Loading...
HomeMy WebLinkAboutContract 31782AMENDMENT NO. 2 STATE OF TEXAS /t> ` �, r 3 CITY SECRETARY CONTRACT 1 I`=J'" COUNTY OF TARF�NT 3 WHEREAS, the City of Fort Worth (City) and Montgomery Watson America Inc., (Engineer) made and entered into City Secretary Contract No. 26319, (the Contract) which was authorized by the City Council by M&C C-18284 on the 10 day of October, 2000; and WHEREAS, the Contract involves engineering services for the following project: Design and construction management of McCart Street Pump Station and Ground Storage Tank, project No.P160-060160160010 and Project No. P160- 060160180010 WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to delete an decreased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: l. Article I of the Contract is amended to delete the construction management and inspection services. Due to lower water demand for south side of Fort V�lorth was projected at the start of this project, construction of McCart Street pump station and ground Storage Tank has been postponed until FY 2007. The Engineer has requested that remaining work including construction management and inspection services be deleted, which would allow engineering agreement to be closed out and decreasing the total cost to City by $102,276. � Article II of the Contract is amended to provide for a decrease in the maximum fee to be paid to Engineer for all other work and services performed under the Contract, so that the total fee paid by the City for all work and services shall not exceed the sum of $452,124. � .,��� �•. 0�' r � p� D� v����;]�,� '����v'��.0 ����tij ����'r°'��.r1°� � �: �: 1. � ;:,;;;,,.�;�� �'��:� �� u'� i �RIGINAL 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of ���` , 2005, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: � J � _ ,�/'��,�, .� S Frank Crumb, P.E. Acting Director, Water Department MWH Americas, Inc. ENGINEER � � � _ i By : --� I I \ V�lr \vi��'. 1 Name: Todd Papes, Vice President 7557 Rambler Road Suite 1050 Dallas, Tx. 75231 APPROVED AS TO FORM AND LEGALITY: _ �� ,� Gary Ste'nberger Assistant City Attorney APPROVED: Marc A. Assista ATTEST: � t �_" t City Manager Marty Hendrix, City Secretary C-19538 Contract Authorization 4-8-03 Date G� , � 2 C����°1;�;=, L a;.� ��,'Ua:� ���'� ��r>�I� (���?�`i ��,�„ �, � �`'� �:�i n � �':. ��: � City of Fort Worth, Texas �i✓IJ' Ayar And Caunc�l Cammun�cAt�an DATE REFERENCE NUMBER LOG NAME 4/s/o3 **C-19538 60WATSON PAG E 1 of 1 SUBJECT AMENDMENT NO. 1 TO THE ENGINEERING AGREEMENT WITH MONTGOMERY WATSON AMERICAS, INC. FOR DESIGN AND CONSTRUCTION MANAGEMENT OF THE MCCART AVENUE PUMP STATION AND GROUND STORAGE TANK RECOMMENDATION: It is recommended that The City Council authorize the City Manager to execute Amendment No. 1 to the engineering agreement with Montgomery Watson Americas, Inc. (City Secretary Contract No. 26319) for the McCart Avenue Pump Station and Ground Storage Tank, increasing the total contract cost by $72,200 to $554,400. DISCUSSION: On Octob�r 10, 2000 (M&C C-18284), the City Council authorized an engineering agreement with Montgomery Watson Americas, Inc. for design and construction management of McCart Avenue Pump Station and Ground Storage Tank. The pump station and ground storage tank were required due to increasing wholesale and retail demands in the Southside III pressure plane. Amendment No. 1 will provide for additional design, construction management and inspection services. The pump station was identified in the current water system master plan as requiring 15 MGD (million gallons per day) capacity. After the project was first authorized the projected water demands in Southside III pressure plane increased and must be expanded to 33 MGD capacity, requiring additional engineering services for design, construction management, and inspection. Montgomery Watson Americas, Inc. is in compliance with the City M/WBE Ordinance by committing to an additional 31 % M/WBE participation on this amendment No. 1% M/WBE participation. The City goal on this project is 17%. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Project Fund. MO:r Submitted for City Manager's Of�ce by: Marc Ott Originating Department Head: Dale Fisseler Additional Information Contact: Dale Fisseler FUND ACCOUNT (to) 6122 8207 (from) P160 531200 8207 CENTER I AMOUNT � CITY SECRETARY 060160160010 � $72,200.00 APPROVED 04/08/03