Loading...
HomeMy WebLinkAboutContract 48670 CITY SECRETARY CONTRACT NO. 16 Developer and Project Information Cover Sheet: Developer Company Name: Pulte Homes of Texas,LP Address, State,Zip Code: 4800 Regent Blvd, Suite 100 Phone&Email: 972-462-3409,clint.vincent@pultegroup.com Authorized Signatory,Title: Clint Vincent,Vice President of Land Development,Dallas Division Project Name and Brief Willow Ridge Estates Phase 5 Description: i<' Project Location: Plat Case Number: FP-16-051 Plat Name: Willow Ridge Estates Mapsco: 7 Council District: 19L City Project Number: 100480 CFA Number: 2016112 DOE Number: <DOE#> taRecTo be completed by staff.- Received eived by: �.50 Date: City of Fort Worth,Texas EFFICIAStandard Community Facilities AgreementiM CFA Official Release Date: 10.07.2015 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Pulte Homes of Texas, LP, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Willow Ridge Estates Phase 5 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Proj ect; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Proj ect. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer (A-1) ®, Paving (B) ®,, Storm Drain (B-1) ®i, Street Lights & Signs (C) M. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section 11, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent(100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to constuct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. I Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or dafnages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 11 Cost Summary Sheet Project Name: Willow Ridge Estates Phases CFA No.: 2016-112 CP No.: 100480 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 475,599.10 2.Sewer Construction $ 608,151.80 Water and Sewer Construction Total $ 1,083,750.90 B. TPW Construction 1.Street $ 1,281,186.15 2.Storm Drain $ 769,648.50 3.Street Lights Installed by Developer $ 173,325.75 4. Signals $ - TPW Construction Cost Total $ 2,224,160.40 Total Construction Cost(excluding the fees): $ 3,307,911.30 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 21,675.02 D. Water/Sewer Material Testing Fee(2%) $ 21,675.02 Sub-Total for Water Construction Fees $ 43,350.04 E. TPW Inspection Fee(4%) $ 82,033.39 F. TPW Material Testing(2%) $ 41,016.69 G. Street Light Inspsection Cost $ 6,933.03 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 129,983.11 Total Construction Fees: $ 173,333.15 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 3,307,911.30 x Completion Agreement= 100%/Holds Plat $ 3,307,911.30 Cash Escrow Water/Sanitary Sewer=125% $ 1,354,688.63 Cash Escrow Paving/Storm Drain=125% $ 2,780,200.50 Letter of Credit=125%w/2yr expiration period $ 4,134,889.13 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 11 ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Pulte Homes of Texas,LP Jesus J. Chapa Assistant City Manager Name: Clint Vincent _ f J Title: Vice President of Land Development Date: , / l / ? Dallas Division> Recommended by: Date: ATTEST: (Only if required by Developer) Wendy Chi- abulal, EMBA, P.E. Development Engineering Manager Water Department Signature ci Douglas&. Wiersig, P.E. Director Transportation& Public Works Department Approved as to Fo"n &Legality: ATTEST: �y pF -0 Richard A. McCracken X Assistant City Attorney Nlary J. Kays ri City Secretary •qs•• M&C No. 10 JA Date: F#r--,,, ►Z5S: vv�/� City of Fort Worth,Texas Standard Community Facilities Agreement ..•---- CFA Official Release Date: 10.07.2015 Page 9 of 11 s : s opt) °:I T?A TAif Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement Location Map ®' Exhibit A: Water Improvments Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate ® Exhibit B: Paving Improvements Paving Cost Estimate Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACHMENT"I" Changes to Standard Agreement Community Facilities Agreement City Project No.<City Project#> Insert"None." if there are no negotiated changes. If changes have been negotiated,please insert them below citing to the paragraph for reference. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 PLANS FOR THE CONSTRUCTION OF WATER,ER, SEWER, PASTING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE WILLOW RIDGE ESTATES, PHASE 5 Q MESA �S �DRIVE SI MES � CREST �7 Z RIVE HAWKS 3: �� LANDING o fid, ROAD TWISTING STAR DRIVE WAGLEY ROBERTSON ROAD- BONDS RANCH ROAD VICINITY MAP (N.T.S.) N CITY PROJECT NO. 100480 TEXAS REGISTERED E"°ENTERNGFM"F-"8 WATER PROJECT NO. 59601-0600430-100480-001580 16301QuorurnMe,Surte200B Addison,Texas 75001 SEWER PROJECT NO. 59607-0700430-100480-001380 Tel:972-248-7676 Fax:972-24&1414 FILE NO. W-2417 OCTOBER 2016 - SHEET 1 L_ FINAL PLAT WILLOW RIDGL ESTATES PHASE 196 RESIDENTIAL LOTS 3 COMMON AREA AND/OR OPEN SPACE LOTS E'UL F OF TEXAS, L.P. OWNER/DEVELOPER 4800 Regent Blvd., Suite 100 (972) 304-2600 Irving, Texas 75063 JBI PARTNERS, INC. SURVEYOR/ENGINEER 16301 Quorum Or., Suite 200 B (972) 248®7616 Addison, Texas 75001 TBPE No. F®438 TBPLS No. 10076000 �r CITY PROJECT NO. 100480 TENS REGISTERED ENGMERNG FIR%f F438 WATER PROJECT NO. 59601-0600430-100480-001580 16301 Quorum Drive,Suite 200B Addison,Texas 75001 SEWER PROJECT NO. 59607-0700430-100480-001380 Tel:972-248-7676 Fax 972.248.1414 FILE NO. W-2417 OCTOBER 2016 - SHEET 2 k L OW R EST TES v v � ]� 9 � m o t CNE SEC ONE PN A. t2 38 NLLON P,DGE ESTATE a PHAS 2A DOG NOD 14122517 a�90 �v � s. � ¢ ♦c \ _ z - DDr D 6 P//v z 2 , 2s JW fRipOf e rTWSTING OND 1 x \ R q0 ] DRIVE wuzl i P �2 ♦ n s i s ] n 3 wvA�raool�6)sPx. Mw 9 a \ ars U - 2i PLATEAU RIDGE WAY - r °k me, 24 c TA 2]6� oN ; ]i w z9 26 n zfi s z. z] / 193 6( '¢�♦ s ♦ ♦ z 0 21 e 1 z3 �\� OW NDLE sTA- tatE £- K Z2 Zi ' 2 TWi TING y, ria` E MEADOWS DRIVE 2D " TUSTING RIDGE TERRACE 21 21 v o e R~ s ,D k ♦z 24� 9 41 6 172 3 StP D ° \ DEx 6 aG ,611 12 U 14 6 iD zoa� \ z 5 W PINNACLE BREEZE DRIVE I J 0 5♦� p is � U 13i r 2. 275. 21 F1 1� 1. 11 1 15 1. 1� 1� 11 �•{. 13 T� oI CALLED:.116 275 ACRES 'J ' ' —TE HOO£S OE TEKAs.EP. I—UENT ND.D215127258 225' ,♦ IAEA 4!GUST DRIVE ,s WALOW�MDGE ESTATES ZD MT — PH Y E SEG110N T10 2t 33 3J 2088 5, 2♦ 25 26A W Q 2 =�♦e 5 6 6 ¢va a CAB.A AIOF K Z O� ¢�6 VAN EZANDT EARNS / AT DSSN CREEK 7\ CAB.A SLDE 6<59 „ .. P�AT MAP SCALE: 1"=300' PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & d ' .�. DRAINAGE IMPROVEMENTS TO SERVE ���■��r WILLOW RIDGE ESTATES,PHASE 5 TEXAS REGISTERED ENGINEERING EMI F-438 (CPN#100480) 16301 Quorum Drive,Suite 200B Addison,Texas 75001 Tel:972-24&7676 Fax:972-248-1414 OCTOBER 2016 - SHF_: T 3 CONNECT TO EX. 8" WL CONNECT TO EX. 8" WL WILLOW RIDGE ESTATES a WILLOW RIDGE ESTATES PHASE 2A " PHASE 1, SECTION 2 CPN#02186 / DOE 5325 M B• P265-6071502186-83 / \ Low R E E9T TESS' P164-0601640 15525 \ oR Y BR Yci ax Ae.0. roE t2 M ffi o/ WLlon RIDGE EStAiE \ HAY 2A 2. 2, 3 3 e s 26 22 " DOC Roo,117- 3 \ CONNECT TO EX. 8" WL VALLOW 6 Qom° b \mob PHASERI GE ESTATES 2.o CPN#100123 59601-5310350-0600430- 2 A°�"O4o \ 100123-001580 TulsTwc DRIVE 21 36 3 to EX B-ft LOT 6 �' '♦ 1. 21 ASE,�L B "� - — 212 � PLATEAU RIDGE 6 223 32 JI 30 2B 2.j 2M-5a z] A. 11 23 NLL05Y H10E STALE ' z3 B•9h 1 -T\ _ EX.B-1Y alwt n 2, ' z I6 slk 2 `EX B'ni B WL TnISTWG 1.1EADDWS e DRIVE p iW121 511NG RIDGE TERRACE p „ CONNECT TO EX. 8" WL 9 " 6 B nL WILLOW RIDGE ESTATES 24, PHASE 1• SECTION 2 Dy ° DOE#5325 P164-060164015525 ♦ n1l. to 1] EX.B•ni A,B.S�OWW 1E Is ,o n 11 !1„\ PRIIIACLE BREEZE DRIVE 1 N P 2 q 12 9f ,i CALLED:116.225 A— ULTE MOVES OE TEXAS,LP. RDO<UVERi 0.D21 s,22258 t I 3 ♦ t, WAD..GUST DRIVE E, w1LOW RroLE ESTATES 2° IA°tz i PHS 0.6LIOE 12— 3111 22 23 2, a251. -7 VNI ZNIDT EAFVB / Al(0550.[BECK CAB.A 5110E 6459 21 LEGEND PROP. WATERLINE -- - — PROP. VALVE WATER SCALE: 1"=300' PROP. FIRE EXHIBIT A �— HYDRANT PLANS FOR THE CONSTRUCTION OF NATER, �- - EXIST. WATER LINE SEWER, PAVING, STREET LIGHTING, & dB- ' �� & VALVE DRAINAGE IMPROVEMENTS TO SERVE a WILLOW RIDGE ESTATES,PHASE 5 TEXAS MGISIFREDENGINEERWG FMIF438 PROPOSED WATER (CPN#100480) LINES ARE 8" UNLESS 16301 Quorum Drive,Suite 200B OTHERWISE INDICATED. Addison,Texas 75001 972-248-7676 Fax:972-248.1414 OCTOBER 2016 - SHEET 4 Fax CFA WATER COST ESTIMATE UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. Section No. Measure Quantity UNIT 1: WATER IMPROVEMENTS 3311.0001 Ductile Iron Water Fittings w/ Restraint 33 11 11 TON 6.95 $ 4,700.00 $ 32,665.00 3311.0261 8"PVC Water Pie 33 1112 LF 9,582.00 $ 22.45 $ 215,115.90 3312.0001 Fire Hydrant 33 1240 EA 11.00 $ 2,850.00 $ 31,350.00 3312.2003 1"Water Service 33 1210 EA 196.00 $ 730.00 $ 143,080.00 3312.2003 1"Irrigation Service 33 1210 EA 2.00 $ 730.00 $ 1,460.00 3312.2103 1 1/2"Water Service 33 1210 EA 1.00 $ 1,200.00 $ 1,200.00 3312.2103 1 1/2"Irrigation Service 33 1210 EA 1.00 $ 1,200.00 $ 1,200.00 3312.3002 6"Gate Valve 33 1220 EA 11.00 $ 850.00 $ 9,350.00 3312.3003 8"Gate Valve 33 1220 EA 28.00 $ 1,240.00 $ 34,720.00 3312.0117 Connect to Existing 8"Water Main 33 1225 EA 6.00 $ 750.00 $ 4,500.00 3305.0109 Trench Safety 3305 10 LF 1 9,582.001 $ 0.10 $ 958.20 UNIT 1: WATER IMPROVEMENTS BID SUMMARY $ 475,599.10 END OF SECTION WILLOW RIDGE ESTATES,PHASE 5 CITY OF FORT WORTH CPN 100480 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONST. 4' MANHOLE AT \ o1i"cT:EST TEs" '� EX. 8" SSWR pR1 SE CNE SECT1(Y IXtE AB-0. 338 ` wttOw ATES WILLOW RIDGE ESTATES — PHASE 1—SECTI0N 2 DD 1DAo 1a X912 o DOE#5325 P174-070174013515 H` CONNECT TO EX. 10" \ q 6 SSWR WILLOW RIDGE ESTATES PHASE 3A -OUQ,�0 CPN#100123 (To BE RE"OVED) J6 MNgC� 2 59607-5310350-0700430 0 9 a R0b —100123-001380 — — — , TVfiSTINC N1Nq , • z Is ,• DB1w ] 21 n 8'BSwR Arz(o 3�� w •s \ EX 8-SSWR • as xfi V� —r wu1 (To REV.) 5 t •q y -- _.. 26 PLATEAU R�WAY 524 2 4 6 2] 32ql � 29 26 21 2 5 1z V 1 23 N,rISEMn 25 G3VEzrr W.LLDn RASE �STn ' &aa Iz ftr(To BE D208NaludD) " 23 EX.To,SSWR 18 _ EX.8-SSNR 2 ] 4 (TD BE REMOVED) EX.10 SSWR (TO BE REMOVED) ' --X. TWiSPNG MEADOWS _ – —�� zo �— TIVSTING RIDCE IERRgCE ° q � f 1a 8 SSWR 1x 43 EtOCK 24y CONNECT TO EX. 10" 6 6e SSWR SSWR Ex 1D•ss1R % 12 , WILLOW RIDGE ESTATES 1$ �,,.\ PWNAQE BREEZE DRIVE PHASE 3A 2�j a — CPN#100123 3 59607-5310350-0700430 / 2 6 —100123-001380 17 CONST. 4' MANHOLE AT _ CALIED.116275-5 EX. 10" SSWR — a—x T 11 a 211177TE—. DOCUMENT f10.D315122259 WILLOW RIDGE ESTATES 0 SS" 10 PHASE 1—SECTION 2 12 ] 6 ° °� to,ss- DOE#5325NI P174-070174013515 uEgn°w cusT wavE u wu°w TeDQ EsrATEs z6 — PNAg IXIE.YCT1(XI T5O aaa z CAB.0.SAE 12089 z1 2x 2] z4 25 26 2z I z 3 a 5 6 aaa 6 VAN 5 -INT F 64 / AT F—QtEEK CAH.0.5110£ 59 z, LEGEND PROP. S.S. LINE - 0 PROP. S.S. MH --0 EXIST. S.S. MH TO BE REMOVED SANITARY SCALE: 1"=300' - - EXIST. S.S. LINE TO BE REMOVED EXHIBIT Al - �- - EXIST. S.S. MH PLANS FOR THE CONSTRUCTION OF WATER, dB- 1 EXIST. S.S. LINE SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE WILLOW RIDGE ESTATES,PHASE 5 TEXAS REGISTERED ENGUMERING FMJ F439 - (CPN#100480) PROPOSED SANITARY 16301 Quorum Drive,Suite 200B SEWER LINES ARE 8" Mclison,Texas 75001 UNLESS OTHERWISE Tel:972-248-7676 INDICATED. OCTOBER 2016 - SHEET 5 Fax:972-248-1414 L CFA SANITARY COST ESTIMATE UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. Section No. Measure Quantity UNIT 2: SANITARY SEWER IMPROVEMENTS 0241.2013 Remove 8"Sewer Line 0241 14 LF 545 $ 14.50 $ 7,902.50 0241.2014 Remove 10"Sewer Line 0241 14 LF 1,510 $ 14.50 $ 21,895.00 0241.2201 Remove 4'Sewer Manhole 0241 14 EA 5 $ 300.00 $ 1,500.00 0330.0001 Concrete Encase Sewer Pie 03 30 00 CY 1 $ 900.00 $ 630.00 3301.0002 Post-CCTV Inspection 3301 31 LF 8,357 $ 1.40 $ 11,699.80 3301.0101 Manhole Vacuum Testing 33 01 30 EA 33 $ 110.00 $ 3,630.00 3305.0106 Manhole Adjustment,Major 3305 14 EA 1 $ 1,300.00 $ 1,300.00 3305.0107 Manhole Adjustment,Minor 3305 14 EA 2 $ 1,300.00 $ 2,600.00 3331.4115 8"SDR-26 PVC Sewer Pie 33 11 10 LF 5,730 $ 34.85 $ 199,690.50 3331.4116 8" SDR-26 PVC Sewer Pipe,CSS Backfill 33 11 10 LF 460 $ 44.00 $ 20,240.00 3311.4201 10" SDR-26 PVC Sewer Pie 33 11 10 LF 1,927 $ 36.00 $ 69,372.00 3311.4202 10" SDR-26 PVC Sewer Pipe, CSS Backfill 33 11 10 LF 240 $ 46.00 $ 11,040.00 3339.1001 4'Manhole 3339 10 EA 33 $ 2,620.00 $ 86,460.00 3339.1003 4'Extra Depth Manhole 3339 10 VF 155 $ 110.00 $ 17,050.00 3331.3101 4"Sewer Service 3331 50 EA 193 $ 745.00 $ 143,785.00 3331.3201 6" Sewer Service 33 31 50 EA 1 $ 1,000.00 $ 1,000.00 3305.0109 Trench Safety 3305 10 LF 8,357 $ 1.00 $ 8,357.00 UNIT 2: SANITARY SEWER IMPROVEMENTS BID SUMMARY $ 608,151.80 END OF SECTION WILLOW RIDGE ESTATES,PHASE 5 CITY OF FORT WORTH CPN 100480 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS OWR5 CONNECT TO EX. 24' E—E «ECLARDY FSTAR NDC,5T2 B WILLOW RIDGE ESTATES . " °PRASE 2A PHASE 1—SECTION 2 B-No D 14lzzan DOE#5325 ° 0 ° CONNECT TO EX. 29' B—B m °pp ° ° + WILLOW RIDGE ESTATES p0 °00 0 0 0 000° 0000 : PHASE 2A o0 0 00 °o CPN#02186 6 3O °o o 1 9 0 zs s 00 O° > °OOp X,j 31 c 0 3 _........ TWISTING WIND ° °op e io ' CONNECT TO DI�NVE0 2 F1— o' N °° EX. 29' B—B p 3 , `0:693 AFiFR A 000 WILLOW RIDGE CONNECT TO 0 26 °Oo ESTATES EX. 24' E—E 16 , p°° 36 36 "h„ ., PHASE 3A PLATEAU RIDGE VlAV CPN#100123 WILLOW RIDGE 6 p°o 2, — _ o° =1 �' ESTATES 23 p s o 0 0 0 o 0 0 0 0 0 - 000° 5.s ` >: z PHASE 1— ° _ 24 > — SECTION 2 °O DO 25 24 o a ° 2 0 9 e 2] 6 " °p°p N po° °o '] 23 Q 17 o0 °O° OO NLLIaN NAGE STATE sE aa°21 16°4xr 2z e 9 JTRIIA 14 s o z4 0 _ o T STIN RID E °p ° m ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° °o°p°° DRIVE ° ,9 0°° 00 a 9 op v ,6 0o42 4l 1 2. • '; _ °° '° p° �2' �• ° � CONNECT TO p° ° EX. 29' B—B 17 24 ° �� WILLOW RIDGE L ° J ESTATES p o G 000 2 ,5 °0 PIN ACL BR EZE RIVE CPNS# 0 100123 0 s�D stjz Q��� l 000 14 00 0 1 0 .0 1> oc 00 °°° ,°Op0° C—..116275CONNECT TO CONNECT TO EX. 25' E—E — jT12 '. —ROPE:OF TEXAS.LP. �s9 0°o°0 o VAN ZANDT FARMS AT poanENT No.p2sm2 e EX. 24' E—E e ° WILLOW RIDGE F °°° FOSSIL CREEK 46 7 e 9 D .11 ESTATES „ °O 11 E Dw GUT DRIVE ° PHASE 1— o SECTION 20oo°0°000000000000000002028280°opopo opo°0o-o00° 00000000 o LEGEND 'DOE#5325 „ — — wuow RIDCE ESTARS L-4 PMCI.,lYA21 =2 =3 24 25 „ 2] w 2 , 5 6' RESIDENTIAL 29' B—B _— VAN`NAT RIER / AT OssA CREEK CAD.A.51AK 6459 RESIDENTIAL 24' E—E 60'R.aw VARIES 24'/25'ROADWAY TAYPEO TOPSat lY/12.5" +2'/125' AVPED TOPSaL —Ml"�z s`9" 'CR °°° ® RESIDENTIAL J2 91 19 51ui0ARD 6-RERLFOR4D STANDARB 25' E—E 9FWA1K Ca1CRER SAEWAUt E SECnaI —T PER PER SECTION 2 13 20 SECTION 32 13 13 C 32 13 20 �4S SDXVR OSKY4)I Sp;Y x osKLLw, 5 0 SIDEWALK BY DEVELOPER A,CEaine E mu i u 12 P—CUD 6-LNE sib -E. AA-T 11—BA[KFLL /3 BARS 0 PER 32 iJ 13-0511 SUBGRAOE 0 30 1a6/SY PER Ant£BACKfRE ' PER I.2.0I IB-0.G&W. S—Oft 32 11 29 SEE wLLOn RIDGE Fi TARS 31 24 W 31 200011 PHASE 5 CaI51RUCt a1ME RPLAHS, Ell 41&1 41 101S' 24'E-EI25'E-E CONCRETE rnapvle sIFE1s 4o t 41 FOR ROAODx DITCH DETULs STREET SECTIONS R0A04DE DRa+DETASS losPAaKwnY 29'Ronownr 10.s'PARKwxY RQIE-- 14.5' 14.5' 9.5' 1. —..K—SHAU.ILL A- ' SECETION°P329 9R TANOARO Y NRB TAPED TOP501 PER PER Fa)T DYAX)LRe255 STANpARO SA 1 1. PER 32 13 1}p525 .—32 91 19 aRECRD OiH£Rw15E BY THE ST-BARD SAEWAIK C—R. (BY OTHERS) 6"(— 6'REINEWCFD (BY—RS)) CRETE TPIAARO 7"}0CURB PFA �-PER fi(YAX ) C PER 32 13 1525 Y' Ft.(LIAIJ 4'i SEC al 32P 13 13 2%T1P. 214 IVP. 6:1(YAK) -'��—i I I (SM YAY:0.511 LLa) (50;YA%05;YP!) •.. ' NYPACRD K' , —,,,� �1�1� -••"� Ca2PACRD CCEPTADLE w NAnIt A. L 12' LDNCJIUDNK 12- ACCEPT BAC ER 5EC1i01I CaR1RUCIm—11 PROPOSED C UYE STABtUZED �£BACKFRL R 31 24 N 'i3 BARS 0 pFR 32 13 13-0511 SUBGRADE 030 UIS./SY PEP PER MCI Ia+ SCALE: ,=�oo, 8-040.W. mc-321129 3+2400 RESIDENTIAL CONCRETE STREET P A VI N G SECTION(L) EXHIBIT B 32 77 13-D602 PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TEXAS REGISTERED ENGINEERING FIMI F-038 TO SERVE WILLOW RIDGE ESTATES,PHASE 5 16301 Quorum Drive,Suite 200B (CPN#100480) Addison,Texas 75001 Tel.972-248-7676 OCTOBER 2016 — SHEET 6 Fax:972-248-1414 L CFA PAVING COST ESTIMATE UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. I I Section No. Measure Quantity UNIT 4: PAVING IMPROVEMENTS' 3211.0400 Hydrated Lime 30lbs/SY 32 11 29 TN 493 $ 150.00 $ 73,950.00 3211.0501 6"Lime Treatment 32 11 29 Sy 32,857 $ 2.60 $ 85,428.20 3213.0101 6"Conc Pvmt 32 13 13 Sy 30,968 $ 31.65 $ 980,137.20 3213.0301 4"Conc Sidewalk 32 13 20 SF 10,417 $ 4.75 $ 49,480.75 3213.0501 Barrier Free Ramp,Type R-1 32 13 20 EA 13 $ 1,950.00 $ 25,350.00 3213.0503 Barrier Free Ramp,Type M-1 32 13 20 EA 13 $ 1,900.00 $ 24,700.00 3213.0506 Barrier Free Ramp,Type P-1 32 1320 EA 13 $ 1,600.00 $ 20,800.00 3471.0001 Traffic Control 3471 13 LS 1 $ 1,000.00 $ 1,000.00 9999.0001 Connect to Existing Pavement 99 99 01 LF 184 $ 20.00 $ 3,680.00 9999.0002 Provide and Install Street Name Blades 99 99 02 EA 68 $ 245.001 $ 16,660.00 UNIT 4: PAVING IMPROVEMENTS BID SUMMARY $ 1,281,186.15 END OF SECTION WILLOW RIDGE ESTATES,PHASE 5 CITY OF FORT WORTH CPN 100480 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS " a E51 iE5 v ss z 31 z° `\`\``` v v u °I v • ss I wPN SE Orff YLTI CNE �g AB 0. 12 JB F y � W1�OW o ESTATE ° I til 1> z 20 7Q 21 z 3 a 5 26 21 {V W o y REMOVE EX. RIPRAP & HEADWALL m CONNECT TO EX. 5'x5' RCB -\ WILLOW RIDGE ESTATES PHASE 3A ` ] CPN#100123 2. ;DRIVE ISTING o amc V51ND AR,N r a.oa n 2J°"� C(f J 1O z muF ' AO�E, 2 Ec sow '° i n„rTt TF xo TEEN G 3 • \_ 2 J 2 A V�6ou a1� 3 • \ BPs*E1 22 Iw • $6 J y s w .41E j J 4 fitoo,s 4 zs z J b � 21 J PLATEAU RIDGE WAY I' 32 31 lar 2 / y � al II za ¢ J2 J1 So 26 2J n 1s 1z I/ wLLOW sTATE 22 JASE 25 —2] N // zObL 21 1 2 i 1 .6TOR 2 TwIsTING 216 MEADOWS r DRIVE s zo'r T\NS11NC RIDGE TERRACE 41 [�4 31 �I 2. 1. n 6 �_ Iv 13 L s 16 1 3 PINNACLE ° a 1z BREEZE DRIVEle — O$ c a ] r a 13 n mtl.Ll� _ CI1lEP.116.z15 ALES �Pp P—NUIES OF—AS ooauENi 140.ozlslnzse is 9 CVExij f jl 1 z J 4 5 [1DRIVE[' 10GU t3 r WALO'N ft1pGE—A— 20 IT—1 — PHA4 MK.SECTION TNO W tpx> CAB.A YIOE2088 �w 21 32 23 N zs 26 2] O J � 1 2 J 1 5 6 7 VPN`AIfOT EPBYS AT OSA CRCE% US a0 n LEGEND o PROP. INLET EXIST. INLET PROP. ONSITE STORM DRAIN EXIST. STORM DRAIN ER SCALE: 1"=300' STORM DRAINAGE _ EXHIBIT B1 PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE TEXAS MLSTEREDENGINEERMG FMIF438 WILLOW RIDGE ESTATES,PHASE 5 (CPN#100480) 16301 Quorum Drive,Suite 200B Addison,Texas 75001 Tel:972.248-7676 Fax:972.248.1414 OCTOBER 2016 - SHEET 7 CFA STORM DRAIN COST ESTIMATE UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. Section No. Measure Quantity UNIT 3: STORM DRAIN IMPROVEMENTS 0241.0800 Remove Riprap 0241 13 SF 900 $ 0.80 $ 720.00 0241.4401 Remove FW-0 Headwall,at 5'x5' RCB 0241 14 EA 1 $ 1,500.00 $ 1,500.00 3137.0104 Medium Stone Ri ra ,Dry 31 37 00 SY 165 $ 46.00 $ 7,590.00 3305.0112 Concrete Collar 3305 17 EA 15 $ 300.00 $ 4,500.00 3341.0201 21"RCP,Class III 3341 10 LF 1177 $ 50.00 $ 58,850.00 3341.0202 21"RCP,Class IV 3341 10 LF 53 $ 56.00 $ 2,968.00 3341.0205 24"RCP,Class III 3341 10 LF 1543 $ 57.00 $ 87,951.00 3341.0206 24"RCP,Class IV 3341 10 LF 16 $ 67.00 $ 1,072.00 3341.0208 27"RCP,Class III 3341 10 LF 135 $ 64.00 $ 8,640.00 3341.0302 30"RCP,Class III 3341 10 LF 91 $ 72.00 $ 6,552.00 3341.0305 33"RCP,Class III 3341 10 LF 672 $ 80.00 $ 53,760.00 3341.0309 36"RCP,Class III 3341 10 LF 417 $ 95.00 $ 39,615.00 3341.0402 42"RCP,Class III 3341 10 LF 1313 $ 127.50 $ 167,407.50 3341.0409 48"RCP,Class I11 3341 10 LF 268 $ 154.00 $ 41,272.00 3341.0503 54"RCP,Class IV 3341 10 LF 186 $ 238.00 $ 44,268.00 3341.1203 5x5 Box Culvert 3341 10 LF 237 $ 267.00 $ 63,279.00 3349.0001 4'Storm Junction Box 3349 10 EA 5 $ 3,800.00 $ 19,000.00 3349.0002 5'Storm Junction Box 3349 10 EA 3 $ 4,000.00 $ 12,000.00 3349.0102 4'Manhole Riser 33 49 10 EA 2 $ 2,400.00 $ 4,800.00 3349.5001 10'Curb Inlet 33 49 20 EA 12 $ 3,400.00 $ 40,800.00 3349.5002 15'Curb Inlet 33 49 20 EA 17 $ 4,650.00 $ 79,050.00 9999.0001 SETP-CD Headwall,at 21"RCP 33 49 40 EA 7 $ 1,900.00 $ 13,300.00 9999.0002 SETP-CD Headwall,at 24"RCP 33 49 40 EA 1 $ 2,100.00 $ 2,100.00 9999.0003 SETP-CD Headwall,at 30"RCP 33 49 40 EA 1 $ 2,300.00 $ 2,300.00 9999.0004 SETP-CD Headwall,at 48"RCP 33 49 40 EA 1 $ 3,300.00 $ 3,300.00 3305.0109 Trench Safety 3305 10 LF 6108 J$ 0.50 $ 3,054.00 UNIT 3: STORM DRAIN IMPROVEMENTS-BID SUMMARY $ 769,648.50 END OF SECTION WILLOW RIDGE ESTATES,PHASE 5 CITY OF FORT WORTH CPN 100480 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS A�nc - - W110W fiDGF ESTATES FH J. -- s PNAY iA DDC NOD 16112811 m y zc 14 s. ss oos 1 „ 0 s r77 eue qNN z qC� z• E Ripp f e TWISTING W1No ' \ H q0 J DRIVE ze I ,o aoct n +okf ,z PRTVArz Ho°,TreEN sPAa • 1J ,• • z, EASAE1—1 S sqt 2113; u PLATEAU RIDGE WAY21 (� 24 4 s cs4 Zl a 3f JD 29 ZBZ4 ZJ Z Z �t9 41 Q O \ Q ,] NH10W ZZ —GE STATE ' 23 NAY ECPt P 21 1 Z J 4 Al 21Z >aes DR^T TNT TING e MEADOWS DRIVE za TWISTING RIDGE TERRACE 1 i s ,ogt az T4. . x<r ,s 24 4 : 14 1� 1. 11 LT.c jp N 1E - } IS Y G 3 PINNACLE BREEZE13 DRIVE a s 4 n Tz xTeAa —1.1, ]S A—S 11—IS .—S L£TEAS.LP. 19 J, A2 1 Z S 4 5 6 ] , • DOCUUEM I.ro.D2151]>25B '�sFAUE Ji "} 1. EAD 14 GUST DRIVE u WLLOW RIDGE ESTATES PHM �} ASE ONE.SECTK)1 lYq 4 Z5 nea] GAB.0.S SE.12089 Z, Zz IJ 2 Z M Z] U J 1 I J . 5 6 VPN ZNAi(ARMS (OSYL CREEK aaa:e / CAB.I SURE 6459 zs LEGEND PROP. RESIDENTIAL LUMINAIRE EXIST. RESIDENTIAL LUMINAIRE SCALE: 1"=300' STREET -LIGHTSEXHIBIT C PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & g' �� DRAINAGE IMPROVEMENTS 4TO SERVE WILLOW RIDGE ESTATES,PHASE 5 TEXAS REGISTEREDENGR4EEERWG FIRA1 F-438 (CPN#100480) 16301 Quorum Drive,Suite 200B Addison,Texas 75001 TelFax:972.248.141 OCTOBER 2016 - SHEET 8 Fax:972.248.1414 L OM Po EST iES, ss Y J, JI n ,e _� v >i " • >o SE ONE SECTi ONE bb{»r t A8,0. UDE 12 J8 � 12LLOW PKK£CSTAIE x PNASE 2A DDL NOD 1.122P12 o H 2 IS 2 Z J a J is z] P tv JQ i s4 ss �, w� a i° Bq�,° s1 ��� s • TNG O t is s 1v v P/N,y i ] WIND DRIVE 'aC( s o� `r' eToa4 n ze ] P R/pCf RpFD J J • w _ n z "`J , ua.�+ly aiNe ArE • 4 ' to +• J 2 aarx x� •s eAsuT wuoW J4 , ' 41 n s PLATEAU RIDGE WAY 41 24 B ZJ 32JI JO 29 21 17 M 15 14 2J 12 uowHar STATE zz a E a0a n 21 I z 1B syWT24 2 s TWSTINGe MEADDWS DRIVE i0 I TVSYSTING RIDGE TERRACE + � 21 s +° 42 J1 z44 I L� ac'�0� PR \ It 1z B is 1 s t Lto 1 + PINNACLE BREEZE DRIVE �syc.ss is $c °L 1J] a ° 1 3 2. P CAUEP.11&2]5 ACRES ,s T[t� PIATE NCYES CC TEKA;LP, 1 DOCUVENT N0.D2151]]253 2 J 5 6 B 0 IS MEADOW GUST DRIVE +J —M RIDGE ESTATES 2° PHASE IXlE.SECTI(Y1 Two w 12— n zz zJ z4 zs zs n p J + z a s ° vul—T—US Al EDssn Iz,EEK aoa�B CAD.A SLIDE 64. „ LEGEND PROP. SIGN BLADE (TO BE PROVIDED BY DEVELOPER) STOP PROP. STOP SIGN .. STREET SIGNS SC AEE: 1"=300' ♦ EXHIBIT C1 PROP. STOP AHEAD O SIGN PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & dB- ' PROP. HORIZONTAL DRAINAGE IMPROVEMENTS ALIGNMENT SIGN TO SERVE WILLOW RIDGE ESTATES,PHASE 5 TEXAS REGISTERED ENGINEERING FMI F438 PROP. ADVISORY SPEED (CPN#100480) 15 SIGN AIPH 16301 Quorum Drive,Suite 200B Addison,Texas 75001 Tel:972-248-7676 OCTOBER 2016 - SHEET 9 Fax:972-248.1414 L CFA LIGHTING COST ESTIMATE UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No. Section No. Measure Quantity UNIT 5: STREET LIGHTING 3441.3002 Rdmy Ilium Assembly TY 11 with 33B arm 34 41 20 EA 46 $ 1,684.00 $ 77,464.00 3441.3201 Install ATBO-20BLEDE70- MVOLT-R2-3K-NL-P7-PCSS 34 41 20 EA 46 $ 358.00 $ 16,468.00 3441.3301 Rdmy Ilium Foundation TY 1 34 41 20 EA 46 $ 955.00 $ 43,930.00 2605.3015 2"CONDT PVC SCH 80, T 26 05 33 LF 3,675 $ 7.10 $ 26,092.50 3441.1408 NO 6 Insulated Aluminum Elec Condr 3441 10 LF 11,025 $ 0.70 $ 7,717.50 3441.1410 NO 10 Insulated Copper Elec Condr 3441 10 LF 3,675 $ 0.45 $ 1,653.75 UNIT 5: STREET LIGHTING BID SUMMARY $ 173,325.75 END OF SECTION WILLOW RIDGE ESTATES,PHASE 5 CITY OF FORT WORTH CPN 100480 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS