HomeMy WebLinkAboutContract 46419-A1 CITY SECRETARY AMENDMENT No.1 CONTRACT N0. 7 %T TO CITY SECRETARY CONTRACT No. 46419 WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 46419, (the CONTRACT) which was administratively authorized on the 13th day of February, 2015 in the amount of $ 38, 546. 00; and WHEREAS, the CONTRACT involves engineering services for the following project: White Settlement at University Traffic Signal Improvements; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated January 6, 2017, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $10,050. 00. (See Attached Funding Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $48,596. 00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the dattj--, -yizitten by a signatory, below. / 6x ,O City of Fort Worth �� n, n o FOFFICIALRECORD Professional Services Agreement Amendment Templatern 11 RETARY PMO Official Release 8/1/2012 C� 0 Ai FTS WORTH,TX Page 1 of 3 d� d s $ £ ZV APPROVED: City of Fort Worth ENGINEER Kimley-Horn and Associates, � Inc. Jesus J. Chapa S ott R. Arnold Assistant City Manager Assistant Secretary DATE: DATE: APAL RECOMMENDED: i Douglas&- Wiersig, P.E Director, Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: Date: Doug as W. Black Assistant City Attorney A by:� lu onald P. r �nzalbs,Mst. City Switary XAS OFFICIAL RECORD City of Fort Worth Professional Services Agreement Amendment Template CITY SECRETARY PMO Official Release 8/1/2012 FT.WORTH,TX Page 2 of 3 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Wi liam odd Estes,P.E. Engineering Manager, Transportation and Public Works Department Title FUND IDENTIFIER SHEET City Secretary No. 46419 Amendment No. 1 Department FID Amount Total : City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 Kimley)))Horn January 6, 2017 Lissette Acevedo, P.E., PTOE City of Fort Worth—Transportation and Public Works Department 1000 Throckmorton Street Fort Worth, Texas 76102 Re: Amendment#1 02530—White Settlement at University Traffic Signal Improvements Dear Lissette: Kimley-Horn and Associates, Inc. ("Kimley-Horn"or"Consultant')is pleased to submit this Amendment #1 to the City of Fort Worth (City) to provide additional services to design landscaping and irrigation improvements and construction phase services. The following Scope of Services has been developed based on our discussions with the City. Scope of Services Kimley-Horn will provide the services specifically set forth below, Task 6—Landscaping and Irrigation Design Kimley-Horn will design landscaping and irrigation improvements on the northeast corner of White Settlement and University. These improvements were added to the project because of the closure of two (2) Fort Worth ISD driveways. The design will comply with applicable City specifications and details. Task 7—Construction Phase Services ENGINEER will support the construction phase of the project as follows. 7.1, Notice to Proceed Package • The ENGINEER will prepare a NTP package consisting of the following: o Cover letter o Project map o Cost estimate for project o Task order summary spreadsheet o Plans 7.2. Construction Support • The ENGINEER shall attend the preconstruction conference. • After the pre-construction conference, the ENGINEER shall provide project exhibits and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. kimiey-hom.com 801950, Fort Kim ep Horn Page • The ENGINEER shall visit the project site at requested intervals as construction proceeds to observe and report on progress. Such visits and observations by ENGINEER are not intended to be exhaustive or to extend to every aspect of Contractor's work. Observations are to be limited to spot checking, selective measurement, and similar methods of general observation. Based on information obtained during such visits, ENGINEER will evaluate whether Contractor's work is generally proceeding in accordance with the Contract Documents, and ENGINEER will keep Client informed of the general progress of the Work. ENGINEER shall not, during such visits or as a result of such observations, supervise, direct, or have control over Contractor's work, nor shall ENGINEER have authority over or responsibility for the means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction selected by Contractor, for safety precautions and programs incident to Contractor's work, nor for any failure of Contractor to comply with applicable laws and regulations. ENGINEER neither guarantees the performance of any Contractor nor assumes responsibility for any Contractor's failure to furnish and perform its work in accordance with the Contract Documents. • The ENGINEER will schedule and conduct construction progress meetings to be held every week, on-site. • The ENGINEER will coordinate with CITY departments as necessary. • Pay Applications. Based on its observations and on review of applications for payment and accompanying supporting documentation, ENGINEER will determine the amounts that ENGINEER recommends Contractor be paid. Such recommendations will be based on ENGINEER's knowledge, information and belief, and will state whether in ENGINEER's opinion Contractor's work has progressed to the point indicated, subject to any qualifications stated in the recommendation. In the case of unit price work, ENGINEER's recommendations of payment will include determinations of quantities and classifications of Contractor's work, based on observations and measurements of quantities provided with pay requests. ENGINEER's recommendations will not be a representation that its observations to check Contractor's work have been exhaustive, extended to every aspect of Contractor's work, or involved detailed inspections. • The ENGINEER will update the BuzzSaw and One Note folders on a regular basis. • The ENGINEER shall review shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. Such review shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies or omissions. The ENGINEER shall log and track all shop drawings, samples and other submittals in Buzzsaw. • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and make recommendations as to the acceptability of the work. • The ENGINEER shall attend the"Final" project walk through and assist with preparation of final punch list. Kim ey>>)Horn Page ASSUMPTIONS • Up to eight(8) site visits are assumed. • Up to two(2) submittal reviews are assumed. • Up to five (5) RFPs are assumed. • One(1) Change Order is assumed. DELIVERABLES • Response to Contractor's Request for Information • Review of Change Orders • Review of shop drawings • Final Punch List items Additional Services Any services not specifically provided for in the above scope will be billed as additional services and performed at our then current hourly rates Schedule We will provide our services in a mutually agreed upon schedule following Notice to Proceed from the City. Additional services, if desired, will be performed in a timely manner upon authorization by the City. Fee and Expenses Kimley-Horn will perform the services in Tasks 6 and 7 for an hourly, not-to-exceed fee of$10,050. All permitting, application, and similar project fees will be paid directly by the Client. Kimley-Horn will not exceed the total maximum labor fee shown without authorization from the Client. • 8011 Fort Worth, 76102 Kimley>>> Horn Page 4 We appreciate the opportunity to provide these services to you. Please contact me if you have any questions. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. r 4"� By: Scott R. Arnold, P.E. Project Manager, Assistant Secretary 801 -- - 950, Fort Worth, TX 76102 Level of Effort Spreadsheet TASKMOUR BREAKDOWN Design Services for White Settlement at University Traffic Signal Improvements City Project No.02530 Labor(hours) Expense Task No. Task Description Project Project Surveyor Project EIT CADD Administrative Total Labor Subconsultant Total Expense Task Sub Total Director Mana er RPLS En ineer Cost Travel Fees Cost Rate - - - SBE Non-SBE 6.0 Landscape and Irrigation Design 0 0 0 6 12 0 0 $2,340 $0 $0 $0 $0 $0 $2,340 6.1 Landscape Design 2 4 $780 $0 $780 6.2 Irrigation Design 4 B $1,560 $0 $1,560 1.0 Construction Phase Services 0 25 0 6 14 0 0 $7,580 $0 $0 $130 $0 $130 $7,710 1.1 Notice to Proceed Package 1 1 2 $590 $0 $590 1.2 Construction Support Preconstruction meeting 2 $400 $0 $400 Weekly construction progress meetings(8) 8 $1,600 $80 $80 $1,680 Coordination with CITY departments 2 $400 $0 $400 Review pay applications(8) 6 $1,200 $50 $50 $1,250 Maintain BuzzSaw and One Note folders 4 $460 $0 $480 Review shop drawings(2) 1 1 $350 $0 $350 RFI's(5) 1 2 4 $980 $0 $980 Revise plans as needed per change orders 1 1 21 4 $980 $0 $980 Attend Final Walk Through with City 2 $400 $0 $400 Project acceptance 1 $200 $0 $200 Totals 01 25 01 121 261 01 0 $9,920 $0 $0 $130 $0 $130 $10,050 Project Summary Total Hours 63 Total Labor $9,920 Total Expense $130 MBE/SBE Subconsultant $0 Non-MBE/SBE Subconsultant $0 10% Sub Markup $0 MBE/SBE Participation 0.0% Total Project Cost $10,050 City of Fort Worth,Texas Attachment B-Level of Effort Supplement PMO Official Release Date:8.09.2012