Loading...
HomeMy WebLinkAboutContract 44165-A4 C17Y SECRETARY AMENDMENT No.4 CONTRACT N0. q TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Bridgefarmer & Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No . 44165, (the CONTRACT) which was administratively authorized by the City on the 1st day of February, 2013 in the amount of $39 , 300 . 00; and WHEREAS, the CONTRACT was subsequently revised by Amendment Number 1 in the amount of $393 , 767 . 65 authorized by the City Council by M&C C- 26422 on September 10, 2013 ; subsequently revised by Amendment Number 2 in the amount of $131, 637 .20 authorized by the City Council by M&C C- 26846 on July 22, 2014; and subsequently revised by Amendment Number 3 in the amount of $39, 740 . 00 administratively authorized by the City on August 8, 2014; WHEREAS, the CONTRACT involves engineering services for the following project : Parker-Henderson Road from Mansfield Highway to David Strickland Road WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated July 6, 2016, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $478, 620 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1, 803 , 064 . 85 . 3 . OFFICIAL RECORD CITY SECRETARY Page -1- FT.WORTH,TX All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect . EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Bridgefarmer & Associates, Inc . Jay Chapa M. Mansoor Ahs n, P.E. Assistant City Manager Chief ExecutivI4 Officer DATE: J DATE: Cl APPROVAL RECOMMENDED: C�' Dougla Wiersig, P. Director, Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: 280 31 Douglas W. Black Assistant City Attorney ATTEST: OF FONT Ma2!y J, a e City Secretary /-�S . OFFICIAL RECORD CITY SECRETARY Page -2- FT. WORTH, TX Professional Services Contract Amendment No. 4, Project C01419 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Raul E. Lopez Name of Employee Senior Professional Engineer—Project Manager Title From: Lopez. Raul To: Black Doug Subject: FW:CN#1419 Parker Henderson Road Date: Thursday,February 09,2017 9:34:21 AM Attachments: LOE for Parker Henderson Project Amendment 2016-07-06.xls Attachment A-2014-07-06 Parker-Henderson(PMO Release 20120723).docx Doug, Does the below email along with the attachments work? Raul E Lopez, P.E. Senior Professional Engineer Department of Transportation and Public Works Infrastructure Design and Construction Office: 817.392.2457 Email: caul.lopeez�t.fortworthtexas.gov City of Fort Wortli— Working togetlier to build a strong community. FORT ORTHo How am I doing? Please contact my supervisor.martin,philli safortworthtexas.gov From: Weiss, Michael Sent:Thursday, February 9, 2017 9:23 AM To: Lopez, Raul <Raul.Lopez Roura@fortworthtexas.gov> Subject: FW: CN#1419 Parker Henderson Road Raul, All I have is the email below. Thanks, Mike From: Lisa Deitemeyer [mailto:deitemeyer(a)bridgefarmer.com] Sent: Wednesday, July 06, 2016 1:31 PM To: Weiss, Michael Subject: RE: CN#1419 Parker Henderson Road Mike, The updated scope and LOE are attached. Per our discussion, we have added additional fee for: • Bridge design and required geotechnical investigation • Surveying relocated utilities during construction and showing them on the plans We also added a little more funds for bid phase services and easements because they seemed low. Please let me now if you have any comments or need additional information. (972) 231-8800 direct(469) 916-0338 www.bridgefarmer.com 1--1_-__---- --_-__ __-- _--- _._____..., . From: Weiss, Michael [mailto:Michael.Weiss(abfortworthtexas.gov] Sent: Friday, June 03, 2016 2:23 PM To: Lisa Deitemeyer Subject: FW: CN#1419 Parker Henderson Road Lisa, Attached are the Oncor's plans for Parker-Henderson Road. Thanks, Mike Weiss, P.E. Senior Professional Engineer City of Fort Worth Transportation and Public Works Department Infrastructure Design and Construction 1000 Throckmorton Street Fort Worth, TX 76102 (817) 392-8485 Office phone (817) 584-6441 Cell phone Michael.Weissnfortworthtexas.gov How am I doing? Please feel free to contact my supervisor: Mai-tin.Phi llipsCc4fortworthtexas.gov City of Fort Worth— Working together to builrl a strong community. FORT WORTH,, From: Bruton, Kevin Sent: Thursday,June 02, 2016 8:33 AM To: Cognasi,Antony;joe_toone(a)kinetic-eng.com; Penni BURT(pm6463(@att.com) Cc: Baldwin, Larry; Weiss, Michael Subject: RE: CN#1419 Parker Henderson Road Thanks, K.B. From: Cognasi,Antony [mailto:Antony.Cognasi(doncor.corn] Sent: Thursday,June 02, 2016 8:27 AM To:joe_toone(a)kinetic-eng.com; Penni BURT(pm6463(catt.com); Bruton, Kevin Cc: Baldwin, Larry Subject: CN#1419 Parker Henderson Road All, Attached you will find the Oncor construction prints for the Fort Worth Project on Parker ATTACHMENT "A" Scope for Engineering Design Related Services for Street Improvements The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVE The objective of this contract is to progress and complete design and construction plans for Parker-Henderson Road. The project scope has been changed to include the following: • Pulverize and overly the existing road from Mansfield Highway to Lifestyle Circle. • Reconstruct the existing road from Lifestyle Circle to David Strickland with sidewalks on both sides. • Construct sidewalk on both sides of the road from David Strickland to the existing bridge culvert. • Replace the existing bridge culvert for flood improvements and provide sidewalks on both sides of the road to Willow Springs Road. • Construct sidewalks on the east side of the road from Willow Springs Road to East Kellis Street. This contract amendment includes work for the design of roadway, drainage, water, structural, geotechnical, easements, survey, and permitting services required to change the project limits and update all affected sheets. Additional bid phase services are also included. WORK TO BE PERFORMED Task 1 Design Management Task 4. Final Design Task 5 Bid Phase Task 7. ROW/Easement Services Task 8. Survey and Subsurface Utility Engineering Task 9. Permitting TASK 1. DESIGN MANAGEMENT. ENGINEER will manage the work outlined in this scope to ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER will manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. Manage and direct design team activities • Ensure quality control is practiced in performance of the work • Communicate internally among team members • Task and allocate team resources City of Fort Worth,Texas Attachment A PMO Release Date:07.23.2012 Page 1 of 6 1.2. Communications and Reporting • Conduct and document monthly project update meetings with CITY Project Manager. • Conduct and document monthly design team meetings. • Prepare invoices, in accordance with Attachment B to this Standard Agreement and submit monthly in the format requested by the CITY. • Prepare and submit monthly progress reports in the format provided by the respective CITY Department. • Prepare and submit baseline Project Schedule initially, and Project Schedule updates as needed and according to the City of Fort Worth's Schedule Guidance Document. • Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at the end of the project. • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design. • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. • Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub-consultants shall carry readily visible information identifying the name of the company and the company representative. DELIVERABLES A. Meeting summaries with action items B. Monthly invoices C. Monthly progress reports D. Baseline design schedule E. Monthly MMBE Report Form and Final Summary Payment Report Form F. Plan Submittal Checklists TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). 4.1 Cast-in-place walls. Complete structural design for cast-in —place cantilever walls. 4.2 Jointing plan. Prepare jointing plan for construction of concrete pavement along the Parker Henderson project limits. 4.3 Prepare replanting plan. Trees to be removed in front of the gas well site (Parcel 10PT2) will need to be mitigated (inch per caliper inch removed). City of Fort Worth,Texas Attachment A PMO Release Date:07.23.2012 Page 2 of 6 4.4 Prepare table of all trees to be removed including size, species and ID#. 4.5 Traffic Control Plans. Design effort to develop sequence of construction and traffic control plans based on new scope of project. 4.6 Complete final design calculations for new bridge or culvert over Prairie Dog Creek including hydraulic calculations, scour analysis, and grading. 4.7 Preparation of details for block wall and channel protection. 4.8 Bridge design at Prairie Dog Creek. a. Bridge geometry b. Bridge layout and typical sections c. Boring logs sheet d. Beam design and details e. Abutment design and details f. Bent design and details g. Column design and details h. Foundation design and layout sheet i. Framing plan j. Slab plan k. Bridge quantities 4.9 Updated water main improvement plans. Proposed water main will end at the limit of asphalt pavement transition to the north of David Strickland. 4.10 Geotechnical Investigations. The ENGINEER shall perform soil investigations, including field and laboratory tests, borings, related engineering analysis and recommendations for determining soil conditions will be made for the design of a bridge crossing at Prairie Dog Creek. Required information includes d50 and d90 grain size determination for scour analysis; L-Pile parameters to be used for bridge foundation recommendations; and soil parameters to be used for the design of channel protection. The ENGINEER shall provide retaining wall design and construction recommendations including global stability analysis. The ENGINEER shall prepare a detailed engineering report summarizing the results of the field and laboratory data. The report shall be prepared by a registered engineer. 4.11 Drainage plans. a. Update drainage area maps b. Update drainage computation sheets c. Update drainage plan and profile sheets d. Design drainage ditches adjacent to proposed sidewalk. 100 year design to be contained within ROW. e. Design driveway culverts as needed. 4.12 Update plan sheets for revised project scope including: a. Cover sheet b. General notes City of Fort Worth,Texas Attachment A PMO Release Date:07.23.2012 Page 3 of 6 c. Key map/horizontal alignment d. Typical sections e. Right-of-way maps f. Demolition plans g. Roadway plan and profile sheets h. Pavement construction details i. Driveway details j. Signing and marking plans k. Erosion control plans 4.13 Show relocated utilities on plan sheets. 4.14 Construction Cost. Update final quantities and unite prices for construction cost estimate. 4.15 Specifications. Complete project final specifications documents. TASK 5. BID PHASE SERVICES. ENGINEER will support the bid phase of the project as follows. 5.1. Bid Support • The ENGINEER shall upload all plans and contract documents onto Buzzsaw for access to potential bidders. • Contract documents shall be uploaded in a .xis file. • Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. • Plan Sets are to be uploaded to Buzzsaw in two formats, .pdf and Awf files. The .pdf will consist of one file of the entire plan set. The Awf will consist of individual files, one for each plan sheet, and will be numbered and named in a manner similar to that of the plan set index. • The ENGINEER shall sell contract documents and maintain a plan holders list on Buzzsaw from documents sold and from Contractor's uploaded Plan Holder Registrations in Buzzsaw. • The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information. The procedures shall include a log of all significant bidders questions and requests and the response thereto. The log shall be housed and maintained in the project's Buzzsaw folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests, in the form of addenda. The ENGINEER shall upload all approved addenda onto Buzzsaw and mail addenda to all plan holders. City of Fort Worth,Texas Attachment A PMO Release Date:07.23.2012 Page 4 of 6 • Attend the prebid conference in support of the CITY. • Assist the CITY in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. • When substitution prior to award of contracts is allowed in the contract documents, the ENGINEER will advise the CITY as to the acceptability of alternate materials and equipment proposed by bidders. • Attend the bid opening in support of the CITY. • Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only are to be uploaded into the project's Bid Results folder on Buzzsaw. • Incorporate all addenda into the contract documents and issue conformed sets. TASK 7. ROW/EASEMENT SERVICES. ENGINEER will support and perform activities related to ROW and land as outlined below, per scoping direction and guidance from the CITY's Project Manager 7.2. Right-of-Way/Easement Preparation and Submittal. • The ENGINEER shall prepare documents to be used to obtain right-of-way and permanent and/or temporary easements required to construct the improvements. • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Buzzsaw site. ASSUMPTIONS • Additional easements may be needed for the proposed work as well as revisions to previously prepared documents. DELIVERABLES A. Easement exhibits and meets and bounds provided on CITY forms. TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES. ENGINEER will provide survey support as follows. 8.1. Survey Verification ENGINEER will perform field surveys to collect horizontal and vertical elevations of relocated utilities constructed in place. Information to be provided includes X, Y and Z coordinates in the datum established for the project, in a Microstation file format that can be referenced into the project Cadd files for the design plan sheets. City of Fort Worth,Texas Attachment A PMO Release Date:07.23.2012 Page 5 of 6 TASK 9. PERMITTING. ENGINEER will provide permitting support for the CITY to obtain any and all agreements and/or permits normally required for a project of this size and type, as follows. 9.2. Environmental Services: US Army Corp of Engineers Section 404 Nationwide Permit • Negotiating and coordinating to obtain approval of the agency issuing the agreement and/or permits. • Prepare wetland mitigation plan, if needed. • Completing all forms/applications necessary. • Submitting forms/applications for CITY review • Submitting revised forms for agency review • Responding to agency comments and requests 9.3. Floodplain Services: • Meet, negotiate and coordinate to obtain approval of the agency issuing the agreement and/or permits. • Completing all forms/applications necessary. • Submitting forms/applications for CITY review • Submitting revised forms for agency review • Responding to agency comments and requests 9.4. TxDOT Permit: • Revise and resubmit TxDOT permit according to revised project scope. 9.6. City of Fort Worth Park Conversion: • Revise and resubmit City Parks Conversion application City of Fort Worth,Texas Attachment A PMO Release Date:07.23.2012 Page 6 of 6 N A O O O O0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 O O O O p ~O O O O O 0 0 0000 0 0 0 0 0 0 O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 O O O O F- o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O o O N N W Q)Q)Q)Q)O (O V O m Ql (O�-f0(O Q)Q)O V�-N V O O Q) O O O O O O O O O d N(D (D V N Q)�(O(O 0 0)N(O O V M O O m O V O N�M t�V O A O)O)(D N M N 0 0 0 0 1\1 O O V 3 ai N Y y m r N O O O O O m d O O O y O O ~ C d a x w 0 U 7 a 0 a v Z a y � C d w w C � m C O C Z O O O O O O a w �0 fn co 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 80 0 0 o 0 0 0 m 0 00 0 000000 000000 00000 00000000000000 0 000000 00 J N ;! O O O O O O O N N W..M M O O V O w M O O l0 O N O V W V O O Q O 000. O O O O O N(O Q) N M (O Q) - Q)N(O O V M O O(Yl(D O Ol N M r- V O (3l m(D N M N 0 0 0 0 N O a V Q ~ O O O O O O Z ^ N O M W a0 J- 0 O L t O N 6 D y„ 'OI�• N ,c E E � Q ayia � c a aw ,� dod Z Q o 0000 0 00000 00000000011111 0 0 0 r� 0 0 0 0 0 0 0 0 0 0 0 9P.9..0 0 0 0 0 0 O IL d Q U O N N m Q) O (O V O t0 O N V N V O V O O W = C C a 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .� � •°f ' d V o 000 00 00000 00000000000 O o d ,0. r W W 0 O V O .0.0. N(O 0 0 0 CQ)0 c0 O O O V N F�-V N V V N N > U) WV ~ i a t OO O O O O O O O O O O O O O 00 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O .0 Ea u d o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 A O 00000 .-O V V(O a0 Ov O O(O V a N 0 Q1 Q)Q)QJ t0 N R V J a a c C w d = O o .. 0 ..0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000 0 0 0 0 0 0 0 0 0 V d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 L 0 0 0 0 0 0 0 0 0 0 0 0 0 0 R. N N V N V V 7 7 V N a V a S o0 n.o a( y � v K E m p o E U C m � � (n a cn y r y c a y a m '3 E c w 0 0 o p y m y o m Q o c o m w Fp, 00 N c m K� y L y a y 0 G U d G o m m, 1.(n o m 0 aci m m. t7 LU c rc c wa m o O Kin a m m m E m u t m E o y m E c c U w E ao ~ E m m ami o m m y v v o w y a o c m=W o c a y v m m m c w m m 2 Zi o 0 c r 4 q o co 3 m o m m m m 3 " N E c c'm E o ami U v c n p ,-yo_ € v w o m m o m m y c m m c c c c p m m'a m c m .o v m c E m v m >' m v p L u mp o 0 o p w � mmU w coo w �' c N3 c m ��'' yon aao m y� A•� �° c'a ._ c v EU o m m m d u u E O o-o c _ m m m p cc w d d d c c m m m o c w L o U m c c o m w o m N d d¢ E a o a> d v m m v k c m m m._._m a5 a5 E u r o o aEi a>'i m voi r ~ > m Q m 5 O p U E m a a a C (p o m m m m v v v m ag o o w w m o m'c o`s o m a D U:7 `"a s F- m O a U u.0 0 HHo70 D 00 D U(7 YF�OKa O(n w(n U(n mm >m� N M O N r U Z V V V V V ! p m N N N N N N N at V V V V V �tl N n n w NNNN ui vi wtO F o o O U Q a N A O O O 0 0 0 0 0 0 0 p - 0 0 O 0090 O O N F- o o � c �o 0 0 o 0 0 O O N N N O O N F• O O Cl! M (n M N N M } N Q A O O O E j N E J CO Q (n r w O C H ON uoi' a m o w 0 CO U ~ N U U mO CL F-HO—U), � w w n �<ncn W F a W W m J C F- 0 O n O W O 0 j W W O m F F 7 (D m O C CL O � Z m d � N F- c d w w C � O C j O C Z O O O O m w o o 0 ++ O m o o c d y 3 0 0 0 d o 0 0 t+ N C0 C d O O O (a J O d V N O F N } T j O O O E M Q V C d Q MLU , f) m Z E o 0o c 0 CO a) u N O W = L a Gl oo . av o o 2 o aNi cue � > ` r_ o 0 W N aiQ � VHr O `o h y o 0 0 o roi a a c C w d = O O o o m � h y o 0 0 0 0 d w m o v v a o L �p N a� a 000 0 N V n O N N ID a0 M O a0 0.p N c N V K � O W ~ O W a _ H �j w rn m a > F a N = 0 O F-W v m U OU W F- N o q U U (0 U d W� O.O F- 'OC c 2 d �" 'V w 0: 7 0 U O QQ J (n 0 N m m IL 1-1 0 F d v v c t Q Q Q W O 06> x�- Em 000 G z`oU 2"onm6 F F-F- Z H d Z d> C O J Y m m m a _ D D DR L (n(n 0.(n W W F-Q U (n N(n (9 p J N m� O O(F O N f`O'J O N C C V y C6 a6 of of of ai of of 0 E',C `o 0 v¢a m o 0 o0 0 0 0 0 0 0 o o o o o O o 0 0 0 o 0 0 0 0� o 0 go 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 o 0 o 0 0 o 0 0 G o o 0 0 0 0 0 0 0 0 0 0 0 0 O O o o o' o M O o 0 ' 0 0 O N O V O O N of<O tp<D V O OJ OJ O t0 O O N O qO O O O N h L A V O V N O O) _lO a lO O O N OD Y N f A E O O O O O O > >a C,�.. Y O i0 U O C:5 O O O N =J O J N tO 4 U O C O O 16 O N �O-' AF 6 w p p L H C N N N 3 N d fn d 3 LU x € �cnm w r W W mco co O o �,)Q w m wwom mm v g� o CL o � Z d d � C ~ N O W m C � O C O N Z d o L a W o 0 0 0 0 pp o 0 0 0 0 PN N (Q 0 O O O o o 0 0 0 0 0 0 0 o o 0 O 0 o 0 O a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o o 0 q 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J N N 0 7 O O N OJ c0(O(O C O N of O 00 O O N O O O V'O N V -Cl�-r O)7 7 N�f! OJ O Q) l0 R U Q d Z � OE' H a) E w o ' 0 m y S o m E e G W ,v yQ E Z a O Q' U) y Wa O o 0 0 000o0o0oo0 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W 0 Oi N 4 b O .+_T' o oo0 0o00000000o 0 o0 0 o M N Y O O ♦♦,, a' 0 0 0 0 0 0 0 o o o o 0 0 0 0 0 0 0 o o a J O v O E W N N N N 't 7 7 0 V V o O o o W N OO V O O Cl) 'o V N O 0 0 0 O O 0 0 0 0 0 0 0 0 0 O O O O N 0 0 0 O O 0 0 0 0 0 0 0 0 0 O O O q O M C O U C N O O O N N o O O O O N O W N C 00 W O O O 2 awe Y o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 y o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NNS -a O C N 0 N V� 0 O N o` o y N o N O H � C C � 0 o _a d > v o m @ y U o .°. 0- 0 N H N^ZNw >LR ONi>OT C 1Uo�l,D�o�rnT UOI)N aO0)Cw N NCO�D. N(0.0V WN OU•OyLL( 0Np U W CZ ta �0 �O0 DC ] C WE c E ED 0 w 8 o WO v o o 0 _ xO 0mmm¢mULLLLa a Cx.tmmo wO- 0 0 0�n ro o 0 0 0 0 0 0 0 0 0 0 Z O O MT N N 10 ( ( } k )\ \ ) E 0 La \))�} co co Qm§ ) / LU�\`Co � � ƒ » _ § . / o f § ( 3 t ) 0 §/ } } } k0 0 } $ - - 22 � Iow ) e « e2 k �LU > z ® eee@2 ■ o ■ mmew � R , � o R e 4,—x U) i2 0 \ co f 2 w \ § § » 2 § � f � ! $ .21 � ) k E 2 { f $ M&C Review Page 1 of 3 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FORTI ORTII COUNCIL ACTION: Approved on 12/13/2016 REFERENCE ** 20PARKER- DATE: 12/13/2016 NO : C-28035 LOG NAME: HENDERSON AMEND 4 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 4 in an Amount Not to Exceed $478,620.00 to City Secretary Contract No. 44165, an Engineering Services Agreement with Bridgefarmer& Associates, Inc., for the Design of Parker-Henderson Road from Mansfield Highway to Martin Street for a Revised Contract Amount Not to Exceed $1,083,064.85 (COUNCIL DISTRICT 5) RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 4 in an amount not to exceed $478,620.00 to City Secretary Contract No. 44165, an Engineering Services Agreement with Bridgefarmer&Associates, Inc., for the design of Parker-Henderson Road from Mansfield Highway to Martin Street for a revised contract amount not to exceed $1,083,064.85 (CPN C01419). DISCUSSION: The 2008 Capital Improvement Program allocated funds for the reconstruction of Parker-Henderson Road from Mansfield Highway to David Strickland Road with the construction of sidewalks from David Strickland Road to Martin Street. An Engineering Services Agreement, City Secretary No. 44165 with Bridgefarmer& Associates, Inc. was authorized for the design of the project that included full concrete reconstruction of the roadway from Mansfield Highway to Prairie Dog Creek, a new Bridge at Prairie Dog Creek and sidewalks from the new bridge to Martin Street. Project costs to complete this project are estimated to substantially exceed the project funding allocation of$4.7 million. Staff has reevaluated the scope of the project and determined that modifications can occur that incorporate project elements that parallel the needs of the community and maintain the project budget within the funding allocation of$4.7 million. The proposed design Amendment is to revise the project scope to include the following improvements: Pulverization and overlay of the existing pavement from Mansfield Highway to Lifestyle Circle. This will reduce the quantity of new concrete pavement, but additional design effort is required to install drainage ditches, driveway culverts, or other storm drain improvements within the existing right-of-way; Full reconstruction of the Parker-Henderson Road from Lifestyle Circle to David Strickland Road including sidewalks to link the abutting residential land uses to the elementary school and Prairie Dog Park; Final design of box culverts to replace the existing bridge on Parker-Henderson Road over Prairie Dog Branch; Construction of sidewalks on the west side of Parker-Henderson Road from David Strickland Road to Kellis Street. The previous project scope called for full reconstruction for this segment of Parker- Henderson Road, which is being eliminated. Additional design effort is required to install drainage ditches, driveway culverts, and storm drains within the existing right-of-way; and Construction of sidewalks on the east side of Parker-Henderson Road from David Strickland Road to Willow Springs Road with drainage ditches in the existing right-of-way. Funds for this Amendment will be provided from the 2008 Street Improvements Fund. Adjustments to current project appropriations will occur as part of the construction contract award such that remaining funds can be appropriated to other capital roadway needs. The following Table summarizes previous contract action and Amendments. http://apps.cfwnet.org/council_packet/Me_review.asp?ID=22933&councildate=12/13/2016 2/2/2017 M&C Review Page 2 of 3 - Amount Project Description NM&C Approved Conceptual Design of Parker Initial Contract $39,300.00 Henderson Road from N/A 2/13/2013 Mansfield Highway to Martin Street Amendment No. 1 $393,767.65 Final Design Plans C-26422 1/26/2010 Subsurface Utility Amendment No. 2 $131,637.20 Investigations, Additional C-26846 7/22/2014 Geotechnical Investigations, ROW Surveys and Exhibits Amendment No. 3 $39,740.00 Waterline Design Revisions N/A 8/08/14 Amendment No. 4 $478,620.00 Revise Design as Noted _ Pending Above Contract Total $1,083,064.85 - - - M/WBE Office - Bridgefarmer&Associates, Inc. is in compliance with the City's BIDE Ordinance by committing to an additional nine percent SBE participation on this Amendment No. 4. The City's SBE goal on this Amendment or extra work is nine percent. This project is located in COUNCIL DISTRICT 5. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the 2008 Street Improvements Fund and the Water Improvements Fund. Description Existing Appropriations Proposed Appropriations Appropriations Per this M&C 2008 Street $ 7,817,807.28 $ 0.00 $ 7,817,807.28 Improvements Fund 39407 Stormwater Capital $ 199,428.10 $ 0.00 $ 199,428.10 Projects Fund 59651 Water Capital $ 201,336.49 $ 0.00 $ 201,336.49 Projects Fund 59601 TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 FROM Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Douglas Wiersig (7801) Additional Information Contact: Mike Weiss (8485) http://apps.cfwnet.org/council_packet/mc_review.asp?ID=22933&councildate=12/13/2016 2/2/2017 M&C Review Page 3 of 3 ATTACHMENTS 20Paker-Henderson Amend 4 Map 11-22-16.pdf Bridgefarmer Form 1295 Certificate CofFW.pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=22933&councildate=12/13/2016 2/2/2017 C-28035 C CERTIFICATE OF INTERESTED PARTIES FORM 1295 lofl 7-7 Complete Nos.i-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2016-117700 Bridgefarmer&Associates, Inc. Dallas,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 09/28/2016 being filed. City of Fort Worth Date Acknow� ll/jdc�e'd: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. Project No.01419 Engineering services for development of plans,specifications and estimates for Parker Henderson Road from Mansfield Highway to Martin Street. Nature of interest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling I Intermediary Ahsan, Mansoor Dallas,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFI A IT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. KENNETH HSU t•lotofy Public,State of Texas My Commission Expires +:= May 21, 2019 ignature of aut ized agent of contract g business entity AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me,by the said Mansoor Ahsan this the 28th day of September 2016 to certify which,witness my hand and seat of office. Kenneth Hsu Accounting Manager Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.277