Loading...
HomeMy WebLinkAboutContract 46926-CO2 FORT WORTH. City of Fort Worth 011Y SECWARY Change Order Request Breakdown CONTRACT NO• Lyg76 Project Name Hemphill/Berry Urban Village City Sec# 1 46926 Client Project#(s)l CPN#0700 DOE 6055 CSJ 0902 48 829 Contractor C Green Scaping PMF Lissette Acevedo Inspector Roy Scharfenberg Change Order Submittal# Date 10/21/2016 Dept. Planning Totals Contract Time D Original Contract Amount $670,337.80 $670,337.80 65 Extras to Date Credits to Date $15,565.00 $15,565.00 Pending Change Orders(in M&C Process) Contract Cost to Date $654,772.80 $654,772.80 65 Amount of Proposed Change Order $2,647.30 $2,647.30 60 Revised Contract Amount $657,420.10 $657,420.10 125 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $15,565.00 $15,565.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT -1.93% MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $837,922.25 JUSTIFICATION (REASONS) FOR CHANGE ORDER This Change order is intened to clean up the project addtions and deletions and zero out any under runs and over runs. Item 42 SEALER OVER TEXTURED CONCRETE was authorized by TPW to add additional protection to the colored textured concrete. Item 43 COST DIFFERENCE FOR TREE SPECIES CHANGE was authorized by TPW under the recomendation of the Parks Dept. Item 44 FREIGHT FOR ONE TRASH RECEPTACLE is to compensate the contractor for the shipping cost of an addtional Trash receptacle Item 36 TRASH RECEPTACLE to place a damaged trash recetacle at approx Sta.8+50 35 RT that was involved in a traffic incident FCP pT RECEIVED -� 0 � cirY � OF FORT WORTH ly-09.fry dD CITYSECRETARY b ss t� , OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX FORT WORTH City of Fort Worth Change Order Additions Project Name Hemphill/Berry Urban Village City Sec# 46926 Client Project# CPN#0700 DOE 6055 CSJ 0902 48 829 Contractor C Green Scaping PM Lissette Acevedo Inspector Roy Scharfenberg Change Order Submittal# F---2 Date 10121/2016 ADDITIONS ty nit UnitCost -----Tota annmgSY 28 ) Planning 15.00000000 LF $18.60 29 CONDUIT P BORE Planning 1.00000000 LF 31.80 30 CONDUIT PVC(SCH 80)(4°)BORE 0618.204 Planning 21.00000000 LF $38.70 36 TRASH RECEPTACLE Planning 1.00000000 EA $1,790.00 ADD 42 SEALER OVER TEXTURED CONCRETE Planning 4,945.59000000 SF $1.50 ADD 43 COST DIFFERENCE FOR TREE SPECIES Planning 8.00000000 EA $300.00 ADD 44 FREIGHT FOR ONE TRASH RECEPTACLE Planning 1.00000000 LS $375.00 20 PVC PIPE(SDR 35)(4°) Planning 8.00000000 LF $28.40 25 INTERSECTION,DRIVEWAYS,AND TURNOUT Planning 111.90000000 SY 68.40 Planning 1 $21,036.05 Sub Total Additions $21,036.05 Change Order Additions Page 2 of 4 FORT WORTH City of Fort Worth Change Order Deletions Project Name Hemphill/Berry Urban Village City Sec# 46926 Client Project# CPN#0700 DOE 6055 CSJ 0902 48 829 Contractorl C Green Scaping PM Lissette Acevedo I Inspector rT Scharfenberg Change Order Submittal# F-2 Date 10/2112016 DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost I Tota 3 REMOVING CONCRETE WALKS Planning 0.25000000 SY $18.00 $4.50 4 REMOVING CONCRETE DRIVES Planning 80.00000000 SY $18.00 5 REMOVING CONCRETE CURB AND GUTTER Planning 127.00000000 LF $14.00 3,77 . 7 BLOCK SODDING Planning 5.00000000 SY $197.00 5. 12 PLANT MATERIAL MIN 4°CAL Planning 3A0000000 EA $870.00 19 CL A CONC(MISC) Planning 1.00000000 CY $1,200.00 24 CONC CURB&GUTTER(TY II) Planning 7.15000000 LF $29.00 $207.35 27 CONC SIDEWALKS(4-)(ROCK SALT FINISH) Planning 28.44000000 SY $60.60 72. 34 TREE PROTECTION Planning 225.00000000 LF $12.00 7 35 EROSION CONTROL LOGS Planning 16.00000000 LF $4.00 23 COLORED TEXTURED CONCRETE Planning 58.52000000 SY $97.00 5,97. Planning $18,388.75 Sub Total Deletions Change Order Deletions Page 3 of 4 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00 CFW Change Order Approval CO - 08 -P and D Page 2 of 5 t 0 RT WO RT He City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 2 Change Order No.: CO - 08 - P and D Date Started: 2016-10-26 City Sec. No.: 46926 Date Due: 2016-12-15 Project Name: 00700 - Urban Villages SW Cluster Hemphill-Berry Project Numbers: 00700 DOE Numbers: 6055 Project construction of pedestrian and streetscape improvements in Description: the Hemphill/Berry Urban Village Along Hemphill Street Project Manager: Lissette Acevedo City Inspector: Roy Scharfenberg Contractor: Greenscaping COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 2,647.30 31001 0060419 5740010 C00700 C( 0 Total Cost: $ 2,647.30 Total Requested Days: 0 Approval Status: https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 1/26/2017 CFW Change Order Approval CO - 08 -P and D Page 4 of 5 Approved: Yes Comments: User: Stacy Geigenmiller Date: 2016-10-27 11:25 AM Approved: Yes Comments: User: Lissette Acevedo Date: 2016-10-27 1:10 PM Approved: Yes Comments: User: Patrina Newton Date: 2016-10-27 4:38 PM Approved: Yes Comments: User: Stacy Geigenmiller Date: 2016-11-17 3:06 PM Approved: Yes Comments: User: Lissette Acevedo Date: 2016-11-17 3:09 PM Approved: Yes Comments: User: Patrina Newton Date: 2016-11-17 3:30 PM Approved: Yes Comments: User: Eric Fladager Date: 2016-11-18 9:18 AM Approved: Yes Comments: User: Dana Burghdoff Date: 2016-12-22 1:56 PM Approved: Yes Comments: User: Randle Harwood Date: 2017-01-20 10:37 AM Approved: Yes Cornments- https://prqiectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 1/26/2017 CFW Change Order Approval CO - 08 - P and D Page 5 of 5 User: Doug Black Date: 2017-01-24 6:22 PM Approved: Yes Comments: User: Fernando Costa Date: 2017-01-25 12:28 PM Action Required: https://projeetpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 1/26/2017 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Lissette cevedo,P.E.,PTOE Sr. Professional Engineer Title