HomeMy WebLinkAboutContract 47731-CO1 CITY SECRETARY r FORT WORTH. City of Fort Worth CONTRACTNO. Change Order Request Breakdown Project Namel Heritage Trace Parkway and Tehama Ridge Parkway Roundabout City Sec# 8 ?7 Client Project#(s)l DOE 7516,City Project Number 02529 Contractor Reyes Group,LTD PM Wilma Smith I Inspectorl Ariel Duarte Change Order Submittal# 0 Date 11/3/2016 Contract Time Dept. TPW Totals CD Original Contract Amount $2,076,653.30 $2,076,653.30 140 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $2,076,653.30 $2,076,653.30 140 Amount of Proposed Change Order $127,287.58 $127,287.58 100 Revised Contract Amount $2,203,940.88 $2,203,940.88 240 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $127,287.58 $127,287.58 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 6.13% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,595,816.63 JUSTIFICATION(REASONS)FOR CHANGE ORDER Additional Time Due to AT&T Relocation: Additional 25 days were required due to delay of work from AT&T.AT&T had a fiber conflict with the existing inlet on Heritage Trace adjacent to the concrete headwall as well as a copper line on Tehama Ridge that was in conflict with proposed storm drain.AT&T had to relocate the existing copper line on Tehama Ridge to allow Reyes to continue work.AT&T also had to expose their line and move temporarily out of the way for Reyes to excavate the existing inlet.AT&T then adjusted their fiber line to the final agreed upon location.AT&T has relocated both of their lines and are out of conflict with construction as of 10/24. Traffic Control Revisions: Additional 75 days were required due to increased traffic control phasing.Two additional phases were added to the construction of the project which requires additional time for construction.The additional time was added due to Right-of-Way acquisition difficulties on the northeast corner.It was originally planned to construct the roundabout in two major phases with the north half being one phase,and the southern half being another.We have had to revise that to constructing the north half in two phases. Splitting the north phase into two phases required the following addtional items: additional project management due to extending the construction duration;additional pavment pours needed;additional sawcuts to maintain a portion of the existing pavement rather than removing all of existing;mobilization for utility adjustments;additional SWPPP inspections for the extra phase of construciton;and survey mobilization. Additional signs and message boards were needed for detour revisions to phase 1 detour.This was to encourage drivers to avoid cutting through the Reatta Ranch neighborhood. Additional Plan Revisions: Plan revisions were due to 7-Eleven unwillingness to coo th acquisitions and to avoid franchise utilities. �OR7' !�O Py t :Z OFFICIAL.RECORD ~' CITY SECRETARY 03', >! Secretary FT.WORTH,TX - TE3tp5 Hawkins Commercial Project Additions: Mycoskie+Mcinnis+Associates is providing site design for a development on the northwest corner around the 7-Eleven property.They are proposing improving the storm capacity of the existing 48"lateral to allow for the development to tie in to the existing system.This has been approved through the storm water group.There will be a Future Improvement Agreement in place to pay for this portion of this change order.The time spent on this work will be awarded to Reyes Group by a change order after the completion of this work. The items that the Future Improvement Agreement will pay for are: 1-12, 1-13, 1-81, 1-82, 1-83, 1-84, 1-85.These items total $92,399.50 which is the amount the Future Improvement Agreement will fund. Southeast Sidewalk and ROW Delays: **On the redesign of northwest corner the sidewalk and pedstrian buffer are called out to be installed pending ROW acquisition. This will hold up the contract until the ROW issues are resolved.Reyes Group will hold theses prices for a year for the sidwalk and the pedestrian buffer,but it has to be separate from the origianl contract so no retainage is held after the rest of the project is completed. FORTWORTH City of Fort Worth --`V--- Change Order Additions Project Name I Heritage Trace Parkway and Tehama Ridge Parkway Roundabout City Sec# 45098 Client Project# I DOE 7516,City Project Number 02529 contractorl Reyes Group,LTD PM Wilma Smith Inspector Ariel Duarte Change Order Submittal# 0 Date 11/3/2016 ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 1-86 9999.0000 Additional ncrete Paving Pour Phases 757 77 evenvwy $2,856M 5. I-87 9999.0000 Additional Mobilization for UBlities in Phase 3 TPW 1.00000000 LS 3,420.00 1-88 9999.0000 Additional Mobilization for Asphalt Crew in Phase TPW 1.00000000 LS 2,280.00 I-89 9999.0000 Additional Project Management TPW 2.5000000 MO 22,415.00 5=, 7 1-90 9999.0000 Additional Mobilization for Survey TPW 2.00000000 EA $850.00 7 1-91 9999.0000 Additional Demo Sawcut TPW 4,798.00000000 LF $0.40 1-92 9999.0000 Additional SWPPP Inspections TPW 12.110000000 EA $67.00 1-93 "9999.0105 Re-Mobilization and Escalation for Sidewalk and Pedestrian Buffe TPW 1.00 00000 LS $3,000.06 1-94 9999.0108 Additional Traffic Control for Project Delay Due to AT&T TPW 0.50000000 MO $3,562.75 7 1-12 0241.3023 Remove 48°Storm Line TPW 107.00000000 LF $52.505, 7.5 1-81 3341.1202 5'X4'Box Culvert TPW 97.00000000 LF 552.00 5 ,5 1-82 3349.7003 7'X6'Drop Inlet TPW 00000000 EA 18,500.00 5 1-83 3341.0312 39°RCP,Class III TPW 20.00000000 LF $395.00 $7,900.00 1-84 0241.4202 Remove 5'Drop Inlet TPW 1.00000000 EA $2,800.00 1-85 3305.0109 Trench Safety TPW 1 7.00000000 LF $34.00 7 . TPW $166,137.58 Sub Total Additions 6,137.58 FORT WORTH City of Fort Worth v--- Change Order Deletions Project Name Heritage Trace Parkway and Tehama Ridge Parkway Roundabout City Sec# 45098 Client Project# DOE 7516,City Project Number 02529 Contractor Reyes Group,LTD PM Wilma Smith Inspector Ariel Duarte Change Order Submittal# Date 11/3/2016 DELETIONS DESCHIP I ION DEPT Qty Unit Unit Cost Total 73-775w7y7 anTPW 5. 7. ,5. TPW $38,850.00 Sub Total Deletions $38,850.00 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO Total Previous Change Orders CO#` DATE AMOUNT Total M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CI COUNCILAGENDA FOR�TWORT111 COUNCIL ACTION: Approved on 12/13/2016 - Ordinance No. 22541-12-2016 DATE: 12/13/2016 REFERENCE NO.: **C-28033 LOG NAME: 20HERITAGE TRACE CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Change Order No. 1 to City Secretary Contract No. 47731 with Reyes Group, Ltd. in the Amount of$127,287.58 for the Heritage Trace Parkway and Tehama Ridge Parkway Roundabout Project, Thereby Increasing the Contract to an Amount Up to $2,308,940.88 and Adopt Appropriation Ordinance (COUNCIL DISTRICT 7) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing the estimated receipts and appropriations in the Developer Contribution Fund in the amount of$92,339.50 from available funds for the Heritage Trace Parkway and Tehama Ridge Parkway Roundabout Project; and 2. Authorize execution of Change Order No. 1 to City Secretary Contract No. 47731 with Reyes Group, Ltd. in the amount of$127,287.58 for the Heritage Trace Parkway and Tehama Ridge Parkway Roundabout Project, thereby increasing the contract to an amount up to $2,308,940.88 (City Project No. CO2529). DISCUSSION: On March 29, 2016 (M&C C-27654) the City Council authorized award of a construction contract with Reyes Group, Ltd. in the amount up to $2,181,653.30, inclusive of potential incentives, for the construction of a roundabout at Heritage Trace Parkway and Tehama Ridge Parkway. This change order is to incorporate storm drain revisions due to the Hawkins Commercial Project adjacent to the Heritage Trace Parkway and Tehama Ridge Parkway Roundabout Project. The revisions will allow for the development to increase the size of the existing storm lateral that connects the Hawkins Commercial site's internal storm drain to the existing 7 inch x 6 inch storm drain box culvert under Heritage Trace Parkway. By including this with the Heritage Trace construction project, this will reduce additional or future construction needed along or within the roadway. A portion of this project will include 2014 Bond Funds. Available resources within the General Fund will be used to provide interim financing for these expenses until debt is issued. Once debt associated with this project is sold, bond proceeds will reimburse the General Fund in accordance with the statement expressing official intent to reimburse, that was adopted as part of the ordinance canvassing the bond election and the approval of subsequent bond issues. The developers of the Hawkins Commercial Project are funding their portion of this change order, $92,339.50, as outlined in a separate agreement between the developers and the City. Project(CO2529) Amount M&C No. Approved Notes http://apps.cfwnet.org/council_packet/mc review.asp?ID=24068&councildate=12/13/2016 1/26/2017 M&C Review Page 2 of 2 Original Contract $2,076,653.30 C-27654 3/29/2016 Base Bid:$1,986,644.30 Bid Alt 1: $89,929.00 Total Bid:$2,076,653.30 Change Order No. 1 $127,287.58 Pending Pending - Totals $2,203,940.88 1 - - - M/WBE Office-A waiver of the goal for MBE/SBE subcontracting requirements was requested by the Department and approved by the M/WBE Office, in accordance with the BIDE Ordinance, because the purchase of goods or services from source(s) where subcontracting or supplier opportunities are negligible. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendation and adoption of the attached appropriation ordinance funds will be will be available in the current capital budget as appropriated, of the Developer Contribution Fund and the 2014 Bond Program Fund. Existing Appropriations Per Existing Description Appropriations M&C Appropriations 2014 Bond Program Fund 34014 $2,326,901.61 $ 0.00 $2,326,901.61 Developer Contribution Fund 30104 $2,500,000.00 $92,339.50 $2,592,339.50 TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year (Chartfield 2 FROM Fund Department Account Project Program Activity Budget Reference# Amount ID I I ID Year Chartfield 2 Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Douglas Wiersig (7801) Additional Information Contact: Todd Estes (5448) Wilma Smith (8485) ATTACHMENTS 20HERITAGE TRACE AOr.docx HERITAGE TRACE TEHAMA RIDGE Rndbt 02529.pdf Reyes Group Ltd 1295 Form CO 1.pdf http://apps.cfwnet.org/council_packet/mc_review.asp?ID=24068&councildate=l2/13/2016 1/26/2017 MAYOR AND COUNCIL COMMUNICATION MAP 1NG1M - Pt� QUAIL L Z AP O 81 —co BAYNE _ �l \; s 00 ti�cy �y L aS 0GOLDEN Ole a y J a !y t�.�.l Z TRIANGLE r W �G� / o 0z l°l BONDS BONDS a o A 11 �� RANCH RANCHO ' o m ,��L\P" iNTA E ..WH l ._.. L!ON f O r HERITAGE m _ TRACE r J 4r r O N MAGMA' G T I -•, .O Y 0 -o ® 8 Z - �(n O z I1 0 _ G� QU ILS ..3 .__.. "'I E W Zf p (G� E T C ,zx —•L J m PG co Q, _- W X A3 HIV R o N `o Z� m W Z 81 TARRANT o W Q J J 000 m m HARMON '`�NT •9J' ANTERI tA THO S14 RANCH p C ``, PARR y E 4 WILD SUMMER-IE LD D. - r 1 p0 Q P \ BNSF mZ c m W NTE - ?� BASSWOOD �'' ``•C� i t :rz w I BOAZ _ - ��\6�5,•c• ._._ ROUGHRRI RIDER _ ym Or s m 1T' d !Yi/ r A Z WESTERN p L-EiC� Lu, z CENTER' Eaa i o UI- 00 u _ ,IXf' OFOSSIL Z CANTR +'- :DSANSOM CREEK 5 ILII 's ` We11 R Trace Parkway r z Y•_ CROSS3 t N > Clalrborne Drlve '@` BNS BNSF= W .1p. °• EACHAMMEAC AM 2. MEACHAM m 2 _ w O P a� o Z ., DOWNING ,. TERMINAL r tJSF `rte GrandRaprdsCrit a�` o a5 17o . - - a Fl t H DETAIL OF PROJECT LOCATION _ Copyright 2016 qty of FortWorth.Unauthorized reproduction's a violation of applicable lays. ® CITY PROJECT#02529 This product is for nfamational purposes and may not have been prepared for or be suitable for legal,engneerng,or surveying purposes.It does net represent an on-the-ground survey and represents only the approximate relative beaten of property boundaries. DOE#7516 The City of Fort Worth assumes re responsibility fa the accuracy of said data C-28033 C CERTIFICATE OF INTERESTED PARTIES FORM 1295 1of1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 12016-124069 Reyes Group Ltd. Grand Prairie,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 10/14/2016 being filed. City of Fort Worth Date Acknowledged: G' ( 3 Provide the identification number used by the governmental entity or state agency to track oridentify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 02529 Heritage Trace Parkway at Tehama Ridge Roundabout-Change Order No. 1,This supercedes certificate 2016-120949 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary Reyes,Marcos Grand Praire,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. '' DENYS SANTANA e% r' �= Notary Public,State of Texas ' - My Commission Expires July 18, 2019 S' at o horized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me,by the said this the day of e_V, 20 L 1,Q ,to certify which,witness my hand and seal of office. Signature of ffi administering oath Printed name of officer administering oath Title of officer administering Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.277 Contract Compliance Manager Re: Change Order No. 1 ($127,237.53) Contractor: Reyes Group, Inc. Project Name: Heritage Trace Parkway City Secretary No. 47731 Project No. 02529 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract including ensuring all performance and reporting requirem� s. � J4,4& Name of Employee J, Title CFW Change Order Approval St-COApp03 Page 2 of 3 FORT WORTH. City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 1 Change Order No.: St-COApp03 Date Started: 2016-12-20 City Sec. No.: 47731 Date Due: 2017-02-08 Project Name: Heritage Trace Parkway 02529 DOE Numbers: Project Numbers: Project Heritage Trace Pkwy/Tehama Ridge RAB Construction Description: Project Manager: Wilma Smith City Inspector: Ariel Duarte Contractor: Reyes Group COUNCIL ACTION (If Required): M&C Log Name: 20Heritage Trace M&C Number: C-28033 M&C Date: 2016-12-13 COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 34,948.08 34014 100 TPW $ 92,339.50 30104 Total Cost: $ 127,287.58 Total Requested Days: 100 Approval Status: yg7 8gro, ftc6Vz 2 a `*?7 �� ro Myo g �� r S CRET OR7?i ti 68 199 https://projeetpoint.buzzsaw.com/ bz_web/Folms/FonuPrint.aspx?SiteId=51500&ProcessI... 1/25/2017 CFW Change Order Approval St-COApp03 Page 3 of 3 Approved: Yes Comments: User: Tara Fishback Date: 2017-01-05 4:16 PM Approved: Yes Comments: Approved User: Wes Lancaster Date: 2017-01-12 1:51 PM Approved: Yes Comments: User: Wilma Smith Date: 2017-01-12 2:56 PM ;Approved: Yes Comments: User: Todd Estes Date: 2017-01-17 2:35 PM Approved: Yes Comments: User: Bryan Beck Date: 2017-01-24 2:56 PM Approved: Yes Comments: User: Doug Wiersig Date: 2017-01-24 11:08 AM Approved: Yes Comments: User: Doug Black Date: 2017-01-25 5:17 PM Approved: Yes Comments: ;User: ]ay Chapa Date: 2017-01-25 5:37 PM Action Required: https://projeetpoint.buzzsaw.com/ bz web/Fonns/FonnPrint.aspx?Siteld=51500&Processl... 1/25/2017 CFW Change Order Approval St-COApp03 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 2 fortworthgov/Infrastructure Projects/02529 - Heritage Trace Parkway/Contractor/Change Orders/2016-11-03- Heritage Trace Parkway Change Order#i.xls fortworthgov/Infrastructure Projects/02529 - Heritage Trace Parkway/Contractor/Change Orders/02529 Change Order No. 1 MandC.pdf Attachments(0) i No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessL.. 1/25/2017