Loading...
HomeMy WebLinkAboutContract 43893-A4 CITY SECRETARY CCMMOT NO. AMENDMENT No. 4 TO CITY SECRETARY CONTRACT 00901 WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 43893, (the CONTRACT) which was authorized by the City Council by M&C C-25936 on the 23rd day of October, 2012 in the amount of $563, 730. 92; and Amendment No. 1 'which was authorized by the City Council by M&C C-26486 on the 7th day of October, 2013; Amendment No. 2 which was administratively authorized by the City on the 8th day of June, 2015; and Amendment No. 3 which was authorized by the City Council by M&C C-27775 on the 21st day of June, 2016; and WHEREAS, the CONTRACT involves engineering services for the following project: Chapel Creek Bridge over Interstate Highway 30 WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated January 25, 2017, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $16, 680. 00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $921, 616. 92. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD Page -1- CITY SECRETARY FT,WORTH,TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Teague Nall and Perkins, Inc. Jay Chapa Josep Atwood, P.E. Assistant City Manager Principal DATE: ;� ' L e —) 7 DATE: 04Z-2247=017 _ APP R VAL RECOMMENDED: aR 6J Lj Douglag W. Wiersig, .E. Director, Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: Date: Douglas W. Black Assistant City Attorney Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ATTEST: ensuring all performance and reporting requirements. ry J a se Michael Weiss, P.E. City Secretary Senior Professional Engineer OFFICIAL RECORD CITY SECRETARY XAS FT.WORTH,TX Page -2- AN tnp ^ league nail 8r perkins www.tnpinccom January 25,2017 engineers surveyors landscape architects Mr. Michael Weiss,P.E. City of Fort Worth Transportation &Public Works Department 1000 Throckmorton Fort Worth, Texas 76102 RE: IH 30 at Chapel Creek Boulevard Bridge replacement Fee Proposal for Contract Amendment No.4 DOE Number 901 CSJ: 0918-48-722 Dear Mr.Weiss: Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above referenced contract based on additional services to add utility adjustment monitoring and verification to the project scope. The following is a brief description and cost for the additional services to be provided on this project: I. Project Management: Teague, Nall and Perkins will be required to perform additional project management services to coordinate with utility owners, City of Fort Worth and TxDOT. TNP will. 1. Status Reports: The Engineer shall provide the State with a status report for all utility adjustments on a monthly basis. The State will provide the status report format to the Engineer. 2. Review Payment Request: The Engineer shall review all payment requests for conformance with the utility estimate and verify the work has been performed. Fee: $1,910.00 II. Utility Adjustment Monitoring and Verification 1. Utility Adjustment Monitoring and Verification include the utility location installation verification, compliance with Utility Accommodation Rules, monitoring,reporting, and as-built surveying as required for the State. 2. The Engineer shall schedule a Pre-Construction meeting for each utility adjustment for which they are required to perform field verification and inspection duties. The Engineer is responsible for ensuring the necessary State representatives are present. Fort Worth-1 100 Macon Street-Fort Worth,Texas 76102-817.336.5773 ^ Dallas-17304 Preston Road,Suite 1340-Dallas,Texas 75252-21 4.461.9867 Denton-1517 Centre Place Drive,Suite 320-Denton,Texas 76205-940.383A177 Sherman-200 North Travis Street,Suite 500-Sherman,Texas 75090-903.870.1089 Registered by the Texas Board of Professional Engineers,Firm No.F-230- Registered by the Texas Board of Professional Surveyors,Firm No.100116-00 Mr.Michael Weiss,PE January 30,2017 Page 2 of 3 3. Verification: a. The Utility Engineer shall field verify all utility adjustments to ensure that the new facilities are located according to plans, specifications, and the Proposed Utility Layout. This shall include all surveying and right of way staking as needed to clear the proposed construction. b. The Utility Engineer shall insure that the utility is in compliance with the TMUTCD, "Storm Water Pollution Prevention Plan" (SW3P), backfill specifications, and restoration of right of way upon completion of work. 4. Notification. The Engineer shall notify the State when Engineer becomes aware of the demobilization, or before the demobilization process ends. 5. As-Built Drawings and GPS File: The Engineer shall, per work authorization,provide a GPS file showing all bends, install types, casings, and above ground appurtenances and shall be supplied upon completion of the utility work in a format specified by the State. The drawings and GPS files shall also include all utility adjustments and installations that are not to be constructed as a part of the Highway Project. A set of 11" x 17" as built drawings, signed and sealed by the Engineer along with a CD containing electronic files shall be submitted prior to final payment and acceptance of all Utility Coordination activities. 6. The Utility Company retains all responsibility for all inspections related to compliance with Utility Codes, Industry standards, and design of the Utility Facility. 7. The Engineer shall not provide services for the sole benefit of third parties. QL-B & C/D Fee: $9,745.00 Level A Fee: $3,625.00 III. Other Direct Expenses: Direct Expenses for copies,mailings,&mileage needed for Task items above. 1. Traffic Control Plan Fee: $1,400 Summary of Contract Amendment Fee: I. Project Management: Fee: $1,910.00 II. Utility Adjustment Monitoring and Verification: QL-B & C/D Fee: $9,745.00 Level A Fee: $3,625.00 IV. Other Direct Expenses: Fee: $1,400.00 Mr.Michael Weiss,PE January 30,2017 Page 3 of 3 Total Contract Amendment Amount: $16,680.00 Schedule: Utility relocation is currently in process. TNP will begin work within 1 week of amendment execution. Final deliverables will be submitted to the City of Fort Worth within 20 working days of completion of utility relocation. Sincerely, tnp teague nall&perkins 4rh xdt:;� J h W. Atwood, P.E. Director Transportation CC File: FTW12583 Exhibit D Fee Budget Chapel Creek Utility Verification Admin Staff Hours Rate Amount Principle 2 $210.00 $420.00 Sr. Utility Specialist 10 $95.00 $950.00 Sr. Utility Coordinator 4 $135.00 $540.00 $1,910.00 Specified Rate Level D Work Item Hours Rate Cost Survey Tech (mapping) 16 $95.00 $1,520.00 2 person Desg. &Survey 20 $135.00 $2,700.00 Engineer 25 $145.00 $3,625.00 EIT 20 $95.00 $1,900.00 Total QL-B&C/D $9,745.00 Level 'A' TH/Miles/Hrs per Mile/Day Test Holes 0'to 12' 2 $ 1,700.00 $3,400.00 Vac-Truck Mobilzation 50 $ 4.50 $225.00 Traffic Control 1 $ 1,400.00 $1,400.00 Core Drill 0 $ 750.00 $0.00 $5,025.00 Work Summary Level A Admin Level B Total $5,025.00 $1,910.00 $9,745.00 $16,680.00 W.A.Total $16,680.00 Page 1/1 Exhibit D CERTIFICATE OF INTERESTED PARTIES FORM Z295 1 of 1 Complete Nos. 1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-159881 Teague Nall and Perkins, Inc. Fort Worth,--TX,United States Date Filed: 2 Name 6t governmental entity or state agency that is a party to the contract for which the form is 01/30/2017 being#iled. City of Fort Worth Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identity the contract,and provide a description of the services,goods,or other property to be provided under the contract. DOE No. 00901,Amendment 4 Public ROW Utility Verification 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary Turner, Todd Denton, TX United States X Saunders, Greg Fort Worth,TX United States X Dryden, David Fort Worth, TX United States X Jones, Michael Fort Worth, TX United States X Hilton, C.Ty Fort Worth,TX United States X Berry, Mark Fort Worth, TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. j PAULA R S:5� N Notary Public r t STATE OF 4�1�e_sEytT Notary ID 01 wH°' (V Comm.E*JW". igna ure of authorized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE III ll Sworn to and subscribe before me,by the said this the day of 20 !_�,to cer fy ich,witness my hand and eal of office. Signatur (of officer d 'nistering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.277