HomeMy WebLinkAboutContract 48135-A1 CITY SECRETARY
CONTRACT NO, f 33'0 1
AMENDMENT NO. 1 TO COMMUNITY FACILITIES AGREEMENT
FOR WALSH RANCH QUAIL VALLEY,PHASE 1B
STATE OF TEXAS § CITY SECRETARY CONTRACT NO. 48135
COUNTY OF TARRA.NT § AUTHORIZING M&C NO. NA
WHEREAS, this Amendment No. I to Com>nunity Facilities Agreement for Walsh Ranch Quail
Valley, Phase 1B, is entered into by the City of Fort Worth (the "gff") and Quail Valley Devco I, LLC the
"Developer") effective upon execution by both parties.
WHEREAS, the City and the Developer entered into Community Facilities Agreement 2016-043, City
Secretary Contract No. 48135 with a construction cost amount of $1,488,234.50 for Walsh Ranch Quail
Valley, Phase IB (the "Original CFA") which specified the construction of Water, Sewer, Paving (including
certain sidewalks), Storm Drain and Street Lights and Signs (the"Original Infrastructure"); and
WHEREAS, the Developer is in the process of constructing the Water, Sewer, Paving (except for the
concrete sidewalks) and Stone Drain Improvements described in the Original CFA (the "Primary
Infrastructure"); and
WHEREAS, the concrete sidewalks and the Street Lighting Improvements covered by the Original
CFA and described on Exhibit A require additional .time for completion by the Developer (the "Ancillary
Infrastructure"); and
WHEREAS, as reflected in Exhibit A, the construction cost for the Ancillary Infrastiucture is
$354,931.19,with a total amount, inclusive of a 25% contingency, of$443,663.99; and
WHEREAS, the Developer has submitted an application and necessary paperwork for a CFA for
construction of the Ancillary Infrastructure; and
WHEREAS, execution of this Amendment to the Original CFA will remove the Ancillary
Infrastructure from the Original CFA; and
WHEREAS, the Developer and the City entered into that certain Escrow Agreement for the Original
CFA on September 1, 2016 (City Secretary Contract No. 48136) (the "Escrow Agreement") whereby the
Developer pledged funds in the amount of$1,860,293.13 representing 125%of the estimated Developer's cost
of the Original Infrastructure; and
WHEREAS, upon final acceptance and final project reconciliation by the City of the Primary
Infi•astructure, including receipt of any required lien waivers, , the City will authorize the Escrow Agent to
release funds in an amount up to $1,416,629.14, inclusive of any draws previously made pursuant to the
Escrow Agreement leaving a balance of $443,663.99, which will be retained pending completion and
acceptance of the Ancillary Infrastructure, subject to periodic withdrawals of such funds pursuant to Section 9
of the Escrow Agreement; and
WHEREAS, the Escrow Agreement will apply to the Ancillary Infrastructure and will be referenced
and incorporated into Developer's new CFA for completion of the Ancillary Infrastructure; and
iWENDMENT NO. 1
CFA Walsh Ranch Quail Valley,Phase IB OFFIC;k� �,j,...
Page i of 3 CITY;; CReg6Y
FT WORTH TX
WHEREAS, the Developer will amend or change order its construction contracts, as needed, to reflect
the changes in the work reflected herein and all bonding required by the City (Payment, Performance
Maintenance supplied by Developer's contractor(s)) shall remain in place and in full force and effect and shall
be applied to the Ancillary Improvements under the new CFAs; and
WHEREAS, upon completion and final acceptance of the Ancillary Improvements CFA, the Payment
and Performance bonds will be closed as per normal City practices and the Warranty Bond for the Original
Improvements will become effective; and
WHEREAS, Developer agrees to maintain and hereby warrants against damage, all Primary
Infrastructure until the warranty/maintenance period begins after completion and final acceptance of the
Ancillary Improvements CFA;
NOW THEREFORE, in consideration of the recitals above which are hereby incorporated, City and the
Developer, acting herein by and through their duly authorized representatives, amend the Original CFA as
follows:
1.
The Ancillary Infrastructure described in Exhibit A is hereby removed from the Original CFA and will
be the subject of a separate CFA to be executed by the City and the Developer.
2
The Original CFA shall be deemed to be amended in all respects to reflect removal of the Ancillary
Infrastructure described in Exhibit A from the Original CFA. In the event of any conflict between the
Original CFA and this Amendment No. 1,this Amendment shall prevail.
3.
Developer agrees to maintain and repair any damage to the Primary Infrastructure until the completion
and final acceptance of the Ancillary Infrastructure CFA, at which time the maintenance/warranty bond shall
become effective.
4.
All other provisions of the Original CFA not herein amended shall remain in full force and effect.
AMBNUMBNTNO. i
CFA Walsh Ranch Quail Valley,Phase I B
Page 2 of 3
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in
quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the
corporate seal of the City affixed, and said Developer has duly executed this instrument in quadruplicate to be
effective as of the date subscribed by the City's designated City Manager.
Approved by City Manager's Office: Developer:
Quail Valley Devco 1,LLC,
A Texas limited liability company
Jesus J. Chapa
Assistant City Manager
By: RPG QVR, C,
�/ a Te si t lia ility company,its Manager
Date: �
By:
Clint Yeager ice President
Date:
Recommended By:
Water Department Trausportatiori &Public Works
1J �j
Wendy C Babulal,EMBA,P.E. Dougl . Wiersig,;:E.
Development Engineering Manager Director
Y OFFO
Approved as to Fornz &Legality ATTEST:.
Douglas . Black ary We
O
Assistant City Attorney City S
M&C No.: A/ A-
Date: By signing, I acknowledge tis I am the
person responsible for the monitoring and
administration of this contract including ensuring
all performance and reporting requirements.
1295# N/A
ame of Employee
t uo G�y�
Title
AMENDMENT NO. I [FT.
FFICIAL R�
CFA Walsh Ranch Quail Valley,Phase I B Cool)
Page 3 of 3 ITY:ECRETA Y'
W®R`rm, Tx
004243
1/3112017
AAP•BID PROPOSAL
Page I of I
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
Walsh Ranch-Quail Valley:PHASE 1B-Sidewalks&Street Lighting
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidiistltem Description Unit of Specification Bid Unit Price Bid Value
No. Measure Section No. Quantity
UNIT IV:PAVING IMPROVEMENTS
1 3213.0302 5"Conc Sidewalk SF 321320 2,350 $4.00 $9,400.00
2 3213.0506 Bartter Free Ramp,Type P-1 EA 321320 4 $1,200.00 $4,800.00
3 9999.0020 Barrier Free Ramp,Detail A EA 321320 12 $1,200.00 $14,400.00
4 9999.0009 6"Conc.Pvmt(Alley Sy 321313 792 $33.00 $26,136.00
5 3211.0501 6"Lime Treatment SY 32 11 29 913 $5.63 $5,140.19
6 3211.0400 Hydrated Lime 32 lbs/SY TN 321129 14 $175.00 $2,450.00
TOTAL UNIT IV:PAVING IMPROVEMENTSI $62,326.19
UNIT V:STREET LIGHTING IMPROVEMENTS
1 2605.3011 2"CONDT PVC SCH 80(T) LF 260533 3.055 $8.00 $24,440.00
2 3441.1501 Ground Box Type B EA 34 41 10 4 $750.00 $3,000.00
3 3441.3201 LED Lighting Fixture EA 34 41 20 32 $2.00000 $64,000.00
4 3441.3301 Rdwy Ilium Foundation TY 1,2,and 4 EA 34 41 20 32 $1,000.00 $32,000.00
5 3441.3350 Furnish/install Rdway ilium TY 8 Pole EA 34 41 20 32 $5,000.00 $160,000.00
6 3441.3404 2-2-2.4 Quadplex Alum Elec Conductor LF 34 41 20 3,055 $3.00 $9,165.00
7
TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $292,605.00
Bid Summary
UNIT IV:PAVING IMPROVEMENTS $62,326.19
UNIT V:STREET LIGHTING IMPROVEMENTS $292,605.00
BidTotalj $354,931.19
25%contingencyl $88,732.80
Total Construction Bid $443,663.99
Contractor agrees to complete AVORK for F1NAt a Rcalendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS•DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE)B
Fom Vosion Seplen,Mr 1,2015 RZ PROJECT 8303061.02
l � �
�&0 WEATHERFORD ROADi.
l'
PROJECT SITE C ,
4
Lo
NORTH
W .:::�::.,1`.a •� .,.,.,��5 .mom^.. .�-:�`.'sr' .
INTERSTATE 30
_1
o
LOCATION MAP
o N.T.S.
/
N
O
�O
O '
M
O
M
^a
O
4
4
N
Y
N
Q
s
r-
oc
o _
N
s
COVER SHEET
o QUAIL VALLEY•PHASE 1 B-
SIDEWALKS&STREET LIGHTING
h
a January 11,2017
N
aWi RANK
"r
W
mOaW � €
r
m
� a.
406
C
� ao
� JIM. wIaSIa as�',�qm
m
Ho D it
ilo
i
m
co
m
p
d /
J !
• fir`/ � 1�
m to
M
Q'
CL
o �
Q rn
M �
O
L 3z:
NyJ
.J
OwS2 ,
twu
'..� Q1 J F- r
J E"
woe�
& UjiaQ,no
�C t-
m F5 o:
Ic
oyW
{� OIC ,ROAD,
4
00
CD
CL
N
N
15
tV
r
N �
m