Loading...
HomeMy WebLinkAboutContract 46134-CO1 FORT WORTH. City of Fort Worth CITY SECRETARY Change Order Request Breakdown CONTRACT N0. Ccs Project Namel 2014 CIP Street Reconstruction-Contract 1 City Sec# 1 46134 Client Project#(s)l Project#02353-DOE#7295 Contractorl Stabile&Winn, Inc. PM Kristian Sugrim Inspector William Mason Change Order Submittal# One Date 11/30/2016 Contract Time Dept. TIPW Totals CD Original Contract Amount $5,815,787.50 $5,815,787.50 350 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $5,815,787.50 $5,815,787.50 350 Amount of Proposed Change Order $696,774.00 $696,774.00 574 Revised Contract Amount $6,512,561.50 $6,512,561.50 924 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $696,774.00 $696,774.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 11.98% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $7,269,734.38 JUSTIFICATION(REASONS) FOR CHANGE ORDER This change order is to cover the costs of overruns on various line items. Overruns on street reconstruction was due to grading and drainage issues which necessitated additional curb/gutter and driveway reconstruction.Additional time is being added to the contract for the following reasons:45 days added due to abnormal weather during the months of December 2015 through February of 2016;85 days are being added for delays encountered when the project was put on hold from lack of funding;65 days are being added for the additional work on Rufus Ave.;32 days are being added for work that was performed which was outside of the normal scope of work.This work consisted of the addition of HMAC transitions at driveways and variable height sidewalk curbs,which was needed in areas where sloping the yards was not permissible due to trees and other obstacles within the parkway. Similarly,32 days are being added to the contract for time lost because of water and gas mains conflict on NW 25th Street.Also,44 days were lost due to Storm Water conflict on Yolanda Drive,during the timeframe of 9/10/2015 and 10/30/2015.An additional 37 days are being added for time lost due to an 8 inch water line conflict on Fairfax, the water line was discovered to be only 20 inches deep;65 days were lost as the contractor had to pull off of Purington Street due to the discovery of lead services; 14 days are being added for time lost during the time that the contractor was instructed to discontinue work in order to avoid inconveniencing residents during the Christmas holidays. In addition, 65 days are being added to complete Rufus Ave.,and 90 days are being added for the time that elapsed during this change order process. F by: ®F .. ®,�A Qom•' d M J. Kayser, City Se x e> xyy 7 ®FFICIAL.RECORD CITY SECRETARY FT.WORTH,TX Fort _ -r�WoRTH City of Fort worth Change Order Additions Project Name 1 2014 CIP Street Reconstruction-Contract 1 City Sec# 46134 Client Project# I Project#02353-DOE#7295 Contractor Stabile&Winn,Inc. PM Kristian Sugdm inspectof William Mason Change Order Submittal# One Date 11130/2016 ADDITIONS ITEM DESCRIPTION DEPT City Unit Unit Cost Total Miscellaneous Adjustments(Utilities) 4 Remove Concrete Driveway T/PW 18,227.00000000 SF $3.05 5 6"Concrete Driveway T/PW 33,250.00000000 SF 7.50 6 Remove Sidewalk T/PW 5,083.00000000 SF 3.00 8 Remove Concrete Valley Gutter T/PW 338.00000000 SY $9.05 9 6"Concrete Valley Gutter T/PW 72.00000000 SY $130.00 10 2"Pavement Surface Milling T/PW 47.00000000 SY $3.00 14 Roadbond EN1 T/PW 35.00000000 GA $145.05 16 Manhole Adjustments(with Concrete Collar) T/PW 17.00000000 EA $450.0 17 Miscellaneous Adjustments(Water Meter Box) T/PW 289.60000000 EA 50.00 18 Unclassified Street Excavation T/PW 1,955.00000000 CY 20.00 19 Curb Address Painting T/PW 152.00000000 EA 18.00 20 Block Sod Replacement T/PW 24,049.00000000 SY $5.00 21 Remove ADA Ramp T/PW 2.00000000 EA 100.00 22 ADA Ramp T/PW 39.00000000 EA 1,150.00 28 4"Solid Yellow Thermoplastic(HAS)Center Lines T/PW 810.00000000 LF 2.00 T/PW $696,774.00 Sub Total Additions 696,774.00 Change Order Additions Page 1 of 1 FORT�WORTH City of Fort Worth Change Order Deletions Project Name 2014 CIP Street Reconstruction-Contract 1 City Sec# 46134 Client Project# Project#02353-DOE#7295 Contractor Stabile&Winn,Inc. PM Kristian Sugrim Inspector William Mason Change Order Submittal# One Date 11130/2016 DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total T/PW $0.00 Sub Total Deletions Change Order Deletions Page 1 of 1 M/SBE Breakdown for this Change Order M/SBE'Sub Type of;Seruice ; Amount for this:C0 Greenscaping Grass Sod $63,000.00 Total $63,000 00 Previous Change Orders co#- `RATE AMQUNT� Total $0.00 CFW Change Order Approval St-COApp01 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 2 fortworthaov/Infrastructure Proiects/02353 - 2014 CIP Street Reconstruction - Contract 1/Contractor/Change Orders/2014 CIP Yr. 1 Ct.1 COI M&C.odf fortworthgov/Infrastructure Proiects/02353 - 2014 CIP Street Reconstruction - Contract 1/Contractor/Change Orders/Change Order Breakdown - 01.x1s Attachments(0) No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&Processld... 2/6/2017 CFW Change Order Approval St-COApp01 Page 2 of 3 FORT WORTH. City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 1 Change Order No.: St-COApp01 Date Started: 2017-01-24 City Sec. No.: 46134 Date Due: 2017-03-15 Project Name: 02353 - 2014 CIP Street Rehabilitation Technique 2 - Contract 1 Project Numbers: '02353 DOE Numbers: DOE No. Project Removal and replacement of nonfunctional or broken curb & Description: ',gutters, driveways and sidewalks; pulverization and stabilization of the existing pavement, followed by an overlay of virgin HMAC surface course. Project Manager: Kristian Sugrim City Inspector: William Mason Contractor: Stabile & Winn, Inc. COUNCIL ACTION (If Required): M&C Log Name: ,2014 CIP STREET RECONSTRUCTION CONTRACT 1 CHANGE ORDER NO. 1 M&C Number: C-28067 M&C Date: 2017-01-24 COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 696,774.00 '34014 5740010 574 Total Cost: $ 696,774.00Total Requested Days:,574 Approval Status: https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 2/6/2017 CFW Change Order Approval St-COApp01 Page 3 of 3 Approved: Yes Comments: User: Tara Fishback Date: 2017-01-26 11:06 AM Approved: Yes Comments: User: Jerry Henderson 'Date: 2017-01-26 3:49 PM Approved: Yes Comments: User: Kristian Sugrim Date: 2017-01-26 4:44 PM Approved: Yes Comments: (User: Najib Fares Date: 2017-01-26 4:51 PM Approved: Yes Comments: User: Kim Arnold Date: 2017-01-27 10:02 AM Approved: Yes ,Comments: ;User: Doug Wiersig Date: 2017-02-03 3:06 PM ;Approved: Yes Comments: User: Doug Black Date: 2017-02-06 9:40 AM ;Approved: Yes Comments: User: Jay Chapa Date: 2017-02-06 12:10 PM Action Required: https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 2/6/2017 M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA F ou WORT REFERENCE ** 202014 CIP STREET DATE: 1/24/2017 NO.: C-28067 LOG NAME: RECONSTRUCTION CONTRACT 1 CHANGE ORDER NO. 1 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Change Order No. 1 to City Secretary Contract No. 46134 with Stabile &Winn, Inc., in the Amount of$696,774.00 to Alleviate Quantity Overruns on Various Bid Line Items,Authorize Additional Days for Contract Completion and Provide for Added Staff and Project Costs Thereby Increasing the Contract Amount to $6,512,561.50 for Hot Mix Asphaltic Concrete 2014 Capital Improvement Plan Street Reconstruction Contract 1 (COUNCIL DISTRICTS 2, 3, 4, 5, 6, 8 and 9) RECOMMENDATION: It is recommended that the City Council authorize the execution of Change Order No. 1 to City Secretary Contract No. 46134 with Stabile&Winn, Inc., in the amount of$696,774.00 and an additional 574 days for 2014 Capital Improvement Plan Street Reconstruction,thereby increasing the contract amount to $6,512,561.50 (2014 Bond Program, City Project No. CO2353). DISCUSSION: On October 21, 2016 (M&C C-27054)the City Council authorized the execution of a contract with Stabile&Winn, Inc., in the amount of$5,815,787.50 for 2014 CIP Street Reconstruction Contract 1. This change order is to provide for quantity overruns to bid items on the existing contract. The recommended change order amount will be funded from the 2014 Bond Program. TPW staff has reviewed and verified the overrun quantities under this Change Order No. 1. The overrun bid items quantities are due to grading and drainage, which necessitated additional curb and gutter, sidewalk and driveways reconstruction. Also,there were water, stormwater and gas utility conflicts which were compounded by unseasonal weather conditions. The water conflicts were on Logonda Ave., 6th Ave., NW 25th St., W Fairfax St. and Purington Ave. The stormwater issue was on Yolanda Dr. and the gas conflict on NW 25th St. The bulk of the added time was due to these utility conflicts. As a result of these conflicts with individual street segments, the contract time will be extended by 574 calendar days to complete the project. Funding for the 2014 CIP Street Reconstruction Contract 1 is as follows: Existing Appropriations Proposed Description Appropriations Per this M&C ApproDriations TPW—Street Rehabilitation Fund-34014 1 $7,100,000.00 $0.00 $7,100,000.00 * Numbers rounded for presentation M/WBE OFFICE-Stabile &Winn, Inc., is in compliance with the City's BDE Ordinance by committing to an additional 9 percent MBE participation on this Change Order No. 1. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the adopted budget of the 2014 Bond Program. TO Fund Department Account Project Program I Activity I Budget Reference# Amount ID ID Year Chartfield 2 http://apps.cfwnet.org/council_packet/mc review.asp?1D=24199&councildate=l/24/2017 1/23/2017 M&C Review Page 2 of 2 FROM Fund Department Account I Project Program I Activity Budget I Reference# Amount ID ID Year Chartfleld 2 Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Douglas Wiersig (7801) Additional Information Contact: Kristian Sugrim (8902) ATTACHMENTS Stabile and Winn Form 1295 02353-46134 Contract 1.pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=24199&councildate=1/24/2017 1/23/2017 Contract Compliance Manager Re: Change Order No. 1 ($696,774.00) Contractor: Stabile & Winn, Inc. Project Name: 2014 CIP Street Rehabilitation, Contract 1 City Secretary No.: 46134 Project No.: 02353 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract including ensuring all performance and reporting requirements. VIZ14� V-'��1 Name of Employee Title C-28007 - C CERTIFICATE OF INTERESTED PARTIES FORM 1295 1of1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2016-144476 Stabile&Winn,Inc. Saginaw,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party tot the contract for which the form is 12/08/2016 being filed. City of Fort Worth Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. Project#02353 2014 CIP Street Reconstruction-Contract 1 Nature of interest 4 Name of Interested Parry City,State,Country(place of business) (check applicable) Controlling I Intermediary Henderson,Jerry Saginaw,TX United States X Winn,Dan Saginaw,TX United States X Stabile,John Saginaw,TX United States X 5 Check only if there is NO Interested Party. O 6 A — 1 swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. OF YESENIA SALAZAp 1afy 3ia.afT"= mm&Pku 12.16.2019 ary ID 13047082-7 1 1/1 Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me,by the said -TS1L iY �E*10 'Sa� this the day of 20�1p_,to certify which,witness my hand and seal of office. ureV&,*r administering oath Printed name of officer admirnstering oath Title of officer adm�inisterinq oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.277