALL TRENCH DRAIN CURB INLET W. BAILEY BOSWELL ROAD I INSTALL 10' (CO. DAD 14040) I CURB INLET INSTALL JUNCTION (VARIABLE D1H RIGHT-OF-WAY) JQ BOX INSTALL DROP INLET INSTALL 10'RECESSED INSTALL 10'RECESSED I INSTALL 10' I u CURB INLET CURB INLET I CURB INLET 4 .— —p— I 2 I INSTALL DROP INLET II m CFA EXHIBIT B-1 -STORM SEWER IlmDEaRmE1mffi BAILEY BOSWELL WIND RIVER TO OLD DECATUR �`• A0000fi:�t ag, Hm e. FORT WORTH, TARRANT COUNTY, TX SHEET CONSULTING CIVIL ENGINEERS ■ SURVEYORS HEIRS OF BENJAMIN THOMAS SURVEY, ABSTRACT NO. 1497 (972)490-7090 FAX(972) 490-7099 CITY OF FORT WORTH 5 TARRANT COUNTY, TEXAS OF Scale : 1" = 250' Date : 04/20/2016 UCD Dwg. File : 19999.OA — CFA — STM.DWG 7001 PRESTON ROAD, SUITE 410 6 Project No. : 19999.OA DALLAS TEXAS 75205 Bailey Boswell Wind River to Old Decatur Quantity Matrix EXHIBIT B-1 -STORM SEWER ITEM UNIT ITEM TOTAL SHEET NO. TOTAL PRICE COST ITEM NO. BID ITEM UNIT 1 2 3 4 56 DRAINAGE 1 Remove 15"Storm Line LF X 1 41 $10.85 $444.85 2 Remove 18"Storm Line LF X 24 $13.00 $312.00 3 Remove 27"Stone Line LF X 56 $16.00 $896.00 4 Remove Headwall/SET EA X 3 $435.00 $1,305.00 5 Trench Safety LF X 3115 $1.08 $3,364.20 6 21"RCP,Class III LF ix 667 $89.00 $59,363.00 7 24"RCP,Class III LF X 32 $99.00 $3,168.00 8 30"RCP,Class III LF X 346 $117.00 $40,482.00 9 36"RCP,Class III LF X 462 $152.00 $70,224.00 10 5x3 Box Culvert LF X 67 $305.00 $20,435.00 11 7x4 Box Culvert LF Ix 1141 $467.00 $532,847.00 12 8x4 Box Culvert LF X 702 $505.00 $354,510.00 13 12"Trench Drain LF IX 30 $550.00 $16,500.00 14 4'Stonn Junction Box EA X 1 $4,820.00 $4,820.00 15 4'Stacked Manhole EA I X 4 $1,400.00 $5,600.00 16 10'Curb Inlet EA I ix 3 $4,280.00 $12,840.00 17 10'Recessed Inlet EA ix 2 $4,500.00 $9,000.00 18 4'Drop Inlet EA ix 3 $7,150.00 $21,450.00 19 Large Stone Riprap,grouted SY X 40 $130.00 $5,200.00 20 10'x8'Storm Junction Box-Construct EA X 1 $11,760.00 $11,760.00 21 Connect to Existing 6'X3'Box Culvert EA X 1 $3,250.00 $3,250.00 22 Connect to-Ex I isting Wingwall EA X 1 $1,515.00 $1T5.00 T T- 23 8'x6'Junction Box-Construct NS X 1 $11,975.00 $11,975.00 24 Connect to Existing 6'X6'Junction Box JEA X 1 $3,800.00 $3,800.00 25 Single Guardrail Terminal-Install EA X 2 $3,410.00 $6,820.00 26 Standard Guardrail-Install LF X 69 $22.50 $1,552.50 27 Wingwall at Sta.0+00.00 EA X 1 $11,270.00 $11,270.00 SUBTOTAL $1,214,703.55 \ \ N LEGEND \ \ o- PROPOSED STREET LIGHT \ -------- PROPOSED CONDUIT AND WIRING \ \ PROPOSED SIGNAL POLE S \ >o a� \ o0 W. BAILEY BOS LU ROAD (CO.ROAD 040 \ (VARIABLE WDTH RIG T- -WAY) pt INSTALL SIGNAL D — - - - - POLE o III VI F1 o ' m m CFA EXHIBIT C —STREET LIGHTS AND SIGNAL w,;-N7Q m k;Il m f m ffi BAILEY BOSWELL WIND RIVER TO OLD DECATUR SULTING (N Acoodmtso, Hme. FORT WORTH, TARRANT COUNTY, TX SHEET CIVIL ENGINEERS ■ SURVEYORS HEIRS OF BENJAMIN THOMAS SURVEY, ABSTRACT NO. 1497 6 (972) 490-7090 FAX (972) 490-7099 CITY OF FORT WORTH TARRANT COUNTY, TEXAS OF Scale 1" = 300' Date :04/20/2016 UCD Dwg. File 19999.OA — CFA — LIGHTS.DWG 7001 PRESTON ROAD, SUITE 410 6 Project No. : 19999.OA DALLAS TEXAS 75205 Bailey Boswell Wind River to Old Decatur Quantity Matrix EXHIBIT C-STREET LIGHTS AND SIGNALS ITEM UNIT ITEM TOTAL SHEET NO. TOTAL PRICE COST ITEM NO. BID ITEM UNIT 1 2 3 4; 5 6 STREET LIGHTS 1 Ground Box Type B EA x 8 $650.00 $5,200.00 2 Salvage Traffic Signal EA X 4 $270.00 $1,080.00 3 Rdwy Illum Assmbly TY 18,18A,19,and D-40 EA x 9 $2,220.00 $19,980.00 4 2-2-2-4 Quadplex Alum Elec Conductor LF X 1765 $3.25 $5,736.25 5 Rdwy Illum Foundation TY 3,5,6,and 8 EA X 9 $1,512.00 $13,608.00 6 2"SCH 80 PVC LF 1XI 1765 $10.84 $19,132.60 7 3°SCH 80 PVC LF X 394 $16.25 $6,402.50 8 Pad Mounted Contactor w/Meter EA X 1 $5,960.00 $5,960.00 9 Power Pole with 240/480V Transformer EA X 1 $0.00 10 Provide power to Street Lighting per ELO LS X 1 $2,700.00 $2,700.00 SUBTOTAL $79,799.35 TRAFFIC SIGNAL I Fumish/Install Elec Sery Pedestal EA X 1 $2,790.00 $2,790.00 2 2"CONDT PVC SCH 40(T) LF x 72 $10.85 $781.20 3 3"CONDT PVC SCH 40(T) LF I ix 159 $16.25 $2,583.75 4 3"CONDT PVC SCH 40(B) LF X 368 $19.50 $7,176.00 5 3-Sect Signal Head Assmbly EA X 8 $895.00 $7,160.00 6 4-Sect Signal Head Assmbly EA X 2 $1,030.00 $2,060.00 7 Ped Signal Head Assmbly EA X 8 $705.00 $5,640.00 8 Audible Pedestrian Pushbutton Station EA X 8 $1,670.00 $13,360.00 9 Fumish/Install BBU System EXT Mounted EA X 1 $7,370.00 $7,370.00 10 5/C 14 AWG Multi-Conductor Cable LF X 335 $1.08 $361.80 I1 7/C 14 AWG Multi-Conductor Cable LF X 120 $1.30 $156.00 12 20/C 14 AWG Multi-Conductor Cable LF X 529 $4.33 $2,290.57 13 3/C 14 AWG Multi-Conductor Cable LF X 2328 $1.08 $2,514.24 14 NO 6 Insulated Elec Condr LF I 1XI57 $1.35 $76.95 15 NO 8 Insulated Elec Condr LF X 800 $1.08 $864.00 16 NO 8 Bare Elec Condr LF X 559 $1.08 $603.72 17 Ground Box Type B,w/Apron EA X 1 $650.00 $650.00 18 Ground Box Type D,w/Apron EA ix 4 $760.00 $3,040.00 19 Fumish/Install 10'-14'Ped Pole Assmbly EA I Ix 4 $920.00 $3,680.00 20 Furnish/Install Type 41 Signal Pole EA X 2 $3,370.00 $6,740.00 21 Furnish/Install Type 42 Signal Pole EA X 1 $2,815.00 $2,815.00 22 Furnish/Install Type 43 Signal Pole EA X 1 $4,020.00 $4,020.00 23 Furnish/install Mast Arm 16'-36' EA X 3 $2,500.00 $7,500.00 24 Furnish/Install Mast Arm 40'-48' EA X 1 $3,200.00 $3,200.00 25 TY 1 Signal Foundation EA X 4 $920.00 $3,680.00 26 TY 3 Signal Foundation EA X 3 $2,170.00 $6,510.00 27 TY 4 Signal Foundation EA X 1 $2,765.00 $2,765.00 28 Signal Cabinet/BBU Foundation EA X 1 $2,165.00 $2,165.00 Furnish/Install Controller(2070 ATC)&Cabinet Assembly EA 1 $19,775.00 $19,775.00 29 (Type 352i),Ground MNT I Ix 30 LED Lighting Fixture EA X 3 $870.00 $2,610.00 Furnish/Install Iteris Vantage Vector detection system (includes 4 Iteris Vantage Vector detectors,714 LF of detector $31,420.00 cable,and all materials/labor necessary to install,set up,and 31 activate the detection system) EA Ix 4 $7,855.00 Furnish/Install Opticom Emergency Vehicle Preemption $7,430.00 32 system(includes 2 Opticom detectors,359 LF of detector EA X 2 $3,715.00 33 Install!Furnish Aluminum Sign Mast Arm Mount EA4 $1,030.00 1 $4,120.00 X SUBTOTAL $167,908.23 M&C Review Page 1 of 2 "official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FORgl I_ COUNCIL ACTION: Approved on 9/29/2015 - Ordinance No. 21944-09-2015 DATE: 9/29/2015 REFERENCE NO.: C-27494 LOG NAME: 061000 BAILEY BOSWELL CFA CODE: C TYPE: NON- PUBLIC CONSENT HEARING: NO SUBJECT: Authorize Execution of a Community Facilities Agreement with Boswell Marketplace, LP, in the Estimated Project Amount of$2,835,679.83 Including City Participation in an Amount Not to Exceed $1,342,556.38 to Construct West Bailey Boswell Road from Wind River Drive to Old Decatur Road and Adopt Appropriation Ordinance (Transportation Impact Fee Funds) (COUNCIL DISTRICT 7) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Transportation Impact Fee Fund in the amount of$1,342,556.38 from available funds; and 2. Authorize the execution of a Community Facilities Agreement with Boswell Marketplace, LP, in the estimated project amount of$2,835,679.83 which includes City participation in an amount not to exceed $1,342,556.38 to construct West Bailey Boswell Road from Wind River Drive to Old Decatur Road. DISCUSSION: The purpose of this M&C is to authorize execution of a Community Facilities Agreement (CFA) with Boswell Marketplace, LP, the developer of the proposed Boswell Marketplace located generally at Old Decatur Road and West Bailey Boswell Road for the construction of four lanes of West Bailey Boswell Road from Wind River Drive to Old Decatur Road. The City will participate in the oversizing of the Developer's road construction requirement in order to have West Bailey Boswell built to its ultimate cross-section and alignment through this area. The Developer will publicly bid and provide initial funding for the roadway construction while the City will use transportation impact fee funds to reimburse the Developer for the City's share of the construction cost through periodic draws. Project Expenditures: Project Component De ellosper's City's Cost Total Cost Co Estimated Construction Costs J $ 1,140,659.63 $ 1,140,659.63 $ 2,281,319.26 Design Fees 87,830.79 87,830.79 175,661.58 Contingency 114,065.96 11 14,065.96 11 228,131.92 Material Testing & Inspection Fees 150,567.07 11 0.001 1567.07 TOTAL 11 $ 1,493,123.451 $ 1,342,556.381 $ 2,835,679.83 FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon the approval of the above recommendation and the adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Transportation Impact Fee Fund. http://apps.cfwnet.org/council packet/mc_review.asp?ID=21334&councildate=9/29/2015 1/19/2017 M&C Review Page 2 of 2 TO Fund/Account/Centers FROM Fund/Account/Centers C206 488139 061249991500 $1,342,556.38 206 541200 207230262480 $1,342,556.38 1) $1,342,556.38 C206 541200 061249991500 Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: Randle Harwood (6101) Additional Information Contact: Julie Westerman (2677) David Schroeder (2239) ATTACHMENTS 061000 BAILEY BOSWELL CFA C206 A015R.docx bailey boswell.pdf http://apps.cfwnet.org/council_packet/mc_review.asp?ID=21334&councildate=9/29/2015 1/19/2017 I CERTIFICATE OF INTERESTED-PARTIES - - FOitA-li 1-29 loll Complete Nos.2-4 and 6 it there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 it there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2016-1.25465 Bailey Boswell Marketplace LP Dallas,TX United States [late Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the. form is1011612016 being filed. City of Fort Worth Date Acknowledged: 1-'-'k A r-1 1 3 Provide the identification number used by the governmental entity or state agency to track or Identify the_ contract,and provide a description of the services,goods,or other property to be provided under the contract. 2016.027 Construction of a four-lane divided road Including associated turn lanes and traffic signal improvements. Naturu of interest A Name of Interested Parry City,State,Country(place of business) (check applicable) Controlling Intermediary Bailey Boswell Marketplace LP Dallas,TX United States X 5 Check only if there Is No Interested Party. ❑ b AFFIDAVIT I swear,o der penalty.of perjury,that the above disclosure Is true and correct. ►"°►� TERRY MONDAY PIPER Notary Puohc,Stale of Texas 4 My Corntriission Exptes Signature of authtzed alent of contracting business entity '+ „+ NOvern"i 24. 2017 AFFIX NOTARY$TAMP/SEAL ABOVE Sworn to and subscribed before me,by the said LK.✓ Y . 111Jr_U1 ,this the day of Q+��Q'XYi.. 201�2 _,to certify which,witness my hand and seal of office, r j nature Y officer adm1rh6rinopath Printed name dl officer adminiltering oath Title of officer admin' tering oath 9 Forms piovided by 1 e gas Ethics commission www.ethics.state.tx.us Version V1.0.2T7