WHEREAS, the City of Fort Worth (CITY) and Bridgefarmer &
Associates, Inc. , (ENGINEER) made and entered into City Secretary
Contract No . 44165, (the CONTRACT) which was administratively authorized
by the City on the 1st day of February, 2013 in the amount of $39 , 300 . 00;
and
WHEREAS, the CONTRACT was subsequently revised by Amendment Number 1
in the amount of $393 , 767 . 65 authorized by the City Council by M&C C-
26422 on September 10, 2013 ; subsequently revised by Amendment Number 2
in the amount of $131, 637 .20 authorized by the City Council by M&C C-
26846 on July 22, 2014; and subsequently revised by Amendment Number 3 in
the amount of $39, 740 . 00 administratively authorized by the City on
August 8, 2014;
WHEREAS, the CONTRACT involves engineering services for the
following project :
Parker-Henderson Road from Mansfield Highway to David Strickland Road
WHEREAS, it has become necessary to execute Amendment No. 4 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated July 6, 2016, a copy
of which is attached hereto and incorporated herein. The cost to City
for the additional design services to be performed by Engineer totals
$478, 620 . 00 .
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $1, 803 , 064 . 85 .
3 .
OFFICIAL RECORD
CITY SECRETARY
Page -1- FT.WORTH,TX
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect .
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth ENGINEER
Bridgefarmer & Associates, Inc .
Jay Chapa M. Mansoor Ahs n, P.E.
Assistant City Manager Chief ExecutivI4 Officer
DATE: J DATE: Cl
APPROVAL RECOMMENDED:
C�'
Dougla Wiersig, P.
Director, Transportation and Public Works Department
APPROVED AS TO FORM AND LEGALITY:
280 31
Douglas W. Black
Assistant City Attorney
ATTEST:
OF FONT
Ma2!y J, a e
City Secretary
/-�S .
OFFICIAL RECORD
CITY SECRETARY
Page -2- FT. WORTH, TX
Professional Services Contract Amendment No. 4, Project C01419
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Raul E. Lopez
Name of Employee
Senior Professional Engineer—Project Manager
Title
From: Lopez. Raul
To: Black Doug
Subject: FW:CN#1419 Parker Henderson Road
Date: Thursday,February 09,2017 9:34:21 AM
Attachments: LOE for Parker Henderson Project Amendment 2016-07-06.xls
Attachment A-2014-07-06 Parker-Henderson(PMO Release 20120723).docx
Doug,
Does the below email along with the attachments work?
Raul E Lopez, P.E.
Senior Professional Engineer
Department of Transportation and Public Works
Infrastructure Design and Construction
Office: 817.392.2457
Email: caul.lopeez�t.fortworthtexas.gov
City of Fort Wortli— Working togetlier to build a strong community.
FORT ORTHo
How am I doing?
Please contact my supervisor.martin,philli safortworthtexas.gov
From: Weiss, Michael
Sent:Thursday, February 9, 2017 9:23 AM
To: Lopez, Raul <Raul.Lopez Roura@fortworthtexas.gov>
Subject: FW: CN#1419 Parker Henderson Road
Raul,
All I have is the email below.
Thanks,
Mike
From: Lisa Deitemeyer [mailto:deitemeyer(a)bridgefarmer.com]
Sent: Wednesday, July 06, 2016 1:31 PM
To: Weiss, Michael
Subject: RE: CN#1419 Parker Henderson Road
Mike,
The updated scope and LOE are attached. Per our discussion, we have added additional fee for:
• Bridge design and required geotechnical investigation
• Surveying relocated utilities during construction and showing them on the plans
We also added a little more funds for bid phase services and easements because they seemed low.
Please let me now if you have any comments or need additional information.
(972) 231-8800
direct(469) 916-0338
www.bridgefarmer.com
1--1_-__---- --_-__ __-- _--- _._____..., .
From: Weiss, Michael [mailto:Michael.Weiss(abfortworthtexas.gov]
Sent: Friday, June 03, 2016 2:23 PM
To: Lisa Deitemeyer
Subject: FW: CN#1419 Parker Henderson Road
Lisa,
Attached are the Oncor's plans for Parker-Henderson Road.
Thanks,
Mike Weiss, P.E.
Senior Professional Engineer
City of Fort Worth Transportation and Public Works Department
Infrastructure Design and Construction
1000 Throckmorton Street
Fort Worth, TX 76102
(817) 392-8485 Office phone
(817) 584-6441 Cell phone
Michael.Weissnfortworthtexas.gov
How am I doing?
Please feel free to contact my supervisor: Mai-tin.Phi llipsCc4fortworthtexas.gov
City of Fort Worth— Working together to builrl a strong community.
FORT WORTH,,
From: Bruton, Kevin
Sent: Thursday,June 02, 2016 8:33 AM
To: Cognasi,Antony;joe_toone(a)kinetic-eng.com; Penni BURT(pm6463(@att.com)
Cc: Baldwin, Larry; Weiss, Michael
Subject: RE: CN#1419 Parker Henderson Road
Thanks,
K.B.
From: Cognasi,Antony [mailto:Antony.Cognasi(doncor.corn]
Sent: Thursday,June 02, 2016 8:27 AM
To:joe_toone(a)kinetic-eng.com; Penni BURT(pm6463(catt.com); Bruton, Kevin
Cc: Baldwin, Larry
Subject: CN#1419 Parker Henderson Road
All,
Attached you will find the Oncor construction prints for the Fort Worth Project on Parker
ATTACHMENT "A"
Scope for Engineering Design Related Services for Street Improvements
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
OBJECTIVE
The objective of this contract is to progress and complete design and construction plans for
Parker-Henderson Road. The project scope has been changed to include the following:
• Pulverize and overly the existing road from Mansfield Highway to Lifestyle Circle.
• Reconstruct the existing road from Lifestyle Circle to David Strickland with sidewalks
on both sides.
• Construct sidewalk on both sides of the road from David Strickland to the existing
bridge culvert.
• Replace the existing bridge culvert for flood improvements and provide sidewalks on
both sides of the road to Willow Springs Road.
• Construct sidewalks on the east side of the road from Willow Springs Road to East
Kellis Street.
This contract amendment includes work for the design of roadway, drainage, water,
structural, geotechnical, easements, survey, and permitting services required to change the
project limits and update all affected sheets. Additional bid phase services are also
included.
WORK TO BE PERFORMED
Task 1 Design Management
Task 4. Final Design
Task 5 Bid Phase
Task 7. ROW/Easement Services
Task 8. Survey and Subsurface Utility Engineering
Task 9. Permitting
TASK 1. DESIGN MANAGEMENT.
ENGINEER will manage the work outlined in this scope to ensure efficient and effective use
of ENGINEER's and CITY's time and resources. ENGINEER will manage change,
communicate effectively, coordinate internally and externally as needed, and proactively
address issues with the CITY's Project Manager and others as necessary to make progress
on the work.
1.1. Manage and direct design team activities
• Ensure quality control is practiced in performance of the work
• Communicate internally among team members
• Task and allocate team resources
City of Fort Worth,Texas
Attachment A
PMO Release Date:07.23.2012
Page 1 of 6
1.2. Communications and Reporting
• Conduct and document monthly project update meetings with CITY Project Manager.
• Conduct and document monthly design team meetings.
• Prepare invoices, in accordance with Attachment B to this Standard Agreement and
submit monthly in the format requested by the CITY.
• Prepare and submit monthly progress reports in the format provided by the respective
CITY Department.
• Prepare and submit baseline Project Schedule initially, and Project Schedule updates
as needed and according to the City of Fort Worth's Schedule Guidance Document.
• Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at
the end of the project.
• Coordinate with other agencies and entities as necessary for the design of the
proposed infrastructure, and provide and obtain information needed to prepare the
design.
• With respect to coordination with permitting authorities, ENGINEER shall
communicate with permitting authorities such that their regulatory requirements are
appropriately reflected in the designs. ENGINEER shall work with regulatory
authorities to obtain approval of the designs, and make changes necessary to meet
their requirements, as part of the design scope.
• Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub-consultants shall carry readily visible
information identifying the name of the company and the company representative.
DELIVERABLES
A. Meeting summaries with action items
B. Monthly invoices
C. Monthly progress reports
D. Baseline design schedule
E. Monthly MMBE Report Form and Final Summary Payment Report Form
F. Plan Submittal Checklists
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT).
4.1 Cast-in-place walls. Complete structural design for cast-in —place cantilever walls.
4.2 Jointing plan. Prepare jointing plan for construction of concrete pavement along the
Parker Henderson project limits.
4.3 Prepare replanting plan. Trees to be removed in front of the gas well site (Parcel
10PT2) will need to be mitigated (inch per caliper inch removed).
City of Fort Worth,Texas
Attachment A
PMO Release Date:07.23.2012
Page 2 of 6
4.4 Prepare table of all trees to be removed including size, species and ID#.
4.5 Traffic Control Plans. Design effort to develop sequence of construction and traffic
control plans based on new scope of project.
4.6 Complete final design calculations for new bridge or culvert over Prairie Dog Creek
including hydraulic calculations, scour analysis, and grading.
4.7 Preparation of details for block wall and channel protection.
4.8 Bridge design at Prairie Dog Creek.
a. Bridge geometry
b. Bridge layout and typical sections
c. Boring logs sheet
d. Beam design and details
e. Abutment design and details
f. Bent design and details
g. Column design and details
h. Foundation design and layout sheet
i. Framing plan
j. Slab plan
k. Bridge quantities
4.9 Updated water main improvement plans. Proposed water main will end at the limit of
asphalt pavement transition to the north of David Strickland.
4.10 Geotechnical Investigations. The ENGINEER shall perform soil investigations,
including field and laboratory tests, borings, related engineering analysis and
recommendations for determining soil conditions will be made for the design of a
bridge crossing at Prairie Dog Creek. Required information includes d50 and d90
grain size determination for scour analysis; L-Pile parameters to be used for bridge
foundation recommendations; and soil parameters to be used for the design of
channel protection.
The ENGINEER shall provide retaining wall design and construction
recommendations including global stability analysis.
The ENGINEER shall prepare a detailed engineering report summarizing the results
of the field and laboratory data. The report shall be prepared by a registered
engineer.
4.11 Drainage plans.
a. Update drainage area maps
b. Update drainage computation sheets
c. Update drainage plan and profile sheets
d. Design drainage ditches adjacent to proposed sidewalk. 100 year design to be
contained within ROW.
e. Design driveway culverts as needed.
4.12 Update plan sheets for revised project scope including:
a. Cover sheet
b. General notes
City of Fort Worth,Texas
Attachment A
PMO Release Date:07.23.2012
Page 3 of 6
c. Key map/horizontal alignment
d. Typical sections
e. Right-of-way maps
f. Demolition plans
g. Roadway plan and profile sheets
h. Pavement construction details
i. Driveway details
j. Signing and marking plans
k. Erosion control plans
4.13 Show relocated utilities on plan sheets.
4.14 Construction Cost. Update final quantities and unite prices for construction cost
estimate.
4.15 Specifications. Complete project final specifications documents.
TASK 5. BID PHASE SERVICES.
ENGINEER will support the bid phase of the project as follows.
5.1. Bid Support
• The ENGINEER shall upload all plans and contract documents onto Buzzsaw for
access to potential bidders.
• Contract documents shall be uploaded in a .xis file.
• Unit Price Proposal documents are to be created utilizing CFW Bidtools only
and combined in a specified spreadsheet workbook, Bid Proposal Worksheet
Template, and will be populated and configured so that all pages are
complete and the Summary Worksheet(s) in the workbook detail and
automatically summarize the totals from the inserted Unit Price Proposal
document worksheets.
• Plan Sets are to be uploaded to Buzzsaw in two formats, .pdf and Awf files.
The .pdf will consist of one file of the entire plan set. The Awf will consist of
individual files, one for each plan sheet, and will be numbered and named in
a manner similar to that of the plan set index.
• The ENGINEER shall sell contract documents and maintain a plan holders list on
Buzzsaw from documents sold and from Contractor's uploaded Plan Holder
Registrations in Buzzsaw.
• The ENGINEER will develop and implement procedures for receiving and
answering bidders' questions and requests for additional information. The
procedures shall include a log of all significant bidders questions and requests
and the response thereto. The log shall be housed and maintained in the
project's Buzzsaw folder titled Request for Information. The ENGINEER will
provide technical interpretation of the contract bid documents and will prepare
proposed responses to all bidders questions and requests, in the form of
addenda. The ENGINEER shall upload all approved addenda onto Buzzsaw and
mail addenda to all plan holders.
City of Fort Worth,Texas
Attachment A
PMO Release Date:07.23.2012
Page 4 of 6
• Attend the prebid conference in support of the CITY.
• Assist the CITY in determining the qualifications and acceptability of prospective
contractors, subcontractors, and suppliers.
• When substitution prior to award of contracts is allowed in the contract
documents, the ENGINEER will advise the CITY as to the acceptability of
alternate materials and equipment proposed by bidders.
• Attend the bid opening in support of the CITY.
• Tabulate and review all bids received for the construction project, assist the CITY
in evaluating bids, and recommend award of the contract. A copy of the Bid
Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only
are to be uploaded into the project's Bid Results folder on Buzzsaw.
• Incorporate all addenda into the contract documents and issue conformed sets.
TASK 7. ROW/EASEMENT SERVICES.
ENGINEER will support and perform activities related to ROW and land as outlined below,
per scoping direction and guidance from the CITY's Project Manager
7.2. Right-of-Way/Easement Preparation and Submittal.
• The ENGINEER shall prepare documents to be used to obtain right-of-way and
permanent and/or temporary easements required to construct the improvements.
• The documentation shall be provided in conformance with the checklists and
templates available on the CITY's Buzzsaw site.
ASSUMPTIONS
• Additional easements may be needed for the proposed work as well as revisions
to previously prepared documents.
DELIVERABLES
A. Easement exhibits and meets and bounds provided on CITY forms.
TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES.
ENGINEER will provide survey support as follows.
8.1. Survey Verification
ENGINEER will perform field surveys to collect horizontal and vertical elevations of
relocated utilities constructed in place.
Information to be provided includes X, Y and Z coordinates in the datum established for the
project, in a Microstation file format that can be referenced into the project Cadd files for the
design plan sheets.
City of Fort Worth,Texas
Attachment A
PMO Release Date:07.23.2012
Page 5 of 6
TASK 9. PERMITTING.
ENGINEER will provide permitting support for the CITY to obtain any and all agreements
and/or permits normally required for a project of this size and type, as follows.
9.2. Environmental Services: US Army Corp of Engineers Section 404 Nationwide Permit
• Negotiating and coordinating to obtain approval of the agency issuing the
agreement and/or permits.
• Prepare wetland mitigation plan, if needed.
• Completing all forms/applications necessary.
• Submitting forms/applications for CITY review
• Submitting revised forms for agency review
• Responding to agency comments and requests
9.3. Floodplain Services:
• Meet, negotiate and coordinate to obtain approval of the agency issuing the
agreement and/or permits.
• Completing all forms/applications necessary.
• Submitting forms/applications for CITY review
• Submitting revised forms for agency review
• Responding to agency comments and requests
9.4. TxDOT Permit:
• Revise and resubmit TxDOT permit according to revised project scope.
9.6. City of Fort Worth Park Conversion:
• Revise and resubmit City Parks Conversion application
City of Fort Worth,Texas
Attachment A
PMO Release Date:07.23.2012
Page 6 of 6
N
A O O O O0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 O O O O p
~O O O O O 0 0 0000 0 0 0 0 0 0 O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 O O O O
F- o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
O O O O O o O N N W Q)Q)Q)Q)O (O V O m Ql (O�-f0(O Q)Q)O V�-N V O O Q) O O O O O O O O O
d N(D (D V N Q)�(O(O 0 0)N(O O V M O O m O V O N�M t�V O A O)O)(D N M N 0 0 0 0 1\1
O O V
3 ai N
Y
y
m
r
N O O
O O O
m d O O
O y O O
~ C
d
a
x
w
0
U
7
a
0
a
v
Z
a
y �
C
d
w w
C �
m C
O
C Z
O O O
O O O
a w
�0
fn
co
0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
C a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 80 0 0 o 0 0 0
m 0 00 0 000000 000000 00000 00000000000000 0 000000 00
J N ;! O O O O O O O N N W..M M O O V O w M O O l0 O N O V W V O O Q O 000.
O O O O
O N(O Q) N M (O Q) - Q)N(O O V M O O(Yl(D O Ol N M r- V O (3l m(D N M N 0 0 0 0 N O a V
Q ~
O O O O O O
Z ^ N O M W a0
J- 0 O L t O N
6 D y„ 'OI�• N ,c
E E
� Q ayia � c a
aw ,� dod
Z Q o 0000 0 00000 00000000011111
0 0 0
r� 0 0 0 0 0 0 0 0 0 0 0 9P.9..0 0 0 0 0 0
O IL d Q U O N N m Q) O (O V O t0 O N V N V O V O O
W = C C a
0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
.� � •°f ' d V o 000 00 00000 00000000000 O o
d ,0.
r W W
0 O V O .0.0. N(O 0 0 0
CQ)0 c0 O O O
V N F�-V N V V N N
> U) WV ~
i a t
OO O O O O O O O O O O O O O 00 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O .0
Ea u d o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
A O
00000 .-O V V(O a0 Ov O O(O V a N 0 Q1 Q)Q)QJ t0 N R V
J
a a c
C w
d
= O o .. 0 ..0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000 0 0 0 0 0 0 0 0 0
V d
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
L 0 0 0 0 0 0 0 0 0 0 0 0 0 0 R.
N N V N V V 7 7 V N a V
a
S
o0
n.o
a( y
� v
K E m p
o
E U C
m �
� (n a cn
y r y c a y a
m '3 E
c w 0
0 o
p y m y o m Q o
c o m w
Fp, 00 N
c m K� y L y a
y 0 G U d
G o m m, 1.(n o m 0 aci
m m. t7 LU c rc c wa m o
O Kin a m m m E m u t m E o y m E c c U w E ao
~ E m m ami o m m y v v o w y a o c m=W o
c a y v m m m c w m m 2 Zi
o 0
c r 4 q o co 3 m o m m m m 3 " N E c c'm E o ami U v c n p ,-yo_ € v w o m
m o m m y c m m c c c c p m m'a m c m .o v m c E m v
m >' m v p L u mp o 0 o p w
� mmU w coo w �' c N3 c m ��'' yon aao m y� A•� �°
c'a ._ c v EU o m m m d u
u E O o-o c _ m m m p cc w d d d c c m m m o c w L o U m c c o m w o m N
d d¢ E a o a> d v m m v k c m m m._._m a5 a5 E u r o o aEi a>'i m voi r ~ > m
Q m 5 O p U E m a a a C (p o m m m m v v v m ag o o w w m o m'c o`s o m a D U:7 `"a s F- m O
a U u.0 0 HHo70 D 00 D U(7 YF�OKa O(n w(n U(n mm
>m�
N M
O N r U
Z V V V V V ! p m
N N N N N N N at V V V V V �tl N n n
w NNNN ui vi wtO
F o o O
U Q a
N
A O O O 0 0 0 0 0 0 0 p
- 0 0 O 0090 O O N
F- o o � c �o 0 0 o 0 0
O O N N N O O N F•
O O Cl! M
(n M N N M }
N Q
A
O O O E j N
E J CO Q (n
r w
O C H ON uoi' a m o w 0 CO U
~ N U U mO
CL F-HO—U), � w
w n �<ncn W F a
W W
m J
C
F-
0
O n O W O 0
j W W O m F F
7 (D m
O
C
CL O
� Z
m
d �
N F-
c
d
w w
C �
O C
j O
C Z
O O O O
m w o o 0
++ O m o o c
d y 3 0 0 0
d o 0 0
t+ N
C0
C d O O O
(a J O d V N
O
F N
} T j O O O
E
M Q V C d Q
MLU
,
f) m Z E o 0o c
0 CO a) u N O
W = L a
Gl
oo . av o o
2
o aNi cue �
> ` r_ o
0 W N
aiQ � VHr
O `o h y o 0 0 o roi
a a c
C w
d
= O O o o m
� h y o 0 0 0 0
d w m o v v a o
L �p
N a�
a
000 0
N V n O N N
ID
a0 M O a0
0.p N c N V
K �
O
W ~
O
W
a _ H
�j w rn m
a > F a
N = 0 O F-W
v m U OU W F- N
o
q U U (0 U d W� O.O
F- 'OC c 2 d �" 'V w 0:
7 0 U O QQ J (n 0
N
m m IL 1-1 0 F d
v v c t Q Q Q W O
06> x�- Em 000 G z`oU
2"onm6 F F-F- Z H d
Z d> C O J Y m m m a
_ D D DR L
(n(n 0.(n W W F-Q U (n N(n (9 p J N
m�
O O(F O N f`O'J O N C C V
y C6 a6 of of of ai of of 0
E',C
`o 0
v¢a
m o 0 o0 0 0 0 0 0 0 o o o o o O o 0 0 0 o 0 0 0 0� o
0
go 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 o 0 o 0 0 o
0
0 G o o 0 0 0 0 0 0 0 0 0 0 0 0 O O o o o' o M O o 0 ' 0 0 O
N O V O O N of<O tp<D V O OJ OJ O t0 O O N O qO O O O N h
L A V O V N O O) _lO a lO O O N OD
Y
N
f A
E
O O O O O O > >a C,�.. Y O
i0 U O
C:5 O O O N =J O J N tO 4 U
O C O O 16 O N �O-' AF 6 w p p L
H
C N N N 3 N d fn d 3
LU x € �cnm w
r W W mco co
O
o �,)Q w m
wwom
mm
v g�
o
CL o
� Z
d
d �
C ~
N
O
W m
C �
O C
O
N Z
d o
L a W o 0 0 0 0
pp o 0 0 0 0
PN N
(Q 0 O O O o o 0 0 0 0 0 0 0 o o 0 O 0 o 0 O
a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o o 0 q 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
J N N 0 7 O O N OJ c0(O(O C O N of O 00 O O N O
O O V'O N V -Cl�-r O)7 7 N�f! OJ O Q) l0
R U Q
d Z � OE'
H
a) E w o
' 0
m y S o m
E e
G W ,v yQ E
Z a
O Q' U) y Wa O o 0 0 000o0o0oo0
O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
W 0 Oi N 4 b O
.+_T' o oo0 0o00000000o 0 o0 0 o M
N Y O O ♦♦,, a' 0 0 0 0 0 0 0 o o o o 0 0 0 0 0 0 0 o o a
J O v O E W N N N N 't 7 7 0 V V o O o o W N OO V O
O Cl) 'o
V
N O 0 0 0 O O 0 0 0 0 0 0 0 0 0 O O O O N
0 0 0 O O 0 0 0 0 0 0 0 0 0 O O O q O M
C O U C N O O O N N o O O O O N O W N C 00 W O O O
2 awe
Y o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
y o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NNS -a
O C N
0
N V�
0 O N
o` o
y N o
N
O
H
� C
C �
0 o _a d >
v o m @ y U o
.°.
0-
0 N
H N^ZNw >LR ONi>OT C 1Uo�l,D�o�rnT UOI)N aO0)Cw N NCO�D. N(0.0V WN OU•OyLL(
0Np U
W CZ ta
�0
�O0
DC ] C WE c E ED 0 w 8
o WO v o o 0
_ xO
0mmm¢mULLLLa a Cx.tmmo wO-
0 0 0�n ro o 0 0 0 0 0 0 0 0 0 0
Z O O MT N
N
10
( ( } k )\ \
) E
0
La
\))�}
co co
Qm§ )
/ LU�\`Co
� �
ƒ »
_ § .
/ o
f
§ (
3
t
)
0 §/ } } }
k0
0 } $ -
-
22 � Iow )
e « e2 k
�LU > z ®
eee@2 ■
o ■ mmew � R ,
� o R e
4,—x U)
i2 0
\ co f 2 w \ § § »
2
§ �
f � !
$
.21
� )
k E
2 {
f $
M&C Review Page 1 of 3
Official site of the City of Fort Worth,Texas
CITY COUNCIL AGENDA FORTI ORTII
COUNCIL ACTION: Approved on 12/13/2016
REFERENCE ** 20PARKER-
DATE: 12/13/2016 NO : C-28035 LOG NAME: HENDERSON AMEND 4
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of Amendment No. 4 in an Amount Not to Exceed $478,620.00 to City
Secretary Contract No. 44165, an Engineering Services Agreement with Bridgefarmer&
Associates, Inc., for the Design of Parker-Henderson Road from Mansfield Highway to
Martin Street for a Revised Contract Amount Not to Exceed $1,083,064.85 (COUNCIL
DISTRICT 5)
RECOMMENDATION:
It is recommended that the City Council authorize the execution of Amendment No. 4 in an amount not to
exceed $478,620.00 to City Secretary Contract No. 44165, an Engineering Services Agreement with
Bridgefarmer&Associates, Inc., for the design of Parker-Henderson Road from Mansfield Highway to
Martin Street for a revised contract amount not to exceed $1,083,064.85 (CPN C01419).
DISCUSSION:
The 2008 Capital Improvement Program allocated funds for the reconstruction of Parker-Henderson Road
from Mansfield Highway to David Strickland Road with the construction of sidewalks from David Strickland
Road to Martin Street. An Engineering Services Agreement, City Secretary No. 44165 with Bridgefarmer&
Associates, Inc. was authorized for the design of the project that included full concrete reconstruction of the
roadway from Mansfield Highway to Prairie Dog Creek, a new Bridge at Prairie Dog Creek and sidewalks
from the new bridge to Martin Street. Project costs to complete this project are estimated to substantially
exceed the project funding allocation of$4.7 million. Staff has reevaluated the scope of the project and
determined that modifications can occur that incorporate project elements that parallel the needs of the
community and maintain the project budget within the funding allocation of$4.7 million.
The proposed design Amendment is to revise the project scope to include the following improvements:
Pulverization and overlay of the existing pavement from Mansfield Highway to Lifestyle Circle. This will
reduce the quantity of new concrete pavement, but additional design effort is required to install drainage
ditches, driveway culverts, or other storm drain improvements within the existing right-of-way;
Full reconstruction of the Parker-Henderson Road from Lifestyle Circle to David Strickland Road including
sidewalks to link the abutting residential land uses to the elementary school and Prairie Dog Park;
Final design of box culverts to replace the existing bridge on Parker-Henderson Road over Prairie Dog
Branch;
Construction of sidewalks on the west side of Parker-Henderson Road from David Strickland Road to
Kellis Street. The previous project scope called for full reconstruction for this segment of Parker-
Henderson Road, which is being eliminated. Additional design effort is required to install drainage
ditches, driveway culverts, and storm drains within the existing right-of-way; and
Construction of sidewalks on the east side of Parker-Henderson Road from David Strickland Road to
Willow Springs Road with drainage ditches in the existing right-of-way.
Funds for this Amendment will be provided from the 2008 Street Improvements Fund. Adjustments to
current project appropriations will occur as part of the construction contract award such that remaining
funds can be appropriated to other capital roadway needs.
The following Table summarizes previous contract action and Amendments.
http://apps.cfwnet.org/council_packet/Me_review.asp?ID=22933&councildate=12/13/2016 2/2/2017
M&C Review Page 2 of 3
- Amount Project Description NM&C Approved
Conceptual Design of Parker
Initial Contract $39,300.00 Henderson Road from N/A 2/13/2013
Mansfield Highway to Martin
Street
Amendment No. 1 $393,767.65 Final Design Plans C-26422 1/26/2010
Subsurface Utility
Amendment No. 2 $131,637.20 Investigations, Additional C-26846 7/22/2014
Geotechnical Investigations,
ROW Surveys and Exhibits
Amendment No. 3 $39,740.00 Waterline Design Revisions N/A 8/08/14
Amendment No. 4 $478,620.00 Revise Design as Noted _ Pending
Above
Contract Total $1,083,064.85 - - -
M/WBE Office - Bridgefarmer&Associates, Inc. is in compliance with the City's BIDE Ordinance by
committing to an additional nine percent SBE participation on this Amendment No. 4. The City's SBE goal on
this Amendment or extra work is nine percent.
This project is located in COUNCIL DISTRICT 5.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available in the 2008 Street Improvements Fund and the
Water Improvements Fund.
Description Existing Appropriations Proposed Appropriations
Appropriations Per this M&C
2008 Street $ 7,817,807.28 $ 0.00 $ 7,817,807.28
Improvements
Fund 39407
Stormwater Capital $ 199,428.10 $ 0.00 $ 199,428.10
Projects Fund
59651
Water Capital $ 201,336.49 $ 0.00 $ 201,336.49
Projects Fund
59601
TO
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year Chartfield 2
FROM
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year Chartfield 2
Submitted for City Manager's Office by: Jay Chapa (5804)
Originating Department Head: Douglas Wiersig (7801)
Additional Information Contact: Mike Weiss (8485)
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=22933&councildate=12/13/2016 2/2/2017
M&C Review Page 3 of 3
ATTACHMENTS
20Paker-Henderson Amend 4 Map 11-22-16.pdf
Bridgefarmer Form 1295 Certificate CofFW.pdf
http://apps.cfwnet.org/council_packet/mc review.asp?ID=22933&councildate=12/13/2016 2/2/2017
C-28035 C
CERTIFICATE OF INTERESTED PARTIES FORM 1295
lofl
7-7
Complete Nos.i-4 and 6 if there are interested parties. OFFICE USE ONLY
Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING
1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number:
of business. 2016-117700
Bridgefarmer&Associates, Inc.
Dallas,TX United States Date Filed:
2 Name of governmental entity or state agency that is a party to the contract for which the form is 09/28/2016
being filed.
City of Fort Worth Date Acknow� ll/jdc�e'd:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a
description of the services,goods,or other property to be provided under the contract.
Project No.01419
Engineering services for development of plans,specifications and estimates for Parker Henderson Road from Mansfield Highway
to Martin Street.
Nature of interest
4
Name of Interested Party City,State,Country(place of business) (check applicable)
Controlling I Intermediary
Ahsan, Mansoor Dallas,TX United States X
5 Check only if there is NO Interested Party. ❑
6 AFFI A IT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct.
KENNETH HSU
t•lotofy Public,State of Texas
My Commission Expires
+:= May 21, 2019
ignature of aut ized agent of contract g business entity
AFFIX NOTARY STAMP/SEAL ABOVE
Sworn to and subscribed before me,by the said Mansoor Ahsan this the 28th day of September
2016 to certify which,witness my hand and seat of office.
Kenneth Hsu Accounting Manager
Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.277