HomeMy WebLinkAboutContract 48670 CITY SECRETARY
CONTRACT NO. 16
Developer and Project Information Cover Sheet:
Developer Company Name: Pulte Homes of Texas,LP
Address, State,Zip Code: 4800 Regent Blvd, Suite 100
Phone&Email: 972-462-3409,clint.vincent@pultegroup.com
Authorized Signatory,Title: Clint Vincent,Vice President of Land Development,Dallas Division
Project Name and Brief Willow Ridge Estates Phase 5
Description: i<'
Project Location:
Plat Case Number: FP-16-051 Plat Name: Willow Ridge Estates
Mapsco: 7 Council District: 19L City Project Number: 100480
CFA Number: 2016112 DOE Number: <DOE#>
taRecTo be completed by staff.-
Received
eived by: �.50 Date:
City of Fort Worth,Texas
EFFICIAStandard Community Facilities AgreementiM
CFA Official Release Date: 10.07.2015 Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, Pulte Homes of Texas, LP, ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements") related
to a project generally described as Willow Ridge Estates Phase 5 ("Project") within the City or
the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Proj ect; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Proj ect.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 2 of 11
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ®, Sewer (A-1) ®, Paving (B) ®,, Storm Drain (B-1) ®i, Street Lights &
Signs (C) M.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section 11, of the Policy. Developer shall
ensure its contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent(100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 3 of 11
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other state-
approved form) supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to constuct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 4 of 11
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
I Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers,servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such injuries, death or dafnages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its officers,
servants, or employees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 5 of 11
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent(2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 6 of 11
the end of two (2) years from the date of this Agreement (and any extension
period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 7 of 11
Cost Summary Sheet
Project Name: Willow Ridge Estates Phases
CFA No.: 2016-112 CP No.: 100480
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 475,599.10
2.Sewer Construction $ 608,151.80
Water and Sewer Construction Total $ 1,083,750.90
B. TPW Construction
1.Street $ 1,281,186.15
2.Storm Drain $ 769,648.50
3.Street Lights Installed by Developer $ 173,325.75
4. Signals $ -
TPW Construction Cost Total $ 2,224,160.40
Total Construction Cost(excluding the fees): $ 3,307,911.30
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 21,675.02
D. Water/Sewer Material Testing Fee(2%) $ 21,675.02
Sub-Total for Water Construction Fees $ 43,350.04
E. TPW Inspection Fee(4%) $ 82,033.39
F. TPW Material Testing(2%) $ 41,016.69
G. Street Light Inspsection Cost $ 6,933.03
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 129,983.11
Total Construction Fees: $ 173,333.15
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 3,307,911.30 x
Completion Agreement= 100%/Holds Plat $ 3,307,911.30
Cash Escrow Water/Sanitary Sewer=125% $ 1,354,688.63
Cash Escrow Paving/Storm Drain=125% $ 2,780,200.50
Letter of Credit=125%w/2yr expiration period $ 4,134,889.13
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 8 of 11
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
Pulte Homes of Texas,LP
Jesus J. Chapa
Assistant City Manager Name: Clint Vincent
_ f J Title: Vice President of Land Development
Date: , / l / ? Dallas Division>
Recommended by: Date:
ATTEST: (Only if required by Developer)
Wendy Chi- abulal, EMBA, P.E.
Development Engineering Manager
Water Department Signature
ci
Douglas&. Wiersig, P.E.
Director
Transportation& Public Works Department
Approved as to Fo"n &Legality:
ATTEST: �y pF -0
Richard A. McCracken X
Assistant City Attorney Nlary J. Kays ri
City Secretary •qs••
M&C No. 10 JA
Date:
F#r--,,, ►Z5S: vv�/�
City of Fort Worth,Texas
Standard Community Facilities Agreement ..•----
CFA Official Release Date: 10.07.2015
Page 9 of 11 s : s opt)
°:I T?A TAif
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
Location Map
®' Exhibit A: Water Improvments
Water Cost Estimate
Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
® Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit B-1: Storm Drain Improvements
® Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 10 of 11
ATTACHMENT"I"
Changes to Standard Agreement
Community Facilities Agreement
City Project No.<City Project#>
Insert"None." if there are no negotiated changes. If changes have been negotiated,please insert them
below citing to the paragraph for reference.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 11 of 11
PLANS FOR THE CONSTRUCTION OF
WATER,ER, SEWER, PASTING, STREET
LIGHTING, & DRAINAGE IMPROVEMENTS
TO SERVE
WILLOW RIDGE ESTATES, PHASE 5
Q MESA
�S
�DRIVE SI MES
� CREST �7
Z RIVE
HAWKS
3: �� LANDING
o fid, ROAD
TWISTING STAR
DRIVE
WAGLEY
ROBERTSON
ROAD-
BONDS RANCH ROAD
VICINITY MAP
(N.T.S.)
N
CITY PROJECT NO. 100480 TEXAS REGISTERED E"°ENTERNGFM"F-"8
WATER PROJECT NO. 59601-0600430-100480-001580 16301QuorurnMe,Surte200B
Addison,Texas 75001
SEWER PROJECT NO. 59607-0700430-100480-001380 Tel:972-248-7676
Fax:972-24&1414
FILE NO. W-2417 OCTOBER 2016 - SHEET 1
L_
FINAL PLAT
WILLOW RIDGL ESTATES
PHASE
196 RESIDENTIAL LOTS
3 COMMON AREA AND/OR
OPEN SPACE LOTS
E'UL F OF TEXAS, L.P. OWNER/DEVELOPER
4800 Regent Blvd., Suite 100 (972) 304-2600
Irving, Texas 75063
JBI PARTNERS, INC. SURVEYOR/ENGINEER
16301 Quorum Or., Suite 200 B (972) 248®7616
Addison, Texas 75001
TBPE No. F®438
TBPLS No. 10076000
�r
CITY PROJECT NO. 100480 TENS REGISTERED ENGMERNG FIR%f F438
WATER PROJECT NO. 59601-0600430-100480-001580 16301 Quorum Drive,Suite 200B
Addison,Texas 75001
SEWER PROJECT NO. 59607-0700430-100480-001380 Tel:972-248-7676
Fax 972.248.1414
FILE NO. W-2417 OCTOBER 2016 - SHEET 2
k L
OW R EST TES v v � ]� 9 � m o t
CNE SEC ONE
PN A. t2 38 NLLON P,DGE ESTATE
a PHAS 2A
DOG NOD 14122517
a�90 �v � s. � ¢ ♦c \
_ z
-
DDr D 6
P//v z 2 ,
2s JW fRipOf e
rTWSTING OND 1 x \ R q0 ]
DRIVE
wuzl i P �2 ♦ n
s i s ] n 3 wvA�raool�6)sPx. Mw 9 a \ ars
U -
2i
PLATEAU RIDGE WAY
- r °k
me,
24 c TA 2]6� oN ; ]i w z9 26 n zfi s z. z] / 193 6( '¢�♦ s ♦ ♦ z
0
21
e
1 z3 �\� OW NDLE sTA-
tatE £- K Z2 Zi ' 2
TWi TING y, ria`
E MEADOWS DRIVE 2D " TUSTING RIDGE TERRACE 21
21
v o
e R~
s ,D k ♦z 24� 9
41
6 172 3
StP D ° \
DEx 6 aG ,611 12 U 14
6 iD zoa�
\ z 5 W
PINNACLE BREEZE DRIVE I J
0
5♦� p is � U
13i r
2. 275. 21 F1 1� 1. 11 1 15 1. 1� 1� 11
�•{. 13 T� oI CALLED:.116 275 ACRES
'J ' ' —TE HOO£S OE TEKAs.EP.
I—UENT ND.D215127258
225'
,♦ IAEA 4!GUST DRIVE
,s WALOW�MDGE ESTATES ZD MT —
PH Y E SEG110N T10 2t 33 3J
2088
5,
2♦ 25 26A W Q 2 =�♦e 5 6 6
¢va a CAB.A AIOF K Z
O�
¢�6 VAN EZANDT EARNS /
AT DSSN CREEK
7\
CAB.A SLDE 6<59 „
.. P�AT MAP
SCALE: 1"=300'
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
d
' .�. DRAINAGE IMPROVEMENTS
TO SERVE
���■��r WILLOW RIDGE ESTATES,PHASE 5
TEXAS REGISTERED ENGINEERING EMI F-438 (CPN#100480)
16301 Quorum Drive,Suite 200B
Addison,Texas 75001
Tel:972-24&7676
Fax:972-248-1414 OCTOBER 2016 - SHF_: T 3
CONNECT TO EX. 8" WL
CONNECT TO EX. 8" WL WILLOW RIDGE ESTATES a
WILLOW RIDGE ESTATES PHASE 2A "
PHASE 1, SECTION 2 CPN#02186 /
DOE 5325 M B• P265-6071502186-83 / \
Low R E E9T TESS' P164-0601640 15525 \
oR Y BR Yci ax
Ae.0. roE t2 M ffi
o/ WLlon RIDGE EStAiE \
HAY 2A
2. 2, 3 3 e s 26 22 " DOC Roo,117- 3 \
CONNECT TO EX. 8" WL
VALLOW 6 Qom° b \mob PHASERI GE ESTATES
2.o CPN#100123
59601-5310350-0600430-
2 A°�"O4o \ 100123-001580
TulsTwc
DRIVE 21 36 3 to
EX B-ft LOT 6 �' '♦
1.
21
ASE,�L
B "� - — 212
�
PLATEAU RIDGE
6 223 32 JI 30 2B 2.j 2M-5a z] A.
11 23 NLL05Y H10E STALE '
z3 B•9h 1 -T\ _
EX.B-1Y alwt n 2, ' z I6 slk 2 `EX B'ni
B WL
TnISTWG 1.1EADDWS e
DRIVE p iW121
511NG RIDGE TERRACE p „
CONNECT TO EX. 8" WL 9 " 6 B nL
WILLOW RIDGE ESTATES 24,
PHASE 1• SECTION 2 Dy °
DOE#5325
P164-060164015525
♦ n1l. to
1]
EX.B•ni A,B.S�OWW 1E Is ,o
n
11 !1„\ PRIIIACLE BREEZE DRIVE
1
N P 2
q 12 9f
,i CALLED:116.225
A—
ULTE MOVES OE TEXAS,LP.
RDO<UVERi 0.D21 s,22258
t I 3 ♦
t, WAD..GUST DRIVE
E, w1LOW RroLE ESTATES 2°
IA°tz i PHS 0.6LIOE 12— 3111 22 23 2, a251.
-7 VNI ZNIDT EAFVB /
Al(0550.[BECK
CAB.A 5110E 6459 21
LEGEND
PROP. WATERLINE
-- - — PROP. VALVE WATER
SCALE: 1"=300' PROP. FIRE EXHIBIT A
�— HYDRANT PLANS FOR THE CONSTRUCTION OF NATER,
�- - EXIST. WATER LINE SEWER, PAVING, STREET LIGHTING, &
dB- ' �� & VALVE DRAINAGE IMPROVEMENTS
TO SERVE
a WILLOW RIDGE ESTATES,PHASE 5
TEXAS MGISIFREDENGINEERWG FMIF438 PROPOSED WATER (CPN#100480)
LINES ARE 8" UNLESS
16301 Quorum Drive,Suite 200B OTHERWISE INDICATED.
Addison,Texas 75001
972-248-7676
Fax:972-248.1414 OCTOBER 2016 - SHEET 4
Fax
CFA WATER COST ESTIMATE
UNIT PRICE BID
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
Description Unit Price Bid Value
No. Section No. Measure Quantity
UNIT 1: WATER IMPROVEMENTS
3311.0001 Ductile Iron Water Fittings w/
Restraint 33 11 11 TON 6.95 $ 4,700.00 $ 32,665.00
3311.0261 8"PVC Water Pie 33 1112 LF 9,582.00 $ 22.45 $ 215,115.90
3312.0001 Fire Hydrant 33 1240 EA 11.00 $ 2,850.00 $ 31,350.00
3312.2003 1"Water Service 33 1210 EA 196.00 $ 730.00 $ 143,080.00
3312.2003 1"Irrigation Service 33 1210 EA 2.00 $ 730.00 $ 1,460.00
3312.2103 1 1/2"Water Service 33 1210 EA 1.00 $ 1,200.00 $ 1,200.00
3312.2103 1 1/2"Irrigation Service 33 1210 EA 1.00 $ 1,200.00 $ 1,200.00
3312.3002 6"Gate Valve 33 1220 EA 11.00 $ 850.00 $ 9,350.00
3312.3003 8"Gate Valve 33 1220 EA 28.00 $ 1,240.00 $ 34,720.00
3312.0117 Connect to Existing 8"Water
Main 33 1225 EA 6.00 $ 750.00 $ 4,500.00
3305.0109 Trench Safety 3305 10 LF 1 9,582.001 $ 0.10 $ 958.20
UNIT 1: WATER IMPROVEMENTS BID SUMMARY $ 475,599.10
END OF SECTION
WILLOW RIDGE ESTATES,PHASE 5
CITY OF FORT WORTH CPN 100480
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
CONST. 4' MANHOLE AT \
o1i"cT:EST TEs" '� EX. 8" SSWR
pR1 SE CNE SECT1(Y IXtE
AB-0. 338 ` wttOw ATES
WILLOW RIDGE ESTATES —
PHASE 1—SECTI0N 2 DD 1DAo 1a X912
o DOE#5325
P174-070174013515 H` CONNECT TO EX. 10" \
q 6 SSWR
WILLOW RIDGE ESTATES
PHASE 3A
-OUQ,�0 CPN#100123
(To BE RE"OVED) J6 MNgC� 2 59607-5310350-0700430
0 9 a
R0b —100123-001380
— — — ,
TVfiSTINC N1Nq , • z Is ,•
DB1w ]
21 n 8'BSwR Arz(o 3�� w •s \
EX 8-SSWR • as xfi V� —r wu1
(To REV.) 5 t •q y --
_.. 26
PLATEAU R�WAY
524
2
4 6 2] 32ql � 29 26 21
2 5
1z V 1 23 N,rISEMn
25 G3VEzrr W.LLDn RASE �STn '
&aa Iz ftr(To BE D208NaludD) " 23
EX.To,SSWR 18 _
EX.8-SSNR 2 ] 4 (TD BE REMOVED) EX.10 SSWR
(TO BE REMOVED) ' --X.
TWiSPNG MEADOWS _
– —�� zo �— TIVSTING RIDCE IERRgCE ° q �
f 1a 8 SSWR 1x 43 EtOCK 24y
CONNECT TO EX. 10"
6 6e SSWR SSWR
Ex 1D•ss1R % 12 , WILLOW RIDGE ESTATES
1$ �,,.\ PWNAQE BREEZE DRIVE PHASE 3A
2�j a — CPN#100123
3 59607-5310350-0700430
/ 2 6 —100123-001380
17
CONST. 4' MANHOLE AT
_ CALIED.116275-5
EX. 10" SSWR — a—x T 11 a 211177TE—.
DOCUMENT f10.D315122259
WILLOW RIDGE ESTATES 0 SS" 10
PHASE 1—SECTION 2 12 ] 6 ° °� to,ss-
DOE#5325NI
P174-070174013515 uEgn°w cusT wavE
u wu°w TeDQ EsrATEs z6 —
PNAg IXIE.YCT1(XI T5O
aaa z CAB.0.SAE 12089 z1 2x 2] z4 25 26 2z I z 3 a 5 6
aaa 6 VAN 5
-INT F 64 /
AT F—QtEEK
CAH.0.5110£ 59 z,
LEGEND
PROP. S.S. LINE
- 0 PROP. S.S. MH
--0 EXIST. S.S. MH TO BE REMOVED SANITARY
SCALE: 1"=300' - - EXIST. S.S. LINE TO BE REMOVED EXHIBIT Al
- �- - EXIST. S.S. MH PLANS FOR THE CONSTRUCTION OF WATER,
dB- 1
EXIST. S.S. LINE SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
WILLOW RIDGE ESTATES,PHASE 5
TEXAS REGISTERED ENGUMERING FMJ F439 - (CPN#100480)
PROPOSED SANITARY
16301 Quorum Drive,Suite 200B SEWER LINES ARE 8"
Mclison,Texas 75001 UNLESS OTHERWISE
Tel:972-248-7676 INDICATED. OCTOBER 2016 - SHEET 5
Fax:972-248-1414
L
CFA SANITARY COST ESTIMATE
UNIT PRICE BID
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
Description Unit Price Bid Value
No. Section No. Measure Quantity
UNIT 2: SANITARY SEWER IMPROVEMENTS
0241.2013 Remove 8"Sewer Line 0241 14 LF 545 $ 14.50 $ 7,902.50
0241.2014 Remove 10"Sewer Line 0241 14 LF 1,510 $ 14.50 $ 21,895.00
0241.2201 Remove 4'Sewer Manhole 0241 14 EA 5 $ 300.00 $ 1,500.00
0330.0001 Concrete Encase Sewer Pie 03 30 00 CY 1 $ 900.00 $ 630.00
3301.0002 Post-CCTV Inspection 3301 31 LF 8,357 $ 1.40 $ 11,699.80
3301.0101 Manhole Vacuum Testing 33 01 30 EA 33 $ 110.00 $ 3,630.00
3305.0106 Manhole Adjustment,Major 3305 14 EA 1 $ 1,300.00 $ 1,300.00
3305.0107 Manhole Adjustment,Minor 3305 14 EA 2 $ 1,300.00 $ 2,600.00
3331.4115 8"SDR-26 PVC Sewer Pie 33 11 10 LF 5,730 $ 34.85 $ 199,690.50
3331.4116 8" SDR-26 PVC Sewer Pipe,CSS
Backfill 33 11 10 LF 460 $ 44.00 $ 20,240.00
3311.4201 10" SDR-26 PVC Sewer Pie 33 11 10 LF 1,927 $ 36.00 $ 69,372.00
3311.4202 10" SDR-26 PVC Sewer Pipe,
CSS Backfill 33 11 10 LF 240 $ 46.00 $ 11,040.00
3339.1001 4'Manhole 3339 10 EA 33 $ 2,620.00 $ 86,460.00
3339.1003 4'Extra Depth Manhole 3339 10 VF 155 $ 110.00 $ 17,050.00
3331.3101 4"Sewer Service 3331 50 EA 193 $ 745.00 $ 143,785.00
3331.3201 6" Sewer Service 33 31 50 EA 1 $ 1,000.00 $ 1,000.00
3305.0109 Trench Safety 3305 10 LF 8,357 $ 1.00 $ 8,357.00
UNIT 2: SANITARY SEWER IMPROVEMENTS BID SUMMARY $ 608,151.80
END OF SECTION
WILLOW RIDGE ESTATES,PHASE 5
CITY OF FORT WORTH CPN 100480
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
OWR5 CONNECT TO EX. 24' E—E
«ECLARDY FSTAR
NDC,5T2 B WILLOW RIDGE ESTATES . " °PRASE 2A
PHASE 1—SECTION 2 B-No D 14lzzan
DOE#5325 ° 0 °
CONNECT TO EX. 29' B—B
m
°pp ° ° + WILLOW RIDGE ESTATES
p0 °00 0 0 0 000° 0000 : PHASE 2A
o0 0 00 °o CPN#02186 6
3O °o
o 1 9
0 zs s
00
O° > °OOp X,j 31 c
0 3 _........
TWISTING WIND ° °op e io ' CONNECT TO
DI�NVE0 2 F1— o' N °° EX. 29' B—B
p 3 , `0:693 AFiFR A 000 WILLOW RIDGE
CONNECT TO 0 26 °Oo ESTATES
EX. 24' E—E 16 , p°° 36 36 "h„ ., PHASE 3A
PLATEAU RIDGE VlAV CPN#100123
WILLOW RIDGE 6 p°o 2, — _ o° =1 �'
ESTATES 23 p s o 0 0 0 o 0 0 0 0 0 - 000° 5.s ` >: z
PHASE 1— ° _ 24 > —
SECTION 2 °O
DO 25 24 o a ° 2 0 9 e 2] 6 " °p°p
N po° °o
'] 23 Q 17 o0 °O° OO NLLIaN NAGE STATE
sE
aa°21
16°4xr 2z
e 9 JTRIIA
14 s o z4
0
_ o T STIN RID E °p °
m ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° ° °o°p°°
DRIVE °
,9 0°° 00 a
9 op
v ,6 0o42 4l 1 2.
• '; _
°° '° p° �2' �• ° � CONNECT TO
p°
° EX. 29' B—B
17 24 ° �� WILLOW RIDGE
L ° J ESTATES
p
o
G 000 2 ,5 °0 PIN ACL BR EZE RIVE CPNS#
0
100123
0
s�D stjz Q��� l 000
14 00 0
1
0
.0
1> oc 00 °°° ,°Op0° C—..116275CONNECT TO CONNECT TO EX. 25' E—E — jT12 '.
—ROPE:OF TEXAS.LP.
�s9 0°o°0 o VAN ZANDT FARMS AT poanENT No.p2sm2 e
EX. 24' E—E e °
WILLOW RIDGE F °°° FOSSIL CREEK 46 7 e 9 D .11
ESTATES „ °O 11 E Dw GUT DRIVE °
PHASE 1— o
SECTION 20oo°0°000000000000000002028280°opopo opo°0o-o00° 00000000 o LEGEND
'DOE#5325 „ — —
wuow RIDCE ESTARS
L-4
PMCI.,lYA21 =2 =3 24 25 „ 2] w 2 , 5 6' RESIDENTIAL
29' B—B
_— VAN`NAT RIER /
AT OssA CREEK
CAD.A.51AK 6459 RESIDENTIAL
24' E—E
60'R.aw
VARIES 24'/25'ROADWAY
TAYPEO TOPSat lY/12.5" +2'/125' AVPED TOPSaL —Ml"�z s`9" 'CR °°° ® RESIDENTIAL
J2 91 19
51ui0ARD 6-RERLFOR4D STANDARB 25' E—E
9FWA1K Ca1CRER SAEWAUt
E SECnaI —T PER PER SECTION
2 13 20 SECTION 32 13 13 C 32 13 20
�4S SDXVR OSKY4)I Sp;Y x osKLLw, 5 0 SIDEWALK BY
DEVELOPER
A,CEaine E mu i u 12 P—CUD 6-LNE sib -E. AA-T
11—BA[KFLL /3 BARS 0 PER 32 iJ 13-0511 SUBGRAOE 0 30 1a6/SY PER Ant£BACKfRE
' PER I.2.0I IB-0.G&W. S—Oft 32 11 29
SEE wLLOn RIDGE Fi TARS 31 24 W 31 200011 PHASE 5 CaI51RUCt a1ME RPLAHS,
Ell 41&1 41 101S' 24'E-EI25'E-E CONCRETE rnapvle sIFE1s 4o t 41 FOR
ROAODx DITCH DETULs STREET SECTIONS R0A04DE DRa+DETASS
losPAaKwnY 29'Ronownr 10.s'PARKwxY RQIE--
14.5' 14.5' 9.5' 1. —..K—SHAU.ILL A-
'
SECETION°P329 9R TANOARO Y NRB TAPED TOP501 PER PER Fa)T DYAX)LRe255
STANpARO SA 1 1. PER 32 13 1}p525 .—32 91 19 aRECRD OiH£Rw15E BY THE
ST-BARD SAEWAIK C—R.
(BY OTHERS) 6"(— 6'REINEWCFD (BY—RS))
CRETE TPIAARO 7"}0CURB
PFA
�-PER fi(YAX
) C PER 32 13 1525 Y' Ft.(LIAIJ
4'i SEC al 32P 13 13 2%T1P. 214 IVP. 6:1(YAK)
-'��—i I I (SM YAY:0.511 LLa) (50;YA%05;YP!) •.. '
NYPACRD K' , —,,,� �1�1� -••"� Ca2PACRD
CCEPTADLE w
NAnIt A. L 12' LDNCJIUDNK 12- ACCEPT BAC
ER 5EC1i01I CaR1RUCIm—11 PROPOSED C UYE STABtUZED �£BACKFRL
R 31 24 N 'i3 BARS 0 pFR 32 13 13-0511 SUBGRADE 030 UIS./SY PEP PER MCI
Ia+
SCALE: ,=�oo, 8-040.W. mc-321129 3+2400
RESIDENTIAL CONCRETE STREET P A VI N G
SECTION(L) EXHIBIT B
32 77 13-D602
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TEXAS REGISTERED ENGINEERING FIMI F-038 TO SERVE
WILLOW RIDGE ESTATES,PHASE 5
16301 Quorum Drive,Suite 200B (CPN#100480)
Addison,Texas 75001
Tel.972-248-7676 OCTOBER 2016 — SHEET 6
Fax:972-248-1414
L
CFA PAVING COST ESTIMATE
UNIT PRICE BID
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
Description Unit Price Bid Value
No. I I Section No. Measure Quantity
UNIT 4: PAVING IMPROVEMENTS'
3211.0400 Hydrated Lime 30lbs/SY 32 11 29 TN 493 $ 150.00 $ 73,950.00
3211.0501 6"Lime Treatment 32 11 29 Sy 32,857 $ 2.60 $ 85,428.20
3213.0101 6"Conc Pvmt 32 13 13 Sy 30,968 $ 31.65 $ 980,137.20
3213.0301 4"Conc Sidewalk 32 13 20 SF 10,417 $ 4.75 $ 49,480.75
3213.0501 Barrier Free Ramp,Type R-1 32 13 20 EA 13 $ 1,950.00 $ 25,350.00
3213.0503 Barrier Free Ramp,Type M-1 32 13 20 EA 13 $ 1,900.00 $ 24,700.00
3213.0506 Barrier Free Ramp,Type P-1 32 1320 EA 13 $ 1,600.00 $ 20,800.00
3471.0001 Traffic Control 3471 13 LS 1 $ 1,000.00 $ 1,000.00
9999.0001 Connect to Existing Pavement 99 99 01 LF 184 $ 20.00 $ 3,680.00
9999.0002 Provide and Install Street Name
Blades 99 99 02 EA 68 $ 245.001 $ 16,660.00
UNIT 4: PAVING IMPROVEMENTS BID SUMMARY $ 1,281,186.15
END OF SECTION
WILLOW RIDGE ESTATES,PHASE 5
CITY OF FORT WORTH CPN 100480
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
" a E51 iE5 v ss z 31 z° `\`\``` v v u °I v • ss I
wPN SE Orff YLTI CNE �g
AB 0. 12 JB F y � W1�OW o ESTATE ° I
til 1> z
20 7Q
21 z 3 a 5 26 21 {V
W o y REMOVE EX. RIPRAP & HEADWALL
m CONNECT TO EX. 5'x5' RCB -\
WILLOW RIDGE ESTATES PHASE 3A `
] CPN#100123
2.
;DRIVE
ISTING
o amc V51ND AR,N r
a.oa n 2J°"� C(f J 1O z
muF ' AO�E, 2 Ec sow '° i
n„rTt TF xo TEEN G 3 • \_
2 J 2 A V�6ou a1� 3 • \ BPs*E1
22
Iw • $6 J y s w .41E
j J 4
fitoo,s 4 zs z J b �
21 J PLATEAU RIDGE WAY I' 32 31
lar 2 / y � al II
za ¢ J2 J1 So 26 2J n 1s
1z I/ wLLOW sTATE
22 JASE
25 —2] N //
zObL 21 1 2 i 1 .6TOR 2
TwIsTING 216
MEADOWS
r DRIVE s zo'r T\NS11NC RIDGE TERRACE
41 [�4 31 �I 2. 1.
n 6 �_ Iv
13 L
s 16 1 3 PINNACLE ° a
1z
BREEZE DRIVEle —
O$ c a ] r
a 13 n mtl.Ll�
_ CI1lEP.116.z15 ALES
�Pp
P—NUIES OF—AS ooauENi 140.ozlslnzse
is 9 CVExij
f jl 1 z J 4 5 [1DRIVE['
10GU
t3 r WALO'N ft1pGE—A— 20 IT—1 —
PHA4 MK.SECTION TNO W
tpx> CAB.A YIOE2088 �w
21 32 23 N zs 26 2] O J � 1 2 J 1 5 6
7 VPN`AIfOT EPBYS
AT OSA CRCE%
US a0 n
LEGEND
o PROP. INLET
EXIST. INLET
PROP. ONSITE STORM DRAIN
EXIST. STORM DRAIN
ER
SCALE: 1"=300' STORM DRAINAGE
_ EXHIBIT B1
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
TEXAS MLSTEREDENGINEERMG FMIF438 WILLOW RIDGE ESTATES,PHASE 5
(CPN#100480)
16301 Quorum Drive,Suite 200B
Addison,Texas 75001
Tel:972.248-7676
Fax:972.248.1414 OCTOBER 2016 - SHEET 7
CFA STORM DRAIN COST ESTIMATE
UNIT PRICE BID
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
Description Unit Price Bid Value
No. Section No. Measure Quantity
UNIT 3: STORM DRAIN IMPROVEMENTS
0241.0800 Remove Riprap 0241 13 SF 900 $ 0.80 $ 720.00
0241.4401 Remove FW-0 Headwall,at 5'x5'
RCB 0241 14 EA 1 $ 1,500.00 $ 1,500.00
3137.0104 Medium Stone Ri ra ,Dry 31 37 00 SY 165 $ 46.00 $ 7,590.00
3305.0112 Concrete Collar 3305 17 EA 15 $ 300.00 $ 4,500.00
3341.0201 21"RCP,Class III 3341 10 LF 1177 $ 50.00 $ 58,850.00
3341.0202 21"RCP,Class IV 3341 10 LF 53 $ 56.00 $ 2,968.00
3341.0205 24"RCP,Class III 3341 10 LF 1543 $ 57.00 $ 87,951.00
3341.0206 24"RCP,Class IV 3341 10 LF 16 $ 67.00 $ 1,072.00
3341.0208 27"RCP,Class III 3341 10 LF 135 $ 64.00 $ 8,640.00
3341.0302 30"RCP,Class III 3341 10 LF 91 $ 72.00 $ 6,552.00
3341.0305 33"RCP,Class III 3341 10 LF 672 $ 80.00 $ 53,760.00
3341.0309 36"RCP,Class III 3341 10 LF 417 $ 95.00 $ 39,615.00
3341.0402 42"RCP,Class III 3341 10 LF 1313 $ 127.50 $ 167,407.50
3341.0409 48"RCP,Class I11 3341 10 LF 268 $ 154.00 $ 41,272.00
3341.0503 54"RCP,Class IV 3341 10 LF 186 $ 238.00 $ 44,268.00
3341.1203 5x5 Box Culvert 3341 10 LF 237 $ 267.00 $ 63,279.00
3349.0001 4'Storm Junction Box 3349 10 EA 5 $ 3,800.00 $ 19,000.00
3349.0002 5'Storm Junction Box 3349 10 EA 3 $ 4,000.00 $ 12,000.00
3349.0102 4'Manhole Riser 33 49 10 EA 2 $ 2,400.00 $ 4,800.00
3349.5001 10'Curb Inlet 33 49 20 EA 12 $ 3,400.00 $ 40,800.00
3349.5002 15'Curb Inlet 33 49 20 EA 17 $ 4,650.00 $ 79,050.00
9999.0001 SETP-CD Headwall,at 21"RCP 33 49 40 EA 7 $ 1,900.00 $ 13,300.00
9999.0002 SETP-CD Headwall,at 24"RCP 33 49 40 EA 1 $ 2,100.00 $ 2,100.00
9999.0003 SETP-CD Headwall,at 30"RCP 33 49 40 EA 1 $ 2,300.00 $ 2,300.00
9999.0004 SETP-CD Headwall,at 48"RCP 33 49 40 EA 1 $ 3,300.00 $ 3,300.00
3305.0109 Trench Safety 3305 10 LF 6108 J$ 0.50 $ 3,054.00
UNIT 3: STORM DRAIN IMPROVEMENTS-BID SUMMARY $ 769,648.50
END OF SECTION
WILLOW RIDGE ESTATES,PHASE 5
CITY OF FORT WORTH CPN 100480
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
A�nc - - W110W fiDGF ESTATES
FH J.
-- s PNAY iA
DDC NOD 16112811
m y
zc
14
s. ss oos 1
„ 0 s
r77
eue qNN z
qC�
z• E Ripp f e
TWISTING W1No ' \ H q0 J
DRIVE ze I ,o
aoct n +okf ,z
PRTVArz Ho°,TreEN sPAa • 1J ,•
• z, EASAE1—1
S sqt
2113; u
PLATEAU RIDGE WAY21
(�
24 4
s cs4 Zl a 3f JD 29 ZBZ4 ZJ Z Z �t9 41
Q
O \
Q
,] NH10W
ZZ —GE STATE '
23
NAY
ECPt P 21 1 Z J 4 Al 21Z
>aes DR^T TNT TING e
MEADOWS DRIVE za TWISTING RIDGE TERRACE 1
i s
,ogt az
T4.
.
x<r ,s
24
4 : 14 1� 1. 11 LT.c jp N
1E - } IS
Y
G 3
PINNACLE BREEZE13
DRIVE a
s
4 n Tz xTeAa
—1.1, ]S A—S
11—IS
.—S L£TEAS.LP.
19 J, A2 1 Z S 4 5 6 ] , • DOCUUEM I.ro.D2151]>25B
'�sFAUE
Ji "}
1. EAD 14 GUST DRIVE
u WLLOW RIDGE ESTATES
PHM �}
ASE ONE.SECTK)1 lYq 4 Z5
nea] GAB.0.S SE.12089 Z, Zz IJ 2 Z
M Z] U J 1 I J . 5 6
VPN ZNAi(ARMS
(OSYL CREEK
aaa:e / CAB.I SURE 6459 zs
LEGEND
PROP. RESIDENTIAL
LUMINAIRE
EXIST. RESIDENTIAL
LUMINAIRE
SCALE: 1"=300' STREET -LIGHTSEXHIBIT C
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
g' �� DRAINAGE IMPROVEMENTS
4TO SERVE
WILLOW RIDGE ESTATES,PHASE 5
TEXAS REGISTEREDENGR4EEERWG FIRA1 F-438 (CPN#100480)
16301 Quorum Drive,Suite 200B
Addison,Texas 75001
TelFax:972.248.141 OCTOBER 2016 - SHEET 8
Fax:972.248.1414
L
OM Po EST iES, ss Y J, JI n ,e _� v >i " • >o
SE ONE SECTi ONE bb{»r t
A8,0. UDE 12 J8 � 12LLOW PKK£CSTAIE
x PNASE 2A
DDL NOD 1.122P12
o H
2 IS 2 Z J a J is z]
P
tv JQ i s4 ss �, w� a
i°
Bq�,° s1 ��� s •
TNG
O t is s 1v v P/N,y i ]
WIND DRIVE 'aC( s
o� `r' eToa4 n ze ] P R/pCf RpFD J J • w _
n z "`J , ua.�+ly aiNe ArE • 4 ' to +•
J 2 aarx x� •s eAsuT wuoW
J4 , ' 41
n s
PLATEAU RIDGE WAY
41
24 B ZJ 32JI JO 29 21 17 M 15 14 2J
12 uowHar STATE
zz a E
a0a n 21 I z 1B syWT24 2
s TWSTINGe
MEADDWS DRIVE i0 I
TVSYSTING RIDGE TERRACE + �
21
s +° 42 J1 z44
I L�
ac'�0� PR \ It 1z B is 1 s t Lto
1 + PINNACLE BREEZE DRIVE
�syc.ss is $c °L 1J] a
° 1 3
2.
P CAUEP.11&2]5 ACRES
,s T[t� PIATE NCYES CC TEKA;LP,
1 DOCUVENT N0.D2151]]253
2 J 5 6 B 0 IS
MEADOW GUST DRIVE
+J —M RIDGE ESTATES 2°
PHASE IXlE.SECTI(Y1 Two w
12—
n zz zJ z4 zs zs n p J + z a s °
vul—T—US
Al EDssn Iz,EEK
aoa�B CAD.A SLIDE 64. „
LEGEND
PROP. SIGN BLADE (TO BE PROVIDED BY DEVELOPER)
STOP PROP. STOP SIGN
.. STREET SIGNS
SC AEE: 1"=300' ♦ EXHIBIT C1
PROP. STOP AHEAD
O SIGN PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
dB-
' PROP. HORIZONTAL DRAINAGE IMPROVEMENTS
ALIGNMENT SIGN TO SERVE
WILLOW RIDGE ESTATES,PHASE 5
TEXAS REGISTERED ENGINEERING FMI F438 PROP. ADVISORY SPEED (CPN#100480)
15 SIGN
AIPH
16301 Quorum Drive,Suite 200B
Addison,Texas 75001
Tel:972-248-7676 OCTOBER 2016 - SHEET 9
Fax:972-248.1414
L
CFA LIGHTING COST ESTIMATE
UNIT PRICE BID
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
Description Unit Price Bid Value
No. Section No. Measure Quantity
UNIT 5: STREET LIGHTING
3441.3002 Rdmy Ilium Assembly TY 11
with 33B arm 34 41 20 EA 46 $ 1,684.00 $ 77,464.00
3441.3201 Install ATBO-20BLEDE70-
MVOLT-R2-3K-NL-P7-PCSS 34 41 20 EA 46 $ 358.00 $ 16,468.00
3441.3301 Rdmy Ilium Foundation TY 1 34 41 20 EA 46 $ 955.00 $ 43,930.00
2605.3015 2"CONDT PVC SCH 80, T 26 05 33 LF 3,675 $ 7.10 $ 26,092.50
3441.1408 NO 6 Insulated Aluminum Elec
Condr 3441 10 LF 11,025 $ 0.70 $ 7,717.50
3441.1410 NO 10 Insulated Copper Elec
Condr 3441 10 LF 3,675 $ 0.45 $ 1,653.75
UNIT 5: STREET LIGHTING BID SUMMARY $ 173,325.75
END OF SECTION
WILLOW RIDGE ESTATES,PHASE 5
CITY OF FORT WORTH CPN 100480
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS