WHEREAS, the City of Fort Worth (City) and Montgomery Watson America
Inc., (Engineer) made and entered into City Secretary Contract No. 26319,
(the Contract) which was authorized by the City Council by M&C C-18284 on
the 10 day of October, 2000; and
WHEREAS, the Contract involves engineering services for the following
project:
Design and construction management of McCart Street Pump Station and
Ground Storage Tank, project No.P160-060160160010 and Project No. P160-
060160180010
WHEREAS, it has become necessary to execute Amendment No. 2 to said
Contract to delete an decreased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their
duly authorized representatives, enter into the following agreement which
amends the Contract:
l.
Article I of the Contract is amended to delete the construction
management and inspection services. Due to lower water demand for south
side of Fort V�lorth was projected at the start of this project,
construction of McCart Street pump station and ground Storage Tank has
been postponed until FY 2007. The Engineer has requested that remaining
work including construction management and inspection services be deleted,
which would allow engineering agreement to be closed out and decreasing
the total cost to City by $102,276.
�
Article II of the Contract is amended to provide for a decrease in
the maximum fee to be paid to Engineer for all other work and services
performed under the Contract, so that the total fee paid by the City for
all work and services shall not exceed the sum of $452,124.
� .,���
�•. 0�' r � p� D�
v����;]�,� '����v'��.0
����tij ����'r°'��.r1°�
� �: �: 1.
� ;:,;;;,,.�;�� �'��:�
�� u'� i
�RIGINAL
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the day of ���` , 2005, in Fort
Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED:
� J
� _ ,�/'��,�,
.�
S Frank Crumb, P.E.
Acting Director, Water Department
MWH Americas, Inc.
ENGINEER �
�
� _ i
By : --� I I \ V�lr \vi��'.
1
Name: Todd Papes, Vice President
7557 Rambler Road Suite 1050
Dallas, Tx. 75231
APPROVED AS TO FORM AND LEGALITY:
_ �� ,�
Gary Ste'nberger
Assistant City Attorney
APPROVED:
Marc A.
Assista
ATTEST:
� t �_"
t City Manager
Marty Hendrix, City Secretary
C-19538
Contract Authorization
4-8-03
Date
G� , �
2 C����°1;�;=, L a;.� ��,'Ua:�
���'� ��r>�I� (���?�`i
��,�„ �,
� �`'� �:�i n � �':. ��: �
City of Fort Worth, Texas
�i✓IJ' Ayar And Caunc�l Cammun�cAt�an
DATE REFERENCE NUMBER LOG NAME
4/s/o3 **C-19538
60WATSON
PAG E
1 of 1
SUBJECT AMENDMENT NO. 1 TO THE ENGINEERING AGREEMENT WITH MONTGOMERY
WATSON AMERICAS, INC. FOR DESIGN AND CONSTRUCTION MANAGEMENT OF
THE MCCART AVENUE PUMP STATION AND GROUND STORAGE TANK
RECOMMENDATION:
It is recommended that The City Council authorize the City Manager to execute Amendment No. 1 to
the engineering agreement with Montgomery Watson Americas, Inc. (City Secretary Contract No.
26319) for the McCart Avenue Pump Station and Ground Storage Tank, increasing the total contract
cost by $72,200 to $554,400.
DISCUSSION:
On Octob�r 10, 2000 (M&C C-18284), the City Council authorized an engineering agreement with
Montgomery Watson Americas, Inc. for design and construction management of McCart Avenue Pump
Station and Ground Storage Tank. The pump station and ground storage tank were required due to
increasing wholesale and retail demands in the Southside III pressure plane.
Amendment No. 1 will provide for additional design, construction management and inspection services.
The pump station was identified in the current water system master plan as requiring 15 MGD (million
gallons per day) capacity. After the project was first authorized the projected water demands in
Southside III pressure plane increased and must be expanded to 33 MGD capacity, requiring additional
engineering services for design, construction management, and inspection.
Montgomery Watson Americas, Inc. is in compliance with the City M/WBE Ordinance by committing to
an additional 31 % M/WBE participation on this amendment No. 1% M/WBE participation. The City
goal on this project is 17%.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of
the Water Capital Project Fund.
MO:r
Submitted for City Manager's
Of�ce by:
Marc Ott
Originating Department Head:
Dale Fisseler
Additional Information Contact:
Dale Fisseler
FUND ACCOUNT
(to)
6122
8207 (from)
P160 531200
8207
CENTER I AMOUNT � CITY SECRETARY
060160160010 � $72,200.00
APPROVED 04/08/03