Loading...
HomeMy WebLinkAboutContract 47875-A1 CITY SECRETARY AMENDMENT No. 1 CONTRACT NO.-11'70-IL-Al qr& TO CITY SECRETARY CONTRACT No. GQ-2� WHEREAS, the City of Fort Worth (CITY) and Gupta & Associates Inc. , (ENGINEER) made and entered into City Secretary Contract No. N9M , (the CONTRACT) which was authorized by M&C C-27720 on the 17 day of May, 2016 in the amount of $517, 782; and WHEREAS, the CONTRACT involves engineering services for the following project: h Village Creek Water Reclamation Facility Miscellaneous Switchgear Replacement Project; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. N NOW THEREFORE, CITY and ENGINEER, acting herein by and through their �. duly authorized representatives, enter into the following agreement, j which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated 01/30/2017, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $82, 943. 00 . (See Attached Proposal) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $600, 725. 00 . 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect . EXECUTED and EFFECTIVE as of the date last written by a signatory, below. City ofs Fort Worth OFFICIAL RECORD Professional Services Agreement Amendment PMO Official Release 8/1/2012 CITY SECRETARY Page 1 of 3 FT NORTH, TX APPROVED: City of Fort Worth ENGINEER Gupta & Associates Inc. Jesus J Chapa Puneet Gupta, PE Assistant City Manager Vice President DATE: r c�o DATE: 1/30/2-17 APPROVAL RECOMMENDED: J, n Rober Carman irector, Water Department APPROVED AS TO FORM AND LEGALITY: M&C: N/A wak, Date: Douglas W. Black Assistant City Attorney ATTE FOP�2 ary J. Kayser City Secretary �"� Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX Farida Goderya, PhD, PE City of Fort-Worth- Senior Project Manager W Professional Services Agreement Amendment PMO Official Release 8/1/2012 Page 2 of 3 01/30/2017 Gupta &Associates, Inc CONSULTING ENGINEERING 13717 Neutron Road Dallas,TX 75244 Tel:972-490-7661 Ms. Farida Goderya, PhD, PE City of Fort Worth Water Department Subject: Village Creek Water Reclamation Facility Miscellaneous Switchgear Replacement Project— Amendment No. 1 Dear Ms. Goderya, At the 30%design review meeting two items were discussed as additional services requiring an amendment to the Design contract. 1. Special Services—Field topographic survey and geotechnical engineering services. 2. Primary Effluent Pump Station 1(PEI)—Design and bid services for electrical rehabilitation of PEI. The table is a breakdown of the additional services: Scope Item Description Fee 1.Special Services— 1.Survey—field topographic survey for the following $22,785 Survey&Geotechnical Primary Effluent PS 1, Primary Effluent PS 2,Sludge PS 4 and Sludge PS 3. 2.Geotechnical—two boring locations, one each at Sludge PS 4 and Sludge PS 3. 2. PEI—Electrical 1. Primary Effluent 1 Area $60,158 Rehab a. Replace the following equipment: Design& Bid Phase I.Selector Switch SS11 ii.Selector Switch SS12 iii.Transformer PA11 iv.Transformer PA12 v. Motor Control Center(MCC) PE1A vi. Motor Control Center(MCC) PE1B b. Replace the associated wire and conduit to the equipment. c. Provide a canopy for the electrical equipment identified above. d. Existing ancillary electrical equipment shall remain and not replaced under this project. We appreciate the City of Fort Worth giving us the opportunity to provide additional design services. Sincerely, Puneet Gupta, PE CC:George Luke, PE V.K.Gupta, PE 1�9�IvoCity of th ACCEPTANCE OF PREVIOUS SBE COMMITMENTFORM (for use with CHANGE ORDE!1 P QrAMJ9NPRkN_TO_OT x.0140$09NO) To be.Completed by City Project Manager Amendment(for Profosslohal Bervices Agreomprit Prolpoi.Name: Pity Project Number CO-264-8, VC YVRF$Witbhqear ImoroVements,-Ph1 Pilmmy Area City-Prolopt-Manager Farida God Ow Gupta and Associates,Ine City-&SbE Prpje6t Goal: 12 ;Qrjglrial Amount of AgreOhiOnjf. $517,782-00 Aq.cep(,qd--,St.E Cftmltfttt, Total of Pr&vio'us Amehdmerits- $0.00 D'ate of SBE;Rep6rt; 1120/2017 Amount4br this Amendment-. $82;943:00 . Amendment I Revised-Amount of Agreement: $00,0726,`00 Date: 9. Language fa to beInsoetod.40 theIR140--for-thIsAgreemOnt Gupta-and A 8 so c'[*a t % e 00-, Ino O�re00.to MAInjOlh-it$-Initle'l.-.8b!E-�.00tb-tnittnent..o-f,32 ' that It made the oj�l IppIpgy.eOmeni,and extend zn 9j ictqjnt6al n that same _R5.qpMmjjMp.nt of to this ftt amendment. Therefore'Gu-pta end Associates, lrfcf b6diolhs,1606brOP116inte!With 4he-City's BDE1 Ordinance and attests.to lts_� -e by I" e.On-­the_-A-Oqap.ja of.P.e vlous SBE pprnmftrn_�t its signature e 9 Commitment form executed by-an-aAbdidd rep.res.dn'tatfV6--6f.--It§-.-compaqy.. To be-Completed by the'Representative;of the C.bns 'it t* 's -Punoet Gupta Vice President. Pflnt.600igqaturd- AA6040 S '0046-and Astool to j a Os no, Cbmipany Narrie Contact Name(if diffore"nt): 1-3.717 NoutronRoOd _gupta@ p 90 Icons Ring,ppm Address E.-malFeWdress Pollast-Tqns/70244 *97,2-490:=7061° City/State/Zip Phone number Fox Nuimbdr 8% as.of T _6.13E;�%Pald.'to Data Date Q 11Y.?f9ject Manager -as rev ewe aqq _4 _W.#O.th.a-Wqrk--a6 �qtqci,Wlt -thl Amen- or a -Or eme ti-a doMthendsi thotr the coftidbrs.]Hho rk Irf the 'Iglh ILA e - n 4t6 'ConsUltanthavo.-the.OPtion-46retain confirm its ts.ex18tIn ,SBE commitment. :FqrIda-Godeya_ pe-4.0- Manager AttacliConiplete.Anistidniont-Doctimentation and Forwardito AMBE office. To be Completed by the M/WBE Compliance Staff Mklan,( vo-lowreal 3 7a, MIWBECO(lance- Staff- .10A. 8BE'C4rent!_%.Level Via Las't.Rbport ffe0d MtWgE-*Slg' nalare- Dat