HomeMy WebLinkAboutContract 47723-FP1 Departent of P &W Cons Services
CPN# �� ` Date
Project anager i
Risk Management*C aduJ �z ITWORTH, CITY SECRETARYI,
D.O.E. Brotherton 7,-Z--)4C_ CONTRACTNO. ' I J' �� I
CFA Westerman/Scanned / t
Esteban Perez/Scanned
The Proceeding people have been Contacted
concerning the request for final payment& have ATION AND PUBLIC WORKS
released this project for such payment. F PROJECT COMPLETION
Clearance Conducted By
Developer Projects)
P,� /
CityProject Ns: 100110
Regarding contract for W.R. MEADOWS- STORM DRAIN&PAVING as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through
M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project
as complete.
Original Contract Price: $149,105.83
Amount of Approved Change Orders: Ns 1
Revised Contract Amount: $149,105.83
Total Cost Work Completed: $149,105.83
I
Al A )f)d
Z_ _ E- 2o /7
e om nded for Acceptance Date
Asst. Director, TPW - Infrastructure Design and Construction
Accepted Date
t Director, P12911TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
Asst. offy Manager Date
Comments:
OFFICIAL RECORD �1bd�gLED
CITY SECRETARY
FT.WORTH,TX FEB 1 017
Rev.9/22/16
Initial:
FO RT BYO RT H
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name W.R.MEADOWS
Contract Limits
Project Type STORM DRAIN&PAVING
City Project Numbers 100110
DOE Number 0110
Estimate Number 1 Payment Number 1 For Period Ending 12/21/2016
CD
City Secretary Contract Number Contract Time 24CD
Contract Date Days Charged to Date 186
Project Manager NA Contract is 100.00 Complete
Contractor KEY CONSTRUCTION
741 WEST SECOND STREET
WICHITA, KS 67203
Inspectors LAYER / GRINDSTAFF
Friday,December 16,2016 Page 1 of 4
City Project Numbers 100110 DOE Number 0110
Contract Name W.R.MEADOWS Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN&PAVING For Period Ending 12/21/2016
Project Funding
STORM DRAIN
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 REMOVE 21"STORM LINE 66 LF $150.00 $9,900.00 66 $9,900.00
2 REMOVE HEADWALL/SET 2 EA $1,500.00 $3,000.00 2 $3,000.00
3 LARGE STONE RIPRAP 65 SY $89.00 $5,785.00 65 $5,785.00
4 3X2 BOX CULVERT 110 $210.00 $23,100.00 110 $23,100.00
5 4X2 BOX CULVERT 53 $230.00 $12,190.00 53 $12,190.00
6 36"STRAIGHT HEADWALL, 1 PIPE 1 $5,238.00 $5,238.00 1 $5,238.00
7 36"STRAIGHT HEADWALL,2 PIPES 2 $6,785.00 $13,570.00 2 $13,570.00
8 CONTENGENCY 1 LS $7,278.30 $7,278.30 1 $7,278.30
Sub-Total of Previous Unit $80,061.30 $80,061.30
PAVING
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 REMOVE CONCRETE DRIVE 1721 SF $3.00 $5,163.00 1721 $5,163.00
2 SITE CLEARING I LS $11,500.00 $11,500.00 _ 1 $11,500.00
3 6"-12"TREE REMOVAL 3 EA $4,500.00 $13,500.00 3 $13,500.00
4 SWPPP>I ACRE 1 LS $150.00 $150.00 1 $150.00
5 6"LIME TREATMENT 450 SY $7.00 $3,150.00 450 $3,150.00
6 10"CONC PVMT 435 SY $60.75 $26,426.25 435 $26,426.25
7 JOINT SEALANT 355 LF $1.00 $355.00 355 $355.00
8 SEEDING,HYDROMULCHING 2450 SY $1.03 $2,523.50 2450 $2,523.50
9 CONTENGENCY 1 LS $6,276.78 $6,276.78 1 $6,276.78
Sub-Total of Previous Unit $69,044.53 $69,044.53
Friday,December 16,2016 Page 2 of 4
City Project Numbers 100110 DOE Number 0110
Contract Name W.R.MEADOWS Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN&PAVING For Period Ending 12/21/2016
Project Funding
Contract Information Summary
Original Contract Amount $149,105.83
Chante Orders
Total Contract Price $149,105.83
_ Date ' f Total Cost of Work Completed $149,105.83
ontr r Less %Retained $0.00
Net Earned $149,105.83
V.� Date �
Inspection e ' or Earned This Period $149,105.83
Retainage This Period $0.00
ma. U 0 Date 2 Qi `7 Less Liquidated Damages
Project Mai ager
�J Days @ /Day $0.00
Q k-LL<) Date `�.'"�" 7 LessPavement Deficiency $0.00
J As/s. 're or/{TP�f-Infrastructure Design and Construction Less Penalty $0.00
�-'y �� Date Less Previous Payment $0.00
Direct, /Contracting Departs nt Plus Material on Hand Less 15% $0.00
EE \ s1 V v-- Balance Due This Payment $149,105.83
!�2,Z
Friday,December 16,2016 Page 3 of 4
City Project Numbers 100110 DOE Number 0110
Contract Name W.R.MEADOWS Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN&PAVING For Period Ending 12/21/2016
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors LAYER / GRINDSTAFF Contract Date
Contractor KEY CONSTRUCTION Contract Time 240 CD
741 WEST SECOND STREET Days Charged to Date 186 CD
WICHITA, KS 67203 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $149,105.83
Less %Retained $0.00
Net Earned $149,105.83
Earned This Period $149,105.83
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $149,105.83
Friday,December 16,2016 Page 4 of 4
FORT WORTH rev
0
3'05
'07
TRANSPORTATION& PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: W.R.Meadows
PROJECT NO.: 100110 CONTRACTOR: Key Construction
DOE NO.: N/A
PERIOD FROM:06/20/16 TO: 12/21/16 FINAL INSPECTION DATE: 21-Dec-16
WORK ORDER EFFECTIVE:6/20/2016 CONTRACT TIME: 240 Q WO CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED DURING CREDITED MONTH HARR GE CREDITED
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS
PERIOD 186
PREVIOUS
PERIOD 0
TOTALS
TO DATE 186
*REMARKS:
CONTRACTOR DATE INSPECTOR DATE
ENGINEERING DEPARTMENT
Q-9The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTHREV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Key Construction W.R.Meadows
DOE Inspector DOE Number
Connor Slaten 100110
DOEInspector Project Manager
[J water❑ Waste water❑ Storm DrainageE] Pavement Khal Jaafari
Initial Contract knount Project Detculty
$149,105.83 Q Simple Routine Q Complex
Final Contract.4mount Date
$149,105.83 12/19/2016
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 3 20 15
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 443
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 443
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS] *100%) 443 / 448 = 99%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
�3/Signature DOE Inspector �Zature Contractor -�,�—
Signature DOE Inspector's Supervisor f�
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
a� The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 j
P
(817)392-7941 •Fax: (817)392-7845
i
CONSENT OF SURETY OWNFR ❑
TO FINAL PAYMENT ARCHITECT ❑
CONTRACTOR M
AIA Dcicun7enl G707 SURETY ❑
Bond No. 09213631 OTHER �
TO OWNE1 ARCHITECT'S PROJECT
(Narue runt adrh z)
W.R. Meadows, Inc. /City of Fort Worth, TX
Ct7NTRACT P4K: Construction
2555 NE 33rd Street
Fort Worth, TX 76111
PROJECT: CONTRACT DATED:
(A+rnne and udrhYx.�
W.R. Meadows, CFA No. 2016-021, City Project No. 100110
In accordance with The provisions of the Contract between the Owner and the Contractor as indimtett above,the
(ltrsrrt nunrrand addrxn ofSurzry}
Colonial American Casualty and Surety Company/ Fidelity and Deposit Company of Maryland
1299 Zurich Way
Schaumburg, IL 60196-1056
, SURETY,
on bond of
{hewn nanta anal address gfContrrrctrn)
Key Construction Texas, LLC
3960 Sandshell Drive
Fort Worth, TX 76137
CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of
any of its ohligatians to
(buret narrteand adklress of(Teener)
W.R. Meadows, Inc. /City of Fort Worth, TX
2555 NE 33rd Street
Fort Worth, TX 76111
OWNER,
as set forth in said Surety's bond.
IN WITNESS WHEREOF,the Surety has heretanto set its hand oa this date: December 21, 2016
(f11ar19 tet tnrltfrrg the month jolkrukd ht tfx trraner{cdatearrda car 1
Colonial American Casualty and Surety
Company/Fidelity and Deposit Company of Maryland
By:
(s�grtatxrngfurttbo! drxptrrArrnfutitrl
Attest: Mary T. Flanigan Attorney-in-Fact
CSe�}�c
(Prrivad uaure and titlrt)
Surety Phone No. 847-605-6000
0707-1994
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS:That the ZURICH AMERICAN INSURANCE COMPANY,a corporation of the State of New
York,the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY,a corporation of the State of Maryland,and the FIDELITY
AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Maryland (herein collectively called the "Companies"), by
GERALD F.HALEY,Vice President,in pursuance of authority granted by Article V,Section 8,of the By-Laws of said Companies,which
are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate,
constitute,and appoint Debra J.SCARBOROUGH,Christy M.BRAH.E,Mary T.FLANIGAN,Laura M.BUHRMESTER,Charissa
D.LECUYER,Larissa SMITH,Rebecca S.LEAL,C.STEPHENS GRIGGS,Tahitia M.FRY and Megan L.BURNS-HASTY,all of
Kansas City,Missouri, EACH its true and lawful agent and Attorney-in-Fact,to make,execute,seal and deliver,for,and on its behalf as
surety,and as its act and deed:any and all bonds and undertakings,and the execution of such bonds or undertakings in pursuance of these
presents, shall be as binding upon said Companies, as fully and amply, to, all intents and purposes, as if they had been duly executed and
acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New
York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings
Mills,Maryland.,and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings
Mills, Maryland.,in their own proper persons.
The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V,Section 8,of
the By-Laws of said Companies,and is now in force.
IN WITNESS WHEREOF, the said Vice-President has hereunto subscribed his/her names and affixed the Corporate Seals of the said
ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and
FIDELITY AND DEPOSIT COMPANY OF MARYLAND,this 4th day of November,A.D.2016.
ATTEST:
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
su
SEAL :0.
ii'p...*„n,.�
, d
Secretary Vice President
Eric D.Barnes Gerald F.Haley
State of Maryland
County of Baltimore
On this 4th day of November,A.D.2016,before the subscriber,a Notary Public of the State of Maryland,duly commissioned and qualified,GERALD
F.HALEY,Vice President,and ERIC D.BARNES,Secretary,of the Companies,to me personally known to be the individuals and officers described in
and who executed the preceding instrument,and acknowledged the execution of same,and being by me duly swom,deposeth and saith,that he/she is the said
officer of the Company aforesaid,and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies,and that the said Corporate
Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations.
IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed my Official Seal the day and year first above written.
Constance A.Dunn,Notary Public
My Commission Expires:July 9,2019
POA-F 076-5892U
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me,the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Eric Peterman, Vice
President of Construction Of Key Construction Texas, LLC, known to me
to be a credible person, who being by me duly sworn,upon his oath
deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
W.R. Meadows, Inc./City of Ft. Worth, TX
BY
v1 � j,r Name or Title
Subscribed and sworn before me on this date 23 of December, 2016.
OLGA RODRIGUEZ SEGURA
'2 Notary Public,state of Texas
My Commission Expires
July 28, 2019
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: 12/19/2016
Name of Contractor Project Name
Key Construction W.R.Meadows
DOEInspector Project Manager
Connor Slaten Khat Jaafari
DOE Nmnber ProjectD�cu4 Type of Contract
100110 0 Simple Q Routine 0 Complex � water waste water0 Storm Drainag� Pavement
Initial Contact Amount Final Contract Aniount
$149,105.83 $149,105.83
In PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector '- 1 Accuracy of Plans to Existing Conditions
-
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details Li
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 4 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs L 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor h
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
(D The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845