HomeMy WebLinkAboutContract 48603 Cir sr:CRErARY
CONTRACT NO.
COMMUNITY FACILITIES AGREEMENT
WITH CITY OVERSIZING PARTICIPATION
Developer Company Name: Wal-Mart Real Estate Business Trust
Address, State, Zip Code: 2001 SE I O h St,Bentonville,AR,72716
Phone&Email: 479-204-2622,Lewis.Johnson@wal-mart.com
Authorized Signatory,Title: LB Johnson,VP Real Estate
Project Name and Brief Park Vista Road Improvements
Description:
Project Location: SEC of Golden Triangle and proposed Park Vista
Plat Case Number: PP-14-027„ Plat Name: Golden Triangle Addition
FP-14-058
Mapsco: 22Q Council District: 2 City Project Number: 02319
CFA Number: 2016-116 DOE Number: None
To be completed by staff
Received by: Date:
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date: 07.30.2015 0FICIAL RECORD
Page 1 of 11 CITY secRE rARY
'a
WORM, TX
�_
COMMUNITY FACILITIES AGREEMENT
WITH CITY OVERSIZING PARTICIPATION
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS,Wal-Mart Real Estate Business Trust,("Developer"),desires to make certain
specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Park Vista Road Improvements
("Project")within the City of Fort Worth,Texas("City"); and
WHEREAS, the City has reviewed the proposed Improvements and desires to have
the Developer oversize a portion of the proposed Improvements to provide capacity for future
development in the area("Oversized Improvements"); and
WHEREAS,the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project; and
WHEREAS,the City has reviewed the Project and desires to participate in the Project
in accordance with this Agreement as presented by the Cost Summary Table and Exhibits
attached hereto and authorized by City Council via M&C C - 286 2 on
13 .20 1 lQ:and
WHEREAS, The City's cost participation shall be in an amount not to exceed
$130,900.00 ("Participation"); and
WHEREAS,the City has requested the Developer to cause, and the Developer agrees
to cause,the design,permitting and construction of the Project for which the City will, subject
to City Council approval, reimburse the Developer for the City's portion of those costs after
City's final acceptance of the Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim.Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 2 of 11
hereunder and to cause all contractors hired by Developer to comply with the Policy in
connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II,
of the Policy and recognizes that there shall be no reduction in the collateral until the
Project has been completed and the City has officially accepted the Improvements.
Developer further acknowledges that said acceptance process requires the Developer's
contractor(s) to submit a signed affidavit of bills paid signed by its contractor and
consent of surety signed by its surety to ensure the contractor has paid any sub-
contractors) and suppliers in full. Additionally, the contractor will provide in writing
that the contractor has been paid in full by Developer for all the services provided
under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ®, Sewer (A-1) ❑, Paving (B) ®, Storm Drain (B-1) '®,, Street Lights &
Signs (C) M.
E. The Developer shall award all contracts for the construction of community facilities in
accordance with Section II, paragraph 7 of the Policy and the contracts for the
construction of the public infrastructure shall be administered in conformance with
paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the
then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
L To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 3 of 11
(100%) of the contract price of the infrastructure, and a maintenance bond in
the name of the City for one hundred percent (100%) of the contract price of
the infrastructure for a period of two (2) years from the date of final
acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of Chapter
2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other
state-approved form) supplied by the contractor's insurance provider and
bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to
commence construction to the City's Construction Services Division so that
City inspection personnel will be available; to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, to not install or relocate any sanitary sewer, storm drain, or
water pipe unless a responsible City inspector is present and gives his consent
to proceed, and to make such laboratory tests of materials being used as may
be required by the City.
V. To require its contractor to have fully executed contract documents submitted
to the City to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting.No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 4 of 11
G. Developer shall provide, at its expense, unless otherwise agreed to by City, all
engineering drawings and documents necessary to construct the Improvements under this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer
in the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder. City will be responsible for the costs of utility
relocation necessitated by the City's participation in this Agreement.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,fully
indemnify, hold harmless and defend the City, its officers, agents and employees from
all suits, actions or claims of any character, whether real or asserted, brought for or on
account of any injuries (including death) or damages sustained by any persons or to
any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees.
M. The Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and all
claims, suits or causes of action of any nature whatsoever, whether real or asserted,
brought for or on account of any injuries or damages to persons or property, including
death, resulting from or in any way connected with the construction of the
infrastructure contemplated herein, whether or not such injuries, death or damages
are caused, in whole or in part, by the allered neelizence of the City of Fort
Worth, its officers, servants, or employees. Further, Developer will require its
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 5 of 11
contractors to indemn& and hold harmless the City for any losses, damages, costs or
expenses suffered by the City or caused as a result of said contractor's failure to
complete the work and construct the improvements in a good and workmanlike
manner,free from defects, in conformance with the Policy, and in accordance with all
plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered
into by the Developer with its contractor along with an assignment of all warranties given
by the contractor, whether express or implied. Further, Developer agrees that all
contracts with any contractor shall include provisions granting to the City the right to
enforce such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows and further apportioned in the
Cost Summary Table below
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the Developer's
share of the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the Developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the City is not
installing the streetlights, inspection fees equal to four percent (4%) of the
Developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs necessary for
Developer's portion of the Project.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in this
Agreement shall terminate if the Improvements are not completed by
December 31, 2018, minus any delays caused by the City; provided, however,
if construction of the Improvements has started within the before December
31, 2018, the Developer may request that the CFA be extended for one (1)
additional year. If the Improvements are not completed within such extension
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 6 of 11
period, minus any delays caused by the City, there will be no further
obligation of the City to participate. City participation in this CFA shall be
subject to the annual availability of City funds as approved by the City
Council.
ii. Subject to paragraph i, above, the City shall reimburse Developer for the
City's costs upon presentation of proper documentation of completion of
installation of the Oversized Improvements.
iii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement
with its contractor or other related agreements.
iv. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if
on December 31, 2018 (and any extension period) the Improvements have not
been completed and accepted.
V. The City may utilize the Developer's financial guarantee to cause the payment
of costs for construction of the Improvements before December 31, 2018 if the
Developer breaches this Agreement, becomes insolvent or fails to pay costs of
construction and the financial guarantee is not a Completion Agreement. If the
financial guarantee is a Completion Agreement and the Developer's
contractors and/or suppliers are not paid for the costs of supplies and/or
construction, the contractors and/or suppliers may put a lien upon the property
which is the subject of the Completion Agreement.
Q. With respect to the City's Participation, upon Developer's completion of construction and
acceptance by the City of the infrastructure for which the City is participating, Developer
shall submit to the City an application for payment and invoice. The City shall make
payment to Developer in accordance with this Agreement and Chapter 2251 of the Texas
Government Code.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 7 of 11
COST SUMMARY TABLE
Developer's Cost City's Cost Total Cost
A.Water and Sewer Construction
1.Water $ 1,171,760.16 $ - $ 1,171,760.16
2.Sewer $ - $ - $
Water Construction Cost Sub-Total $ 1,171,760.16 $ - $ 1,171,760.16
B.TPW Construction
1.Paving $ 6,307,078.29 $ 130,900.00 $ 6,437,978.29
2.Storm Drain $ 7,063,290.00 $ - $ 7,063,290.00
3.Street Lights $ 395,013.00 $ $ 395,013.00
4.Traffic Signal $ - $ $ -
TPW Construction Cost Sub-Total $ 13,765,381.29 $ 130,900.00 $ 13,896,281.29
Total Construction Cost $ 14,937,141.45 $ 130,900.00 $ 15,068,041.45
Construction Fees:
C.Water/Sewer Inspection Fee(2%) $ 23,435.20 $ - $ 23,435.20
D.Water/Sewer Material Testing Fee(2%) $ 23,435.20 $ $ 23,435.20
Water Construction Fees Sub-Total $ 46,870.40 $ $ 46,870.40
E.TPW Inspection Fee $ 540,050.73 $ - $ 540,050.73
F.TPW Material Testing Fee $ 270,025.37 $ $ 270,025.37
G.Street Light Inspection Fee $ 15,800.52 $ $ 15,800.52
H.Traffic Signal Inspection Fee $ $ $ -
I.Street Signs Installation Cost $ - $ - $ -
TPW Construction Fees Subtotal $ 825,876.62 $ $ 825,876.62
Total Construction Fees $ 872,747.02 $ - $ 872,747.02
TOTAL PROJECT COST $ 15,809,888.47 $ 130,900.00 $ 15,940,788.47
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 15,068,041.45 X
Completion Agreement=100%/Holds Plat N/A
Cash Escrow Water/Sanitary Sewer=125% N/A
Cash Escrow Paving/Storm Drain=125% N/A
Letter of Credit=125%w/2yr expiration period N/A
The costs stated herein may be based upon construction estimates rather than actual costs. The City's
portion of inspection and material testing fees are directly allocated to the City's accounts for charges and
does not reimburse the Water Inspection and Material Testing Fees to the Developer. The City's
participation estimate shall be limited to the unit prices contained in City of Fort Worth Ordinance No.
19192-06-2010, as amended,("Unit Price Ordinance")or as determined by public competitive bid. The
City's cost participation(excluding inspection and material testing fees)is not a lump sum amount and
may be less than stated above depending upon actual quantities as shown on the Notice of Final
Completion package(`Green sheet')and based on unit prices from the construction contract documents. In
no event shall the City pay more per unit than as determined pursuant to the Unit Price Ordinance or public
competitive bid.
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 8 of 11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
®' Location Map
®' Exhibit A: Water Improvements
®' Water Cost Estimate
❑ Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
®' Exhibit B: Paving Improvements
® Paving Cost Estimate
®! Exhibit 13-1: Storm Drain Improvements
®' Storm Drain Cost Estimate
®' Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 9 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No.02319
Revised Subsection P to provide for a specific date (December 31, 2018).
Added Subsection Q.
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 10 of 11
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in quadruplicate, effective as of the date subscribed by the
City's designated City Manager.
CITY OF FORT WORTH DEVELOPER
Wal-Mart Real Estate st
esus J. Chapa Na
Assistant City Manager Title: VP Real Estate and Portfolio
Management(West Division)
Date:
Date:
Recommended by: -ja liq
ATTEST: (Only if required by
Developer)
�Wendy Chi-Babulal, EMBA,P.E.
etopment Engineering Manager
Water Department 4Siganare
'0, Name: <Name> M,-co`e C�\oupmCcxj
Dougla . Wiersig, P.E.
Director
Transportation&Public Works
Department
•FQ&;P-GL
Approved as to Form &Legality: ATTEST: (_a
r � 2
Richard A. McCracken Mary J. er,j
Assistant City Attorney City Secr ary
M&C No. e- yg o 2
Date: 12113114
Foawl IZci 5: 26 14 • 1 3 7$2-�
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement with City Participation CITY SECRETARY
CFA Official Release Date: 07.30.2015
Page 11 of 11 FT.WORTH,TX
Contract Compliance Manager:
By signing I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
te: t (1
ulie Westerrnan
Development Manager
00 42 43
DAP BIDPROPOSAL
1 of5
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
City Project#02319 Park Vista Blvd
UNIT PRICE Bidder's Application
PROJECT BASE BID
Project Item Information Bidder's Proposal
LBidlistm No. Description Spec Section No. Unitof Bid Quantity Unit Price Bid Value
Measure
UNIT I-WATER UHPROVEMENTS
WATER-PARK VISTA BLVD
1 0241.1021 Remove 36"Water Line 0241 14 LF 382 $ 44.24 $ 16 899.68
2 0241.1018 Remove 20"Water Line 024114 LF 341 $ 37.91 $ 12927.31
3 0241.1016 Remove 16"Water Line 0241 14 LF 251 $ 25.28 $ 6,345.28
4 3311.0874 36"Concrete AW WA C303 Water Pie Restrained Joints 33 11 13 LF 321 $ 284.36 $ 91 279.56
5 3305.2009 36"Water Carver Pie Restrained Joints 33 05 24 LF 68 $ 195.90 $ 13 321.20
6 3305.1009 54"Casing By Oen Cut 33 05 22 LF 68 $ 1,124.82 $ 76 487.76
7 3305.2006 20"Water Carrier Pie Restrained Joints 33 05 24 LF 71 $ 94.79 $ 6,730.09
8 3305.1005 30"Casing By Oen Cut 33 05 22 LF 85 $ 505.531$ 42 970.05
9 3305.1006 36"Casing By Oen Cut 33 05 22 LF 71 $ 612.93 $ 43 520.16
10 3312.5000 36"AW WA Butterfly Valve w/Vault 33 12 21 EA 1 $ 96 684.00 $ 96 684.00
11 3312.3007 20"Gate Valve w/Vault 33 12 20 EA 2 $ 48 342.00 $ 96 684.00
12 3311.0021 C303 Fittings 36-inch Main 33 It 13 LS 1 $ 150 327.00 $ 150 327.00
13 3311.0021 C303 Fittings 20-inch Main 33 11 13 LS 1 $ 91 628.00 $ 91 628.00
14 3305.0110 Utilitv Markers/Locators 33 05 26 LS 3 $ 809.00 $ 2,427.00
15 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 3 $ 2,527.85 $ 7,583.55
I6 3312.0110 Connection to Existing 36"Water Main 33 1225 EA 2 $ 12 006.00 $ 24 012.00
17 3312.0107 Connection to Existing 20"Water Main 33 1225 EA 2 $ 9,668.00 $ 19 336.00
18 3312.0106 Connection to Existing 16"Water Main 33 12 25 EA 2 $ 7,204.00 $ 14 408.00
19 3312.0117 Connection to Existing 4"-12"Water Main 33 1225 EA 2 $ 2,401.00 $ 4,802.00
20 3312.2003 1"Water Service 33 12 10 EA 2 $ 1,612.00 $ 3,224.00
21 3312.6002 6"Blow Off Valve 33 12 60 EA 1 $ 35A51.00 $ 35 451.00
22 3312.1004 4"Combination Air Valve Assembly for Water 33 12 30 EA 1 $ 7,204.00 $ 7,204.00
23 3305.0109 Trench Safety 33 05 10 LF 1 869 $ 1.26.$ 2,354.94
24 3311.0161 6"PVC Water Pie 33 11 12 LF 82 $ 69.51 $ 5,699.82
25 3311.0361 10"PVC Water Pie 3411 12 LF 553 $ 82.15 $ 45 428.95
26 3311.0561 16"PVC C905 Water Pie Restrained Joints 33 11 12 LF 181 $ 157.98 $ 28,594.38
27 3305.2005 16"Water Carrier Pie Restrained Joints 33 05 24 LF 85 $ 101.10 $ 8,593.50
28 3312.3002 6"Gate Valve 33 12 20 EA 5 $ 1,201.00 $ 6,005.00
29 3312.3106 16"Gave Valve w/Vault 33 1220 EA 1 $ 27 804.00 $ 27 804.00
30 3312.0001 Fire Hydrant Assembly 33 1240 EA 2 $ 3,792.00 $ 7,584.00
31 3312.3004 10"Gate Valve 33 12 20 EA 1 $ 2,528.00 $ 2,528.00
32 3311.0461 12"PVC WaterPipe331112 LF 208 $ 88.47 $ 18401.76
33 9999.0001 20"Concrete AW WA C303 Water Pie Restrained Joints 33 11 13 LF 205 $ 183.26 $ 37 568.30
34 9999.0002 6"Blow Off Valve eller 20" Per Detail EA 1 $ 21 486.00 $ 21,486.00
35 9999.0003 6"Blow Off Valve Southlake 36" Per Detail EA 1 $ 22 560.00 $ 22 560.00
36 9999.0004 4"Combination Air Valve Assembly Keller 20" Per Detail EA 1 $ 29 532.00 $ 29 532.00
371 9999.0005 4"Combination Air Valve Assembly Southlake 36") Per Detail EA 1 $ 30.§
0 614.00 $ 30 614.00
WATER-PARK VISTA BLVD $1,159,006.29
WATER-WAL-MART DRIVEWAY ROUNDABOUT
16 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TON 0.25 $ 2,244.02 $ 561.01
24 3305.0109 Trench 8-fety 3305 10 LF 54 $ 1.13 $ 61.02
25 3311.0161 6"PVC Water Pi a 3311 12 LFL
$ 61.72 $ 3,332.88
29 3312.3002 6"Gate Valve 33 12 20 EA 2 $ 1,066.00 $ 2,132.00
32 3312.0001 Fire Hydrant Assembly 33 12 40 EA 2 $ 3,333.00 $ 6,666.00
WATER-WAL-MART DRIVEWAY ROUNDABOUT $12,752.91
TOTAL UNIT I:WATER IWROVENIFNTS $1,171,759.20
UNIT II-ROADWAY IMPROVEIIIENTS
REMOVALS-PARK VISTA BLVD
1 0241.0100 Remove Sidewalk 0241 13 SF 1%238 $ 0.85 $ 8,702.30
2 0241.0500 Remove Fence 0241 13 LF 6,497 $ 1.00 $ 6,497.00
3 0241.1000 Remove Conc Pvmt 0241 15 SY 8,796 $ 8.75 $ 76 965.00
4 3110.0102 6"-12"Tree Removal 31 1000 EA 214 $ 125.00 $ 26 750.00
5 0241.3015 Remove 24"Storm Line 0241 14 LF 172 $ 22.44 $ 3,859.68
6 0241.3201 Remove 6'x3'Box Culvert 0241 14 LF 60 $ 56.10 $ 3,366.00
7 0241.3201 Remove 8 A3'Box Culvert 0241 14 LF 139 $ 72.94 $ 10,138.66
8 0241.1100 Remove Asphalt Pvmt 0241 15 SY 9,089 $ 6.50 $ 59 078.50
9 0241.4001 Remove 10'Curb Inlet 0241 14 EA 6 $ 1,066.0 $ 6,396.00
10 0241.4101 Remove IV Recessed Inlet 0241 14 EA 6 $ 1,066.00 $ 6,396,00
11 0241.4401 Remove Headwall/SET 0241 14 EA 3 $ 3,366.00 $ 10 098.00
12 0241.0600 Remove Wall<4' 0241 13 LF 7 $ 236.00 $ 1,652.00
13 0241.1510 Salvage Fire Hydrant 0241 14 EA 1 $ 1646.00 $ 1,646.00
14 3441.4108 Remove Sign 344130 EA 13 $ 51.00 $ 663.00
15 9999.0006 Remove En Monument Si and Rebuild 0241 13 LS 1 $ 10,911.15 $ 10 911.15
16 9999.0007 Remove Handrail 02 41 13 LF 195 $ 5.69 $ 1,109.55
171 9999.0008 1 Remove Gravel Driveway 02 41 13 SF 9,660 $ 0.301$ 2,898.00
18 9999.0009 Remove Metal Building&Foundation 02 41 13 SF 4 332 $ 5.751S 24 909.00
Pagel of 5 Pmk Vut Bl d
g CityPj.t 402319
00 42 43
DAP BID PROPOSAL
2 of5
Developer Awarded Projects-PROPOSAL FORM
City Project#02319 Park Vista Blvd
UNIT PRICE Bidder's Application
PROJECT BASE BID
Project Item Information Bidder's Proposal
Bidlist Item No. Description Spec Section No. Unit of Bid Quantity Unit Price Bid Value
Measure
19 9999.0010 1 Remove Brick Building&Foundation 0241 13 SF 6,609 $ 5.751$ 38 001.75
REMOVALS-PARK VISTA BLVD 1 $300,037.59
REMOVALS-WALdtIART DRIVEWAY ROUNDABOUT
1 0241.0100 Remove Sidewalk 0241 13 SF 6,361 $ 0.85 $ 5,406.85
2 0241.0500 Remove Fence 0241 13 LF 1,767 $ 1.00 $ 1,767.00
3 0241.1000 Remove Cone Pvmt 0241 15 SY 4,027 $ 8.75 $ 35 236.25
9 0241.4001 Remove IV Curb Inlet 0241 14 EA 4 $ 1,065.00 $ 4,260.00
13 0241.1510 Salvage Fire Hydrant 0241 14 EA 2 $ 1,230.00 $ 2,460.00
18 3441.4108 Remove Sign 34 41 30 EA 1 $ 111.00 $ 111.00
REMOVALS-WAL-MART DRIVEWAY ROUNDABOUT $49,241.10
PAVING-PARK VISTA BLVD
1 3211.0400 Hydrated Lime 32 11 29 TN 1,003 $ 171.85 $ 172 365.55
2 3211.0502 8"Lime Treatment 321129 SY 47,782 $ 2.27 $ 108 465.14
3 3213.0301 4"Cone Sidewalk 32 13 20 SF 67,170 $ 5.88 $ 394 959.60
4 3213.0401 6"Concrete Driveway 32 13 20 SF 2,081 $ 7.15 $ 14 879.15
5 3216.0102 7"Cone Curb and Gutter 321613 LF 2,378 $ 34.09 $ 81 066.02
6 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 25 $ 770.00 $ 19,250M
7 3213.0510 Barrier Free Ramp,Type C-3 32 13 20 EA 13 $ 1 085.00 $ 14 105.00
8 3213.0504 Barrier Free Ramp,Type M-2 32 13 20 EA 5 $ 916.00 $ 4,58000
9 3123.0101 Unclassified Excavation by Plan 31 23 16 CY 28,283 $ 6.55 $ 185 253.65
10 3124.0101 Embankment by Plan 31 24 00 CY 40,053 $ 1.98 $ 79 304.94
11 3123.0103 Borrow by Plan 31 23 23 CY 20,425 $ 26.29 $ 536 973.25
12 3232.0100 Cone Ret Wall with Sidewak Face 323213 SF 2,163 $ 34.65 $ 74 947.95
13 9999.0011 10.5"Cone Pvmt 32 13 13 SY 39,513 $ 57.68 $ 2 279 109.84
14 9999.0012 12"Asphalt Pay 2"Type D 10"Type B 321216 SY 6.932 $ 64.87 $ 449,678.84
15 9999.0014 Concrete Flume 32 16 13 SF 1,632 $ 12.47 $ 20 351.04
16 9999.0015 Bike Ramp 32 13 20 EA 15 $ 825.00 $ 12,375.00
17 9999.0016 10.5"Broom Integral Color Concrete Island TxDOT 528 SY 2,641 $ 144.13 $ 380 647.33
18 9999.0017 4"Stamped Integral Color Concrete Island TxDOT 528 SY 2,463 $ 83.71 $ 206177.73
19 9999.0018 Monolithic Median Nose TxDOT 420 LF 75 $ 341.48 $ 25 611.00
20 9999.0019 Asphalt Driveway 321129 SF 1,909 $ 4.77 $ 9,105.93
21 9999.0020 Gravel Drivewa 3211 29 SF 927 $ 1.44 $ 1,334.88
22 9999.0021 Pedestrian Rail(Type PRI) Txl) 450 LF 699 $ 125.13 $ 87 465.87
23 9999.0036 MSE Wall RW MSE TxDOT 423 SF 5,404 $ 100.86 $ 545 031.88
241 9999.0037 MSE Wall Mow Strip TxDOT 423 CY 12 $ 665.13 $ 7,981.56
PAVING-PARK VISTA BLVD $5,711,021.15
PAVING-WAIrMART DRIVEWAY ROUNDABOUT
1 3211.0400 Hydrated Lime 321129 TN 115 $ 178.50 $ 20,527.50
2 3211.0502 8"Lime Treatment 32 11 29 SY 5,493 $ 2.77 $ 15 215.61
3 3213.0301 4"Cone Sidewalk 32 13 20 SF 9,690 $ 6.15 $ 59 593.50
6 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 8 $ 770.00 $ 6,160.00
7 3213.0510 Barrier Free Ramp,Type C-3 32 13 20 EA 4 $ 1,085.00 $ 4,340.00
8 9999.0011 10.5"Cone Pvmt 3213 13 SY 5,155 $ 61.00 $ J14,455.00
9 9999.0015 Bike Ramp 32 13 20 EA 4 $ 825.00 $ 3,300.00
10 9999. 16 10.5"Broom Integral Color Concrete Island TxDOT 528 SY 858 $ 144.13 $ 123 663.54
11 9999.000017 4"Stamped IntegralColor Concrete Island , OT 528 1 SY 583 $ 83.71 $ 48 802.93
PAVING-WAL•MART DRIVEWAY ROUNDABOUT $596,058.08
DRAINAGE-PARK VISTA BLVD
1 3305.0109 Trench Safety 33 05 10 - LF 7,064 $ 1.12 $ 7,911.68
2 3341.0201 21"RCP Class 1I1 3341 10 LF 1,838 $ 84.16 $ 154 686.08
3 3341.0205 24"RCP Class III 3341 10 LF 1,175 $ 95.38 $ 112 071.50
4 3341.0302 30"RCP Class III 3341 10 LF 185 $ 112.21 $ 20,758.85
5 3341.0309 36"RCP Class 111 3341 10 LF 799 $ 134.65 $ 107,585.35
6 3341.0402 42"RCP Class III 3341 10 LF 954 $ 162.71 $ 155 225.34
7 3341.1102 4x3 Box Culvert 3341 10 LF 84 $ 274.92 $ 23 093.28
8 3341.1303 6x4 Box Culvert 3341 10 LF 133 $ 392.74 $ 52 234.42
9 3341.1401 7x3 Box Culvert 3341 10 LF 77 $ 420.79 $ 32 400.83
10 3341.1501 8x4 Box Culvert 3341 10 LF 64 $ 482.51 $ 30 880.64
11 3341.2001 10x4 Box Culvert 3341 10 LF 193 $ 617.17 $ 119113.81
12 3341.2002 10x5 Box Culvert 3341 10 LF 444 $ 673.27 $ 298 931.88
13 3341.2201 12x4 Box Culvert 3341 10 LF 2 216 $ 815.37 $ 1,806,859.92
14 3341.2202 12x5 Box Culvert 3341 10 LF 468 $ 875.26 $ 4K621.68
15 3349.6001 10'Recessed Inlet 33 49 20 EA 35 $ 4,488.00 $ 157 080.00
16 3349.6002 15'Recessed Inlet 33 49 20 EA 8 $ 6,172.00 $ 49 376.00
17 3349.7001 4'Drop Inlet 33 49 20 EA 2 $ 5,611.00 $ 11 222.00
18 3349.7003 6'Drop Inlet 33 49 20 EA 2 $ 3,928.00 $ 7,856.00
19 3123.0101 Unclassified Excavation by Plan 3123 16 CY 11,770 $ 1.26 $ 14 830.20
20 3349.0001 4'Storm Junction Box 33 49 10 EA 3 $ 5,049.00 $ 15 147.00
21 3349.0002 5'Storm Junction Box33 49 10 EA 4 $ 7 855.00 $ 31 420.00
22 3349.0006 Storm Junction Structure
9'x6' 334910 10 LS I $ 11 221.00 $ 11 221.00
23 3349.0006 Storm Junction Structure 14'x6' 33 49 10 LS 16 832.00
Page 2 of 5 Ped Visa BI
City Pm*t 002319
00 42 43
DAP BID PROPOSAL
3 of 5
Developer Awarded Projects-PROPOSAL FORM
City Project#02319 Park Vista Blvd
UNIT PRICE Bidder's Application
PROJECT BASE BID
Project Item Information Bidders Proposal
Bidlist Item No. Description Spec Section No. Unit of Bid Quantity Unit Price Bid Value
Measure
24 3349.0006 Storm Junction Structure 30'x20' 334910 LS 1 $ 84 178.00 $ 94J78.00
25 3137.0104 Medium Stone Riprap,dry 31 37 00 SY 4 875 $ 44.75 $ 218 156.25
26 3349.1000 Headwall Box Culvert 2-12x5 PW-1 Hw=7 33 49 40 EA 1 $ 40 418.00 $ 40 418.00
27 3349.1000 Headwall,Box Culvert 10x5 SETB-PD Hw-6 33 49 40 EA 1 $ 12 763.00 $ 12 763.00
28 3349.1000 Headwall Box Culvert 4-10x5 PW-1 Hw=11 33 49 40 EA 2 $ 46 568.00 $ 93,136.00
29 3349.1003 24"Flared Headwall 1 pipe FW-S-45 H�r-3 33 49 40 EA 1 $ 3.927.00 $ 3,927.00
30 3349.1009 42"Flared Headwall 1 pipe CH-FW-30 Hw=-4.5 33 49 40 EA 1 $ 7,852.00 $ 7,852.00
31 3349.0102 4'Manhole Riser 33 49 10 EA 2 $ 3,928.00 $ 7,856.00
321 9999.0022 121"RCP Plup 3341 10 EA 2 $ 732.00 $ 1,464.00
DRAINAGE-PARK VISTA BLVD $4,116,109.71
DRAINAGE-WAL-MART DRIVEWAY ROUNDABOUT
I 3305.0109 Trench Safety 330.5 10 LF 240 $ 1.12 $ 268.80
3 3341.0205 24"RCP Class M 3341 10 LF 219 $ 89.77 $ 19 659.63
5 3341.0309 36"RCP Class IH B41 10 LF 21 $ 134.63 $ 2,827.23
15 3349.6001 10'Recessed Inlet 33 49 20 EA 4 $ 5,050.00 $ 20 200.00
17 3349.8003 20'Type 2 Inlet 33 49 20 EA 1 $ 16 621.00 $ 16 621.00
DRAINAGE-WAL•MART DRIVEWAY ROUNDABOUT $59,576.66
SIGNING AND PAVEMENT MARKINGS-PARK VISTA BLVD
1 3217.0001 4"SLD Pvmt Markin HAS 32 17 23 LF 10,443 $ 1.22 $ 12 740.46
2 3217.0002 4"SLD Pvmt Markin HAS Y 32 1723 LF 12,586 $ 1.22 $ 15,354.92
3 3217.0003 4"BRK Pvmt Markin HAS 32 17 23 LF 880 $ 1.66 $ 1,460.80
4 3217.0005 4"DOT Pvmt Markin HAS 32 1723 LF 1,155 $ 2.22 $ 2,56410
5 3217.0201 8"SLD Pvmt Markin HAS 32 17 23 LF 3,164 $ 1.94 $ 6,138.16
6 3217.0202 8"SLD Pvmt Markin HAS Y 32 17 23 LF 952 $ 1.94 $ 1,846.88
7 3217.0501 24"SLD Pvmt Markin HAE ) 32 1723 LF 1,703 $ 8.59 $ 14 628.77
8 3217.1002 Lane Legend Arrow 32 17 23 EA 41 $ 205.00 $ 8,405.00
9 3217.1004 Lane Legend Only 32 17 23 EA 2 $ 277.00 $ 554.00
10 3217.1006 Lane Legend Bike 32 17 23 EA 23 $ 249.00 $ 5327.00
11 3217.2102 REFL Raised Marker TY I-C 32 17 23 EA 16 $ 6.00 $ 96.00
12 3217.2103 REFL Raised Marker TY II-A-A 32 17 23 EA 18 $ 6.33 $ 114.00
13 3217.2104 REFL Raised Marker TY II-C-R 32 17 23 EA 121 $ 6.00 $ 726.00
14 3441.4002 Fumisb/Install Alum Sign Ground Mount TxDOT Std. 34 41 30 EA III $ 722.00 $ 80142.00
15 9999.0023 4"BIKE Pvmt Markings HAS W 32 17 23 LF 1 198 $ 2.22 $ 2,659.56
16 9999.0024 12"DOT Pvmt Markin HAE W 32 17 23 LF 410 $ 4.43 $ 1,81630
17 9999.0025 Lane Le end Yield 321723 EA 22 $ 261.00 $ 5 742.00
18 9999.0026 Lane Le end Trian le 18" 32 17 23 EA 195 $ 47.00 $ 9,165.00
SIGNING AND PAVEMENT MARKINGS-PARK VISTA BLVD $169,880.95
SIGNING AND PAVEMENT MARKINGS-WAIrMART DRIVEWAY ROUNDABOUT
1 3217.0001 4"SLD Pvmt Markin HAS 32 17 23 LF 974 $ 2.22 $ 2,16228
2 3217.0002 4"SLD Pvmt Markin HAS Y 32 17 23 LF 60 $ 2.22 $ 133.20
3 3217.0003 4"BRK Pvmt Markin HAS W 32 17 23 LF 240 $ 2.22 $ 532.80
4 3217.0005 4"DOT Pvmt Markin HAS 32 17 23 LF 101 $ 2.22 $ 224.22
5 3217.0201 8"SLD Pvmt Markin HAS W 32 17 23 LF 834 $ 2.99 $ 2,493.66
7 3217.0301 12"SLD Pvmt Markin HAE 32 17 23 LF 125 $ 4.43 $ 553.75
8 3217.0501 24"SLD Pvmt Markin HAE W 321723 LF 450 $ 8.59 $ 3,865.50
9 3217.1002 Lane Legend Arrow 32 17 23 EA 10 $ 205.00 $ 2,050.00
11 3217.1006 Lane Legend Bike 321723 EA 3 $ 249.00 $ 747.00
12 3217.2102 REFL Raised Marker TY I-C 321723 EA 1 $ 6.00 $ 6.00
14 3217.2104 REFL Raised Marker TY H-C-R 32 17 23 EA 23 $ 6.00 $ 138.00
15 3441.4002 Furnish/Install Alum Si Ground Mount TxDOT Std. 34 41 30 EA 27 $ 821.00 $ 22 167.00
16 9999.0023 4"BIKE Pvmt Markings HAS 321723 LF 92 $ 2.22 $ 204.24
17 9999.0024 12"DOT Pvmt Markin HAE 321723 LF 86 $ 4.43 $ 380.98
18 9999.0025 Lane Le end Yield 32 17 23 EA 6 $ 261.00 $ 1,566.00
19 9999.0026 Lane Le end Triangle 18" 32 17 23 EA S8 $ 47.00 $ 2,726.00
SIGNING AND PAVEMENT MARKINGS-WAL-MART DRIVEWAY ROUNDABOUT $39,950.63
STREET LIGHTING-PARK VISTA BLVD
1 2605.0112 Install Elec Sery Pedestal 26 05 00 EA 1 $ 10 799.92 $ 10 799.92
2 2605.3015 2"CONDT PVC SCH 80 T 26 05 33 LF 7,470 $ 6.65 $ 49 675.50
3 2605.3014 2"CONDT RM Riser 26 05 33 LF 40 $ 19.13 $ 765.20
4 2605.3025 3"CONDT PVC SCH 80 T 26 05 33 LF 1,000 $ 8.87 $ 8,870,00
5 3441.1407 NO 4 Insulated Elec Condr 3441 10 LF 120 $ 2.11 $ 253.20
6 3441.1502 Ground Box Type B w/A ron 3441 10 EA 35 $ 721.00 $ 25 235.00
7 3441.3003 Rdwv Illum Assmbl TY D-40-9 Single 34 41 20 EA 16 $ 2,716.00 $ 43 456.00
8 3441.3003 Rdwy Blum Assmbly TY 18,18"9and D40 9-T I Luminare 34 41 20 EA 5 $ 3,287.00 $ 16 435.00
9 3441.3003 Rdwy Illum Assmbly TY 18,18A,19 and D-40 9-T 2 Luminares 34 41 20 EA 27 $ 3,797.00 $ 102 519.00
10 3441.3302 Rdwy Ilium Foundation TY 3 5 6 and 8 34 41 20 EA 48 $ 1164.00 $ 55 872.00
11 3441.3201 LED Lighting Fixture 3441 20 EA 9 $ 771.00 $ 6,939.00
12 3441.3323 Furnish/Install 8'Wood Light Pole Arm 34 41 20 EA 2 $ 820.00 $ 1,640.00
13 3441.3404 2-2-2-4 Quadplex Alum Elec Conductor 34 41 20 LF 7,890 $ 3.27 $ 25 800.30
14 3441.3411 lReconnect Conductor 344120 EA 4 $ 166.00 $ 664.00
Page 3 of 5 P"h Vi Bl
City Pmje #02319
00 42 43
DAP BID PROPOSAL
4 of 5
Developer Awarded Projects-PROPOSAL FORM
City Project#02319 Park Vista Blvd
UNIT PRICE Bidder's Application
PROJECT BASE BID
Project Item Information Bidder's Proposal
Bidlist Item No. Description Spec Section No. Unitof Bid Quantity Unit Price Bid Value
Measure
STREET LIGHTING-PARK VISTA BLVD $348,924.12
STREET LIGHTING-WAL-MART DRIVEWAY ROUNDABOUT
2 2605.3015 2"CONDT PVC SCH 80 T 26 05 33 LF 1,010 $ 7.00 $ 7,070.00
6 3441.1502 Ground Box Type B w/A ron 3441 10 EA 9 $ 721.00 $ 6,489.00
7 3441.3003 Rd%w Blum Assmbl TY D-40-9 SinpJe 34 41 20 EA 4 $ 2,716.00 $ 10 864.00
9 3441.3003 Rdwy lllum Assmbly TY IS 18A 19 and D-40 9-T 2 Luminares 3441 20 EA 2 $ 3,797.00 $ 7,594.00
10 3441.3302 Rdwy Ilium Foundation TY 3 5,6 and 8 34 41 20 EA 6 $ 1,164.00 $ 6,984.00
11 3441.3201 LED Lighting Fixture 34 41 20 EA 4 $ 770.55 $ 3,082.20
13 3441.3404 2-2-2-4 Quadplex Alum Elec Conductor 34 41 20 LF 1,225 $ 3.27 $ 4,005.75
STREET LIGHTING-WAL-MART DRIVEWAY ROUNDABOUT $46,088.95
TRAFFIC CONTROL-PARK VISTA BLVD
1 3471.0001 Traffic Control(Including temp as Baltpavement) 34 71 13 1 MO 1 12 $ 15 255.26 $ 183 063.12
TRAFFIC CONTROL-PARK VISTA BLVD 1 $183,063.12
EROSION CONTROL-PARK VISTA BLVD
1 3125.0101 SW3P>I Acre 31 2500 1 LS I I $ 207 864.96 1 $ 207 864.96
EROSION CONTROL-PARK VISTA BLVD $207,864.96
LANDSCAPING AND IRRIGATION-PARK VISTA BLVD
1 3291.0100 Topsoil 3291 19 CY 8,806 $ 16.39 $ 144 330.34
2 3292.0400 Seeding,H dromulch 329213 SY 54,313 $ 0.90 $ 48 881.70
3 9999.0027 Steel Ede Spec in Plans LF 273 $ 4.09 $ 1,116.57
4 9999.0028 8"Mow Strip Sec in Plans LF 978 $ 20.37 $ 19 921.86
5 9999.0029 Plant 5 Gallon Shrub 32 93 43 EA 78 $ 30.00 $ 2,340.00
6 9999.0030 Plant 1 Gallon Shrub 32 93 43 EA 1,345 $ 25.00 $ 33 625.00
7 9999.0031 Aggregate/Natural Stone S ec in Plans CY 50 $ 1,318.95 $ 65 947.50
8 9999.0032 A e ate/Decom used Granite S ec in Plans CY 9 $ 1,203.62 $ 1 1073.30
9 9999.0033 Irrigation System at Keller Hicks Sec in Plans LS 1 $ 21,366.00 $ 21 366.00
101 9999.0034 Irrigation System at Park Vista and Golden Triangle Sec in Plans LS 1 $ 15 087.05 $ IS 087.05
111 9999.0035 Hardwood Mulch Sec in Plans CY 69 $ 437.28 $ 30172.32
LANDSCAPING AND IRRIGATION-PARK VISTA BLVD $393,861.64
LANDSCAPING AND IRRIGATION-WAL-MART DRIVEWAY ROUNDABOUT
1 3291.0100 Topsoil 3291 19 CY 493 $ 16.39 $ 8080.27
2 3292.0400 Seeding,H dromulch 32 92 13 SY 1482 $ 0.90 $ 1 333.80
3 9999.0027 Steel Ede Sec in Plans LF 162 $ 4.09 $ 662.58
5 9999.0029 Plant 5 Gallon Shrub 32 93 43 EA 57 $ 30.00 $ 1,710.00
6 9999.0030 Plant 1 Gallon Shrub 32 93 43 EA 512 $ 25.00 $ 12 800.00
7 9999.0031 Aggrepate/Natural Stone Sec in Plans CY 17 $ 1,318.95 $ 21 894.57
10 9999.0034 Irri ation System at Wal Mart Driveway Sec in Plans LS I $ 7,788.00 $ 7,788.00
LANDSCAPING AND IRRIGATION-WAL-MART DRIVEWAY ROUNDABOUT $54,269.22
BRIDGE-PARK VISTA BLVD
1 4006005 CEM STABIL.BKFL TxDOT 400 CY 266 $ 139.03 $ 36 981.98
2 4166601 DRILL SHAFT 18 INTxDOT 416 LF 90 $ 123.47 $ 11,112.30
3 4166004 DRILL SHAFT 36 INTxDOT 416 LF 742 $ 311.63 $ 231 29.46
4 4206014 CL C CONC ABUT HPC TxDOT 420 CY 83 $ 944.04 $ 78 355.32
5 4206026 CL C CONC BENT HPC TxDOT 420 CY 87 $ 1,161.89 $ 101 084.43
6 4206002 REINF CONC SLAB HPC TxDOT 422 SF 14,800 $ 20.42 $ 302 216.00
7 4226014 BRIDGE SIDEWALK HPC TxDOT 422 SF 4,320 $ 8.85 $ 38 232.00
8
4226016 APPROACH SLAB HPC TxDOT 422 CY 142 $ 427.81 $ 60 749.02
9 425 6035 PRESTR CONC GIRDER TX28 TxDOT 425 LF 356 $ 222.69 $ 79 277.64
10 4256066 PRESTR CONC GIRDER(TX40) TxDOT 425 LF 1,590 $ 256.50 $ 407 835.00
11 4426007 STR STEEL MISC NON-BRIDGE TxDOT 442 LB 630 $ 18.66 $ 11 755.80
12 4506033 RAIL TY C223 HPC TxDOT 450 LF 460 $ 165.53 $ 76 143.80
13 4546001 SEALED EXP JOINT 4 INSEJ-A DMOT454 LF 174 $ 132.75 $ 23 098.50
14 5126005 PORT CTB FURN&INST F-SHAPE TY 1 TxDOT 512 LF 330 $ 95.04 $ 31,363.20
BRIDGE-PARK VISTA BLVD $ 1,489 434.45
TOTAL UNIT H:ROADWAY IMPROVEMENTS-PARK VISTA BLVD $ 12 920197.69
TOTAL UNIT II:ROADWAY IMPROVEMENTS-WAL•MART DRIVEWAY ROUNDABOUT $ 845184.64
TOTAL UNIT II:ROADWAY IMPROVEMENTS $ 13 765 82.33
SUMMARY
TOTAL UNIT I:WATER IMPROVEMENTS $ 1,171 759
TOTAL UNIT II:ROADWAY IMPROVEMENTS $ 13,765,382
PROJECT BASE TOTAL $ 14,937,142
Page 4 of 5 Puh Via n Bhd
S Cit1 Pmj_1112319
00 42 43
DAP BID PROPOSAL
5 of5
Developer Awarded Projects-PROPOSAL FORM
City Project#02319 Park Vista Blvd
UNIT PRICE Bidder's Application
PROJECT BASE BID
Project Item Information Bidder's Proposal
Bidlist Item No. Description' Spec Section No. Unit f Bid Quantity Unit Price Bid Value
Measure
ore
PROJECT SUMMARY
PROJECT GRAND TOTAL $ 14,937,142
Page 5 of 5 Perk W—and
a
B Cep.P,6-902319
8
Eg
z W <
11l
ww =
U < � a
� J >
U
W
J
J
W
1
A'
NNC\2
W W
P' z X
�C I W ui~
J � U
I-
Z � Wo
W � QP ' 3:
r�
JL �
~ Z o
W E~
Li
LQ
� Z
Z
cr
C,
.uj of
c[� LLJ
� _
� I (Z)Ict�
M. 0 J o0
Z = W
? kz
Q cn � U w
O
�s 2 �� � P � O cn
k O � w k � Lj-j W LLJ Q CY)
p •� �
Lai C) ZZ woo
I j o f
w (i
Q � V > C O wtw--i
p I wQ¢
�uW I OWE v=i0C)
� � � m � �
MATCH LINE - SHEET 1
4
1-1" WATER METER GRAPHIC SCALE
0 50 100
1 I I
235 LF 10"
WATER LINE
1-1" WATER METER
1-10"X6" ANCHOR TEE
1-10" PLUG
1-STD FIRE HYDRANT
0
J
00
Q
i—
LEGEND -
VALVE ►�
FIRE HYDRANT * Q
AIR RELEASE VALVE
BLOW—OFF VALVE A—
MATCH LINE - SHEET 3
EXHIBIT 'A' - WATER „�DUNAWA
SHEET: 2 OF 9 WALMART SUPERCENTER #2834 Y
DATE: 11-09-16 BclOYA"e -sLft4m.Fwftfft TK 741m
SCALE: 1:100-XREF (836" X 11") FORT WORTH, TEXAS T�L81_M5.ioi21n1-mai'�"3'
MATCH LINE - SHEET 2
4
GRAPHIC SCALE
0 50 100
O
v
O
Q'
Q'
Q
LEGEND
VALVE ►�
FIRE HYDRANT
AIR RELEASE VALVE
BLOW-OFF VALVE A-
AIZATCH LINE - SHEET 4
EXHIBIT 'A' - WATER ,�DUNAWA
SHEET: 3 OF 9 WALMART SUPERCENTER #2834 1
DATE: 11-09-16 s Bc&eyAv« .Suft4W-rmftditT 76107
SCALE: 1:100—XREF (836" X 11") FORT WORTH, TEXAS W81731.i�21�T��'-'W"3'
3
H
G
Ed
� NQ
W � o O
J � �
O V J
N O
w v �
J CrJ
O co
O �
E" W
8zx
PPRP I U ~
W
� �D �
Q pq U' o
a �
� x �
N
x
>
J W
O Q W O J
t�
Q- •• No � w >I a •-
l
xr
ui j
0 1O
� O 0 (
LLI
W WJLd
Ox �
W J
(Yi J L.� Q �] W Q Q
�
�V)
Q > LLJ
W ,� W >
J Z z zw >
W Q V)
Z � JW W o 0 111
:t LLJ z w W
Lw W Q
-j > ¢ m
z °� p � u Z
W
~ J Q
n
J I M
o N
c�
I
CJ
W �
W
W
zX
I U ~
m
E-
o
H
X
cc z
o 017000J Z 01
io LLI
=ov
aTr gs ' ATAEr7 H SVW V) U)
111 �
Q
z
J CJ
W �
NJo �
N O
C+'J
w w
zX
ansa Vi IA Nddd
� w
Co
X
W
>
i W
0 1— > Q cp ui
0
Q �QO
- J O p 0
V o Z = W
> cD
wfW-Gj
x J > Q m WQQ
C7 o NON
MATCH LINE - SHEET 6
4
GRAPHIC SCALE
0 50 100
1 1 �
LEGEND
VALVE ►�
FIRE HYDRANT J
AIR RELEASE VALVE Q
H
BLOW—OFF VALVE �— N
Q
o_
MATCFT LINE SHEET 8
EXHIBIT 'A' - WATER „�DUNAWA
SHEET: 7 OF 9 WALMART SUPERCENTER #2834 Y
DATE: 11-09-16 s emtey nve`x,e.9ile am.Fod Vftft TeX=76107
SCALE: 1:100—XREF (8%” X 11") FORT WORTH, TEXAS Tet817135.111121-FMC817335-7437
MATCH LINE - SHEET 7
GRAPHIC SCALE
0 50 100
0
>
m
Q
U)
Of
Q
LEGEND CL
VALVE ►�
FIRE HYDRANT
AIR RELEASE VALVE
BLOW-OFF VALVE AIL -
MATCH LINE - SHEET 9
EXHIBIT 'A' - WATER �'y PMWA
SHEET: 8 OF 9 WALMART SUPERCENTER #2834 Vv y
DATE: 11-09-16 ssneoieya�•team.ratwolm.T�76107
SCALE: 1:100-XREF (8%" X 11") FORT WORTH, TEXAS Tt8]7.�&1121-.F=8117845.7437
�s
> > g
z w > �
s
Of
W o rrl
zw = w
�- w > 3
waLe
LJ
U
W � Q -j-j W
W10)
� U »
0%
Z �j Q s( !— �.I %
w
cc
p �j � CQ� a � zz
� -j :5:x
z If, UU a
3.
X
I � ~
1+1 F-
E
3
d� AiIHM AVd E LL-
C14 N >-
cc
N�U. Ch C7 Q) C7 C9
Q Q Q Q Q
U U U U U
Q �s x
00
CD
N N �yj N U N M S o f
Q CD 0
a w¢¢
�D ( ccn
8
o
- -
0
Via; i I 111 �
z \� o
I
z z \\ \ E- co
co
W
��� o w 0:)
II cn (j)
Co
rr (7' �t v
i
Z Ri _
0
W
v = o o v o
mi
cr_ Cl- 4�
w �
Li
J Z o�
! w W W W 10
LLJ� J I 01 0
cn 199 UQ
(n (n I w iii
Ln
Y Lj w t
o Io ( U) V)0
MATCH LINE - SHEET 1
I
I
I II
GRAPHIC SCALE
0 50 100
I I —
I ^,
R760.50'
I �
I � I
I i
I I \
I
I � I
I ( I
I � I
I
CONC. SIDEWALK
I
I
I
I
I
CONC. SIDEW4 K
I
I I
CONC. PA YEMEN 7� 79'
I I
16' I
I 7 {
I I
I o
J
I I m
I i I
I � I
I _ I
I
I � I
I I Q I
I I CL
I
MATCH LINE - SHEET 3
EXHIBIT 'B' - PAVING IMPROVEMENTS �DUNAWA
SHEET: 2 OF 9 WALMART SUPERCENTER #2834 Y
DATE: 11-09-161 �OB7e''^"�—We 4W-f dYi- ,Tw-76107
SCALE: 1:100_XREF (8,z" X 11") FORT WORTH, TEXAS T t81733&1112 �m7-IW437
MATCH LINE - SHEET 2
I
I , I
5'
5I
GRAPHIC SCALE
0 50 100
I I
RIOI.5' I
CONC. SIDEWALK
I I
i
- - - - - - - - - - - - - -
CONC. SIDETWAL.K
A V A
i Q
CONC. PAVEMENT , \
R1010.5'
CONC. SIDEWALK
I
CONC. SIDEWALK
I
i
I
MATCH LINE - SHEET 4 _
EXHIBIT 'B' - PAVING IMPROVEMENTS �DUNAWA
SHEET: 3 of 9 WALMART SUPERCENTER #2834 Y
DATE: 11-09-16 —SammyA--sfte+m.roawdm TW-76107
SCALE: 1:100 XREF (8116" X 11") FORT WORTH, TEXAS T.L-817J35-1121-F.CSUMS7437
0 '
1po
TAX
a j
Y > o \
CC
Z W
Q D ) O
O
,9 Lij
U _ �n U Cn d'
Z: �, �� � z Wz �
00 0Ww �
v
� w
~�
t�
LLJ
r
W tra E-+ �o
a
J
WW c�
W Z w D
D Q W W a Z
cn
cv cv
0 0 Ln ^� X
0 0
co
Li
N : Li
AXI
N< X00
v� Ln 0 I 0
o
P I -Lij Lil
W Q Q
oj =n u
cn V)
8
w �
a �
!/ fill
v
ltl �
0
J U
Q
Z
� Q
Wcl-
cs
co
6
x w
0
ZX
� d
0
�[ U _
J 0 Q r r \
/ r �
00
IAJ
O)X�
000co0
� 4\!�_ w w
wQQ
S0 U
HOWL T�'M `/)
jo
a�
O
n 5\ z \
\a � Cl-
Z Z
1� n
rA o
vl ci'
C �o
E �
X
0
0 I X)
� I m
o1oo
x
w<<
C7 o cn cn
P
LLJ
coLQ
W o /
E4 x
Lo
r
28'
0
W
/ x
XI
o �oo
Wt— J
=Ou
/ / cn
MATCH LINE - SHEET 7
- - - - - - - - - - - - - -
- - - - - - - - - - - - - - - I - - -
I I
GRAPHIC S ALE
0 50 100
— — — — I I I
T
ASPHALT
T CONC. PA t/EMEN T
- —I
Q) \ �\ CONC. SIDEWALK _ — —
T
CL
�T
I
T\T I
1 :
I � I
I \ �
MATCH LINE - SHEET 9
EXHIBIT 'B' - PAVING IMPROVEMENTS - DUNAWA
SHEET: 8 of 9 WALMART SUPERCENTER #2834
DATE: 11-09-16 sso em';.yn—•sae am•ronwdflhrm-76lo7
SCALE: 1:100 XREF (81%" X 11") FORT WORTH, TEXAS TeL 81739.'11YFac 173357437
a
o
fill
Ca.7 o Q
co
U
CU O CU CU
U Q U U
O_ W W\' Z Co
00
CQ
aW
E- cn
W ( ►— —► i i i i z x
LLJ
Ln
E—+
T
Z: z Q3 \ Q v
LQ LQ
--j -j
O ? ? W �— O W x
W W 0000
(n Cf) I N4- rn7Xl
- - 010
_ w�--�
- - WQQ
co
_ 3
U 0 I � mff
r
i U �
S
W
- J J
i
LULQ Z Z
O O n,
Q) UIL
v � z �
oi� ck�
I U) �
C-1
P C W W
L N o N! J � U ~
0
E-
E-4 E
r-i
LLJ
W �
f � W
i
l� IIL
? Cl-
/ N
C N
N J �
o x
LLl U V O
Z - Lli 00
_
O `L
N L
Ld
LLJ �
W I L ��x
0
Lq
oho
w
WQQ
NON
MATCH LINE - SHEET 1
24" RCP
10' RECESSED INLET
GRAPHIC SCALE
21" RCP 0 50 100
15' RECESSED INLET
21" RCP
30" RCP
5' JUNCTION BOX
21" RCP
10' RECESSED INLET
24" RCP 10' RECESSED INLET
36" RCP 21" RCP
I
5' JUNCTION BOX
42" RCP
0
J
10' RECESSED INLET 00
21" RCP 10' RECESSED INLET
> 21" RCP
21" RCP o
10' RECESSED INLET 10RECESSED INLET
42" RCP 21" RCP
MATCH LINE - SHEET 3
EXHIBIT 'B1' — STORM DRAIN v�y �NA
SHEET: 2 OF 9 WALMART SUPERCENTER #2834 DI WAy
DATE: 11-09-16 FORT WORTH, TEXAS -Bd----V M .St.4W-F tW°'"''�76Tm
SCALE: 1:100-XREF (8%" X 11") Td-8178iS�2�RKSIM7437
MATCH LINE - S.F3NT 2
i
5' JUNCTION BOX
GRAPHIC SCALE
o ioo
1 so
42" RCP
I
4-10'X4' MBC
i
0
v j
I 24" HEADWALL
I �
24" RCP 7
21" RCP 24" RCP
I Q
2
10' RECESSED INLET 21" RCP
24" RCP 10' RECESSED INLET
4' JUNCTION BOX
21" RCP j
21" RCP
10' RECESSED INLET
10' RECESSED INLET
i
I
i
I
MATCH LINE - SHEET 4
EXHIBIT 'B1' — STORM DRAIN v DUNAWA�/
SHEET: 3 OF 9 WALMART SUPERCENTER #2834 1
DATE: 11-09-16 —B."A—•aae+m.Z wotth,Too.76107
SCALE: 1:100—XREF (8%" X 11") FORT WORTH, TEXAS Tet817.3i47zi�.F=III 957477
l— Qn _
LAU
LLJ
IR
N
d - \
I L\
m
V V \ \
1 \ ap
Lv ` H N
cn
1 � ~ moo
W a
— -- - — — Cl- ! CL Qi
J J �
O
V-
Q) O x
Q: co
U-
0)
-
rn I XI
000
0
U-
LO
6i CJ
W I-J
U p =00
U �
' L)
` x
� W
o J sgg
1 v
N( ff
Z m @
W ( 0 � co
LLJ \ z c\2
E x
Ld
f O
E W
CIZJ E-4
W P4
k \ /
I E '
00\ L,
P ✓ - b �w
LO
E . ui<
Z"
/���/ ry =0v
P �i"H LZi�L.L7 H Z YM (n N
LJJ m
ew
J Jar j V
lV
LO o N d'
k
z co
E-+
—V
� Zx
_ -
E-
G
W
GA -18 ViSIA 1ldbd
W 0
o
W LJ
Z m ~ E-"Q) CUL
o
W
Q: CCN
pJ O O p N
N N N <1
x
X
e
I.i
rn 1 x
- 0 I
O i
- x F. Lij
a w¢a
0 MOO
MATCH LINE - SHEET 6
42" RC
GRAPHIC SCALE
0 50 100
I i I
42" HEADWALL
PROPOSED BRIDGE
0
m
a
2-12'X5' HEADWALL
a MSE RETAINING WALL
a-
2-12'X5'-RCB
21" RCP21" RCP
INLET�_ - 10' RECESSED
4' DROP
INLET
7X3 RCB MANHOLE RISERS
21" RCP 21" RCP
4' DROP INLET 10' RECESSED
INLET
2-12"X4' RCB
MATCH LINE - SHEET 8 _
1
EXHIBIT 'Bl' - STORM DRAIN �DUNAWA
SHEET: of 9 WALMART SUPERCENTER #2834
DATE: 1 1-09-16 aso e�y nv�.suae goo•fortwartR rax�lslol
SCALE: 1:100 XREF (81X" X 11") FORT WORTH, TEXAS Teit817MLI121-F=817-335.7437
MATCH LINE - SHEET T
�-21" RCP
I
21" RCP PLUG i I 15' RECESSEDI
I INLET
21" RCP GRAPHIC SCALE
I 0 50 100
2-12"X4' RC
� � I
I
0
~ i
_ I
>
� I
� I
L21" RCP
i I
4' DROP INLET 15' RECESSED
INLET
21" RCP
I
11111 H!,
i I I
I I
I I
I
I
I '
r
MATCH LINE - SHEET 9
EXHIBIT 'B1' - STORM DRAIN ODUNAWA
SHEET: 8 OF 9 WALMART SUPERCENTER #2834 1
DATE: 11-09-16 .was am.rodwatn,Ta=76107
SCALE: 1:100—XREF (8%" X 11") FORT WORTH, TEXAS Tet 817.34iroltt22 373.357437
s
U
to
111 �
m z
J
cl�
1 W o — — — -- co
Z CQ
co
40 c- W o I cl�ON L'i _ A G4
oZ o ? co 0 0 GHQ
N N , ►. � oz <
Lli
Ey W F-
i
I a 0
cr
0
W �
802 ,-kX,8 —�
X08 ONOP ,9X,�L z N
X08 ION011 ,9X,6 0
c
/ w
W o
2 i
I
o� 0,:: cr-
00
LLI
rn 0)
X00
I
01
I ~w6.i
' wQ¢
N0N
i
0
2
L) 0
o C) z
CD
z
F-
J: 0
CDtll
Of z Lli
LLI -i
Wm
0 D
U U) Jo
U)
LLJ
z C\l
F-4 U)
Z <
x
C.) LLI
PF-
4
E" E-
00
Lli
Lli
x
0 0
o
ui
�L:
LLI F--j
Lli<<
M 0 0
Ul En
MATCH LINE - ,SHEET Y
GRAPHIC SCALE
0 50 100
0
J
m
Q
H
LEGEND Y
a
SINGLE LIGHTING H
DOUBLE LIGHTING
ih
MATCH LINE - SHEET S
EXHIBIT 'C' - STREET LIGHTING �DI�NAWA
SHEET: 2 OF 9 WALMART SUPERCENTER #2834 y
DATE: 11-09-16 FORT WORTH, TEXASOSagey^"�'S'e40D'FOF"b"y7�7cio7
SCALE: 1:100-XREF (8%" X 11") r�ava �z���7-3+v.07
MATCH LINE - SHEET 2
4
GRAPHIC SCALE
0 50 100
O
v
m
Q'
co
Q'
Q
LEGEND
SINGLE LIGHTING �+
DOUBLE LIGHTING
MATCH LINE - SHEET 4
EXHIBIT V — STREET LIGHTING „t��NAWA
SHEET: 3 OF 9 WALMART SUPERCENTER #2834 Y
DATE: 11-09-16 —ewer Ave •S ft am.Fo W.#LTm 76107
SCALE: 1:100—XREF (816" X 11") FORT WORTH, TEXAS T t817335.�2���733S7437
*D
L9
o
CO
N
E-
E- Z
x
w
P4
E-
o
0
F-4
00
CD L�
CD z
z F-
F- x
CD I
C)
u z Ld
Qxy
Lo-
LLJ
CD 0 m
:D
ui ZO I�j Gj
-i U) 0 �--i
Lo<<
=in C)
V) V)
0
0 3 ��_
z
Z
F-
F-
M 0
C) 111
LLJ m
LLJ z 0
U) 0
O
F- >
Z
W
z C\2 CC)
o
E-4
O P4
E- E--4 v)
x
z
HPC
F-
E-
pq 94
":4
pq
(D
of I X
0) 1
0L'oo
10
LLJ
LLJ
Mac)
P ALIMHO ZW7 HOAL VM ) )
Z Z
F- M
CD
Q J J
111
LLJ W m
O m
W Z O
�N
W Y
r th
00
Z
cli
' E-
W E X
—� � w w W
---a -1e dlsin NaedCY
`� =
i 0
o
w H
E a'
x �
� a
w �
x
co
ui
o �W
0 ' x�
000
o i�
xLO
a waQ
0 0-1 Moo
AMTOH LINE - SHEET 6
GRAPHIC SCALE
0 50 100
i
7
f
t
J
m
a
a '
LEGEND
SINGLE LIGHTING H
DOUBLE LIGHTING
IM
MATCH LINE - SITEET 8
1
EXHIBIT V - STREET LIGHTING „��NAWAY
SHEET: OF 9 WALMART SUPERCENTER #2834 1
DATE: 11-09-16 FORT WORTH, TEXAS —�'^"�'"1B'S"''a4°°'Ft"e`"''r�761o7
SCALE: 1:100—XREF (8%" X 11") TeL 817-135.1121- 8J713SI437
MATCH LINE - SHEET 7
i
, 1
GRAPHIC SCALE
0 50 100
I I I
D
J
m
Q
F—
N
Q
0_
MATCH LINE -,SHEET 8
LEGEND
SINGLE LIGHTING E+
DOUBLE LIGHTING
EXHIBIT 'C' - STREET LIGHTING UNAWA
SHEET: 1 OF 91—09-16 WALMART SUPERCENTER #2834 lDY
DATE: 1sv k&v n—•su»e.wo•Folrn+oftT�7e107
SCALE: 1:100—XREF (8%" X 11") FORT WORTH, TEXAS Tet8,73YL�Z8173357437
U o ■ „a
00
o J J 111 �
Z W J
W J
CD O
W ? O
J to
C7 CO
z c�
H
H N
WzW
� L �
f \ ✓ SWIS u cn WO O
E-
14
x
00
v
Li.
�W
0) X
0 O O
h LJ LJ
WF-J
W Q Q
S O U
V) N
° 1 w rve Ol 9 6o—Il-6la2�� OI.Rw3sli(i,TaaRS\vf�\°Y.R4°3\c6wn�a\i.6,ae6\lap'�6lWOB\OOIOM\"'il'rt°'�"�
Official site of the City of Fort Worth,Texas
CITY COUNCIL AGENDA FLIRT 11
COUNCIL ACTION: Approved on 12/13/2016 -Ordinance No. 2253842-2016 & 22539424016
REFERENCE ** 06PARK VISTA - ILA AND
DATE: 12/13/2016 NO.: C-28029 LOG NAME: CFA WITH CITY
PARTICIPATION
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of an Interlocal Agreement with the City of Keller in the Amount of
$163,700.00, Authorize Execution of a Community Facilities Agreement with Wal-Mart
Real Estate Business Trust in the Amount of$16,112,388.00 for the Construction of Park
Vista Boulevard from Keller Hicks Road to Ray White Road, with City Participation in the
Amount of$294,600.00 for Increasing the Height of the Park Vista Boulevard Bridge and
the Installation of a 48-Inch Casing for a Water Line to Serve the City of Keller and Adopt
Appropriation Ordinances (COUNCIL DISTRICT 7)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of an Interlocal Agreement with the City of Keller to accept $163,700.00 for a
48-Inch water line casing for a future water line to serve the City of Keller;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in
the Park Vista Boulevard Project of the Intergovernmental Contribution Fund in the amount of
$163,700.00;
3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in
the Park Vista Boulevard Project of the Transportation Impact Fee Legacy Fund in the amount of
$130,900.00 and reduce the fund balance in the Unspecified Center of Service Area D by the same
amount; and
4. Authorize the execution of a Community Facilities Agreement with Wal-Mart Real Estate
Business Trust in the amount of$16,112,388.00 for the construction of Park Vista Boulevard from
Keller Hicks Road to Ray White Road, with City participation in the amount of$294,600.00 for
increasing the height of the Park Vista Road bridge and installations of a 48-inch water casing.
DISCUSSION:
Wal-Mart Real Estate Business Trust is executing a Community Facilities Agreement (CFA) to
construct Park Vista Road from Keller Hicks Road to Ray White Road for its commercial development
in north Fort Worth. The project includes a bridge over Big Bear Creek to the south of Golden
Triangle Boulevard. The City is cost participating in the construction costs to increase the height of
the bridge to provide adequate clearance under the bridge for future park trails.
Additionally, the City of Keller will be executing an Interlocal Agreement with the City of Fort Worth to
have 330 linear feet of a 48-inch water main casing included in this project to serve future
development in Keller. The City's cost participation for the bridge and the installation of the water
main casing is estimated to be $294,600.00, as shown on the table below.
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=24159&councildate=12/13/2016 Page 1 of 2
Item I Developer Cost F City Cost Total Cost
Water Construction F $ 1,171,759.00 $157,404.00 $ 1,329,163.00
Roadway Construction $13,765,382.00 $130,900.00 F $13,896,282.00
Material Testing and
Inspection Fees 1 $ 880,647.00 $ 6,296.00 $ 886,943.00
Total Project Cost 1 $15,817,788.00 $294,600.00 $16,112,388.00
The reimbursement of the participation, excluding inspection and material testing fees, is not a lump-
sum amount and may be less than the stated amount depending upon the actual quantities and unit
prices from the Notice of Final Completion Package, commonly referred to as the Green Sheet
Package.
This development is located COUNCIL DISTRICT 7.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that upon approval of the above recommendations, funds will be
available in the current capital budgets, as appropriated, of the Intergovernmental Contribution Fund
and the Transportation Impact Fee Legacy Fund.
TO
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year Chartfield 2
FROM
Fund Department Account Project Program Activity Budget I Reference# Amount
ID I I ID I Year Chartfield 2
Submitted for City Manager's Office by: Fernando Costa (6122)
Originating Department Head: Randle Harwood (6101)
Additional Information Contact: Julie Westerman (2677)
ATTACHMENTS
06PARK VISTA-ILA AND CFW WITH CITY PARTICIPATION 30106 A017.docx
06PARK VISTA-ILA AND CFW WITH CITY PARTICIPATION 39008 A017.docx
Form 1295.pdf
Park Vista Location Map.pdf
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=24159&councildate=12/13/2016 Page 2 of 2
C-28029 C
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1 of 1
Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY
Complete Nos,1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING
1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number:
of business. 2016-137826
Wal-Mart Real Estate Business Trust
Bentonville,AR United States Date Filed:
2 Name of governmental entity or state agency that is a party to the contract for which the form is 11/16/2016
being filed.
City of Fort Worth Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,andprovidea
description of the services,goods,or other property to be provided under the contract.
CFA 2016-
COMMUNITY FACILITIES AGREEMENT
Nature of interest
4 Name of Interested Party City,State,Country(place of business) (check applicable)
Controlling Intermediary
Lowry, L.Stanton Irving,TX United States X
Biggers,Chris Fort Worth,TX United States X
Allison, Gordon Bentonville,AR United States X
Whaley,Steven Bentonville,AR United States X
Zielske,Steven Bentonville,AR United States X
Suarez,John Bentonville,AR United States X
Wal-Mart Property Co, Bentonville,AR United States X
5 Check only if there is NO Interested Party. ❑
6 AFFIDAVIT _ _ I swear,or affirm,under penalty of rjury,that the above disclosure is true and correct.
LISA M.GARCIA
NOTARY PUBLIC-STATE OF ARKANSAS
WASHINGTON COUNTY
My Commission Expires May 01,2017 'I
Commission#12360574 Si ure of authorized Dent of contracting business entity
AFFIX NOTARY STAMP/SEAL ABOVE t
Sworn to and subscribed before me,by the said ���1 %kc,� e�kC�T _ this the _day of Nni_ 1,e sylbR f
20_Nk,g_,to certify which,witness my hand and seal of office.
Signature of cer administering oath Printed name of officer administering oath Title of off icjr administering oath
Forms provided by Texas Ethics Commission www.ethics.state•tx.us Version V1.0.277