Loading...
HomeMy WebLinkAboutContract 48721 CITYSECRETARY CONTRACT NO. 7/ Developer and Project Information Cover Sheet: Developer Company Name: 287/156 Partners, L.P. Address, State,Zip Code: 8750 N.Central Expressway Suite 1735,Dallas, Texas, 75231 Phone&Email: 214-691-2556,jim@cambridgecos.com Authorized Signatory,Title: James Melino,President Project Name: Ridgeview Farms-Phase 5 Brief Description: Water, Sewer, Paving, Storm Drain, Street Lights Project Location: at end of Prairie Dawn Dr.North of Harmon Rd and West of US287 Plat Case Number: FP-16-045 Plat Name: Ridgeview Farms Mapsco: 34C-D Council District: 2 City Project Number: 100443 CFA Number: 2017-007 DOE Number: None To be completed by Received by: /� Date: City of Fort Worth,Texas — Standard Community Facilities Agreement-Ridgeview Farms-Phase 5 �OR� CFA Official Release Date:01.03.2017 OFFICIAL RE Page 1 of 12 CITY SBGRSTAR FT.WO�H+TX STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, 287/156 Partners, L.P., ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements")related to a project generally described as Ridg_eview Farms Phase 5 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-Ridgeview Farms-Phase 5 CFA Official Release Date: 01.03.2017 Page 2 of 12 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) ©, Sewer(A-1) ®, Paving(B) ®, Storm Drain(B-1) M, Street Lights & Signs (C) M. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement- Ridgeview Farms-Phase 5 CFA Official Release Date: 01.03.2017 Page 3 of 12 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. 1. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement- Ridgeview Farms-Phase 5 CFA Official Release Date: 01.03.2017 Page 4 of 12 Yt J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Ridgeview Farms-Phase 5 CFA Official Release Date: 01.03.2017 Page 5 of 12 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of thisAgreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Ridgeview Farms-Phase 5 CFA Official Release Date: 01.03.2017 Page 6 of 12 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement-Ridgeview Farms-Phase 5 CFA Official Release Date: 01.03.2017 Page 7 of 12 Cost Summary Sheet Project Name: Rdgeview Farms Phase 5 CFA No.: 2017-007 City Project No.: 100443 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 342,284.00 2.Sewer Construction $ 381,276.60 Water and Sewer Construction Total $ 723,560.60 B. TPW Construction 1.Street $ 925,715.22! 2.Storm Drain $ 913,408.00 3.Street Lights Installed by Developer $ 170,304.00 4. Signals $ - TPW Construction Cost Total $ 2,009,427.22 Total Construction Cost(excluding the fees): $ 2,732,987.82 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 14,471.21 D. Water/Sewer Material Testing Fee(2%) $ 14,471.21 Sub-Total for Water Construction Fees $ 28,942.42 E. TPW Inspection Fee(4%) $ 73,564.93 F. TPW Material Testing(2%) $ 36,782.46 G. Street Light Inspsection Cost $ 6,812.16 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 117,159.55 Total Construction Fees: $ 146,101.97 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 2,732,987.82 Completion Agreement=100%/Holds Plat $ 2,732,987.82 Cash Escrow Water/Sanitary Sewer=125% $ 904,450.75 Cash Escrow Paving/Storm Drain=125% $ 2,511,784.03 Letter of Credit=125%w/2yr expiration period $ 3,416,234.78 City of Fort Worth,Texas Standard Community Facilities Agreement-Ridgeview Farms-Phase 5 CFA Official Release Date: 01.03.2017 Page 8 of 12 ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER 287/156 Partners, L.P. a Texas limited partnership Jesus J. Chapa •J l /�-- By: Orinda/Harmon GP Partners,LLC, Assistant City Manager a Texas limited liability company, Date: ,v, -��/ its General Partner By: LLC Manager, Inc., Recommended by: A Texas corporation, Its Manager 6�. 4 Wendy C -Babulal, EMBA, P.E. Development Engineering Manager Water Department ame: J e elino q q Title: P sident Douglas6V. Wiersig, P.E. Date: 2'Z0'20l7 Director Transportation & Public Works Department ATTEST: (Only if required by Developer) Approved as to Form &Legality: Signature Richard A. McCracken Name: Assistant City Attorne M&C No. IJ�� Contract Compliance Manager: Date: 2'zo It-7 - Form 1295: N1�k By signing, I acknowledge that I am the person responsible for the monitoring and .. tTt administration of this contract, including ATTEST: �� ' � nsuring all performance and reporting G 0 quirements. � IVB 1 �� ary J. r .. ... sF Z - ti City Secretary � 4. Name: rr City of Fort Worth, Texas Standard Community Facilities Agreement-Ridgeview Farms-Phase 5 CFA Official Release Date: 01.03.2017 OFFICIAL RECORD Page 9 of 12 CITY SECRETARY FT.WORTH,TX Title: City of Fort Worth,Texas Standard Community Facilities Agreement-Ridgeview Farms-Phase 5 CFA Official Release Date: 01.03.2017 Page 10 of 12 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment 0 Attachment 1 - Changes to Standard Community Facilities Agreement 0 Location Map Exhibit A: Water Improvements Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit B: Paving Improvements 0 Paving Cost Estimate 0 Exhibit 13-1: Storm Drain Improvements ® Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Ridgeview Farms-Phase 5 CFA Official Release Date: 01.03.2017 Page 11 of 12 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100443 None City of Fort Worth,Texas Standard Community Facilities Agreement-Ridgeview Farms-Phase 5 CFA Official Release Date: 01.03.2017 Page 12 of 12 Q t—_ = TR L 156 HERITAGE ACE PK F-7F d _ z 81 = 35W o o I.¢_. J O SIT 156 IN TARR T a KWY HARMON io 287 FOR ORTH ITY SAGIN kIN CITY IT Tit >T a BAS 0 E X @� w G r- 0 00 In 0 0 m .n x x w a LL / x LI � w m i � CU n ( 'u3 E a O M/ M Gp 64 j .O cD JOB N0. 61058-01 LOCATION MAP PAPE-DAWSON DATE AUG 2016 ENG/VEERS cm a DESIGNER JH rmi RIDGEVIEW FARMS PH. 5 3/ CHECKED IT DRAWN TB Q PONT WORTH I SAN ANTONIO I AUSTIN I HOUSTON I DALLAS N S00 WEST SEVENTH ST,STE 350 1 FT.WORTH,TX 701021$17.870.3558 4) SHEET 1 OF 7 FORT WORTH, TEXAS TEXAS BOARD OF PROFESSIONAL ENGINEERS,FIRM REGISTRATION#470 O D Li THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL. LEGEND PROPOSED EXISTING WATER—EX 8"W— LINE RIDLEY ST GATE H VALVE �— FIRE HYDRANT KANATA CT \ ABRAMS RD I z J Ic a z Z m cl J z I N Q U. W QC 0 W fr 'a ac IL rn717 3 w < I DEVONSHIRE DR Lu — I I ¢ w U O T— Do T) O ifl TRUMPET DR x < f. ............. L� cn U / xx � W rn � In SCALE: 1"= 100' % E 0 100 200 300 0 a)/ N Do O JOB N0. 61058-01 EXHIBIT A - WATER PAPE-©AWSON DATE AUG 2016 rmi ENGINEERS a DESIGNER JH RIDGEVIEW FARMS PH. 5 C/ CHECKED TT DRAWN TB FORT WORTH I SAN ANTONIO I AUSTIN I HOUSTON I DALLAS N 500 WEST SEVENTH ST,STE 350 1 FT.WORTH,TX 78102 1817.870.3M N SHEET 2 OF 7 FORT WORTH, TEXAS TEXAS BOARD OF PROFESSIONAL ENGINEERS.FIRM REGISTRATION#470 THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANT'S ORIGINAL SIGNATURE AND SEAL. LEGEND PROPOSED EXISTING SS EX 8"SS LINE RID EY S . MAN HOLE NATA T \ oil ABR MS RD gl i L Z I _ W IL ( a C G W Q CL cn 3 af W Ld W (n � EX 8"SS DEVONSHIRE DR / I f x W — — — — I Q ` tl \U O co L(7 O O X 8"SS(� TRUMPET DR n 0 — c U rn LLLJ 1n co 0 in co SCALE: 1 "= 100' % E 0 100 200 300 0 Do/ N 00 117 O N JOB NO. 61058-01 EXHIBIT Al - SEWER PAPE DAWSON -47 DATE AUG 2016 ENG//VEERS a DESIGNER JH RIDGEVIEW FARMS PH. 5 rmi a/ CHECKED TT DRAWN TB FORT WORTH I SAN ANTONIO I AUSTIN I HOUSTON i DALLAS N 500 WEST SEVENTH ST,STE 350 1 FT.WORTH,TX 78102 1817.870.3888 0 0) SHEET _ 30F7 FORT WORTH, TEXAS TEXASBOARD OF PROFESSIONAL ENGINEERS,FIRM REGISTRATION#470 � LL THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN IAIAnVFATFMTI v AI TCGITn GFI V nnB Y nM PIMA/ WAonrnoY A/ATFRIAI C RCARIMr TUC f nMClli TAMT'C nalrim Al CIf'MATIIRC AMn CFA/ LEGEND PROPOSED SIDEWALK BY DEVELOPER PROPOSED PAVEMENT <`RIDLEY'STREET -: KANATA COURT w a _ q ABRAMS ROAD m N Z Z C z LL W Q a D p W Q Q d: 0) ZUBIA LANE a 3 v c� z a �I DEVONSHIRE DRIVE x w I Li U 0 00 Ln 0 co X TRUMPETDR w rn s LI � w U) I d � U ' SCALE: 1 "= 100' E% 0 100 200 300 as ro CV j O N U) JOB NO. 61058-01 EXHIBIT B - PAVING PAPE-DAWSON �; DATE AUG 2016 rd ENGINEERS �, � DESIGNER JH RIDGEVIEW FARMS PH. 5 �/ CHECKED TT DRAWN I FORT WORTH I SAN ANTONIO I AUSTIN I HOUSTON I DALLAS 500 WEST SEVENTH ST,STE 350 1 FT.WORTH,TX 78102 1 817.870.3888 Q .N SHEET 4 OF 7 FORT WORTH, TEXAS TEXAS BOARD OF PROFESSIONAL ENGINEERS,FIRM REGISTRATION#470 CD LI THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL LEGEND PROPOSED �'— STORM DRAIN PIPE & JUNCTION BOX PROPOSED RIDLEYST CURB INLET PROPOSED HEADWALL KANATA CT ABRAM 1 Z i J j I Z Q J 2 z 0 N 31 W IL I a G a , 0 cn 00 o o DEVONSHIRE DR x — — — — I a w U \ O co O rn TRUMPET DR LJ — — — — c x CONTINUED L— �SEE INSET AREA SCALE: 1"= 100' \7_ 0 100 200 300 ao � 00 INSET AREA 64 j ..O C)% JOB NO. 61058-01 EXHIBIT B1 - STORM DRAIN PAPE-DAWSON N DATE AUG 20'6 ENGIINEERS a DESIGNER JH RIDGEVIEW FARMS PH. 5 rd / CHECKED TT DRAWN TB FORT WORTH I SAN ANTONIO I AUSTIN I HOUSTON I DALLAS Q - N 500 WEST SEVENTH ST,STE 350 19.WORTH,TX 761021817.870.36N SHEET 5 OF 7 FORT WORTH, TEXAS TEXAS BOARD OF PROFESSIONAL ENGINEERS,FIRM REGISTRATION 6470 O THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL. LEGEND s�E PROPOSED FET STREET NAME SIGN SrpE RIDLEY ST S'TRE gTAE FEl' RFFT FT I VIKANATAC sTa ET — ABRAMS RD srRE FET z J Q a z z Q N Q U. W 3 1 a o W z a V) RFET w Q Z c i gTRE — i DEVONSHIRE DR SrT+E w I a Li U I 0 oo Lr)0 (o X TRUMPET DR w — — — — co t x � w rn I -- o "v co SCALE: 1"= 100' % E 0 100 200 300 a0 � 00 cel o ..O C14 z JOB NO. 61058-01 EXHIBIT Cl - STREET NAME SIGNS PAPE-DAWSON L,Q DATE AUG 2016 rai ENGINEERS Q DESIGNER JH RIDGEVIEW FARMS PH. 5 < Q--' CHECKED IT DRAWN TB FORT WORTH i SAN ANTONIO I AUSTIN I HOUSTON I DALLAS — N 500 WEST SEVENTH ST,STE 350 1 FT.WORTH,TX 78102 1817-070-3668 QO G) SHEET 6 OF 7 FORT WORTH, TEXAS TEXAS BOA RD OF PROFESSIONAL ENGINEERS,FIRM REGISTRATION 9470 O Li THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL. LEGEND PROPOSED STREET LIGHT RIDLEYSTj EXISTING al STREET LIGHT KANATA CT 4-41111 IABRAMS R z J OZ g z m � I 0 zi s " z � W U. I a � O W rn v cn F CD J F- Cn DEVONSHIRE DR x — — — — w — — I ¢ Li U O Do O m dTRUMPET DR w — — — — % II— x L X � LtJ coEn I rn SCALE: 1"= 100' E% 0 100 200 300 as �cc CV j ..O 07 N (n JOB NO. 61058-01 EXHIBIT C - STREET LIGHTS PAPE-DAWSON N DATE AUG 2016 rd ENG//VEERS DESIGNER JH RIDGEVIEW FARMS PH. 5 CHECKED TT DRAWN TB FORT WORTH I SAN ANTONIO I AUSTIN I HOUSTON I DALLAS N 500 WEST SEVENTH Sr,SM 350 1 FT.WORTH,TIC 78102 1 817.870,3888 -Q' G) SHEET 7 OF 7 FORT WORTH, TEXAS TEXAS BOARD OF PROFESSIONAL ENGINEERS,FIRM REGISTRATION#470 O in Ll THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL. 064,11 DAP-BID PROPOSAL Page I or'l SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value Item No. Measure Quantity UNIT I:WATER IMPROVEMENTS 1 3305.0109 Trench Safety 3305 10 LF 6,420 $0.20 $1,284.00 2 3311.0001 Ductile Iron Water Fittings w(Restraint 3311 11 TON 3.2 $6,500.00 $20,800.00 3 3311-0241 8"Water Pipe 33 11 10,33 11 12 LF 6,420 $21.50 $138,030.00 4 3312.0001 Fire Hydrant 33 12 40 EA 10 $3,300.00 $33,000.00 5 3312.2003 1"Water Service 3312 10 EA 169 $730.00 $123,370.00 6 3312.3003 8"Gate Valve 33 12 20 EA 18 $1,300-001 $23,400.00 7 3312.0117 Connection to Existing 4"-12"Water Main 33 1225 EA 3 $800.00 $2,40000 TOTAL UNIT 1:WATER IMPROVEMENTS $342,284.00 CITY OF FORT WORTH Hidge,,io,hirnns,Phare i STANDA RD CONSTRUCTION SPECI FICATION DOCUMENTS-DEVELOPER AWARDED PffO)EC-S 100-03 Farm Vmr_vun Seplenrher 1,2013 00,12,13.Bid ProposalDAP_BURNSCO FIs 00 42 43 DAP-BID PROPOSAL Page 2 of 4 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value Item No. Measure Quantity UNIT II:SANITARY SEWER IMPROVEMENTS 1 3301.0002 Post-CCTV Inspection 3301 31 LF 4,993 $1.40 $6,990.76 2 3301.0101 Manhole Vacuum Testing 330130 EA 23 $110.00 $2,530.00 3 3305.0107 Manhole Adjustment,Minor 33 05 14 EA 4 $400.00 $1,600.00 4 3305.0109 Trench Safety 33 05 10 LF 4,993 $1.00 $4,993.40 5 13305.1003 20"Casing By Open Cut 33 05 22 LF 140 $86.001 $12,040.00 6 3305.3002 8"Sewer Carrier Pipe 33 05 24 LF 140 $36.00 $5,040.00 7 3331.3101 4"Sewer Service 3331 50 EA 169 $600.00 $101,400.00 8 3331.4115 8"Sewer Pipe 33 11 10,33 31 12,33 31 20 LF 4,808 $36.00 $173,088.00 9 3331.4116 8"Sewer Pipe,CSS Backfill 33 11 10,33 31 12,33 31 20 LF 185 $47.00 $8,695.00 10 3339.0001 Epoxy Manhole Liner 33 39 60 VF 2.7 $200.00 $540.00 11 13339.1001 4'Manhole 33 39 10,33 39 20 EA 22 $2,210.00 $48,620.00 12 3339.1002 4'Drop Manhole 33 39 10,33 39 20 EA 1 $3,700.00 $3,700.00 13 3339.1003 4'Extra Depth Manhole 33 39 10,33 39 20 VF 43 $140.00 $5,950.00 14 9999.3301 Remove Stub-out&Connect to Existing Manhole 33 39 10,33 39 20 EA 1 $800.00 $800.00 TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $375,987.16 CITY OF FORT WORTH Ridgeview Forms,Phase S STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Clry Project No.100143 Form Version September 1,2015 004243 Bid Proposal_DAP_BURNSCO2.sls 00 12-13 DAP-BID PROPOSAL Page 3 orn SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value Item No. Measure Quantity UNIT III:DRAINAGE IMPROVEMENTS 1 3137.0105 Medium Stone Riprap,grouted 31 3700 SY 1,278 $5000 $63,92000 2 3305.0109 Trench Safety 3305 10 LF 3,461 $050 $1,730.50 3 3341 0201 21"RCP,Class III 3341 10 LF 362 $5000 $18,100.00 4 3341 0205 24"RCP,Class III 3341 10 LF 29 $5800 $1,682.00 5 3341 0208 27"RCP,Class III 3341 10 LF 215 $64.00 $13,760.00 8 3341.3309 36"RCP,Class 111 3341 10 LF 815 $9600 $78,201 60 9 3341.1002 3x3 Box Culvert 3341 10 LF 29 $14600 $4,234.00 10 3341.1101 4x2 Box Culvert 3341 10 LF 21 $155.00 $3,177.50 11 3341 1103 4x4 Box Culvert 3341 10 LF 287 $198.00 $56,746.80 12 3341 1201 5x3 Box Culvert 3341 10 LF 107 $21600 $23,00400 13 3341 1202 5x4 Box Culvert 3341 10 LF 1,155 $238.00 $274,866.20 14 3341 1401 7x3 Box Culvert 3341 10 LF 443 $32600 $144,385.40 16 3349.0001 4'Storm Junction Box 3349 10 EA 5 $3,800.00 $19,000.00 17 3349.0002 5'Storm Junction Box 34 49 10 EA 1 $4,100.00 $4,100-00 18 3349.0003 6'Storm Junction Box 33 49 10 EA 5 $4,400.00 $22.00000 19 3349.0105 5-Sided Manhole 33 49 20 EA 1 $6,800 00 $6,80000 20 3349.5001 10'Curb Inlet 33 49 20 EA 12 $3,500.00 $42.00000 22 3349.5003 20'Curb Inlet 33 49 20 EA 4 $6,600.00 $26,40000 23 9999.3302 5'x3'FW-S Headwall EA 1 $11,000.00 $11,000.00 25 9999.3304 5'x4'FW-S Headwall EA 1 $11,000.00 $11,000.00 26 9999.3305 2-7'x3'FW-0 Headwall EA 1 $11,500.00 $11,500.00 27 9999 3306 2-7'x3'PW Headwall EA 1 $22,000001 $22,00000 29 9999 3308 3-5'x4'PW Headwall EA 2 $23,000.00 $46,000.00 30 9999.3309 21"Sloped Endwall EA 2 $1,700.00 $3,400.00 31 9999.3310 27"Sloped Endwall EA 1 $1,800.00 $1,800.00 33 9999 3312 36"Sloped Endwall EA 1 $2,600.00 $2,600-00 TOTAL UNIT III:DRAINAGE IMPROVEMENT $913,408.00 CITY OF FOR-r WORTH Rirlgei•ie„Fm r¢Phavr 5 STANDARD CONS TRUCTfONSPECIFICA WN DOCUNIENTS-DEVELOPER AWARDED PROJECTS !:rr"P,��dn��i�n i 00 10 Ponn V,--September I,2015 00x213_Hid Proposal_UAP_BU12*iSCO ils 0AP-0MPRO )S,AL SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM SIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal 61dir5t Description Specification Seetion No. Unit of Brd Unit Price Bid Value Item No. Measure Quantity UNIT IV:PAVING IMPROVEMENTS 1 10241M00 Remove Rip Rap 02 41 13 SF 1,530 $1001 $1,530 00 2 0241.1100 Ramove Asphalt FVITA 0241 15 SY 1,170 $10.00 $11,70000 3 9999.3201 Remove Barricade EA 2 $500.00 31,000 00 4 13211.0400 Hydrated Lime 32 11 29 TN 4002 315500 $02,031.00 5 13211 0501 0'Lime Treatment 32 11 29 SY 22,234 $2.50 $55.58425 6 32130101 o ConcPvmt 321313 SY 20,587 1 $31.45 $"647,45172 7 3213.0301 T'Cone Sidewalk(by Developer) 32 1320 SF 12,601 $475 $60,804.75 8 3213.0501 Barrier Free Ramp,Type R-1 32 1320 EA 7 $1,97.5.00 $13,825 00 9 3213.0504 Barrier Free Ramp,Type M-2 32 13 20 EA 7 $1,90000 $13,3CQ C0 10 3213.0506 Barrier Free Ramp,Type P-1 32 1320 EA 7 $1,600.00 ;11,200.00 11 99993202 "End-of Road'barricade EA 2 $1,.`,0000 $3,000.00 12 3441A003 Furnish/Install Alum Sign Ground Mount City Std, 34 41 30 EA 16 $450 00 $7,200.00 13 9999.3203 Traffic Control 1 3471 13 LS 1 .$500 00 .$50000 14 9999.3204 Conc,Flume SY 433 $84501 $36,588.50 TOTAL UNIT IV:PAVING IMPROVEMENT $925,715,22 BILI SUMMARY UNIT I:WATER IMPROVEMENTS UNIT Il:SANITARY SEWER IMPROVEMENTS UNIT III:DRAINAGE IMPROVEMENTS UNIT IV:PAVING IMPROVEMENTS $925,715.22 UNIT V:STREET LIGHTING IMPROVEMENTS UNIT VI--TRAFFIC SIGNAL IMPROVEMENTS TOTAL CONSTRUCTION 810 $925,715.22 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 60 calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CI f`'01=Pi iMT 1L'pKrlr Tigyr,ie!,F„nrr.,Plug,i :iT%N'0A KD CQI�.S UCTIQ`SPL(IW-\r0)1-000(:nn�.{iC-Ut:`.'IE IA)PW p;;\R(2F_O'PoJE(':r3 0rr1o;1,''-10'011 Fonn t"siun Stple,n6cr I,2017 0041,11 n1ti Pwrosal DAP,!L.'pals 00 42 43 DAP-nTD PROPOSAL Psge I nr. SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value Item No. Measure Quantity UNIT V:STREET LIGHTING IMPROVEMENTS 1 2605.3015 2"CONDT PVC SCH 80(T) 26 05 33 LF 5,215 1 $10.85 $56.582.75 2 3441.1408 NO 6 Insulated Elec Condr 3441 10 LF 5,215 1 $2.75 $14,34125 3 3441.1501 Ground Box Type B 3441 10 EA 10 $565.00 $5,650.00 4 3441.3301 Rdwy Ilium Foundation TY 1,2,and 4 3441 20 EA 26 $1,12500 $29,250.00 5 3441.3201 LED Lighting Fixture 34 41 20 EA 26 $745.00 $19,370,00 6 3441.3345 Rdwy Ilium TY D-25-6 Pole 3441 20 EA 26 $1,735.00 $45,110.00 TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $170,304.00 BID SUMMARY UNIT 1:WATER IMPROVEMENTS UNIT II:SANITARY SEWER IMPROVEMENTS UNIT III:DRAINAGE IMPROVEMENTS UNIT IV:PAVING IMPROVEMENTS UNIT V:STREET LIGHTING IMPROVEMENTS $170,304.00 UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS TOTAL CONSTRUCTION BID $170,304.00 Contractor agrees to complete WORK for FINAL ACCEPTANCE within #days calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH Ridg--,Pnnnc Fprrsc 3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS C'iry(h'gjcr.�No-/06.143 For Version September 1,2015 i;D d2 d3_Rid Pa�posai_DAP_C&S xIs