Loading...
HomeMy WebLinkAboutContract 48080-FP2 Department of TPW Const. Services CPV# Date?�� i RiskProject Manager T WO RT H O CITY SECRETARY Risk Management S. Ca dy —1 R CONTRACT NO. o V D.O.E. Brotherton Water Dept. Esteban Perez �7 CFA Westerman/Scanned .TION AND PUBLIC WORKS 1 �O ` 70 The Proceeding people have been Contacted concerning the request ' PROJECT COMPLETION G� /' n �O for final payment&have released this project for such payment. leveloper Projects) �1 js _(_'1P9rgn_np L'nr�rh,ntarl Rv I`i}t,Ljja„A, I City Project No: 100370 Regarding contract 100370 for WALSH RANCH-QUAIL VALLEY PHASE IA as required by the WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. 1!2 Original Contract Price: $888,439.52 Amount of Approved Change Orders: $30,963.48 Ne 1 &3 Revised Contract Amount: $919,403.00 Total Cost Work Completed: $919,403.00 o44Z - - -- To 1 -7 comm ded r Acceptance Date Asst. Director, TPW - Infrastructure Design and Construction Accepted Date Asst. Director, WATER DEPARTMENT Asst, City Manager Date Comments: OFFICIAL RECORD CITY SECRETARY FEB 2017 FT,YIIORTHo TX �nitie4: Rev.9/22/16 L�= WU= U v L-31 FEB 0 2 2017 By M3 7-0 City Project Numbers 100370 DOE Number 0370 Contract Name WALSH RANCH-QUAIL VALLEY-PHASE IA Estimate Number I Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 2/2/2017 Project Funding Project Manager NA City Secretary Contract Number Inspectors LAYER / HOUSTON Contract Date Contractor CONATSER CONSTRUCTION TxLP Contract Time 130 CD 5327 WICHITA ST Days Charged to Date 157 CD FORT WORTH, TX 76119 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $919,403.00 Less %Retained $0.00 Net Earned $919,403.00 Earned This Period $919,403.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $919,403.00 Thursday,February 2,2017 Page 5 of 5 FoRTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name WALSH RANCH-QUAIL VALLEY-PHASE IA Contract Limits Project Type WATER&SEWER City Project Numbers 100370 DOE Number 0370 Estimate Number 1 Payment Number 1 For Period Ending 2/2/2017 CD City Secretary Contract Number Contract Time 18GD Contract Date Days Charged to Date 157 Project Manager NA Contract is 100.00 Complete Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors LAYER / HOUSTON Thursday,February 2,2017 Page 1 of 5 City Project Numbers 100370 DOE Number 0370 Contract Name WALSH RANCH-QUAIL VALLEY-PHASE IA Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 2/2/2017 Project Funding WATER Item Completed Description of Items Estimated Estimated Com leted Com No. P Unit Unit Cost P P ———_————— Quanity Total Quanity Total ————————————————---———— 1 4"PVC WATER PIPE co#1 98 LF $30.00 $2,940.00 98 $2,940.00 2 4"PVC WATER PIPE CLSM BACKFILL 8 LF $36.00 $288.00 8 $288.00 3 8"PVC WATER PIPE co#1 481 LF $32.00 $15,392.00 481 $15,392.00 4 8"PVC WATER PIPE CLSM BACKFILL 8 LF $38.00 $304.00 8 $304.00 5 12"PVC WATER PIPE 4592 LF $42.00 $192,864.00 4592 $192,864.00 6 12"PVC WATER PIPE CLSM BACKFILL 137 LF $52.00 $7,124.00 137 $7,124.00 7 DUCTILE IRON WATER FITTINGS 8.1 TN $4,000.00 $32,400.00 8.1 $32,400.00 W/RESTRAINT 8 4"GATE VALVE co#1 2 EA $850.00 $1,700.00 2 $1,700.00 9 8"GATE VALVE co41 12 EA $1,150.00 $13,800.00 12 $13,800.00 10 12"GATE VALVE 27 EA $2,000.00 $54,000.00 27 $54,000.00 11 30"X12"TAPPING SLEEVE&VALVE 1 EA $6,500.00 $6,500.00 1 $6,500.00 12 4"-12"PRESSURE PLUG co#1 18 EA $500.00 $9,000.00 18 $9,000.00 13 FIRE HYDRANT 10 EA $4,200.00 $42,000.00 10 $42,000.00 14 4"WATERLINE LOWERING 1 EA $2,500.00 $2,500.00 1 $2,500.00 15 8"WATERLINE LOWERING 2 EA $3,500.00 $7,000.00 2 $7,000.00 16 12"WATERLINE LOWERING 10 EA $4,500.00 $45,000.00 10 $45,000.00 17 1"WATER SERVICE 30 EA $900.00 $27,000.00 30 $27,000.00 18 CONCRETE ENCASEMENT FOR UTILITY PIPES 2.9 CY $150.00 $435.00 2.9 $435.00 19 CLEANING WYE 2 EA $100.00 $200.00 2 $200.00 20 TEMPORARY AUTOMATIC FLUSHING VALVE 1 EA $16,500.00 $16,500.00 1 $16,500.00 22 TRENCH SAFETY CO#1 5324 LF $1.25 $6,655.00 5324 $6,655.00 23 2"WATER SERVICE CO#1 2 EA $1,500.00 $3,000.00 2 $3,000.00 Sub-Total of Previous Unit $486,602.00 $486,602.00 SEWER Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total ———————————— 1 8"SEWER PIPE C041 5200 LF $43.22 $224,744.00 5200 $224,744.00 2 8"SEWER PIPE CSS BACKFILL 140 LF $56.00 $7,840.00 140 $7,840.00 3 _ 10"SEWER PIPE 447 LF $48.00 $21,456.00 447 $21,456.00 Thursday,February 2,2017 Page 2 of 5 City Project Numbers 100370 DOE Number 0370 Contract Name WALSH RANCH-QUAIL VALLEY-PHASE IA Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 2/2/2017 Project Funding 4 4'MANHOLE CO#1 22 EA $3,600.00 $79,200.00 22 $79,200.00 5 EXTERNAL DROP MANHOLE CONNECTION 2 EA $5,200.00 $10,400.00 2 $10,400.00 6 4"SEWER SERVICE 34 EA $650.00 $22,100.00 34 $22,100.00 7 EPDXY MANHOLE LINER 32 VF $175.00 $5,600.00 32 $5,600.00 8 TRENCH WATER STOPS 20 EA $300.00 $6,000.00 20 $6,000.00 9 8"SDR-26 SANITARY SEWER PIPE PER ASTM 40 LF $52.00 $2,080.00 40 $2,080.00 10 POST CCTV INSPECTION CO#1 5827 LF $2.00 $11,654.00 5827 $11,654.00 11 MANHOLE VACUUM TESTING 23 EA $100.00 $2,300.00 23 $2,300.00 12 TRENCH SAFETY CO#1 5827 LF $1.00 $5,827.00 5827 $5,827.00 13 STEEL ENCASEMENT CO#1 280 LF $120.00 $33,600.00 280 $33,600.00 --------------------------------- ------ -- Sub-Total of Previous Unit $432,801.00 $432,801.00 Thursday,February 2,2017 Page 3 of 5 City Project Numbers 100370 DOE Number 0370 Contract Name WALSH RANCH-QUAIL VALLEY-PHASE IA Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 2/2/2017 Project Funding Contract Information Summary Original Contract Amount $888,439.52 Chante Orders Change Order Number 1 $39,463.48 Change Order Number 3 ($8,500.00) Total Contract Price $919,403.00 Date a' ? Total Cost of Work Completed $919,403.00 Contr ct Less %Retained $0.00 Date dzk Net Earned $919,403.00 Inhe f n ei Earned This Period $919,403.00 Retainage This Period $0.00 Date ect an Less Liquidated Damages ojger 1Days @ /Day $0.00 L u;mate 7 LessPavement Deficiency $0.00 Asst.Direct//PW-In r ructure Design and Construction Less Penalty $0.00 1�4 1 � Date �� 3`�'� Less Previous Payment $0.00 Director/Contracting Department Plus Material on Hand Less 15% $0.00 Balance Due This Payment $919,403.00 Thursday,February 2,2017 Page 4 of 5 CD 1 M D 0 C7 m O v<. O0 G p OZ m X ;uZ 1l (n O C7 n n Cn Gm D O m 0 o- Dr m z D z Q z6 m C m D Z 0 -� z z o O co D m m m m -i o D m m c) 0 1 -1 o C) n Z7 �1 [1 m d < < O -n O n --I D C7 N .'0 m Z mp 0 m m O n O C- 0 n S C? C) O D -0 D rn -Di 1 D TJ 0 0 m --I Z m C- C- m C7 D D maz -A n m -n D m m m z = � a n c O Z7 CD -i Z m < 1 mM 9 m O m d C_ y Z CD p o vD CD en a v o < ccoo cc"o z o o D Ao Ao= m N rn m o D o 0 w X 0 0 w m � m p .N-. a' N A a w O O O .p. CD .Tl .. o O cn cn O O _ 0 0 0 HG) tou m M 0 o T 77 O O 0 cu2 C) O C7 w O CD o p m 0 o < c m y < Z7 w oCD cn ❑ T G) G m D �/V m p m m a o n X S S n v O O 0 o n (D (D 0 0 o o > O M a N m CD Vm CNn o cn w G A (b O N z n Z n W Z C7 N G N 0 G) Vv m Z W W O m o o n O O p Q y N O m A OD Z A o0 mO W O O O O N < W 00 N N N !Jo 01 � N Z oV D c o c n m n 2 0 0 o mZ N M 0 o m o 0 o o m a a Z < A A A N 0 0 0 -oo Cn m '� in in in m 0 0 o m o -1 o � it O C) 0 0 c o n CD o O p N (7 O O Z Cl 0 0 M D 0 m 1 m m CD CD CD c zr 03 N (D O N n S (D z D Q p CD aIla 3 m O W W v xt m - m 7 CD o T 0 o 03 �. m D C) w 3 A'c0 co W A W j J (n N O A ' N ' N"`c0 W xt W N N N p __ mCDm C 0 D � N N _ C N O Cn N Cn � O co O CO s CO N N Z ten.. O O Cn O '0 0 ' O CL 1 00 < C 0 N r r m r m - ww w m r r r m r m m r r m m r T T D T D Z T D T T T D T D D T T D D T z 1 p (0 W(O CO W W W cD W W CD N W W W W D W w W W O W W 17 0 u 0 0 � 0� O w W W W W W W W N i W c0 c0 p -0 O W C:, A D c0 V c0 c0 W - O W W m c.n 10 N N Cn N-� < O O O 0 0 0 6 0 O O * A 6 0 --i i 1 N W 'C3, . W p Z O Cn O O cn A Cn O W Cn m O O m N 0 0 s O N O N O O O O 0 0 0 0 0 JJ -�co 0 0-� 0 0 a1 O O a1 Cn O m O N N A co N Cn '� W c0 O W O CO 2 Co J Cn W D O O D m O D -p CA Cl m m m 3(� O CD D D m m m D v <0 ^; m < D m < r= 0 0 r m n n0- 2-�a 0 Tz (D n �m m r CD n � m n � m m n d LCDD (D r Cn O 3 v < .� d h N a] 3 � CL N D Z. cD 3 ID T O_ 0 CD - - CD < cD m < A N N (D 3 3 `L N N N O C (D (D C CD (D O p�j C 3 CD - N 3 (D 0 A T N T r 3 D - T (D O E CD I O O DN O O mCD c co n 0 z c z 64 �oo M fA CD M N b9 O CD O N O J fA W fa O N L14 69 O A O VWi W fA p cn W ,'CT7 O N O O O Cn A T A O O -+ N O W CD 0 0 .9 0 m N m O O O O O O J Cn O O O O O O N O O O N O O O m O O O O O O Cn O O O 0 0 0 0 N O O O Cn O O O W W EA EA,�f W W EA i9l J N J W W Ey W EA O J O Hi C) W O W W-:ij Cn -+nO C7 O cn OCDDCOO W O OOCD C c0 0 0 0 0 c0 0 0 0 s O O OO 0 0 0 0 0 0 0 Cn Cn O O O O O W 0 0 0 0 0 0 0 O N N 2 m 2 \ � ) } k \ § / z / / CDf 2 ( § � A q§ > 2> \> ; 0 §g - El , c i ( \ 2 G 2 - i ® } 2 m §e§ ( w9 § §� MED �J rb CD § S & §/ CD } «k Ga =& �2 ( CD i } �3 } �I ( ( agEP2 e - > -4 - - 2 m« \ CD )� z § S qID ■ o m E o m] ] _ « ID 2 m / - , }\ §)\ § ) } / \ - m§ _ k CZ CD _ } » / . _ \ z 2 2 (D 4 ■ { mz , / ID0 7 # 0 A } § \ 7 _ § - ® E ) k § _ \ / \ ( £ G < g z 2 = e ¢ 0 0 0 0 e » J m j ) \ ( C- m \ m m \ \ \ § % g / m _ \ m \ \ S } \ \ \ 0 \ \ \ / \ (- ƒ\ [ z 2 % 2 2 > 2 2 § > / k c 2 w o % o i m m �- £ ± 2 \ j ® j \ \ \ / \ / # [ m; - o --1 ° \ 2 § a a z = \ > > « $ _ _ _ $ » E y / § .. CD & / \ ! 2c � G \ CD CD Cl \ ¥ ƒ / k m 0 C OD 00 o & \ / / � ® / / / 2 - _ \ \ \ m CD > \ ® � e) m � 2 n 00 § � f $ $ � ƒ { > m \ C) _ ( j \ - > - \ \ C; � ~ ƒ ) = n G) m § - / // / / } t3 z 2 �\ ° ; 0 w \\ / / 00 / k > \ @ / / -< / G A { m � S W O C � ° CD N cm'i S N to ° m N) m 3 m at m m z CD o v S O m m ° D O m CD N N N m N V Cn A M Fr 3 cmi A A W cC p N N N w NNco W m po C,CO ON W"I 3 IInn tton N DD�DDD�r.- DDD'n -n -nD m wC� m A dA�.P�.P ONi O N N cc°O N O ctoo N�cCDo co C4 D W m cn yic., �m�vcpmm 1`n� r- ala W W W CvMO <0000 00000 r ooAw WNcnOm <ncnow Zo.a00000 =O O O C n 0 0 0 Z o 0 0 0 D N NJ a C A V W n ;,p 1 —T N T N 19 yy 3N7 iME; -0. m oSR -v oANmOa °�O pAD -y rn r= o m m m . TnZr rTT-'° z r--m 0 m_m_° D � 3 m r 3 N D y 3 o x m m m Q m �m m m m ° mom m lnd 0 o T�<tn ��n 3N m m T o D m Z7 C) m 0 m m m W > > 3 x a n m (n 3 3 ^___Lo 3 o D C_n O 2 1 1 m 3 CD 7co 'o4 m CX 3 m C O m m 3 a m C < G1 m 3 -� v to y m c N C G C) �N CD cD rL CD O T r L 7 (D d y co CL O C a D. ° CT C A D ° m m a ° nl O o o n °' z FL� � m o m 3 N N N 7 C1 7 A m C Hi ffl (fl&9 Z cn fA N !A ffl EA N cin �W NA (n N Cn V NO cn ww.CDOp cn OCn ffl Cn O cn Cn Hl OOO ffl co cn W OO O x O P. O O O O CD 0 0 0 O CD cn O O O O C7 oo2no0000 0000 J CD o o m 00000000 0000 cn000gCD 0 EA to Vi fA (fl f�A W V ffl(fl W W 69 cn d 0 0 o 0-4 N 0000 N W �(D N O p CD O CD 'c°Wo �rn �aocnm aco=.omcnp inch j cn000000cnco cn000cn wco V a0o 0o r 0 0 o a o 0 0 o rn rn p o p rn OD N O o o p o 0 0 inoptno0000 00000 cnin00000 00 op0000000 0000a 000000p o0 m m CD N � ■ I \ § � 2 a ) ( 0 7 = f � ■ 7 2 ■ ■§ Q & � ■ g J - - - � \ § ■® a \ 2 $2 ƒ k ■ mCL k f k g �■ z I ƒ - ra t ■a ƒ ' @ §- ] { 7 $ §§ r rr � K \ � f @ z k k _ § # _ § t 2 0 � FORTWORTH rev 03/05/07 TRANSPORTATION& PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO. 1 NAME OF PROJECT: Walsh Ranch Quail Valley I PROJECT NO.: 100370 CONTRACTOR: Conatser Construction DOE NO. N/A PERIOD FROM 08/23/16 TO: 02/02/17 FINAL INSPECTION DATE: 2-Feb-17 WORK ORDER EFFECTIVE 8/23/2016 CONTRACT TIME 180 O WD O CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED RING CREDITED MONTH DURING CREDITED 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS PERIOD 0 0 0 0 157 157 PREVIOUS 0 0 0 PERIOD 0 0 0 TOTALS 0 0 0 TO DATE 0 157 r157 *REMARKS: CONTRACTOR DATE INS"P' E-C-TW DATE ENGINEERING DEPARTMENT T The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817) 392-7941 •Fax: (817) 392-7845 City of Fort Worth Inspector's Estimate Worksheet City Project Numbers 100370 Contract Name WALSH RANCH-QUAIL VALLEY-PHASE 1A DOE Number 0370 Contract Limits Estimate Number 1 Project Type WATER&SEWER Payment Number 1 Control Number 037001 For Period Ending -2—/ / 11-7 Contract: Contract Date Contract Tim 180 CD Inspectors LAYER / HOUSTON Days Charged to Date 1.57 CD Date Prepared by Inspector / / 17 Contract is d %Complete Construction ID: 10908 Item Description of Items Estimated Uni Unit Cost Previous Quanity Completed Total Cost No. Quanity Quanity for Month Quanity WATER — —. -- -- C pl 1 4"PVC WATER PIPE �10 S8 LF $30.00 2 4"PVC WATER PIPE CLSM 8 LF $36.00 BACKFILL 'RFS _ - yea_ 3 8"PVC WATER PIPE ' i5� LF $32.00 �� � �, c 4 8"PVC WATER PIPE CLSM 8 LF $38.00 BACKFILL 5 12"PVC WATER PIPE 4592 LF $42.00 ? 4 6 12"PVC WATER PIPE CLSM 137 LF $52.00 BACKFILL13 -— ---r_ 7 DUCTILE IRON WATER 8.1 TN $4,000.00 FITTINGS W/RESTRAINT CG � 8 4"GATE VALVE A, EA $850.00 9 8"GATE VALVE 4,6 EA 1,1 50.00, ,E e) 10 12"GATE VALVE 27 EA $2,000.00 a-- 11 30"X12"TAPPING SLEEVE& 1 EA $6,500.00 VALVE 12 4"-12"PRESSURE PLUG x9 EA $500.00 v 0 13 FIRE HYDRANT 10 EA $4,200.00 J6 /U � ac 0. 14 4"WATERLINE LOWERING 1 EA $2,500.00 15 8"WATERLINE LOWERING 2 EA $3,500.00 2-- 16 12"WATERLINE LOWERING 10 EA $4,500.00 17 1"WATER SERVICE 30 EA $900.00 y' Friday,January 27,2017 Pagel City of Fort Worth Inspector's Estimate Worksheet City Project Numbers 100370 Contract Name WALSH RANCH-QUAIL VALLEY-PHASE 1A DOE Number 0370 Contract Limits Estimate Number 1 Project Type WATER&SEWER Payment Number 1 18 CONCRETE ENCASEMENT FOR 2.9 CY $150.00 UTILITY PIPES �w� 2_ 9 p 4,a 19 CLEANING WYE 2 EA $100.00 2__ I 0,,; 20 TEMPORARY AUTOMATIC 1 EA $16,500.00 FLUSHING VALVE /U3 21 4"COMBINATION AIR VALVE —t—EA $8,500.00 ( ASSEMBLY FOR �0 22 TRENCH SAFETY _/0 5334-LF $1.25 estimated Total This Unit $493,254.50 Completed Total This Unit Construction ID: 10909 Item Description of Items Estimated Uni Unit Cost Previous Quanity Completed Total Cost No. Quanity Quanity for Month Quanity SEWER --- S2�a 1 8"SEWER PIPE _5194- LF $43.22j�c�a 5200 22 ° 2 8"SEWER PIPE CSS BACKFILL 140 LF $56.00 /� /�/� 7�`r�. 3 10"SEWER PIPE 447 LF $48.00 CSP ` 4 4'MANHOLE 2T EA $3,600.00 5 EXTERNAL DROP MANHOLE 2 EA $5,200.00 CONNECTION 6 4"SEWER SERVICE 34 EA $650.00 ' 22, foo. UO 7 EPDXY MANHOLE LINER 32 VF $175.00 - - 8 TRENCH WATER STOPS 20 EA $300.00x , �� 0 9 8"SDR-26 SANITARY SEWER 40 LF $52.00 PIPE PER ASTM` _2,a? o__,, C� 10 POST CCTV INSPECTION 5818 LF $2.00 ?2 11 MANHOLE VACUUM TESTING 23 EA $100.00 C o / 12 TRENCH SAFETY 9 584.8-LF $1.00 l3 S,�e f N s � 2 �,f x 2ao4 2FC, g,:c Friday,January 27,2017 Page 2 City of Fort Worth Inspector's Estimate Worksheet City Project Numbers 100370 Contract Name WALSH RANCH-QUAIL VALLEY-PHASE 1A DOE Number 0370 Contract Limits Estimate Number 1 Project Type WATER&SEWER Payment Number 1 32,Pdf, pry ;stimated Total This Unit $395,135.02 Completed Total This Unit -- / ? Total Itemized Amount(Including Change Order DATE Total Cost of Work Completed ��9 '13"00 Inspe Less = t %Retained c� Net Earned o Previous Payment $0.00 Material on Hand 15% c1st, Balance Due This Payment 909 Friday,January 27,2017 Page 3 FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date: 11/31/2017 Name of Contractor Project Name Conatser Construction Walsh Ranch Quail Valley lA DOE Inspector Project Manager Garey Houston Pat Buckley DOE Number Project Difficulty Type of Contract 100370 0 Simple OO Routine O Complex Q Water D Waste Water ❑Storm Drainage ❑ Pavement Initial Contract Amount Final Contract Amount $888,439.52 $919,403.00 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATING INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector 1-f 11 Accuracy of Plans to Existing Conditions Ll 2 Knowledge of Inspector 1/ 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities y 3 Applicability of Specifications 4 Display Of Professionalism '� 4 Accuracy of Plan Quantities `f 5 Citizen Complaint Resolution N PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs y 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager Y 1 Change Order Processing Time y 3 Communication y 2 Timliness of Contractor Payments 1/ 4 Resolution of Utility Conflicts 31 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor /r._9 INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845 FORTWORTHREV:8/20/16 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR n CONTRACTOR&PROJECT DATA Name of Contractor Project Name Conatser Construction TX,LP Walsh Ranch Quail Valley I Inspector City Project Number Garey Houston 100370 Construction Components Project Manager D Water 1�1 Waste Water ❑Storm Drainage ❑ Pavement Pat Buckley Initial Contract Amount Project Difficulty $888,439.52 0 Simple OO Routine Q Complex Final Contract Amount Date $919,403.00 1/31/2017 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 448 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 448 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating([TS/MS] x 100%) 448 / 448 = 100% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signature Contractor Signature Inspector's Supervisor Signature CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•8851 Camp Bowie West Blvd.•Fort Worth,TX 76116• (817)392-8306 FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Walsh Ranch Quail Valley I PROJECT NUMBER: 100370 DOE NUMBER: N/A WATER PIPE LAID SIZE TYPE OF PIPE LF 4"inch PVC 98 LF 8"inch PVC 481 LF 12"inch PVC 4592 LF FIRE HYDRANTS: 10 VALVES(16"OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF N/A DENSITIES: NEW SERVICES: 30- 1"inch copper 300 LF SEWER PIPE LAID SIZE TYPE OF PIPE LF 8"inch SDR-26 PVC 5200 LF 10"inch SDR-26 PVC 447 LF PIPE ABANDONED SIZE TYPE OF PIPE LF N/A DENSITIES: NEW SERVICES: 34-4"inch SDR-26 PVC 700 LF TRANSPORTATION AND PUBLIC WORKS s The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 d (817)392-7941 •Fax: (817)392-7845 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc., general partner of Conatser Construction TX LP, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as: WALSH RANCH QUAIL VALLEY—PH 1A WATER& SS, STORM DRAIN AND PAVING IMPROVEMENTS DOE#: N/A CFA PRJ#: 2016-041 CITY PROJCT #: 100370 CITY OF FORT WORTH STATE OF TEXAS CONATS ONSTRUCTION TX, LP Brock Huggins Subscribed and sworn to before me this 2nd day of F ary, 2017. BERTHA GIANULIS a, No ary Public in Tarrant County, Texas Notary Public,State of Teras my commission Ex ares September 18, 2019 � E CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ TO FINAL PAYMENT CONTRACTOR ❑ SURETY ❑ Conforms with the American Institute of OTHER Architects,AIA Document G707 Bond No 0201473 PROJECT: (name, address)Walsh Ranch-Quail Valley-Phase 1A Fort Worth,TX TO (Owner) CFA No.2016-041 QUAIL VALLEY LAND COMPANY,LLC AND THE CITY ARCHITECT'S PROJECT NO: City Project No.100370 OF FORT WORTH CONTRACT FOR: 8401 N.Central Expressway,Suite 350 Water,Sewer,Drainagge Paving and Street Light Improvements for Walsh Ranch-Quail Valley-Phase 1 A Dallas TX 75225 _I CONTRACT DATE: CONTRACTOR:CONATSER CONSTRUCTION TX, L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (here insert name and address of Surety Company) BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwich CT 06830 , SURETY COMPANY on bond of (here insert name and address of Contractori CONATSER CONSTRUCTION TX, L.P. 5327 Wichita St. Fort Worth TX 76119-6035 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here Insert name and address of Owner) QUAIL VALLEY LAND COMPANY, LLC AND THE CITY OF FORT WORTH 8401 N. Central Expressway,Suite 350 Dallas TX 75225 , OWNER, as set forth in the said Surety Company's bond. IN WITNESS,WHEREOF, the Surety Company has hereunto set its hand this 2nd day of February,2017 BERKLEY INSURANCE COMPANY Surety Company Attest: �� �� (Seal): Signature of Authoriz d Representative Robbi Morales Attorney-in-Fact Title NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition ONE PAGE No. BI-7280f r POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON, DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Delaware,having its principal office in Greenwich, CT, has made, constituted and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E. Cornell; Vena DeLene Marshall,Sophinie Hunter;Robb!Morales, or Kelly A. Westbrook of Aon Risk Services Southwest,Inc. of Dallas, TX its true and lawful Attorney-in-Fact,to sign its name as surety only as delineated below and to execute,seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00),to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. f � . This Power of Attorney shall be construed and enforced in accordance with, and governed by,the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following 0 resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010: _ RESOLVED, that, with respect to the Surety business written by Berkley Surety Group, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney-in-fact and revoke any power of attorney previously granted;and further J° RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the manner and to the extent therein stated; and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or N u other suretyship obligation of the Company; and such signature and seal when so used shall have the same force and effect as though manually affixed, The Company may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. J IN WITNESS WHEREOF, the Company has cau e- these presents to be signed and attested by its appropriate officers and its o corporate seal hereunto affixed this ' ay of Attest: Berkley Insurance Company (Seal) By l B4&ar Ira S. e erman ero Senior Vice President&Secretary side =' WARNING. THIS POWER INVALID IF NOT PRINTED ON BLUE"BERKLEY" SECURITY PAPE,. v STATE OF CONNECTICUT) ss: N COUNTY OF FAIRFIELD ) J Sworn to before me, a Notary Public in the State of Connecticut, this�J0=Public, 2015, by Ira S. Lederman and Jeffrey M.Halter who are sworn to me to be the Senior Vice President and Sice Predent, respectively, of Berkley Insurance Company. MARIA C.RUNDBAKENNOTARY PUBLICMY COMMISSION EXPIRESonnecticut G ,2019 APRIL 30 zr CERTIFICATE I,the undersigned,Assistant Secretary of BERKLEY INSURANCE COMPANY, DO HEREBY CERTIFY that the foregoing is a Jtrue, correct and complete copy of the original Power of Attorney;that said Power of Attorney has not been revoked or rescinded and that the authority of the Attomey-in-Fact set forth therein, who executed the bond or undertaking to which this Power of Attorney is attached,is in full force and effect as of this date. Given under my hand and seal of the Company,this 2nd day of February 2017 (Seal) a