HomeMy WebLinkAboutContract 47924-CO1 FORT WORTH City of Fort Worth C11YSECPVARY
Change Order Request CCRMCTMO. / _ Zl
Project Name:I Water and Sanitary Sewer Replacement Contract 2015 WSM-B, Part 1 City Sec No.: 47924
Project No.(s): 59601/59607-0600430/0700430-C01783 DOE No. 7433 City Proj.No.:1 02436
Project Description: Water and Sanitary Sewer Replacement on Harwen Terrace,Odessa Avenue,Medin Avenue and Wayside Avenue
Contractor: Tejas Commercial Construction,LLC Change Order# 0 Date: 1 2/10/2017
City Project Mgr.1 Walter Norwood City Inspector: Ryan Miller
Phone Number: 817-392-5026 Phone Number: 817-223-2256
Dept. Water Sewer Totals Contract Time
(Calender days)
Original Contract Amount $768,375.30 $95,438.45 $863,813.75 170
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $768,375.30 $95,438.45 $863,813.75 170
Amount of Proposed Change Order $79,051.40 $1,200.00 $80,251.40 060
Revised Contract Amount $847,426.70 $96,638.45 $944,065.15 230
Original Funds Available for Change Orders $51,025.00 $24,661.00 $75,686.00
Remaining Funds Available for this CO $51,025.00 $24,661.00 $75,686.00
Additional Funding(if necessary) $28,026.40 1 $28,026.40
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 9.29%
MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+2591o) $1,079,767.19
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Existing City records indicated the existence of only one water main on the street. However,during
construction two water mains (one PVC, one cast iron)were encountered.The PVC main was removed and
replaced but it was necessary to remove all services from the cast iron pipe and connect them to the new
PVC pipe. Change order No. 1 will provide increased pay item quantites for the following to address the
issue:
• 1-inch water serivice ""Al r, ,, I
• 1-inch water service reconnection I fJ�ll �[I�l� f,3L,(�,� I ,
• Temporary asphalt paving repair ��.•••... T� CITY S€C
RF
:.® ""'9(5)IX-0'r !1 K
Staff concurs with the contractor' uefpy1b days for the change orLr.
A b • `
.. `'
M I a er i ecre '. t
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name Contractor Signature Date
Tejas Commercial Construction,LLC Charles Allen
Inspector Date Project Manager Date
As ' nt irect aAfflater Dept Date o struction uervisor TPW Dept Date
A ' t Ci!y,,Aftomey Date Assis i Manager D to
Council Action If Required
M&C Number N/A M&C Date Approved
FORT WORTH City of Fort Worth CITYSECRUARV
Change Order Request CONTRACT NO,
Project Name:1 Water and Sanitary Sewer Replacement Contract 2015 WSM-B,Part 1 City Sec No.: 47924
Project No.(s): 59601/59607-0600430/0700430-C01783 DOE No. 7433 City Proi.No.: 02436
Project Description: Water and Sanitary Sewer Replacement on Harwen Terrace,Odessa Avenue,Medin Avenue and Wayside Avenue
Contractor: Tejas Commercial Construction,LLC Change Order# Date: 2/10/2017
City Project Mgr.1 Walter Norwood City Inspector: I Ryan Miller
Phone Number: 817-392-5026 Phone Number: 817-223-2256
Dept, Water Sewer Totals Contract Time
(Calender days)
Original Contract Amount $768,375.30 $95,438.45 $863,813.75 170
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $768,375.30 $95,438.45 $863,813.75 170
Amount of Proposed Change Order $79,051.40 $1,200.00 $80,251.40 060
Revised Contract Amount $847,426.70 $96,638.45 $944,065.15 230
Original Funds Available for Change Orders $51,025.00 $24,661.00 $75,686.00
Remaining Funds Available for this CO $51,025.00 $24,661.00 $75,686.00
Additional Funding(if necessary) $28,026.40 $28,026.40
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 9.29%
MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+2591o) $1,079,767.19
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Existing City records indicated the existence of only one water main on the street. However,during
construction two water mains (one PVC,one cast iron)were encountered.The PVC main was removed and
replaced but it was necessary to remove all services from the cast iron pipe and connect them to the new
PVC pipe. Change order No. 1 will provide increased pay item quantites for the following to address the
issue'.
• 1-inch water serivice OFFICIAL REC®i8
• 1-inch water service reconnection
X. �O
• ARY
Temporary asphalt paving repair �0.•""" • r� CITY SECRET
h ® r FT.WORTHS TX
Staff concurs with the contractor's-r-eque f�b days for the change or .-er.
•ka'
`f1i1 T�i�
M J.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name Contractor Signature Date
Tejas Commercial Construction,LLC Charles Allen
Inspector Date Project Manager Date
As ' nt irect r ater Dept Date _ struction ervisor TPW Det Dat
r f z J7 !�
r
A CityoAftorney Date Assis i Manage a D to
i 10
Council Action If Required
M&C Number N/A M&C Date Approved
F_c� Wo a-F H City of Fort Worth
Change Order Additions
Project Name Water and Sanitary Sewer Replacement Contract 2015 WSM-B, Part 1 City Sec No.: 47924
Project No.(s): 59601/59607-0600430/0700430-C01783 1 DOE No. 7433 City Proj. No.: 02436
Project Water and Sanitary Sewer Replacement on Harwen Terrace, Odessa Avenue, Medin Avenue and Wayside Avenue
Description
Contractor Tejas Commercial Construction, LLC Change Order:0 Date: 2/10/2017
City Project Mgr. Walter Norwood City Inspector Ryan Miller
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
6 Remove 4'Sewer Manhole Sewer 2.00 EA $600.00 $1,200.00
16 Temporary Asphalt Paving Repair Water 1500.00 LF $21.00 $31,500.00
25 1"Water Service Reconnection Water 39.00 EA $250.00 $9,750.00
26 1"Water Service Water 39.00 EA $950.00 $37,050.00
37 Valley Gutter Water 11.56 SY $65.00 $751.40
Water $79,051.40
Sewer $1,200.00
Page 2 of 4 Additions Sub Total 1$80,251.40
Ft->RT Avc>R-1'H City of Fort Worth
Change Order Deletions
Project Name Water and Sanitary Sewer Replacement Contract 2015 WSM-B, Part 1 City Sec No.: 47924
Project No.(s): 59601/59607-0600430/0700430-C01783 DOE No. 7433 City Proj. No.: 02436
Project Description Water and Sanitary Sewer Replacement on Harwen Terrace, Odessa Avenue, Medin Avenue and Wayside
Avenue
Contractor Tejas Commercial Construction, LLC Change Order: =1 Date 2/10/2017
City Project Mgr. Walter Norwood City Inspector: Ryan Miller
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Water
Sewer
Page 3 of 4 Deletions Sub Total
MMBE Breakdown for this Change Order
MWBE Sub' Type of Service < Amounfi for this CO :.
Total $0.00
Previous Change Orders
c0,# DATE ` AMOI�NTr
Total
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Walter Norwood
Name of Employee
Senior Professional Engineer
Title