Loading...
HomeMy WebLinkAboutContract 48719 CITY SECRETARY CONTRACT N0. Developer and Project Information Cover Sheet: Developer Company Name: BNM Lake Vista Development,LP Address, State,Zip Code: 9001 Airport Freeway,North Richland Hills, TX 76180 Phone &Email: 817-849-5282 Authorized Signatory, Title: Bruce French,Vice President Project Name and Brief Lake Vista Ranch Phase 2 Description: Project Location: Boaz Road between Boat Club Rd&Bowman Roberts Rd. Plat Case Number: FP-16-013 & Plat Name: Lake Vista Ranch FP-14-044 Mapsco: 32Q Council District: 7 City Project Number: 100372 CFA Number: 2016-069 DOE Number: None To be completed by tafff Received by: , "�/�� Date: OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement .,�pR,p� ,I CFA Official Release Date: 10.07.2015 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, BNM Lake Vista Development, LP, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Lake Vista Ranch Phase 2 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City")- and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth, Texas Standard Conmlunity Facilities Agreement CFA Official Release Date: 10.07.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ©1, Sewer (A-1) ® Paving (B) ©, Storm Drain (B-1) ©, Street Lights & Signs (C) MR E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the allezed ne'alizence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the allezed nezlizence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Font Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 11 Cost Summary Sheet Project Name: Lake Vista Ranch Phase 2 CFA No.: 2016-069 CP No.: 100372 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 198,164.10 2.Sewer Construction $ 270,862.35 Water and Sewer Construction Total $ 469,026.45 B. TPW Construction 1.Street $ 485,603.15 2.Storm Drain $ 403,882.00 3.Street Lights Installed by Developer $ 69,096.10 4. Signals $ - TPW Construction Cost Total $ 958,581.25 Total Construction Cost(excluding the fees): $ 1,427,607.70 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 9,380.53 D. Water/Sewer Material Testing Fee(2%) $ 9,380.53 Sub-Total for Water Construction Fees $ 18,761.06 E. TPW Inspection Fee(4%) $ 35,579.41 F. TPW Material Testing(2%) $ 17,789.70 G. Street Light Inspsection Cost $ 2,763.84 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 56,132.95 Total Construction Fees: $ 74,894.01 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 1,427,607.70 Completion Agreement=100%/Holds Plat $ 1,427,607.70 Cash Escrow Water/Sanitary Sewer=125% $ 586,283.06 Cash Escrow Paving/Storm Drain=125% $ 1,198,226.56 Letter of Credit=125%w/2yr expiration period $ 1,784,509.63 x City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER BNM Lake Vista Develonment.LP By HMH Development,Inc.its General Partner Jesus J. Chapa Assistant City Manager Name: Bruce French Title: Vice President Date: a � O '! � ` Date: Recommended by: ATTEST: (Only if required by Developer) Wendy Chi-Babulal, EMBA, P.E-.-- De elopment Engineering Manager Signature ater Department Name: L4 t-) . lj DouglasMT. Wiersig, P.E. Director Transportation&Public Works Department Approved as to Form &Legality: ATTEST: Richard A. McCracken ary J. ys Assistant City Attorney City Secretary ;0 M&C No. N I in, Date: 1./20 XqS OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement FT. WORTHO U CFA Official Release Date: 10.07.2015 Page 9 of 11 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. °te: -I %lie Westerman Development Manager Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment �? Attachment 1 -Changes to Standard Community Facilities Agreement IR Location Map Exhibit A: Water Improvments Water Cost Estimate FXT' Exhibit A-1: Sewer Improvements �? Sewer Cost Estimate D Exhibit B: Paving Improvements Paving Cost Estimate Exhibit B-1: Storm Drain Improvements Fx[ Storm Drain Cost Estimate nX Exhibit C: Street Lights and Signs Improvements Q Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACI=IMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100372 ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent(100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent(100%) of the contract price of the infrastructure for a period of one(1)year from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. P. COMPLETION WITHIN 1 YEAR i. Developer shall complete the Improvements within one(1)year,provided,however,if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement,its financial guarantee,its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of one(1)year from the date of this Agreement(and any extension period)the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of one(1)year if the Developer breaches this Agreement,becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction,the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 00424, DAP-BIDPROPOSAL Pae.1 or7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value Item No. Measure Quantity UNIT I:WATER IMPROVEMENTS 1 3311.0261 8"PVC Water Pipe -- 3-3-1i 12 LF 3471 $21.00 $72,891.00 2 3312.3003 8"Gate Valve 33 12 20 EA 12 $1,300.00 $15,600.0 3 3312.3002 6"Gate Valve T 33 12 20 EA 7 $900.00 $6,300.00 4 — 3312.0001 Fire Hydrant _------ 33_12 40 2222 _ EA___ __7 $2,900.00 $20,300.00 5 3312.2003 1"WaterSe_rvice 331210 — u EA — 94 $760.00 — $71,440.00 6 3305.0109 Trench Safety — 33 05 10 LF — 3471 $0.10— $347.10 -_7--3311.0001 Ductile Iron Water Fittings w/Restraint__— 3311 11 ---� TON 2.97___A3,800.00 $11,286A0 TOTAL UNIT I:WATER IMPROVEMENTS $198,164.10 CITY OF FORT WORTH 00 42 43_Bid Prop—I rake Vista Ramh.rls< STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Lake Vila Ranch Phase 2 Form V—ion Aptil 2.22014 01393 00 42 43 DAP-BID PROPOSAL Pae.2 or7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project item Information Bidder's Proposal Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value Item No. bteasure Quantity UNIT II:SANITARY SEWER IMPROVEMENTS 1___3331_4115 8"Sewer Pipe- ,-----_— ---_33 11 10,33 31 12,33 3120 WLF - 3959_ $29.25_ $115,80075 23331.4116 8"Sewer Pipe,CSS Backfill �- 33 11 10,33 31 12,33 31 20 LF 23 $40.00 $920.00 3—3331.3101 4"Sewer Service 33 31 50 EA94 $600.00 $56,400.00 4 3339.1001 4'Manhole 33 39 10,33 39 20 EA ---19 $2,340.00 $44,460,00 ----- --- — - — - 5 3471.0001 Traffic Control 34 71 13 MO 1 $1,200_00__-.-$1,200_00 _6 033_0.0001 Concrete Encase Sewer Pipe —` 03 30 00 — CY _ 55 $250.00_ $13,750.00 7—3201.0111 4'Wide Asphalt Pvmt Repair,Residential 3201 17 LF 122___A$75.00 $9,150.00 8 3301.0002 Post-CCTV Inspection -- - 33 01 31 —�_- LF 3959 - $1.40 $5,542.60 _9_ 3305.0109 Trench Safety^- - - - --33 OS 10 _ - --— - LF_ 3959 $1.00 $3,959.00 10 3301.010_1 Manhole Vacuum Testing --- —� 33 01 30 EA ____L9_—$110.00_ $2,_090.00 11 3_339.1003 4'Extra Depth Manhole 33 39 10,33 39 20 VF 85 $120.00____$10,200.00 12 3339.0001 Epoxy Manhole Liner 33 39 60 _— VF 14 $185.00 $2,590.00 13 3305.0112 Concrete Collar for MH not in pavement --- - -33 05 17---_ _ -- EA �- 4_,._._.$450.00_. $1,800_00 14 9999.0001 Connect to Ex.Manhole — 03 80 $1,000.00 $3,000;00 TOTAL UNIT If:SANITARY SEWER IMPROVEMENTS $270,862.35 CITY OF FORT WORTH 00 421_Bid ProWal Like Vista Ranch d c STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AIVARDED PROJECTS lake Viso Ranch Ph'.2 Form Vision April 2.2014 02393 00 42 43 DAP-BID PROPOSAL Page 3 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist. Description Specification Section No. Unit r Bide Quantity Item NoMeasurUnit Price Bid Value UNIT III:DRAINAGE IMPROVEMENTS 1 3_341.0201 21"RCP,Class 111 — --v-- 3341 10 _ LF_ _ 40__—__$48.00 —$1_920;00 2 3341.0205 24"RCP,Class III— 33 41 10 LF_ 38 $53.00- $2,014.00 3 3341.0302 30"RCP,Class III 3341 10 LF 583 $67.00 $39,061.00 _ 4 3341.0402 42"RCP,Class III 3341 10 LF _ 3_5 $118.00 $4,130.00 5_—3341.04_09 54"RCP,Class III ——— —_— 33 41 10 —i— __LF_ 538 $198,00 -- $106,524.00 $106,524.00 6 3341.0409 60"RCP,Class III 3341 10 LF —772 $244.00 $1_88368.00 7 `3349.0002 6'Storm Junction Box 33 49 10 EA— 4— $5,600.00— $22,400.00 8 3349.5002 15'Curb Inlet --T�� 33 49 20 _— EA _ 4_ $6,000.00 $24,000.00 --------- — 9 3305.0109 Trench Safety 33 05 10 — LF 2006 _ $0.50_—_$1,003_00 10 3137.0_102 Large Stone Riprap,dry— — 31 37 00 SY — 28_ _$54.00 $1,512.00 11 9999.0002 42"TxDOT Type CH-FW-0 Headwall —00 00 00 — EA 1 _$4,500.00 $4,500.00 12 9999.0003 60"TxDOT Type CH-FW-00 Headwall 00 00 00 EA— 1 — $6,500.00 $6,500.00 — 13_ 9999.0004 Pyramat with Sod Overlay — —_ ----66-0-006---i SY 65 $30_00--_ $1,950.00 TOTAL UNIT III:DRAINAGE IMPROVMENTS — $403,882.00 CITY OF FORT WORTH OU 4213_Bid Proposal lake Visu Ranch dz< STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Like Vista Ranch Phase 2 Form Version April 2,2014 02393 DD 42 43 D.4P-BID PROPOSAL Page 4 of7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value Item No. Measure I Quantity UNIT IV:PAVING IMPROVEMENTS 1 3211.0400 Hydrated Lime 3211 29 TN 178 $150.00 $26,700.00 2 3211.0501 6"Lime Treatment 3211 29 Sy 11840 $2.40 $28 416.00 3 3213.0101 6"Conc Pvmt 32 13 13 SY 11087 $34.45 $381,947.15 4 _3213.0301 4"Conc Sidewalk 32 13 20 SF 480_ $4.75_ $2,280.00 5 3213.0501 Barrier Free Ramp,Type R-1 32 13 20 — EA 16 $1,947.50 —$31,160.00 63213.0501 Barrier Free Ramp,Type M-2 _ 32 13 20 EA_ 4 — 7 —3305.0111 Valve Box Adjustment ��— —33 05 14 — EA 13_ $100.00 $1,3_00.00 _8 3305.0107 Manhole Adjustment,Minor 3_3 05 14 EA 19.— $200.00 _ $3,8_0_0.00 — 9999.0005 Dead End Barricade —00 00 00 EA 5 $1,500.00 $7,500.00 TOTAL UNIT IV:PAVING IMPROVMENTSI $483,103.15 CITY OF FORT NORTH 00 42 43_Bi0 Prepovl Lake Vista Ranch.e13.c STANDARD CONSTRUCTION SPECIFICATION DOCUNIEMS-DEVELOPER ANV RDED PROJECTS Like Vista Ranch Phase 2 Foran Version April 2,2014 02393 00 42 43 DAP-BID PROPOSAL Page 3 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information - Bidder's Proposal BidlistDescription Specification Section No. Unit of Bid Unit Price Bid Value Item No. Measure Quantity UNIT V:STREET LIGHTING IMPROVEMENTS 1 2605.3015 2"CONDT PVC SCH 80M 26 05 33 LF 2503 $6.30 $15768.90 2..3441_3110 Install Lightinq. llxture 34 41 20 _EA^ _14 $100.00 $1,400.00 3 _3441.3201 LED Lighti _nq Fixture _34 41 20 EA 14 $435.00 $6,090.00 4 _ 3441.3301 Rdwy Illum Foundation TY 1 2 and 4 _3441 20 EA 14 $1,180.00 $16520.00 5 30 3441.32 RdwyRum Foundation TY 3 5 6Land 8 3441 20 _EA_ 14 $1,665_00 - _$23,310.00 6 ^3441.1408 NO 6 Insulated Elec Condr 3441 10 LF 7509 $0.80 $6,007.20 TOTAL UNIT V:STREET LIGHT IMPROVMENTS $69,096.10 CITY OF FORT WORTH 00 42 43 Bid NT-1 Life Vista Ranch_d. ST.A WARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS LA,Vista Ranch Phase 2 Form V-i-Apol 2,2014 03393 004243 DAP-BID PROPOSAL Page 6.1`7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value Item No. 1 feasure Quantity UNIT VI:STREET SIGN IMPROVEMENTS 1 Street Name Signs EA 5 $500.00 $2,500.00 TOTAL UNIT VI:STREET SIGN IMPROVMENTSI $2,500.00 CITY OF FORT WORTH 001213_Bid I'mp—l_Uke Vista Randxlss STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Lake Vista Ranch Phase 2 Farm Versiw April 2.2014 02393 00424, DAP•BID PROPOSAL Parc 7 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value Item No. Measure Quantity Bid Summary UNIT I:WATER IMPROVEMENTS $198,164.10 UNIT II:SANITARY SEWER IMPROVEMENTS $270,862.35 UNIT III:DRAINAGE IMPROVEMENTS $403,882.00 UNIT IV:PAVING IMPROVEMENTS $483,103.15 UNIT V:STREET LIGHTING IMPROVEMENTS $69,096.10 UNIT VI:STREET SIGN IMPROVEMENTS $2,500.00 Total Construction Bid $1,427,607.70 Contractor agrees to complete NVORK for FINAL ACCEPTANCE within 210 calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT tVORTH 00 42 43_Bid P,.W.I_L.k: Vista Ranch.A STANDARD CONSTRUCTION SPECIFICATION DOCUhIEMS-DEVELOPER AWARDED PROJECTS Ike Viva Ranch Phase 2 Form Version April 2.2014 02393 HMH BOAZ RD,L.P. (REMAINDER) N CLECK'S FILE NO.D214088792 C.C.R.T.C.T. to IJ 11 I1 164111�. 1, N 11 I � 9 9 6 I 1 5 to 7 1 --- —W — — 7M---"" TOPSAIL DRIVE V! O t YID J - �� -- 2e w n u v u Js x n a27 33 z ss > g 25 6 �` oo h 24 12 21 O 1 IJ ) ( `il n I 1! is 19 I " 14 m -- SKYS I 15 Is t 21 IJ 16 21 \ „ Is I 2 1 11 1 I 19 21 'b 6 2: e GRAPHIC SCALE 1"=200' 1! 9 Ie 26 p I 24 100 0 100 200 21 2I I ,b LEGEND IS I6 L PROPOSED 8" WATER w- 81, s I LAE VISTA RANC W---- W Y CLECK'S FILE NO.D215169360PROPOSED GATE VALVE SLOOP STREET n 11 C.C.R.T.C.T. 1---- I I PROPOSED FIRE HYDRANT 1 iJ 26 1, , ` ,1 I EXISTING 8'i WATER EXISTING GATE VALVE ---- ——-- F— ` ° " > EXISTING FIRE HYDRANT — ---_, 16 I n (O,o g 10 u i I CITY PROJECT NO. 100372 ( n 1 3 u v e s i m OWNER/DEVELOPER BNM LAKE VISTA DEVELOPMENT, LP 9001 AIRPORT FREEWAY, SUITE 400 1 I IJ NORTH RICHLAND HILLS, TX 76180 1 b TEL: 817-849-5220 p � JS b JB 0 F T\k 1 22 I 31 �.CHARLES,•F. STARK.IIIIII/////// HMH BOAZ RD,L.P. (I i -p� • 57357 ;• (REMAINDER) 1 I I 0 •, CLECK'S FILE NO.D214088792 —J It SS ' ••••• C.C.R.T.C.T. S --- \\ ONAL. _ BOLLARDDRIVE 6 ' 8 1 J 2 1 1 J 1 5 fi USE OF THIS ELECTRONIC SEAL/SIGNATURE AUTHORIZED BY CHARLES F. STARK, P.E. 01 TEXAS REGISTRATION NO. 57357 PROJECT No. 241-9330 Ioo$29!4— DATE,EXHIBIT 'A' WATER IMPROVEMENTS DATE: 04 25 2016 Fort Southwest Boulevard,Suite 32 LAKE VISTA RANCH PHASE 2 SHEET Fort Worth, Texas 76'132 (0)817.231.8100 (F)817.231.8144 /� Texas Registered Engineering Firm F-10998 ,(�` Texas Registered Survey Finn F-10158800 —.barronstark.00m ' N36 NOT TO SCALE 1 I y b.DU 9Em. I SEM E/S66t1F11r I I HMH BOAZ RD,L.P. I (REMAINDER) I CLECK'S FILE NO.D214088792 C.C.R.T.C.T. _ SS TOPSAIL DRi -- A SKYS LRO P " LEGEND " PROPOSED 8" SEWER S " e PROPOSED 4' MANHOLE m K VISTA RANCH i ( CLECK'S FILE N0.D215169360 EXISTING 8" SEWER �L—OOP STREET _= C.C.R.T.C.T. EXISTING 4' MANHOLE i 3 CITY PROJECT NO. 100372 ' " s OWNER/DEVELOPER n u . BNM LAKE VISTA DEVELOPMENT, LP 9001 AIRPORT FREEWAY, SUITE 400 i I NORTH RIHILLS, 76180 I TEL:L: 817 817-849-5222 0 i . rr. P�E••OF•. �� '•J` a I 01*' • :' ••. ................ ... HMH BOAZ RD,L.P. CHARLES F. STAR K ............................... . (REMAINDER) i I ! 57357 ;*QF CLECK'S FILE NO.D214088792 !!!1 1 -$S� " U ���'��• /CENSEO•'\�' C.C.R.T.C.T. ss •••••• i BOLLARDDRIVE ��\\\ION\ AL•• 4 16 — — USE OF THIS ELECTRONIC SEAL/SIGNATURE AUTHORIZED BY CHARLES f. STARK, P.E. TEXAS REGISTRATION NO. 57357 PROJECT No. 241-9330 � ,"`'ft EXHIBIT 'AF WASTE WATER IMPROVEMENTS DATE: 04/25/2016 6221 SDuthvrosl Boulevard,Suite 100 LAKE VISTA RANCH PHASE 2 SHEET Fort Worth, Texas 76132 (0)817.231.8100 (F)817.231.8144 A 1 Texas Registered Engineedng Finn F-10998 Texas Registered Survey Finn F-10158800 vrv,w.barronsta Fl- HMH BOAZ RD,L.P. (REMAINDER) CLECK'S FILE NO.D214088792 N C.C.R.T.C.T. e>` 2 to II 12 13 11 I5 It 1/ I9 19 p 21 I8 2 19 YO JI 83 la N 35 88 83 88 39 b in 27 zs -3-- 2s - 1 (J � 12 21 1 „ to 9 t 3 a 5 4 3 3 i t2 I3 15 1 I I5 tl 1 1 1a 19 Ie I4 � $ $ IS ' II 31 w IS 11 to _—.•""�.. A 21 31 3 T \ 9 p ' it 24 It n � e I9 b 3 le I3 is It 33 19 la i9 GRAPHIC SCALE 1"=200' p 34 it 33 100 0 100 200 21 25 t 6 u , 2e is LAKE VISTA RANCH LEGEND CLECK'S FILE NO.D215169360 2 „ c.c.R.T.c.T. �. PROPOSED 6 CONCRETE ' PAVING I14 , p 10 Q u PROPOSED 4° CONCRETE 1 I ' 1 < SIDEWALK PAVING Fto a OII Is m e g w I I CITY PROJECT NO. 100372 2 u OWNER/DEVELOPER a BNM LAKE VISTA DEVELOPMENT, LP 9001 AY," I I 400 NORTH RIICOHLAND RT SHILLS, TX 16180 i TEL: 817-849-5220 2) a8 J 9 410110 ' •'• �— ti......................:•*••.� HMHBOAZ RD,L.P. 34 I 2 .0......................STARK........... (REMAINDER) 57357 CLECKISFILE s a u O'n•.'� S Q• \w/ NO.D214088792 F` CEN •� C.C.R.T.C.T. t,j,\`AL BOLLARD DRIVE � 8 —14 5 USE OF THIS ELECTRONIC SEAL/SIGNATURE AUTHORIZED BY CHARLES F. STARK, P.E. — — TEXAS REGISTRATION NO. 57357 PROJECT No. 241-9330 � � svvlre EXHIBIT 'B' PAVING IMPROVEMENTS DATE: 04/25/2016 6221 Southwest Boulevard,Suite 100 LAKE VISTA RANCH PHASE 2 SHEET Fort Worth, Texas 76132 (0)817.231.8100 (F)817.231.8144 To—Registered Engineering Finn F•10998 Texas Registered Survey Firm F•10158800 vn+nv.barronstark.cam 1 HMH BOAZ RD,L.P. (REMAINDER) CLECK'S FILE NO.D214088792 N C.C.R.T.C.T. _ II I3 IS I1 15 11 11 19 I9 ZO ]1 , le n e 260 --2 q %i���M ,...CC big 33 n u s, 31 s !e v x !9 a gg ig �. Z 1 1 n 24 N 21 i 0 9 e 6 5 1 i2 �I I 15 11 41 it I I1 le 19 1 p §iA1 SKYSMEROAD §fiA1 � ®iM 1 I n le I m o i6 ✓� p it i T \ IS 21 12 n � e m le 10 � n v 15'q e 15 z! 19 le 2g p I GRAPHIC SCALE 1'=200' n n 100 0 100 200 21 , e PS 16 2 1 ` 'l LA EVISTARANC LEGEND CLECK'S FILE NO.D215169360 5 OOPSTHEET ,� 21 11 C.C.R.T.C.T. PROPOSED STORM DRAIN STM 11 e13 A` PROPOSED STD. CURB INLET Q I a 14 I I 23 13 3 n u 1 1I ' 'S Sp O11 11 ]1 I CITY PROJECT NO. 100372 1 17 1 3 u a 1 n 1 m OWNER/DEVELOPER e e u o- 9NM LAKE VISTA DEVELOPMENT, LP 9001 AIRPORT FREEWAY, SUITE 400 I NORTH RICHLAND HILLS, TX 76180 1 1 TEL: 817-849-5220 OF TF At � 2] b ] 3 11 .........................• — ,CHARLES F. STARK. HMH BOAZ RD,L.P. 357 (REMAINDER) ,t 57 1 I ( ?� •. / O� CLECK'S FILE 1 z I a ......� NO.D214088792 ` � � It C.C.R.T.C.T. \NAL �• 6 BOLLARD DRIVE - - -�- 1 3 2 1 1 2 14 5 rAUTHORIZED OF THIS ELECTRONIC SEAL/SIGNATURE ES REGISTRATION NO.Y CHARLES F. 557357A A P E PROJECT No. 241-9330 Ba .wIft EXHIBIT 'B 1' STORM DRAIN IMPROVEMENTS DATE: 04/25/2016 6221 Southwest Boulevard,6ulte100 LAKE VISTA RANCH PHASE 2 SHEET Fort Worth, Texas 76132 (0)817.231.8100 (F)817.231.8144 Texas Registered Engineering Firm F-10998 Texas Registered Survey Film F-10111100 www.barronstark.com HMH BOAZ RD,L.P. (REMAINDER) CLECWS FILE NO.D214088792 N C.C.R.T.C.T. I a 14- TT-" J to v 1° t5 10 n a o 1a J \` 3 — 1 J ,----' --"-P, �TOPSAIL Z 1 Is 5 _ r ` i1 38 31 �� n 24 N I C � 33 lE 31 I I li it 1] 1 I I IJ II Il ( fe It n 9 Is SKYSA 1 I 1 ( z1 i{ t0 it t] li Iii a K IS N i „ la n � e K e Is Is 2{ GRAPHIC SCALE 1"=200' 1 11 n 21 100 0 100 200 zs le to 1! n , I 2. + " LAK EVISTA RANC LEGEND CLECKIS FILE NO.D215169360 5LOOPSTREET 21 C.C.R.T.C.T. PROPOSED STREET LIGHT I (POLE & LUMINAIRE, 14 EA) 14 1 3s li > 12 Y i + a ,y E ,qV>u of a 5 a ss 1s o.a I ( CITY PROJECT NO. 100372 OWNER/DEVELOPER 33 e BNM LAKE VISTA DEVELOPMENT, LP 9001 AIRPORT FREEWAY, SUITE 400 I I NORTH RICHLAND HILLS, TX 76180 TEL: 817-849-5220 p I K a a !3 I n I { ,z , w f ' OF* .j •CHARLES F. STARK. HMH BOAZ RD,L.P. ' 3tIs 2 (REMAINDER) 1 I f� 57357 CLECK'S FILE I K a �1�'�-' /CENgE1D•' N0.D214088792 ' C.C.R.T.C.T. I ONAL••,80LLARD DRIVE \�� 16 3 I 2 ! { sfi 8 r USE OF THIS ELECTRONIC SEAL/SIGNATURE syr AUTHORIZED BY CHARLES F. STARK, P.E. TEXAS REGISTRATION NO. 57357 PROJECT No. 241-933(1 n ftEq—wift EXHIBIT U STREET LIGHT IMPROVEMENTS DATE: 04/25/2016 6221 Southwest Boulevard,Suite 100 LAKE VISTA RANCH PHASE 2 SHS Fort Worth, Texas 76132 (0)817.231.8100 (F)817.231.8144 Texas Registered Engineering Fine F-10998 Texas Reglslered Survey Finn F-10158800 vnwi.bavonsla rk.corn HMH BOAZ RD,L.P. (REMAINDER) N CLECK'S FILE NO.D214088792 C.C.R.T.C.T. � 9 le II yu it 11 IS I6 I3 Ie 19 i0 xl I `\ I TOPS—AIR E J] N J3 b z is Ix it ) u 9 —"111-ROAD 15 ' I Il xi z! M 17 la ii 4} le 'a v n le 1! 19 'e xa a 1 z GRAPHIC SCALE 1"=200' Ix n 100 0 100 200 zl 15 la le a ( 29 '! LA VISTA RANCH LEGEND CLECK'S FILE NO.D215169360 SLOOP STREET zz C.C.R.T.C.T. PROPOSED STREET SIGN (5 EA) I II Q 1 fs Jo - u � n u O �f Z CITY PROJECT NO, 100372 ,7 ' 3 lz 9 9 M OWNER/DEVELOPER le ; J1 e e x d BNM LAKE VISTA DEVELOPMENT, LP " i I NORTH AIRPORTFREEWAY, ELSUITE HILLS, TX RTH 76180 ( i TEL: 817-849-5220 m l5 a a L F r,�Aj 11 I 17 , 1 W HMH BOAZ RD,L.P. i/ I I + i „C,� •. •. �K� CHARLES F. STAR (REMAINDER) I 57357 �••.'t��� CLECK'SFILE 21I a !CENSEO,: NO.D214088792 •••• C.C.R.T.C.T. �• ,�\S/ON AL• BOLLARD DRIVE \\� 6 1 8 z 1 : 1 , s USE OF THIS ELECTRONIC SEAL/SIGNATURE AUTHORIZED BY CHARLES F. STARK, P.E. TEXAS REGISTRATION NO. 57357 PROJECT No. 241-9330 ftrmnoStarkeSwIftEXHIBIT 'C F STREET SIGN IMPROVEMENTS DATE: 04/25/2016 6221 Southwest Boulevard,Suite 100 LAKE VISTA RANCH PHASE 2 SHEET Fort Worth, Texas 76132 (0)817.231.8100 (F)817.231.8144 Texas Registered Engineering Finn F-10998 Texas Registered Survey Firm F-10158800 www.barronstark.co.