Loading...
HomeMy WebLinkAboutContract 47658-FP1 Department of TP&W Const. Services 'CPN# GlAa n Dat QQ Project anager= Risk Managemen 7 WORTH. CITYSECRETARY D.O.E. BrothertonCONTRACT NO. CFA Westerman/Scanned Esteban Perez/Scanned The Proceeding people have been dontacte concerning the request for final payment& have LTION AND PUBLIC WORKS released this project for such payment. ;PROJECT COMPLETION 5-9 to 01-- 1 b b O1 q )eveloper Projects) Clearance Conducted By �/za�. Or 7'agnm# City Project Ns: 100019 Regarding contract for BNSF DISPATCHER/DR FACILITY as required by the WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director otion&Public Works Department has accepted the project as complete. D �V 2 ` FEB 15 2017.. Original Contract Price: 8y $961,722.00 Amount of Approved Change Orders: Ns Revised Contract Amount: Total Cost Work Completed: $961,722.00 Z s i ,y Reco4nended for Acceptance Date Asst. Director, TPW - Infrastructure Design and Construction �� /1'/'�'/' Z/4s/,/7 Accepted Date Asst. Director, WATER DEPARTMENT X5 Asst. City Manager Date Comments: OFFICIAL RECORD � FEB 2 0, 2017 CITY SECRETARY FT.WORTH,TX Initial: Rev.9/22/16 FEB 15 2017 B 5-9(001- 1 00(D) 9 City Project Numbers 100019 DOE Number 0019 Contract Name BNSF DISPATCH/DR FACILITY Estimate Number I Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 11/2/2016 Project Funding Project Manager NA City Secretary Contract Number Inspectors LAYER / SLATEN Contract Date Contractor WILDSTONE CONSTRUCTION Contract Time 60 CD P O BOX 164429 Days Charged to Date 204 CD FORT WORTH, TX 76161 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $961,722.00 Less %Retained $0.00 Net Earned $961,722.00 Earned This Period $961,722.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $961,722.00 Wednesday,November 2,2016 Page 5 of 5 FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name BNSF DISPATCH/DR FACILITY Contract Limits Project Type WATER&SEWER City Project Numbers 100019 DOE Number 0019 Estimate Number 1 Payment Number 1 For Period Ending 11/2/2016 CD City Secretary Contract Number Contract Time 6GD Contract Date Days Charged to Date 204 Project Manager NA Contract is 100.00 Complete Contractor WILDSTONE CONSTRUCTION P O BOX 164429 FORT WORTH, TX 76161 Inspectors LAYER / SLATEN Wednesday,November 2,2016 Page 1 of 5 City Project Numbers 100019 DOE Number 0019 Contract Name BNSF DISPATCH/DR FACILITY Estimate Number I Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 11/2/2016 Project Funding WATER Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 12"PVC WATER PIPE 4188 LF $46.00 $192,648.00 4188 $192,648.00 2 8"PVC WATER PIPE 61 LF $37.00 $2,257.00 61 $2,257.00 3 6"PVC WATER PIPE 215 LF $30.00 $6,450.00 215 $6,450.00 4 4"WATER PIPE 48 LF $55.50 $2,664.00 48 $2,664.00 5 2"WATER PIPE 53 LF $38.00 $2,014.00 53 $2,014.00 6 CONNECTION TO EXIST 36"WATER MAIN 1 EA $12,100.00 $12,100.00 1 $12,100.00 7 12"GATE VALVE 10 EA $2,552.50 $25,525.00 10 $25,525.00 8 8"GATE VALVE 1 EA $1,610.00 $1,610.00 1 $1,610.00 9 6"GATE VALVE 3 EA $1,220.00 $3,660.00 3 $3,660.00 10 FIRE HYDRANT 3 EA $3,519.00 $10,557.00 3 $10,557.00 11 D.I.FITTINGS 2.2 TN $6,975.00 $15,345.00 2.2 $15,345.00 12 1"COMBINATION AIR VALVE 2 EA $4,966.50 $9,933.00 2 $9,933.00 13 TRENCH SAFETY 4250 LF $1.00 $4,250.00 4250 $4,250.00 14 2"AUTO FLUSH VALVE 1 LS $5,369.00 $5,369.00 1 $5,369.00 15 24"CASING BY BORE 93 LF $410.00 $38,130.00 93 $38,130.00 16 12"CASING BY BORE 216 LF $268.00 $57,888.00 216 $57,888.00 17 3"WATER METER&VAULT 1 EA $12,146.00 $12,146.00 1 $12,146.00 18 2"WATER METER&VAULT 1 EA $3,340.00 $3,340.00 1 $3,340.00 Sub-Total of Previous Unit $405,886.00 $405,886.00 SEWER Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 REMOVE ASPHALT PAVEMENT 100 SY $33.50 $3,350.00 100 $3,350.00 2 18"SEWER PIPE 2430 LF $67.50 $164,025.00 2430 $164,025.00 3 18"SEWER PIPE CSS BACKFILL 110 LF $88.50 $9,735.00 110 $9,735.00 4 8"PVC SEWER PIPE 6'-8' 1628 LF $40.00 $65,120.00 1628 $65,120.00 5 8"PVC SEWER PIPE 8'-10' 990 LF $42.00 $41,580.00 990 $41,580.00 6 8"PVC SEWER PIPE 10'-12' 629 LF $44.50 $27,990.50 629 $27,990.50 7 8"PVC SEWER PIPE 12'-14' 70 LF $47.00 $3,290.00 70 $3,290.00 8 8"PVC SEWER PIPE 16'-18' 54 LF $51.00 $2,754.00 54 $2,754.00 Wednesday,November 2,2016 Page 2 of 5 City Project Numbers 100019 DOE Number 0019 Contract Name ' BNSF DISPATCH/DR FACILITY Estimate Number i Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 11/2/2016 Project Funding 9 8"DIP SEWER PIPE 12'-14' 500 LF $72.50 $36,250.00 500 $36,250.00 10 6"PVC SEWER PIPE 6'-8' 50 LF $36.00 $1,800.00 50 $1,800.00 11 4'SEWER PIPE 77 LF $62.50 $4,812.50 77 $4,812.50 12 4'MANHOLE 19 EA $3,125.00 $59,375.00 19 $59,375.00 13 4'EXTRA DEPTH MANHOLE 134 VF $185.00 $24,790.00 134 $24,790.00 14 TRENCH WATER STOPS 10 EA $987.50 $9,875.00 10 $9,875.00 15 12"CASING BY BORE 72 LF $312.00 $22,464.00 72 $22,464.00 16 16"CASING BY BORE 120 LF $400.00 $48,000.00 120 $48,000.00 17 6'WIDE ASPHALT PAVEMENT REPAIR 700 LF $43.75 $30,625.00 700 $30,625.00 Sub-Total of Previous Unit $555,836.00 $555,836.00 Wednesday,November 2,2016 Page 3 of 5 City Project Numbers 100019 DOE Number 0019 Contract Name BNSF DISPATCH/DR FACILITY Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 11/2/2016 Project Funding Contract Information Summary Original Contract Amount $961,722.00 Chante Orders Total Contract Price $961,722.00 Date � �r6 Total Cost of Work Completed $961,722.00 Co ract Less %Retained $0.00 Net Earned $961,722.00 Date Inspection Su Earned This Period $961,722.00 5w---Cv 2/ Retainage This Period $0.00 Date Pr ject Manager Less Liquidated Damages Days @ /Day $0.00 Date l� LessPavement Deficiency $0.00 Asst.Director/TPW-Infrastructure Design an Con trudtion Less Penalty $0.00 a [2 t Date °�/ � Less Previous Payment $0.00 Director/Contracting Department Plus Material on Hand Less 15% $0.00 'je"J4�"� Balance Due This Payment $961,722.00 Wednesday,November 2,2016 Page 4 of 5 FORTWORTH rev 03/05/07 2� TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:l NAME OF PROJECT: BNSF Dispatch/DR Facility PROJECT NO.: 100019 CONTRACTOR: Raymond Construction DOE NO.: N/A PERIOD FROM.04/18/16 TO: 11/07/16 FINAL INSPECTION DATE: 7-Nov-16 WORK ORDER EFFECTIVE:4/18/2016 CONTRACT TIME: 60 Q WE* CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL & HOLIDAYS &TOO COLD RELOCATIONS OTHERS CHARGED DAYS THIS PERIOD 204 PREVIOUS 0 PERIOD TOTALS TO DATE 204 *REMARKS: C CTO AT INSPECTOR DATE ENGINEERING DEPART-LENT The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,ZZ 76012-6311 (817) 392-7941 •Fax: (817) 392-7845 FORTWORTHREV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR&PROJECT DATA Name of Contractor Project Name Wildstone Construction BNSF Dispatch/DR Facility DOE Inspector DOE Number Connor Slaten 100019 DOE Inspector Project Manager 0 Water Q Waste Water Storm Drainage❑ Pavement Khal Jaafari Initial Contract Amount Project Difficulty $961,722.00 Simple Routine 0 Complex Final Contract Amount Date $961,722.00 11/1/2016 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 3 20 15 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 443 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 443 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating( [TS/MS] * 100%) 443 / 448 = 99% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector Signature Contractor Signature DOE Inspector's Supervisor z �- CONTRACTORS COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TK 76012-6311 (817) 392-7941 •Fat: (817) 392-7845 FO-RT WORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: BNSF Distribution/DR Facility PROJECT NUMBER: 100019 DOE NUMBER: N/A WATER PIPE LAID SIZE TYPE OF PIITE LF yes 12" PVC 4188 yes 8" PVC 61 yes 6" PVC 215 yes 2" PVC 53 FIRE HYDRANTS: 4 VALVES(16" OR LARGER) n/a PIPE ABANDONED SIZE TYPE OF PIPE LF no DENSITIES: yes NEW SERVICES: 4" PVC 48 SEWER PIPE LAID SIZE TYPE OF PIPE LF yes 8" PVC 3371 yes 8" DIP 500 yes 18" PVC 2430 PIPE ABANDONED SIZE TYPE OF PIPE LF no DENSITIES: yes NEW SERVICES: 6" yes 50 TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 y (817)392-7941 •Fax: (817)392-7845 CONSENT OF SURETY COMPANY TO FINAL PAYMENT Bond #8239-72-94 Project: Water & Sanitary Sewer Extension - BNSF Dispatch/DR Facility To (Owner): City of Fort Worth, Texas and BNSF Railway 1000 Throckmorton St. Contract For: See above Ft Worth, TX 76102 Contract Date: February 3, 2016 Contractor: Wildstone Construction, LLC In accordance with the provision of the Contract between the Owner and the Contractor as defined above,the Federal Insurance Company 15 Mountain View Road Warren,NJ 07059 ,Surety Company, on bond of Wildstone Construction,LLC 800 N Main Street Keller, TX 76248 ,Contractor hereby approves of the final payment to the contractor and agrees that final payment to the contractor shall not relieve the Surety Company of any of its obligations to the City of Fort Worth,Texas and BNSF Railway 1000 Throckmorton St. Ft Worth, TX 76102 ,Owner as set forth in the said Surety Company's bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this 2nd day of November, 2016. Federal Insurance Company Wan s: Tracy Tuc rn -m-Fact Chubb POWER Federal Insurance Company Attn: Surety Department OF Vigilant Insurance Company 15 Mountain View Road Surety ATTORNEY Pacific Indemnity Company Warren,NJ 07059 SIB Know All by These Presents, That FEDERAL INSURANCE COMPANY, an Indiana corporation, VIGILANT INSURANCE COMPANY,a New York corporation, and PACIFIC INDEMNITY COMPANY, a Wisconsin corporation, do each hereby constitute and appoint W.Lawrence Brown,Steven M.Tucker and Tracy Tucker of Fort Worth,Texas -------------------------------- each as their true and lawful Attorney-in-Fact to execute under such designation in their names and to affix their corporate seals to and deliver for and on their behalf as surety thereon or otherwise,bonds and undertakings and other writings obligatory in the nature thereof(other than bail bonds)given or executed in the course of business,and any instruments amending or altering the same,and consents to the modification or alteration of any instrument referred to in said bonds or obligations. In Witness Whereof,said FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY have each executed and attest these presents and affixed their corporate seals on this 10 day of Ju ly,2014. wards,Assistant Secretary .Norris,Jr.,Vice Presi �hUNM �Y,J01 'yhV STATE OF NEW JERSEY ss. County of Somerset On this 'I Oth day of July, 2014 before me,a Notary Public of New Jersey,personally came David J,Edwards,to me known to be Assistant Secretary of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY,the companies which executed the foregoing Power of Attorney,and the said David J. Edwards, being by me duly swom, did depose and say that she is Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY and knows the corporate seals thereof,that the seals affixed to the foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of the By-Laws of said Companies;and that she signed said Power of Attorney as Assistant Secretary of said Companies by like authority; and that she is acquainted with David B.Norris,Jr.,and knows him to be Vice President of said Companies;and that the signature of David B.Norris,Jr.,subscribed to said Power ofAttomey is in the genuine handwriting of David B.Norris,Jr.,and was thereto subscribed by authority of said By-Laws and in deponent's presence. Notarial Seal F� •. �d� y KATHERINE J.ADELAAR --o NOTARY PUBLIC OF NEW JERSEY �t PUBLIC No.2316685 yNotary Public Commission Expires July 16,2015 JEP�� CERTIFICATION Extract from the By-Laws of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY: "All powers of attorney for and on behalf of the Company may and shall be executed in the name and on behalf of the Company,either by the Chairman or the President or a Vice President or an Assistant Vice President,jointly with the Secretary or an Assistant Secretary, under their respective designations. The signature of such officers may be engraved,printed or lithographed.The signature of each of the following officers:Chairman,President,any Vice President,any Assistant Vice President,any Secretary,any Assistant Secretary and the seal of the Company may be affixed by facsimile to any power of attorney or to any certificate relating thereto appointing Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof,and any such power of attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached.' I,David J.Edwards,Assistant Secretary of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY(the"Companies`) do hereby certify that (i) the foregoing extract of the By Laws of the Companies is true and correct, (ii) the Companies are duly licensed and authorized to transact surety business in all 50 of the United States of America and the District of Columbia and are authorized by the U.S_Treasury Department;further, Federal and Vigilant are licensed in the U.S.Virgin Islands,and Federal is licensed in American Samoa,Guam,Puerto Rico,and each of the Provinces of Canada except Prince Edward Island;and (iii) the foregoing Power of Attorney is true,correct and in full force and effect. Given under my hand and seals of said Companies at Warren,NJ this David J.Edwards,Assistant Secretary IN THE EVENT YOU WISH TO NOTIFY US OF A CLAIM,VERIFY THE AUTHENTICITY OF THIS BOND OR NOTIFY US OF ANY OTHER MATTER,PLEASE CONTACT US AT ADDRESS LISTED ABOVE OR BY Telephone 906 903-3493 Fax 908 903-3656 a-mail: surety@ctlubb.com Form 15-10-0225B-U GEN CONSENT(rev.02-14) WILDSTONE CONSTRUCTION; LLC AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me,the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared John Kolb, President of Wildstone Construction, LLC, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons,firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been • paid in full; That there are no claims pending for personal injury and/or property damages; • On Contract described as: Water&Sanitary Sewer Extension—BNSF Dispatch/DR Facility Project Number 100019 BY Jo o /President Subs ribed and orn b ore me on is a 14 of November, 2016. Nota y Public Tarrant,Texas aY i . '." Notcry Public, StTexeS ate of y= ' _ My ccmmissien Expires 09 2018 12850Highway 287 Office: 817-847-8660 Fort Worth,TX 76052 Fax: 817-847-8019 .RA/Z!/IiAY Blaine Bilderback BNSF Railway Company Corporate Real Estate Development 2301 Lou Menk Drive GOB-3W Director Corporate Facilities Fort Worth,Texas 76131-2830 blaine.bilderback@bnsf com Telephone 817/352-6461 Facsimile 817/352-7797 November 10, 2016 Wildstone Construction, LLC Attn: John Kolb 12850 Highway 287 Fort Worth, TX 76052 Re: CFA No. 2015-087 14900 John Day Road City Project No. 100019 Dear Mr. Kolb, Section 3.3 of the City/Developer/Contractor Agreement between Developer, BNSF Railway Company and Wildstone Construction, LLC, Contractor, relates to Liquidated Damages paid to BNSF should Work not be completed under the timelines set out in the Agreement. The Project for Work is generally described as Water and Sanitary Sewer Extension — BNSF Dispatch/DR Facility. BNSF is not seeking Liquidated Damages from Wildstone under Section 3.3 of the City/Developer/Contractor Agreement for this Project. We are anxious for the City to accept the Work and issue BNSF the final Certificate of Occupancy for the building that will be served by the water/sewer lines constructed by Wildstone. Please don't hesitate to contact me if you have any questions. Sincerely, 6�� SGA Blaine Bilderback FORTWORTHREV:02'22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date: 8/8/2016 Name of Contractor Project Name Wildstone Contruction BNSF Dispatch/DR Facility DOE Inspector Project Manager Connor Slaten Fred Ehia DOE Number ProjectD culh, Tipe of Contract 100019 O Simple (§) Routine Q Complex D water 2] wastewater[] storm Drainage Pavement Initial Contract Amount Final Contract Amount $961,722.00 $961,722.00 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS& SPECIFICATIONS 1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clarity& Sufficiency of Details 3 Accuracy of Measured Quantities il 3 Applicability of Specifications 4 Display Of Professionalism I 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 3 Communication 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS& IGNATURES (Y � COMMENTS a f r) PO4,C,� IR fid4 W Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS (a The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845