Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Ordinance 2559
ORDINANCE 110. AN ORDINANCE REFERRING BIDS FOR THE IlTROVEFUVT OF A PORTION OF MORTON STREET, IN THE CITY OF FORT WORTH, TEXAS, TO THE DEPARTMENT OF PUBLIC WORKS FOR A REPORT THEREOF;. BE IT ORDAINED BY THE CI^1Y COUNCIL OF THE CITY OF FORT WORTH, TEXAS: SECTION 1. That bids for the construction of improvements on Morton Street, from the westerly line of Currie Street to the easterly line of University Drive, save and except the intersection of Norwood Street, in the City of Fort Worth, Texas, having on the 6th day of July, 1948, been opened and read and the following persons having filed bids for the performance of such work or part thereof, to wit: General Construction Company, Fort Worth, Texas, Worth Construction Company, Fort Worth, Texas, Brown & Root, Inc., Houston, Texas, and Texas Bitulithic Company, Fort Worth, Texas, said bids be and the same are hereby referred to the Department of Public V.orks, which is directed to cause to be j-)romptly filed with the City Council a report and recommendation thereon. SECTION 2. That this ordinance shall take effect from and after its passage. APP3OVED AS TO FORM: City Attorney REPORT OF DEPARTMENT OF PUBLIC WORKS To the Honorable Mayor and City Council of the City of Fort Worth: Your Department of Public Works to which was referred the Bids for the improvement of Morton Street, from the westerly line of Currie Street to the easterly line of University Drive, save and except the intersection of Nor- wood Street, in the City of- Fort Worth, Texas, hereby respectfully reports to your Honorable Body that it recommend the acceptance of the Bid of the General Construction Company for the performance of said work at and for the following prices, to-wit: ITEM UNIT NO, DESCRIPTION? QUAIqTITY PRICE AMOUNT 1 Unclassified Street Excavation 1400 C.Y. 1.03 $1442.00 2 Combined Cone. Curb and Gutter 1950 L.F. 1.69 3295.50 Standard Concrete Curb 50 L.F. 1.45 72.50 Standard Concrete Gutter 100 S.F. 0.55 55.00 5 Standard Cone. Driveway Approaches 200 S.F. 0.45 90.00 6 Standard 5" Concrete Sidewalk 200 S.F. 0.35 70.00 7 Removing Existing Concrete Curb 50 L.F. 0.16 5.00 S Removing Existing Concrete Gutter 100 S.F. 0.12 12.00 9 Removing Existing Concrete Sidewalk 200 S.F. 0.05 10.00 10 Removing Existing Concrete Driveway Approaches 200 S.F. 0.09 16.00 11 711 Reinforced Concrete Pavement 3600 S.Y. 3.88 13,96g.00 TOTAL COST $ 19,039.00 Respectfully submitted, DEPARTMENT OF PUB 0 S By DIREC. R OF UBLIC WORK TO THE CITY 00URCIL OF TEE CITY OF FORT WORTH, TEXAS: Referring to the report of the Department ofPublic WoKs in connection with BMs for the improvement of Morton Street, from the westerly line of Currie Street to the east- erly line of University Drive, save and except the intersec- tion of Norwood Street, In the City of Fort Worth, Texas, and to the proposed Contract therefor, it appears that the amount which t1he City will pay in connection with suzh Con- tract and improvements is the sum of Two Thousand Dollars ($2,000.00), 1 do hereby certify to the City Council of the City of Fort Worth that the money required for such Contract and expendi- tures which will be incurred thereby is in the treasyry to the credit of the Street Improvement Fund and not appropria- ted for any other purpose. Juby l.4o UM -'T PAVIM lirc*etar of rubUe Worts �ldiaf four Mira 1%* CA ,Y U in ss asio» July 140 iti4� 1. %*g Ovdiasn" 30i to US . .Motor of pauin works 2. Approrad J*port of the Pjrr M#er of xie %rb* 3. Adopsed Orft MNW No. V*Vtgg rVort of pirestbY' of Paine -%Now sma mg bbtrsst to the aemoul Constructina GOWPOW to the f!* of ft9.Om.* w 4. Prov" est of Director of irim"m Mrttl. •si4 $20WO.00 sks Cilyte pwiioa of Ow Costs ter thv P-evisig of iit3ft% �9"Z-71% fit Qkwrl* Street to Ukirsrsity 'boars tom• e�. OW K.C.10ldkss1 M.S. Cwstvctlaa Co. City of Fort Worfh, TexcI5 TABULATION OF 5IDS Engineer's Estimate $20,199 .50 PAVING ON • - • tM. Deporfment of Public Works •• UR:IE STREET TO UNIVERSITY DRIVE • • • • Direr-for. 5IDS RECEIVED July • 1949 • • • • • • • . • • i '• •d • I ••. ! TION CO. welpGAZIA4 © ® • • ®MWMM® • • . • ® • • jUnclassified Street Excavation MMj.J0fiMj Combined Concrete Curb &__Gu�er SOMERNONEF Me novel"169mme rom. N=6 "61 16MOU -not its, 0 Iry .LI f • . : - t•liL7tH7fi1•� • . •• , !.i • 1;• • . •• •1• _- as -Removing Existing Concrete Curb KIMUMMOG �Irmifm 0 A# to _stt,r.q Cancratia Gutter MMIMEMI Mom romm or w A=,r,,T.ches___ one rNME10"t., M# ; _--- _- TOTAL COST 1 PROJECT with 7" _• . . �u . . • • • / • •/ • •• 0119.793-•i 1 11 Wity , 11" Hot Mix Asph. Cone, Surface on 611 ReInf. .0 / . . nlua Ttam - • rr 19,433-00 • ' • • ORDERTIME OF COMPLETION (Working Doys) OF • • .