Loading...
HomeMy WebLinkAboutOrdinance 6259 ORDINANCE NO. 6259 ORDINANCE CLOSING HEARING AND LEVYING ASSESSMENTS FOR PART OF THE COST OF IMPROVING A PORTION OF _BLACKSTO�TE DRIVE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS: FIXING CHARGES AND LIENS AGAINST ABUTTING PROPERTY THEREON, AND AGAINST THE OWNERS THEREOF: PROVIDING FOR THE COLLECTION OF SUCH ASSESSMENTS AND THE ISSUANCE OF ASSIGNABLE CERTIFI- CATES IN EVIDENCE THEREOF: RESERVING UNTO THE CITY COUNCIL THE RIGHT TO ALLOW CREDITS REDUCING THE AMOUNT OF THE RESPECTIVE ASSESSMENT TO THE EXTENT OF ANY CREDIT GRANTED: DIRECTING THE CITY SECRETARY TO EN- GROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTES OF THE CITY COUNCIL OF FORT WORTH, AND BY FILING THE ORDINANCE IN THE ORDINANCE RECORDS OF SAID CITY: AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be improved by raising, grading, or filling same and by constructing thereon to-wit: UNIT 1, BLACKSTONE DRIVE From Churchill Drive to Isbell Road, known and designated as Unit 1, Project No. 104-24000-198; a six-inch thick hot- mix asphaltic concrete pavement on a six- inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen- inch wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. UNIT 2, TIDWELL DRIVE From Banks Street to Springer Street, known and designated as Unit 2, Project No. 104-24000-198: a six-inch thick hot- mix asphaltic concrete pavement on a six- inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen- inch wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. UNIT 3, QUAIL TRAIL From Shenna Boulevard to Ohio Garden Road, known and designated as Unit 3, Project No. 104-24000-198: a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven- inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. { UNIT 4, ROBINSON STREET From NW 23rd Street to NW 24th Street, known and designated as Unit 4, Project No. 104-24000-198: deleted by Council Action. UNIT 5, ROBINSON STREET From NW 24th Street to NW 26th Street, known and designated as Unit 5, Project No. 104-24000-198: deleted by Council Action. UNIT 6, McCANDLESS STREET From NW Loraine Street to NW 32nd Street, known and designated as Unit 6, Project No. 104-24000-198: a six-inch thick hot- mix asphaltic concrete pavement on a six- inch thick lime stabilized subgrade, seven- inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete drive- ways and four-foot wide concrete sidewalk where specified. UNIT 7, 29th STREET From McCandless Street to Titus Avenue, known and designated as Unit 7, Project No. 104-24000-198: a six-inch thick hot- mix asphaltic concrete pavement on a six- inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen- inch wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete drive- ways and four-foot wide concrete sidewalk where specified. UNIT 8, NW IORAINE STREET From Titus Avenue to Sherman Avenue, known and designated as Unit 8, Project No. 104- 24000-198:4 six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. • The above,together with combined concrete curbs and gutter on proper grade and line where same are not already so constructed, together with storm drains and other necessary incidentals and appurtenances; all of said improve- ments are to be so constructed as and where shown on the plans and in strict accordance with the Plans and Specifications therefor: and contract has been made and entered into with SRO ASPHALT, INC. ARLINGTON, TEXAS for the making and construction of such improvements on the above said portion of streets, avenues and public places. WHEREAS, estimates of the cost of the improvements of each such portion of streets, avenues and public places were prepared and filed and approved and adopted by the City Council of the City, and a time and place was fixed for a hearing and the proper notice of the time, place and purpose of said hearing was given and said hearing was had and held at the time and place fixed therefor, to-wit, on the 9th day of March _ 19 70 , 9:30 A.M. , in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and at such hearing the following protests and objections were made, to-wit: _protested that _protested that protested that protested that protested that protested that protested that - -- --protested that — -- — — protested that protested that • and said hearing was continued to the present time in order to more fully accomplish the purposes thereof, and all desiring to be heard were given full and fair opportunity to be heard, and the City Council of the City having. fully considered all proper matter, is of the opinion that the said hearing should be closed and assessments should be made and levied as herein ordered: NOW THEREFORE: BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. • Said hearing be, and the same is hereby, closed and the said protest and objections, and any and all other protests and objections, whether herein enumerated or or not, be and the same are hereby, overruled. II. The City Council, from the evidence, finds that the assessments herein levied should be made and levied against the respective parcels of property abutting upon the said portions of streets, avenues and public places and against the owners of such property, and that such assessments and charges are right and proper and are substantially in proportion to the benefits to the respective parcels of property by means of the improvements in the unit for which such assessments are levied, and establish substantial justice and equality and uniformity between the respective owners of the respective properties, and between all parties concerned, considering the benefits received and burdens imposed, and further finds that in each case the abutting property assessed is specially benefited in enhanced value to the said property by means of the said improvements in the unit upon which the particular property abuts and for which assessment is levied and charge made, in a sum in excess of the said assessment and charge made against the same by this ordinance, and further finds that the apportion- ment of the cost of the improvements is in accordance with the law in force in this City, and the proceedings of the City heretofore had with reference to said improvements, and is in all respects valid and regular. III. There shall be, and is hereby, levied and assessed against the parcels of property herein below mentioned, and against the real and true owners thereof (whether such owners be correctly named herein or not) the sums of money itemized below opposite the description of the respective parcels of property and the several amounts assessed against the same, and the owners thereof, as far as such owners are known, being as follows: • • • IV. Where more than one person, firm or corporation owns an interest in any property above described, each said person, firm or corporation shall be personally liable only for its, her or his pro rata of the total assessment against such property in proportion as its, his or her respective interest bears to the total ownership of such property, and its, his or respective interest in such property may be released from the assessment lien upon pay- ment of such proportionate sum. V. • The several sums above mentioned and assessed against the said parcels of property, and the owners thereof, and interest thereon at the rate of six per cent (6%) per annum, together with reasonable attorney's fees and costs of collection, if incurred, are hereby declared to be and are made a lien upon the respective parcels of property against which the same are assessed, and a personal liability and charge against the real and true owners of such property, whether such owners be correctly named herein or not, and the said liens shall be and constitute the first enforceable lien and claim against the property on which such assessments are levied, and shall be a first and paramount lien thereon, superior to all other liens and claims, except State, County, School District and City ad valorem taxes. The sums so assessed against the abutting property and the owners thereof shall be and become due and payable as follows, to-wit: in five (5) equal installments, due respectively on or before thirty (30) days, one (1), two (2), three (3), and four (4) years from the date of completion and acceptance of the improvements in the respective unit, and the assessments against the property abutting upon the remaining units shall be and become due and payable in such installments after the date of the completion and acceptance of such respective units, and shall bear interest from said date at the rate of six per cent (6r:) per annum, payable annually with each install- ment, except as to the first installment, which shall be due and payable at the maturity thereof, so that upon the completion and acceptance of the improvements in a particular unit, assessments against the property abutting upon such completed and accepted unit shall be and become due and payable in such installments, and with interest from the date of such completion and acceptance. Provided, however, that any owner shall have the right to pay the entire assessment, or any installment thereof, before maturity by payment of principal and accrued interest, and provided further that if default shall be made in the payment of principal or interest promptly as the same matures, then the entire amount of the assessment upon which such default is made shall, at the option of said City of Fort Worth, or its assigns, be and become immediately due and payable, and shall be collectable, together with reasonable attorney's fees and cost of collection, if incurred, PROVIDED, however, that acting through its duly authorized Director of Public Works the City of Fort Worth retains the right to authorize payment of the sums assesed against abutting property upon such completed and accepted unit in not more than forty-eight (48) equal regular monthly installments of not less than $9.00 each, the first of such installments to become due and payable not more than thirty (30) days after the completion and acceptance by the City of the particular unit. PROVIDED FURTHER, that the City Attorney is hereby empowered to authorize payments of said sums of lesser installments and/or over a longer period of time in cases in which the Director of Public Works has previously determined that an extreme financial hardship upon the property owner will otherwise result; and PROVIDED FURTHER, that such method of payments shall be authorized only in instances where the owner or owners of property abutting upon such completed and accepted unit shall have executed and delivered to the City of Fort Worth a lawful, valid and binding note and mechanic's and materialman's contract upon forms supplied by the City granting a mechanic's lien upon and conveying the said abutting property in trust to secure the payment by said owner or owners according to the terms thereof of the sums assessed against such property. VI. If default shall be made in the payment of any assessment, collection thereof shall be enforced either by the sale of the property by the Assessor and Collector of Taxes of said City as near as possible in the same man- ner provided for the sale of property for the non-payment of ad valorem taxes, or at the option of the City of Fort Worth, or its assigns, payment of said sums shall be enforced by suit in any court of competent jurisdic- tion, or as provided in any mechanic's or materialman's contract as aforesaid, and said City shall exercise all of its lawful powers to aid in the enforcement and collection of said assessments. .. • VII. The total amount assessed against the respective parcels of abutting property, and the owners thereof, is in accordance with the proceedings of the City relating to said improvements and assessments thereof, and is less than the proportion of the cost allowed and permitted by the law in force in the City. VIII. Although the aforementioned charges have been fixed, levied, and assessed in the respective amounts hereinabove stated, the City Council does hereby reserve unto itself the right to reduce the aforementioned assessments by allowing credits to certain property owners where deemed appropriate. Notwithstanding the City Council has herein reserved the right to issue credits, it shall not be required to issue credits, and will not do so, if same would result in any equity and/or unjust discrimination. The principal amount of each of the several assessment certificates to be issued the City of Fort Worth, Texas, as hereinafter provided, shall be fixed and determined by deducting from the amount of any assessment hereinabove levied such amount or amounts, if any, as may hereafter be allowed by the City Council as a credit against the respective assessments. IX. For the purpose of evidencing the several,sums assessed against the respective parcels of abutting prop • - erty and the owners thereof, and the time and terms of payment, and to aid in the enforcement and collection thereof, assignable certificates in the principal amount of the respective assessments less the amount of any re- spective credit allowed thereon, shall be issued by the City of Fort Worth, Texas, upon completion and accept- ance by the City of the improvements in each unit of improvement as the work in such unit is completed and accepted, which certificates shall be executed by the mayor in the name of the City and attested by the City Secretary, with the corporate seal of the City impressed thereon, and shall be payable to the City of Fort Worth, or its assigns, and shall declare the said amounts, time and terms of payment, rate of interest, and the date of the completion and acceptance of the improvements abutting upon such property for which the certificate is issued, and shall contain the name of the owner or owners, if known, description of the property by lot and block number, or front feet thereon, or such other desciption as may otherwise identify the same; and if the said property shall be owned by an estate, then the description of same as so owned shall be sufficient and no error or mistake in describing any property, or in giving the name of the owner, shall invalidate or in anywise impair such certificate, to the assessments levied. The certificates shall provide substantially that if same shall not be paid promptly upon maturity, then they shall be collectable, with reasonable attorney's fees and costs of collection, if incurred, and shall provide substantially that the amounts evidenced thereby shall be paid to the Assessor and Collector of Taxes of the City of Fort Worth, Texas, who shall issue his receipt therefor, which shall be evidence of such payment on any demand for the same, and the Assessor and Collector of Taxes shall deposit the sums so received by him forth- with with the City Treasurer to be kept and held by him in a separate fund, and when any payment shall be made in the City the Assessor and Collector of Taxes upon such certificate shall, upon presentation to him of the certificate by the holder thereof endorse said payment thereof. If such certificate be assigned then the holder thereof shall be entitled to receive from the City Treasurer the amount paid upon the presentation to him of such certificate so endorsed and credited; and such endorsement and credit shall be the Treasurer's Warrant for making such payment. Such payments by the Treasurer shall be receipted for the holder of such certificate in writing and by surrender thereof when the principal, together with accrued interest and all costs of collection and reasonable attorney's fees, if incurred, have been paid in full. • Said certificates shall further recite substantially that the proceedings with reference to making the improvements have been regularly had in compliance with the law, and that all prerequisites to the fixing of the assessment lien against the property described in such certificate and the personal liability of the owners thereof have been performed, and such recitals shall be prima facie evidence of all the matters recited in such certificates, and no further proof thereof shall be required in any court. Said certificates may have coupons attached thereto in evidence of each or any of the several installments thereof, or may have coupons for each of the first four installments, leaving the main certificate to serve for the fifth installment, which coupons may be payable to the City of Fort Worth, or its assigns may be signed with the facsimile signatures of the Mayor and City Secretary. • Said certificates shall further recite that the City of Fort Worth, Texas shall exercise all of its lawful powers, when requested so to do, to aid in the enforcement and collection thereof, and may contain recitals sub- stantially in accordance with the above and other additional recitals pertinent or appropriate thereof, and it shall not be necessary that the recitals be in the exact form above set forth, but the substance thereof shall be sufficient. The fact that such improvements may be omitted on any portion of any of said units adjacent to any premises exempt from the lien of such assessments shall not in anywise invalidate, affect or impair the lien of such assessments upon other premises. X. Full power to make and levy reassessments and to correct mistakes, errors, invalidities or irregularities, either in the assessments or in the certificates issued in evidence thereof, is, in accordance with the law in force in this City,vested in the City. XI. All assessments levied are a personal liability and charge against the real and true owners of the premises described, notwithstanding such owners may not be named, or may be incorrectly named. XII. The assessments so levied are for the improvements in the particular unit upon which the property described abuts, and the assessments for the improvements in any unit are in nowise affected by the improve- ments or assessments in any other unit, and in making assessments and in holding said hearing, the amounts assessed for improvements in any one unit have been in nowise connected with the improvements or the assess- ments therefor in any other unit. XIII. The assessments levied are made and levied under and by virtue of the terms, powers and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, known as Chapter 106 of the Acts of said Session and now shown as Article 1105b of Vernon's Texas Civil Statutes, which Act has been adopted as an amendment to and made a part of the Charter of the City of Fort Worth, Texas. XIV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete Ordinance in the appro- priate Ordinance Records of said City. XV. This ordinance shall take effect and be in full force and effect from and after the date of its passage and it is so ordained. PASSED AND APPROVED this __day of 1962. APPROVED AS TO FORM AND LEGALITY: 7-0 €4- et City f}tt orney i PROJECT NO. 104-24000-198, UNIT 1, BLACKSTONE DRIVE FROM CHURCHILL DRIVE TO ISBELL ROAD, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cemeht stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF BLACKSTONE DRIVE AND CHURCHILL ROAD NORTH SIDE OF STREET CHURCHILL GARDENS Estate of W.F.Minze 7 -- 175.8' Side Lot Adjusted to 304 Churchill Road Res. 100' Pavement $2,96 $296.00 100' Curb & Gutter 2.44 244.00 $540.00 H. B. Nettleton 8-R-1 & 197.7' Side Lot Adjusted to 301 Byron 8-R-2 Res. 83' Pavement $2.96 $245.68 83' Curb & Gutter 2.44 202.52 85 Sq. Ft. Drive .80 68.00 $516.20 BYRON STREET INTERSECTS C. W. Cole W.95' of 21 95' Adjusted to 1103 Yale Res. 90' Pavement $2.96 5266.40 90' Curb & Gutter 2.44 219.60 $486.00 B. R. Porter E. 55' of 21 55' Pavement $2.96 $162.80 4608 Blackstone Res. 55' Curb & Gutter 2.44 134.20 85 Sq. Ft. Drive .80 68.00 $365.00 BROOKSIDE ACRES ADDITION Gertrude R. Kuban 45 72.8' Pavement $2.96 $215.49 3913 Golden Oaks Drive Res. 62.8' Curb & Gutter 2.44 153.23 85 Sq. Ft. Drive .80 68.00 $436.72 1. PROJECT NO. 104-24000-198, UNIT 1, BLACKSTONE DRIVE FROM CHURCHILL DRIVE TO ISBELL ROAD, CONTINUED BLACK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT PALMETTO DRIVE INTERSECTS NORTH SIDE OF STREET BROOKSIDE ACRES ADDITION C. T. Cowley 44 80' Pavement $2.96 $236.80 7804 Rockdale Road Res. 70' Curb & Gutter 2.44 170.80 85 Sq. Ft. Drive .80 68.00 $475.60 Mrs. Jean Conlin & 43 80' Pavement $2.96 $236.80 Mrs. Lois Milner Res. 80' Curb & Gutter 2.44 195.20 4532 Blackstone 85 Sq. Ft. Drive .80 68.00 $500.00 R. C. Dragoo 42 80' Pavement $2.96 $236.80 1061 W. Rosedale Res. 80' Curb & Gutter 2.44 195.20 85 Sq. Ft. Drive .80 68.00 $500.00 V. W. Smith 41 80' Pavement $2.96 $236.80 4528 Blackstone Res. 80' Curb & Gutter 2.44 195.20 85 Sq. Ft. Drive .80 68.00 $500.00 Brookside Assembly 40 80' Pavement $2.96 $236.80 of God Church Res. 80' Curb & Gutter 2.44 195.20 4526 Blackstone $432.00 Elizabeth Wells 39 80' Pavement 52.96 $236.80 321 Churchill Road Res. 80' Curb & Gutter 2.44 195,20 85 Sq. Ft. Drive .80 68.00 $500.00 NORTH SIDE OF STREET Pearl S. Powell 38 80' Pavement $2.96 236.80 4512 Blackstone Res. 80' Curb & Gutter 2.44 195.20 85 Sq. Ft. Drive .80 68.00 $500.00 2. PROJECT NO.104-24000-198, UNIT 1, BLACKSTONE DRIVE FROM CHURCHILL DRIVE TO ISBELL ROAD CONTINUED BLOCK OWNER IAT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET BROOKSIDE ACRES ADDITION C. W. & Mary Kerns E. 100' 100' Adjusted to 306 Byron of 67 Res. 58' Pavement $2.96 $171.68 58' Curb & Gutter 2.44 141.52 85 Sq. Ft. Drive .80 68.00 381.20 0. A. Roberts W.60' 60' Existing Facilities No Assessment 5200 Blackstone of 67 Res. BYRON STREET INTERSECTS Curtis Murr 46 258' Side Lot adjusted to 274 Churchill Res. 158' Pavement $2.96 $467.68 158' Curb & Gutter 2.44 385.52 85 Sq. Ft. Drive .80 68.00 921.20 TOTAL COST TO PROPERTY OWNERS $12,220.75 TOTAL COST TO CITY OF FORT WORTH $25,008.48 TOTAL ESTIMATED CONSTRUCTION COST $37,229.23 4. PROJECT NO. 104-24000-198, UNIT 2, TIDWELL DRIVE FROM BANKS STREET TO SPRINGER STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide con- crete gutter, so that the finished roadway will be thirty feet wide and by constructing six- inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE INTERSECTION OF BANKS STREET AND TIDWELL DRIVE NORTH SIDE OF STREET TIDWELL SUBDIVISION Arthur L. Gresham 31 111' Side Lot Adjusted to 1016 Banks Res. 100' Pavement $2.69 $269.00 93' Gutter Only 1.22 113.46 140' Sq. Ft. Drive .80 112.00 $ 494.46 Miss Gladys E. Kay 10 166.3' Side Lot Adjusted to 1017 Springer Res. 100' Pavement $2.96 $296.00 $ 296.00 SPRINGER STREET INTERSECTS TIDWELL SUBDIVISION SOUTH SIDE OF STREET M. L. Swaim 11 166.3' Side Lot Adjusted to 1009 Springer Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 $ 540.00 WESTSIDE ACRES FHA 49 270233 2 D 92.6' Pavement $2.69 $249.09 Asst. Commissioner Res. 92.6' Curb & Gutter 2.44 225.94 Washington, 25, D. C. $ 475.03 TOTAL COST TO PROPERTY OWNERS $1,805.49 TOTAL COST TO CITY OF FORT WORTH . . . . 6,669.19 TOTAL ESTIMATED CONSTRUCTION COST $8,474.69 5 PROJECT NO. 104-24000-198, UNIT 3, QUAIL TRAIL FROM SHENNA BOULEVARD TO OHIO GARDEN ROAD, to be improved by constructing a seven-inch thick hot-mix asphaltic concrete pavement on a six- inch thick cement subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick driveways where specified, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE INTERSECTION OF QUAIL TRAIL AND SHENNA BOULEVARD NORTH SIDE OF STREET ROCKWOOD TERRACE THIRD FILING N. E. Dennington 9 15 145' Pavement $2.96 $429.20 1300 Quail Trail Res. 145° Curb & Gutter 2.44 353.80 85 Sq. Ft. Driveway.80 68.00 $ 851.00 J. E. Scarborough 10 15 110' Pavement $2.96 $325.60 c/o Southland Life Res. 110° Curb & Gutter 2.44 268.40 901 Summit 140 Sq. Ft. Driveway.80 112.00 $ 706.00 Floyd Eagan 11 15 121' Pavement $2.96 $358.16 4520 White Oak Lane Res. 121° Curb & Gutter 2.44 295.24 $ 653.40 Charles D. McClafin 12-A & 12-B 15 249° Pavement $2.96 $737.00 704 Roberts Cut-Off Res. 249' Curb & Gutter 2.44 607.56 $1,344.56 Leon Mahan 12-C 15 224.5° Pavement $2.96 $664.52 1304 Park Avenue Res. 224.5' Curb & Gutter2.44 547.78 $1,212.30 SOUTH SIDE OF STREET ROCKWOOD TERRACE 819.1° Adjusted Elton I. Burks 1, 2, & 3 20 758 ° Pavement $2.96 $;x,243.68 1227 Ohio Garden Road Res. 758 ° Curb & Gutter 2.44 1,849.52 b5 Sq. Ft. Driveway.80 bo.00 $4,161.20 6 PROJECT NO. 104-24000-198_, UNIT 3. QUAIL TRAIL FROM SHENNA BOULEVARD TO OHIO GARDEN ROAD - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET FAIR HILLS ADDITION John B.Honts 4 20 80' Pavement $2.96 $236.80 1225 Ohio Garden Road Res. 80' Curb & Gutter 2.44 195.20 $ 432.00 TOTAL COST TO PROPERTY OWNERS .$ 9,360.46 TOTAL COST TO CITY OF FORT WORTH 102365.32. TOTAL ESTIMATED CONSTRUCTION COST '$19,725.78 7 PROJECT NO. 104-24000-198, UNIT 4, ROBINSON STREET FROM NW. 23rd STREET to NW. 24th STREET, to be improved by constructing a seven-inch thick hot-mix asphaltic concrete pavement ona six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by con- structing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF NW. 23rd* AND ROBINSON STREET NORTH SIDE OF STREET ROSEN HEIGHTS SECOND FILING Leon Friedman 24 177 140' Adjusted to 4107 Columbia Res. 100' Pavement $2.96 $296.00 Texarkana, Texas 100' Curb & Gutter 2.44 244.00 140' Sidewalk 2.67 373.80 $ 913.80 W. C Saunders 1 177 140 ' Adjusted to 3101 NW 24th Res. 100° Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 129' Sidewalk 2.67 344.43 85 Sq. Ft. Drive .80 68.00 $ 952.43 NW. 24TH STREET INTERSECTS SOUTH SIDE OF STREET Salvation Army 12 168 140° Adjusted to c/o S/Capt. J. R. Tritton Res. 100' Pavement $2.96 $296.00 920 Monroe 40' Curb & Gutter 2.44 97.60 45' Sidewalk 2.67 120.15 $513.75 Mrs. Mollie Walker 13 168 140' Adjusted to 3022 NW. 23rd Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 129° Sidewalk 2.67 344.43 85 Sq. Ft. Driveway.80 68.00 $ 952.43 TOTAL COST TO PROPERTY OWNERS $3,332.41 a 4 c.7e fic r-'6 TOTAL COST TO CITY OF FORT WORTH 5.562.19 L TOTAL ESTIMATED CONSTRUCTION COST $8,894.60 8 PROJECT NO. 104-24000-198, UNIT 5, ROBINSON STREET FROM NW. 24th STREET TO NW. 26TH STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four foot wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF NW. 24th STREET AND ROBINSON NORTH SIDE OF STREET ROSEN HEIGHTS SECOND FILING Mary Lou Kemp 24 178 140' Adjusted to 3006 NW. 24th Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 129' Sidewalk 2.67 344.43 85 Sq. Ft. Driveway.80 68.00 $ 952.43 Orville T. Gillispie 1 178 140' Adjusted to 3101 NW. 25th Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 129' Sidewalk 2.67 344.43 85 Sq. Ft. Driveway.80 68.00 $ 952.43 NW. TWENTY-FIFTH STREET INTERSECTS Curtis Young 24 179 140' Adjusted to 1301 Grand Avenue Res. 100° Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 122' Sidewalk 2.67 325.74 140 Sq. Ft. Driveway.80 112.00 $ 977.74 W. B. McLeod, Sr. 1 179 140' Adjusted to 3103 NW. 26th Res. 100° Pavement $2.96 $296.00 100° Curb & Gutter 2.44 244.00 140' Sidewalk 2.67 373.80 $ 913.80 NW. 26th STREET INTERSECTS SOUTH SIDE OF STREET Roy D. Rodden 12 166 140° Adjusted to 3023 NW. 26th Res. 100° Pavement $2.96 $296.00 100° Curb & Gutter 2.44 244.00 140' Sidewalk 2.67 373.80 $ 913.80 9 PROJECT NO. 104-24000-198, UNIT 5, ROBINSON STREET FROM NW. 24TH STREET TO NW. 26TH STREET- CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET ROSEN HEIGHTS SECOND FILING Claude & Mrs. Everett Smith 166 140' Adjusted to 3020 NW. 25th 13 Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 140' Sidewalk 2.67 373.80 $913.80 Joseph Fewell 12 167 140' Adjusted to 3023 NW. 25th Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 140° Sidewalk 2.67 373.80 $913.80 I. A. Dingier 13 167 140' Adjusted to 2709 Rosen Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 129' Sidewalk 2.67 344.43 85 Sq. Ft. Drive .80 68.00 $952.43 TOTAL COST TO PROPERTY OWNERS $ 7,490.23 L y TOTAL COST TO CITY OF FORT WORTH 13,876.72 �t.e•-re h TOTAL ESTIMATED CONSTRUCTION COST $21,366.95 I Pc�ip 10 PROJECT NO. 104-24000-198, UNIT 6, McCANDLESS STREET FROM NORTHWEST LORAINE TO NORTHWEST 32nd STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high curb and eighteen-inch concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF McCANDLESS STREET AND NW LORAINE NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING W. A. Rutherford 24 214 140' Adjusted to 3300 W. Loraine Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 118 Sq. Ft. Drive .80 94.40 $ 634.40 George Germain 1 214 140' Adjusted to 3301 NW 29th Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 118 Sq. Ft. Drive .80 94.40 $ 634.40 NW 29th STREET INTERSECTS Tabernacle Baptist 24 215 140' Adjusted to Church Res. 100' Pavement $2.96 $296.00 3300 NW 29th St. 100° Curb & Gutter 2.44 244.00 140' Sidewalk 2.67 373.80 $ 913.80 Robert Wooten 1 215 140' Pavement $5.64 $789.60 3218 NW 30th Comm. 140' Curb & Gutter 2,44 341.60 118 Sq. Ft. Drive .80 94.40 $1,225.60 NW 30th STREET INTERSECTS Mrs. John Dickey 24 216 140' Pavement $5.64 $789.60 3016 Conejos Drive Comm. 140' Curb & Gutter 2.44 341.60 $1,131.20 11 PROTECT NO. 104-24000-198, UNIT 6, McCANDLESS STREET FROM NORTHWEST LORAINE TO NORTHWEST 32nd STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING Morris E. Thomason 1 216 140° Adjusted to 3301 NW 31st Res. 100' Pavement $2.96 $296.00 100° Curb & Gutter 2.44 244.00 118 Sq. Ft. Drive .80 94.40 $ 634.40 NW 31st STREET INTERSECTS G. R. Gordon 24 217 140° Adjusted to Rt, 8, Box 681-H Res. 100° Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 118 Sq. Ft. Drive .80 94.40 $ 634.40 Rosen & Rosen Tract C 200' Pavement $2.96 $592.00 P.O. Box 4454 Res. 200' Curb & Gtr, 2.44 488.00 $1,080.00 NW 32nd STREET INTERSECTS C. H. Howell 12 190 140° Adjusted to 3223 NW 32nd Res. 100' Pavement $2.96 $296.00 100° Curb & Gtr. 2.44 244.00 $ 540.00 W. D. Tallant 13 190 140' Adjusted to 3224 NW 31st Res. 100' Pavement $2.96 $296.00 100° Curb & Gtr. 2.44 244.00 $ 540.00 NW 31st STREET INTERSECTS H. L. Krantz 12 191 140° Adjusted to 4419 Wichita Res. 100° Pavement $2.96 $296.00 100° Curb & Gtr. 2.44 244.00 118 Sq. Ft. Drive .80 94.40 $ 634.40 12 PROJECT NO. 104-24000..198, UNIT 6, McCANDLESS STREET FROM NORTHWEST LORAINE TO NORTHWEST 32nd STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING Paul Howell 13 191 140° Pavement $5.64 $789.60 2122 Loving Comm. 140° Curb & Gtr. 2.44 341.60 $1,131.20 NW 30th STREET INTERSECTS E. C. Underwood 12 192 140° Pavement $4.30 $602.00 3223 NW 30th Comm. 140° Curb & Gtr, 2.44 341.60 $ 943.60 W. M. Clark 13 192 140' Adjusted to 3222 NW 29th Res. 100' Pavement $2.96 $296.00 100° Curb & Gtr. 2.44 244.00 118 Sq. Ft. Drive .80 94.40 $ 634.40 NW 29th STREET INTERSECTS A. P. Ticknor 12 193 140° Adjusted to 2013 Rockridge Res. 100° Pavement $2.96 $296.00 100° Curb & Gtr. 2.44 244.00 118 Sq. Ft. Drive .80 94.40 $ 634.40 Ed Rhody 13 193 140° Adjusted to 321f- NW Loraine Res. 100° Pavement $2.96 $296.00 100° Curb & Gtr. 2.44 244.00 $ 540.00 TOTAL COST TO PROPERTY OWNERS $12,486.20 TOTAL COST TO CITY OF FORT WORTH . . $21,033.55 TOTAL ESTIMATED CONSTRUCTION COST . . . $33,519.75 13 PROJECT NO. 104-24000-198, UNIT 7, 29th STREET FROM McCANDLESS STREET TO TITUS AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide con- crete gutter so that the finished roadway will be thirty feet wide and by constructing six- inch thick concrete driveways and four-foot wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF NW 29th STREET AND McCANDLESS STREET SOUTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING George Germain 1 & 214 100' Pavement $2.96 $296.00 3301 NW 29th 2 Res. 100' Curb & Gtr. 2.44 244.00 $540.00 Laverne Boolen 3 214 50' Pavement $2.96 $148.00 3315 NW 29th Res. 50° Curb & Gtr. 2.44 122.00 $270.00 Bert M. Lambert 4 214 50' Pavement $2.96 $148.00 1609 Norman Res. 50' Curb & Gtr. 2.44 122.00 $270.00 Etta May Johnson 5 214 50' Pavement $2.96 $148.00 3309 NW 29th Res. 50° Curb & Gtr. 2.44 122.00 $270.00 H. R. York 6 & 214 100° Pavement $2.96 $296.00 316 Bailey 7 Res. 100° Curb & Gtr. 2.44 244.00 Suite 112 $540.00 Ace Connell 8 214 50° Pavement $2.96 $148.00 3315 NW 29th Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 14 PROJECT NO. 104-24000-198, UNIT 7, 29th STREET FROM McCANDLESS STREET TO TITUS AVENUE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING Alvie T. Stegall 15 215 50' Pavement $2.96 $148.00 3316 NW 29th Res. 50' Curb & Gtr. 2.44 122.00 $270.00 Thelma Epp Stegall 16 215 50' Pavement $2.96 $148.00 3316 NW 29th Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 W. D. Andrews 17 215 50' Pavement $2.96 $148.00 3310 NW 29th Res. 50' Curb & Gtr. 2.44 122.00 $270.00 W. D. Andrews 18, 19 215 150' Pavement $2.96 $444.00 3310 NW 29th & 20 Res. 150' Curb & Gtr. 2.44 366.00 118 Sq. Ft. Drive .80 94.40 $904.40 Midway Savings Assn. 21 215 50' Pavement $2.96 $148.00 P.O. Box 869 Res. 50' Curb & Gtr. 2.44 122.00 Arlington, Texas 118 Sq. Ft. Drive .80 94.40 $364.40 Arlington Savings 22 215 50' Pavement $2.96 $148.00 Association Res. 50' Curb & Gtr. 2.44 122.00 P.O. Box 869 118 Sq. Ft. Drive .80 94.40 Arlington, Texas $364.40 16 PROJECT NO. 104-24000-198, UNIT 7, 29th STREET FROM McCANDLESS STREET TO TITUS AVENUE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING Tabernacle Baptist 23 & 215 100' Pavement $2.96 $296.00 Church 24 Res. 100' Curb & Gtr. 2.44 244.00 3300 NW 29th 100' Sidewalk 2.67 267.00 $807.00 TOTAL COST TO PROPERTY OWNERS $ 7,691.00 TOTAL COST TO CITY OF FORT WORTH . . . . $ 7,356.45 TOTAL ESTIMATED CONSTRUCTION COST . . . $15,047.45 17 PROJECT NO. 104-24000-198, UNIT 8, NORTHWEST LORAINE STREET FROM TITUS AVENUE TO SHERMAN AVENUE, to be improved by constructing six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen- inch wide concrete gutter so that the finished roadway will be thirty feet wide and by con- structing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING BEGINNING AT THE SOUTHWEST CORNER OF TITUS AVENUE AND NW LORAINE STREET Louise Watson 1 & 224 100' Pavement $2.96 $296.00 3305 NW Loraine 2 Res. 100' Curb & Gtr. 2.44 244.00 $540.00 Jesse Smith 3 224 50' Pavement $2.96 $148.00 3204 Prospect Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 C. B. McWhirter 4 224 50' Pavement $2.96 $148.00 3407 NW Loraine Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 Johnson-Campbell 5 224 50' Pavement $2.96 $148.00 Lumber Co. Res. 50' Curb & Gtr. 2.44 122.00 P.O. Box 10248 118 Sq. Ft. Drive .80 94.40 $364.40 World Baptist 6 224 50' Pavement $2.96 $148.00 Fellowship Res. 50' Curb & Gtr. 2.44 122.00 3001 W. Division 118 Sq. Ft. Drive .80 94.40 Arlington, Texas $364.40 18 PROJECT NO. 104-24000-198, UNIT 8, NORTHWEST LORAINE STREET FROM TITUS AVENUE TO SHERMAN AVENUE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING Eldon Beam 7 224 50' Pavement $2.96 $148.00 3413 NW Loraine Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 J. A. Clark 8 224 50' Pavement $2.96 $148.00 3415 NW Loraine Res. 50' Curb & Gtr. 2.44 $122.00 $270.00 W. L. Sisk 9 224 50' Pavement $2.96 $148.00 1403 Sloan Street Res. 50' Curb & Gtr. 2.44 122.00 Weatherford, Texas 118 Sq. Ft. Drive .80 94.40 $364.40 M. W. Sturdivant 10, 11 224 150' Pavement $2.96 $444.00 3423 NW Loraine & 12 Res. 140' Curb & Gtr. 2.44 341.60 $785.60 SHERMAN AVENUE INTERSECTS NORTH SIDE OF STREET Mrs. R. Long 13 & 223 100' Pavement $2.96 $296.00 3307 NSI Loraine 14 Res. 100' Curb & Gtr. 2.44 244.00 $540.00 I. C. Canup 15 & 223 100' Pavement $2.96 $296.00 3416 NW Loraine 16 Res. 90' Curb & Gtr. 2.44 219.60 118 Sq. Ft. Drive .80 94.40 $610.00 19 PROJECT NO. 104-24000-198, UNIT 8� NORTHWEST LORAINE STREET FROM TITUS AVENUE TO SHERMAN AVENUE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING J. W. Barnes 17 223 50' Pavement $2.96 $148.00 c/o H. R. York Res. 50' Curb & Gtr. 2.44 122.00 Investment Co. 118 Sq. Ft. Drive .80 94.40 316 Bailey $364.40 J. C. Uselton 18 223 50' Pavement $2.96 $148.00 c/o Midway Savings Res. 50' Curb & Gtr. 2.44 122.00 Arlington, Texas 118 Sq. Ft. Drive .80 94.40 $364.40 J. T. Patman 19 223 50' Pavement $2.96 $148.00 2808 NW 30th Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 Ruth Whiteman 20 223 50' Pavement $2.96 $148.00 544 Brown Terrace Res. 50' Curb & Gtr. 2.44 122.00 Hurst, Texas 118 Sq. Ft. Drive .80 94.40 $364.40 Ray Fowler 21 223 50' Pavement $2.96 $148.00 3406 NW Loraine Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 Warren Myers 22 & 223 100' Pavement $2.96 $296.00 3404 NW Loraine 23 Res. 100' Crub & Gtr. 2.44 244.00 118 Sq. Ft. Drive .80 94.40 $634.40 20 PROJECT NO. 104-24000-198 UNIT 8, NORTHWEST LORAINE STREET FROM TITUS AVENUE TO SHERMAN AVENUE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING Cal R. Rice 24 223 50' Pavement $2.96 $148.00 3400 NW Loraine Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 TOTAL COST TO PROPERTY OWNERS $ 7,752.80 TOTAL COST TO CITY OF FORT WORTH . . . $ 8,930.90 TOTAL ESTIMATED CONSTRUCTION COST . . . . $16,683.70 21 ' R01 1 z c.-• .\ ♦n P y9 k`�1 • Mar,z., Or ii. 'v, OHIO GARDEN RD �. ALMENA RD , .).; ULANE .�� �� jL ' _iv, :A3TLEBT Atli ` :. (:, /fir Unit 3 ele��SN � — . 010 ` ;; AVN Jam' Unit 2 ;3`."'Fit (��/ o - J r o ESTE•.iJa. ..� `,1 • A V ccs Z o -o INEZ DR rl/,, � � '• OCit 'a rY o cc J OVID D' 4_ WHITEOAK RI STINE _ \ •-` •.;c F OPE IR 3 ��'.•�' ! , ,� TA BARBARA RI,- o Z ��' ,WoQD RD 1qq� :.r,• ,, •'� )'F•••• 7AKS litlariliiii POINSEIIA DR `n ¢ cc D YI E BONITA DR le ,,,,,. z _ N z 1 MA SH m ; ' t 111 - ' 0 1R HI H DEERI �� ���� a x NG DR RLQ Un tBLAIST�E BLACKSTI E DR . •o CF : p ,,/ mi o W , Op tlf,'. t,:. • d o No • i A,9j N .EME T 5000 AVIV.: elert . Ai •• p r,ti Q• 1 TI ELLO o ..,:.• t \SP����10 ,,,•• I i 11:► \ 'I T ' `` / Unit 8 — o— l\ TITU - Unit 7 Lin D,: '''.'.° N r-}e F• r • ° r'—iw' ..moi-Ar —4- Unit 6 � LP ' ,2 RO KI.LAND m n `' o `nom 1)4 '""'----.0111- Units 4 & 5 -1'.:::Y . •.. TURNER :1,:,. A IE ale AVE1 . 3 P4=' LY I I N 41/Q.,-;,..:{ 'v ND A _ X 7. le, K AR EY AVE _ - _ .N••, _KE ARN EY AVE j.•5•::a':•::.:' j ~' ~LoNG AV III I = 1Ill M: EU xa�'' _ PROJECT NO. 104 - 24000 • 198 8 LOCATIONS ON THE . NORTHWEST SIDE CITY OF FORT WORTH PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 8 LOCATIONS ON THE NORTHWEST SIDE PROJECT NO. 104-24000-198 A Neighborhood Hearing was conducted by the Engineering Division of the Public Works Department at the W. J. Turner Elementary School on January 26, 1970, for the Assessment Paving of 8 Locations on the Northwest Side. Procedures concerning owner participation in the cost, method and policies of determining assessments, street construction standards and methods of payment were explained by Mr. Schmidt to the thirty-three persons in attend- ance. The meeting was then opened for the question and answer period. Unit 1, Blackstone Drive; Mrs. Jay Watts, 209 Isbell Road, owner of Lots 90 and 91 and Tract 2-C, Brookside Acres, objected to the paving. She also said that since Isbell Road had been paved the water stood in the street and that the soil from her land was washing into the storm sewer. Mr. Schmidt told her that someone would check the street to find the cause. Mr. H. B. Nettleton, 301 Byron, owner of Lots 8-R-1 and 8-R-2, Churchill Gardens, said that he had signed the petition for the paving but objected to the sidewalks. Mr. C. W. Kerns, 306 Byron, owner of Lot 67, Brookside Acres, said he had also signed for paving only. Mrs. A. F. Wiggins, 4531 Blackstone, owner of Lot 89, Brookside Acres, said she could not afford the paving and saw no need for sidewalks. Mr. Harry T. Widener, 274 Palmetto Drive, owner of Lot 88, Brookside Acres, stated that he was for the paving but against the sidewalks. Mr. Boss Rush, 275 Palmetto Drive, owner of Lot 68, Brookside Acres, said he also thought the sidewalks were unnecessary but wanted the paving. Mr. V. W. Smith, 4528 Blackstone Drive, owner of Lot 41, Brookside Acres, said that there are at least twenty (20) children in the immediate area and many more would use this route to school if the street was improved. He said that the sidewalks were needed. Unit 2, Tidwell Drive; no questions. Unit 3, Quail Trail; Mr. Charles D. McClafin, 704 Roberts Cut-Off, owner of Lots 12-A and 12-B, Rockwood Terrace, asked us to check the foot- age of his property. Mr. Schmidt told him that this would be done. Mr. Floyd Eagan, 4520 White Oak Lane, owner of Lot 11, Block 15, Rockwood Terrace, asked about the cut in grade. Mr. Lentz told him that at the highest point it would be about 3 feet. Units 4 & 5, Robinson Street; Mrs. W. B. McLeod, 3102 Northwest 26th Street, owner of Lot 1, Block 179, Rosen Heights Addition, 2nd Filing, stated that she thought the sidewalks unnecessary as most of the children used the other side of the street. She also said that if sidewalks were put down they would need retaining walls. Mr. Lentz told her that the sidewalks had been so adjusted that there would no need for retaining walls. Mr. Orville Gillispie, 3101 Northwest 25th Street, owner of Lot 1, Block 178, Rosen Heights 2nd Filing, asked why he had to pay for paving and sidewalks for the benefit of the people that lived down in the flats. He was told that all the people benefitted and also paid for the improvements. He asked if all the land would be taken from one side of the street. Mr. Schmidt told him that the City had a 60' R.O.W. and no property would be taken from either side. Mr. Jospeh Fewell, 3025 Northwest 25th, owner of Lot 12, Block 167, Rosen Heights 2nd Filing, stated that he was opposed to the paving. He said that because of the high embankment retaining walls would be needed. Mr. I. A. Dingler, 2709 Rosen, owner of Lot 13, Block 167, Rosen Heights 2nd Filing, objected to the sidewalks as there were none in the next block. Mrs. Claude Smith, 3020 Northwest 25th Street, owner of Lot 13, Block 166, Rosen Heights 2nd Filing, said her property was vacant and the cost of the improvements would be more than the lot was worth. Mrs. W. C. Saunders, 3101 Northwest 24th Street, owner of Lot 1, Block 177, Rosen Heights 2nd Filing, said they could not afford the improvements. Mrs. Mary Lou Kemp, 3010 Northwest 24th Street, owner of Lot 24, Block 178, Rosen Heights 2nd Filing, said she thought retaining walls would be necessary. • Unit 6, McCandless Street; Mrs. M. E. Thomason, 3301 Northwest 31st Street, owner of Lot 1, Block 216, Rosen Heights 2nd Filing, wanted to know how soon the work would start. Mrs. Robert Wooten, 3218 Northwest 30th Street, owner of Lot 1, Block 215, Rosen Heights 2nd Filing, asked about zoning. Unit 7, Northwest 29th Street; no questions. Unit 8, Northwest Loraine Street; Mrs. C. B. McWhirter, 3407 Northwest Loraine, owner of Lot 4, Block 224, Rosen Heights 2nd Filing, said that some of the property owners would rather have lay-down curb and gutter than driveways. Mr. Schmidt told her that City policy would not allow this. After a short general discussion the meeting was adjourned. I WM :• 47 • 26 II 3 Se Y /e - .ix<t f• Are KI. _ /O i W . /9 3 44 nnppnn rr D R 44 ai. 42 4/ da .39 JD J7 _3i 'd-••--•7 e-R-I • 2/ 2 ' ! s x+ +u. u e i `+. Ma.- .,'. 4.-..' .fes /1.. , A.19. e . # i • .� / <� / / / i .0" .P r ..49�/7 4 � � .ef R b + 111 /70 90 9O .006 <.r /4 44 ; A 17 is J ! Be 1ij, _ -_ 'BLACKS�'ONE DRIVE ' . . NJ., {>, .„505 T aA SEND 8-s7 66 43 j • 87 - o . R lvi C- 0 i,ff 30 1 i,, : CCPi / • \ U , 6S ' I 70 • 9i 89 yo 9/ N Z:315 A•. r ae-A 6 40 a - . I C :., / C Ni• O O ,n.. 'q /4 7l r ( I '. ., Sar a Q' Z r s0 G 549.4 t -- 1 a ` 4 -5.¢ 1), .. . W 72 O EI ➢o -s. ,sea i W w . t°. •Q W 3r 8311 e» K,♦ , C6.30- .e Z! ee' Ir I rn ' ow s 3. 4 • 62 Z! - BU • , r- - H a - Si-/AG I 37-8 _ _ 9a - 9v 4 98 -43.1-.r, r -_ . .--- > ' GI 74 • 82 1. �s Y ya-- m _ 0 9$ ��� A - . H 4 2 S12� Q • 9Z ss 60 7.3 B/ 0 60 Be = r O.'.\ • I s1 74 o BO : 'r' 011 ,° it-it: ,11 ee D - -- 1111 t o • .' •.5a , • .-6077 • ,. . 79 ` ifs° a0 + C 9-";^ 4 SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 2676 1251 963 1107 606 PER CENT 100.0 46.7 36.0 41.4 22.6 PARCELS OF PROPERTY 24 12 9 9 6 PER CENT 100.0 50.0 37.5p 37.5 25.o 8 NO. OF PROPERTY OWNERS 21 12 7 6 PER CENT 100.0 57.1 38.1 33.3 28.6 OWNERS LIVING ON STREET 14 10 6 4 4 PER CENT 100.0 71.4 42.8 28.6 28.6 OWNERS LIVING ELSEWHERE 7 2 2 3 2 PER CENT 100.0 28.5 28.6 42.8 28.6 Unit 1 - Blackstone Drive from Churchill Drive to Isbell Road • -- . ROAD ..���. /-----.7:44.1" .----' ..7., .1- ----""'Lr.Yr'''. .0r""" �. yl N .y@ N •••• f� �.., 4 a J 'f i«r 5,,,,,:l ri L' _ , ' W N to i s 4 •w :: ...1 o. .`Z as si '•BLACIf OAK r: „ C .r .•• 61 LANE BA/VKS Sr • s L+ ti n . ti \\; 4 N 4 I i. M a . ,:;.' \\ '. 41.ih' E 4 ,. �9 A� A i/T�L.s` j,. o I. P r1 wl R SPRINGER AVE ` Jr, )t Iti " ,. - •. •• NI I ,.,1 -. I ,` I ti 1 w 1 1 1 o. t I . I\ L. �I o : I ti I w w Cn 0, 4 Iw Iv I I I I SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 536 166 333 111 93 PER CENT 100.0 31.0 62.0 20.7 17.3 PARCELS OF PROPERTY 4 1 2 1 1 PER CENT 100.0 25.0 50.0 25.0 25.0 NO. OF PROPERTY OWNERS 4 1 2 1 1 PER CENT 100.0 25.0 50.0 25.0 25.0 OWNERS LIVING ON STREET 3 1 2 1 —O— PER CENT 100.0 33.3 66.7 33.3 OWNERS LIVING ELSEWHERE 1 —0— —0— —0— 1 PER CENT 100.0 -0- -0- -0- 100.0 Unit 2 - Tidwell Drive from Banks Street to Springer Street • Poi �� `� l 5 fG ,; .. s • Io c�FF� i 0 !' • s I SOT B. ! . I . / ./ 'i�`' ' T. i' .moi 1 CP N cy ' li,, 2o ...„. 0 � ,,,,, 0 x .�Hl�`_ or --______________:7 SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1749 1749 311 -0- 1438 PER CENT 100.0 100.0 17.8 82.2 PARCELS OF PROPERTY 10 10 3 -0- 7 PER CENT 100.0 100.0 30.0 70.0 NO. OF PROPERTY OWNERS 7 7 3 -0- 4 PER CENT 100.0 100.0 42.9 57.1 OWNERS LIVING ON STREET 4 4 2 -0_ 2 PER CENT 100.0 100.0 50.0 50.0 OWNERS LIVING ELSEWHERE 3 3 1 -0- 2 PER CENT 100.0 100.0 33.3 66.7 Unit 3, Quail Trail from Shenna Boulevard to Ohio Garden Road • A____ 1 ° ...00/Y/SL ANO .fT.CEET ti 'J ,e $ h v :r g 'z r ,fi _II' _ !Y- 1 L „ `.' 01.1.. j 'c 6 } r. � ' , / �5, ___ la to s 40 S 4.0 W J W 4, rt 1 k r. 1 II CJ 2 a....1a....11 t �+ de.32__7 ._____ ___.` / ; t0 / t4 ,Or �, /Pi%v / /�'/ _",�'ROSINSON_ __ T.C�EET iso — , .� ,! .1 c` ^ '3 r, a co n so ;J7' r _ ,a 73 ,O ,5 ,o ,3 ,f 9 74 9 i4 fl .c ,7 1 ,7 g _ .e 7 SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 560 280 280 PER CENT 100.0 50.0 50.0 W PARCELS OF PROPERTY 4 > 2 2 —O— PER CENT 100.0 cn 50.0 50.0 NO. OF PROPERTY OWNERS 4 2 2 PER CENT 100.0 50.0 50.0 a OWNERS LIVING ON STREET 4 133.1 2 2 —A— PER CENT 100.0 50.0 50.0 OWNERS LIVING ELSEWHERE —0 PER CENT Unit 4 - Robinson Street, from NW. 23rd Street to NW. 24th Street eeOC/Y/SL ANO J7eetrr q ''7 I ..,en /J it + j�/V7- r I __-.�. I /I / / 'I V I v/ 'I a .4 // .c rs ` s 9. 9� -� k A - \ -.dr fkk ..0. i f ..4p -8 , , '9 I '9 i! f- 9 _—. `___� to l J JO J \ 4.03 ` to 3 .9/ i a J/ I r/ 1 1, i .--..- e Jr J x 111 ~ r — r: r rJ eMEI r 4%5 -.. r< / I ea 1 / I rs IIII " 40 .19 Jeo 1.'6O s0 - F l✓ 9 ea:VA/SON s .. �� ler v.." f � j � 4, or r- /4 // .4 // j4 // 41.1‘,4 1' /J /p /1 /O /J /o /S /t7 /i 9 /L 9 /9 9 /c 9 J /7 1 /7 B /7 I /7 S .e - — 7 I _ -- 'e _ 7 L 9 SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1120 -0- 840 280 PER CENT 100.0 75.0 25.0 'J+ W PARCELS OF PROPERTY 8 > -0- 6 2 PER CENT 100.0 cn 75.0 25.0 NO. OF PROPERTY OWNERS 8 2 -0- 6 2 PER CENT 100.0 0 75.0 25.0 a I-1 OWNERS LIVING ON STREET 6 a -0- 4 2 PER CENT 100.0 66.7 33.3 OWNERS LIVING ELSEWHERE 2 -0- 2 44).' PER CENT 100.0 100.0 Unit 5 - Robinson Street from NW. 24th Street to NW. 26th Street Cee T Ni•• ed, No• oi oda . ,J yc. -r _ oJ , s I .e /3 io , oil 9 .e /7 l /7 • /7 / .,7 i J^1 i iii 7 i/ V 14 // •7 �� �/ 2k/el ; /S ;-- {I 2✓611/4 .-- W] k. iD 5 /9 G /9 G • 9 y y y `1 - .to cn co J co J 20 S j I/ I .0 z/ Os i•1 N N0 iJ r S M t2 .. ! z2 J M re J W •i :i R 1-1 - R Vt h1 8 r/ to / :, zo / i� ii R 104 i 7 g ':.; ,,, ;I Ai, :?, ,.., 4. ; g ,J .,‘ `,•' i I 5 • '.'t /2 C 10CII STREET - f - -ti. „ /J /o /J /o /5 no '' _./A s i K 9 /c g -' /.' 9 y /i ♦7 • /7 / /7 • 7 } 7 ,/ 7 / 7 r ' /'P o ' a L is r /' ' IV /'ar-2-- --- /g/ - SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 2300 1540 840 480 980 PER CENT 100.0 67.0 36.5 20.9 42.7 PARCELS OF PROPERTY 16 11 6 3 7 PER CENT 100.0 68.8 37.5 18.8 43.7 NO. OF PROPERTY OWNERS 16 11 6 3 7 PER CENT 100.0 68.8 37.5 18.8 43.7 OWNERS LIVING ON STREET 9 7 4 -0- 5 PER CENT 100.0 77.8 44.4 55.6 OWNERS LIVING ELSEWHERE 7 2 2 3 2 PER CENT 100.0 28.6 28.6 42.8 28.6 Unit 6 - McCandless Street from NW. Loraine Street to NW. 32nd Street +T 5sc 0\4' s U 5 2' 3 �" — -S crl 21 a si . t1 I---- .G r/ 4 z i,, tt 2 Q 22. 3 _ U\ 22 s O rt 9 25 2 23 2 OJ t) �_- _ 2J r 241 24 24 i / % ., e4 TITUS STREET cerT .�. _ - ' A, a i0 J .IO II .../ •I 1/ % \de .o/ 4... ,J, . io ^/ IS eo K 9 If 9 \\I ` If J` 9 If 9 07 I e7 • �1 \ 17 J • i1 li • `1 .: 4. .9 �/.}— c l4 ` cZ✓S . gc c/67{. '9 G ` 19 G \I: /9 G to J yro a 1 eo Jro S ft:f `1/ a r/ • % ,1\ rI IrI t.Il{•i.. '`l I. { a ./.`1l ' , r2 ...yr .". ! \.` rr J M \et I ,9 .._.I :: L..:'.:. ......:... I t r' e \ . t3 j 2t�.. t 1J 2 rd r 2 9 ti / g r ' F . 4 .40 ,•o a O ` ,� 44 ,i. 7 is i> �j `�!'- IcCANDLESS ✓ST.CEET SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1200 900 450 50 700 PER CENT 100.0 75.0 37.5 4.2 58.3 PARCELS OF PROPERTY 19 13 8 1 10 PER CENT 100.0 68.4 42.1 5.3 52.6 NO. OF PROPERTY OWNERS 18 13 8 1 9 PER CENT 100.0 68.4 42.1 5.3 52.6 OWNERS LIVING ON STREET 12 10 7 -0- 5 PER CENT 100.0 83.3 58.3 41.7 OWNERS LIVING ELSEWHERE 6 3 1 1 4 PER CENT 100.0 50.0 16.7 16.7 66.6 Unit 7, NW. 29th Street, from McCandless Street to Titus Street co— .g I. iso a N '-'� 5 aI F s s ^' • N a v� Ls — N ✓ O I. 0 cn nee2 r NW LORA INE �°I / iii`s>.„''" 3• _ ' M , _�' / / /�ffi i f-.0 �' la.s S? is ,1 So Sc •H = z 4 �s NN _ b � V w 4°t I"'I P ✓ N N O a a J Q� N ♦ ✓ o ma � e!'. � p 19 d 1H w yr . sz P. CrJ I „ N V n N o .p - - • y p� .J a - N r � N to I. N _- 1I reEET s NW 29T” STREET s S7. I ,e i i ,e i ,z V w W 4 l ,.r N N N N /�'��r / ^O ✓ N O a 3 F N O V'S o N V p ' J O J ,"........4.., I I11 � o.-1..� act n, 1 . , ♦ u n v q ' b o 1 s � ti, I�. I ti 4 1 ♦ , q I �� I SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1200 750 250 300 650 PER CENT 100.0 62.5 20.8 25.0 54.2 PARCELS OF PROPERTY 18 11 4 3 11 PER CENT 100.0 61.1 22.2 16.7 61. 1 NO. OF PROPERTY OWNERS 18 11 4 3 11 PER CENT 100.0 61.1 22.2 16.7 61.1 OWNERS LIVING ON STREET 11 8 3 2 6 PER CENT 100.0 72.7 27.3 18.2 54.5 OWNERS LIVING ELSEWHERE 7 3 1 1 5 PER CENT 100.0 42.9 14.3 14.3 71.4 Unit 8, NWS Loraine Street from Titus Street to Sherman Street FORT WORTH, TEXAS , 19 TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS. Gentlemen: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below: Estimates of the total coat of improvements on a portion of Blackstone Drive and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit: Project No. 104-24000-198, Unit 1, Blackstone Drive from Churchill Drive to Isbell Road, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by con- structing six-inch thick concrete driveways and four-foot wide concrete sidewalks where specified . The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) $2.96/ L.F. Seven-inch curb and eighteen inch gutter 2.44/ L.F. Four-foot wide concrete sidewalk 2.67/ L.F. Six-inch thick concrete driveways .80/ Sq. Ft. The assessments result in the following division of costs TOTAL COST TO PROPERTY OWNERS $18,703.25 TOTAL COST TO CITY OF FORT WORTH 18,525.98 TOTAL ESTIMATED CONSTRUCTION COST $37,229.23 Project No. 104-24u00-198, Unit 2, Tidwell Drive from Banks Street to Springer Street, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified . The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) $2.96/ L.F. (Residential Zoning less .27 credit) 2.69/ L.F. Seven-inch curb and eighteen inch gutter 2.44/ L.F. Eighteen inch gutter only 1 22/ L.F. Six-inch thick concrete driveways 80/ Sq. Ft. The assessments result in the following division of costs: TOTAL COST TO PROPERTY OWNERS $1,805.49 TOTAL COST TO CITY OF FORT WORTH 6,669.19 TOTAL ESTIMATED CONSTRUCTION COST $8,474.68 Project No. 104-24000-198, Unit 3, Quail Trail froin Shenna Boulevard to Ohio Garden Road , to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen- inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick driveways where specified. The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) $2.96/ L.F. Seven-inch curb and eighteen inch gutter 2.44/ L.F. Six-inch thick concrete driveways 80/ Sq. Ft. The assessments result in the following division of costs: TOTAL COST TO PROPERTY OWNERS $ 9,360.46 TOTAL COST TO CITY OF FORT WORTH 10,365.02 TOTAL ESTIMATED CONSTRUCTION COST $19,725.48 Project No. 104-24000-198, Unit 4, Robinson Street from NW. 23rd Street to NW. 24th Street, to be improved by constructing a seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by con- structing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. The following assessment rates have been established : Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) $2 96/ L.F. Seven-inch curb and eighteen inch gutter 2.44/ L.F. Four-foot wide concrete sidewalk 2.67/ L.F. Six-inch thick concrete driveways .80/ Sq. Ft. The assessments result in the following division of costs: TOTAL COST TO PROPERTY OWNERS $ 3,332.41 TOTAL COST TO CITY OF FORT WORTH 5,562.19 TOTAL ESTIMATED CONSTRUCTION COST $ 8,894.60 Project No. 104-24000-198, Unit 5, Robinson Street from NW. 24th Street to NW. 26th Street, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by con- structing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) $2.96/ L.F. Seven-inch curb and eighteen inch gutter 2 44/ L.F. Four-foot wide concrete sidewalk 2.67/ L.F. Six-inch wide concrete driveways 80/ Sq. Ft. The assessments result in the following division of costs: TOTAL COST TO PROPERTY OWNERS $ 7,490.23 TOTAL COST TO CITY OF FORT WORTH 13,876.72 TOTAL ESTIMATED CONSTRUCTION COST $21,366.95 Project No. 104-24000-198, Unit 6, McCandless Street from NW. Loraine Street to NW. 32nd Street, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high curb and eighteen inch con- crete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement (Commercial Zoning) $5.64/ L.F. (Commercial Zoning less owner occupied credit) 4 30/ L.F. (Residential Zoning) 2.96/ L.F. Seven-inch curb and eighteen inch gutter 2.44/ L.F. Four-foot wide concrete sidewalk 2.67/ L.F. Six-inch thick concrete driveway .80/ Sq. Ft. The assessments result in the following division of costs: TOTAL COST TO PROPERTY OWNERS $12,486.20 TOTAL COST TO CITY OF FORT WORTH 21,033.55 TOTAL ESTIMATED CONSTRUCTION COST $33,519.75 Project No. 104-24000-198, Unit 7, NW. 29th Street from McCandless Street to Titus Street, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by con- structing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) $2 96/ L.F. Seven-inch curb and eighteen inch gutter 2.44/ L.F. Four-foot wide concrete sidewalk 2.67/ L.F. Six-inch thick concrete driveways . . . .80/ Sq. Ft. The assessments result in the following division of costs: TOTAL COST TO PROPERTY OWNERS $ 7,691.00 TOTAL COST TO CITY OF FORT WORTH 7,356.45 TOTAL ESTIMATED CONSTRUCTION COST $15,047.45 Project No. 104-24000-198, Unit 8, NW. Loraine Street froij Titus Street to Sherman Street, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by con- structing six-inch thick concrete driveways where specified. The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) $2.96/ L.F . Seven-inch curb and eighteen inch gutter 2.44/L.F. Six-inch thick concrete driveways .80/ Sq. Ft. The assessments result in the following division of costs: TOTAL COST TO PROPERTY OWNERS $ 7,752.80 TOTAL COST TO CITY OF FORT WORTH 8,930.90 TOTAL ESTIMATED CONSTRUCTION COST $16,683.70 PROJECT NO. 104-24000-198. UNIT 1 BLACKSTONE DRIVE FROM CHURCHILL DRIVE TO ISBELL ROAD, to be improved by constricting a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF BLACKSTONE DRIVE AND CHURCHILL ROAD NORTH SIDE OF STREET CHURCHILL GARDENS W. F. Minze 7 _ 175.8' Side Lot Adjusted to 304 Churchill Road Res. 100' Pavement $2.96 $296.00 100° Curb & Gutter 2.44 244.00 175.8' Sidewalk 2.67 469.39 $1,009.39 H. B. Nettleton 8-R-1 & 8-R-2 197.7° Side Lot Adjusted to 301 Byron Res. 83'Pavement $2.96 $245.68 83' Curb & Gutter 2.44 202.52 155.7' Sidewalk 2.67 415.72 85 Sq. Ft. Drive .80 68.00 $ 931.92 BYRON STREET INTERSECTS C. W. Cole W. 95' of 21 95° Adjusted to 1103 Yale Res. 90' Pavement $2.96 $266.40 90' Curb & Gutter 2.44 219.60 90' Sidewalk 2.67 240.30 $ 726.30 B. R. Porter E. 55' of 21 55' Pavement $2.96 $162.80 4608 Blackstone Res. 55° Curb & Gutter 2.44 134.20 44' Sidewalk 2.67 117.48 85 Sq. Ft. Driveway.80 68.00 $ 482.48 BROOKSIDE ACRES ADDITION Gertrude R. Kuban 45 72.8° Pavement $2.96 $215.49 3913 Golden Oaks Drive Res. 62.8' Curb & Gutter2.44 153.23 61.8' Sidewalk 2.67 165.01 85 Sq. Ft. Drivaaay.80 68.00 $ 601.73 1 PROJECT NO. 104-24000-198, UNIT 1, BLACKSTONE DRIVE FROM CHURCHILL DRIVE TO ISBELL ROAD - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT PALMETTO DRIVE INTERSECTS BROOKSIDE ACRES ADDITION NORTH SIDE OF STREET C. T Cowley 44 80' Pavement $2.96 $236.80 7804 Rockdale Road Res. 70 ' Curb & Gutter 2.44 170.80 69' Sidewalk 2.67 184.23 85 Sq. Ft. Driveway.80 68.00 $ 659.83 Mrs. Jean Conkin & 43 80' Pavement $2.96 $236.80 Mrs. Lois Milner Res. 80 ' Curb & Gutter 2.44 195.20 4532 Blackstone 69 ' Sidewalk 2.67 184.23 85 Sq. Ft. Driveway.80 68.00 $ 684.23 R. C. Dragoo 42 80' Pavement $2.96 $236.80 1061 W. Rosedale Res. 80° Curb & Gutter 2.44 195.20 69' Sidewalk 2.67 184.23 85 Sq. Ft. Driveway.80 68.00 $ 684.23 V. W. Smith 41 80' Pavement $2.96 $236.80 4528 Blackstone " Res. 80' Curb & Gutter 2.44 195.20 69' Sidewalk 2.67 184.23 85 Sq. Ft. Driveway.80 68.00 $ 684.23 Brookside Assembly 40 80' Pavement $2.96 $236.80 of God Church Res. 80° Curb & Gutter 2.44 195.20 4526 Blackstone 80° Sidewalk 2.67 213.60 $ 645.60 Elizabeth Wells 39 80' Pavement $2.96 $236.80 321 Churchill Road Res. 80' Curb & Gutter 2.44 195.20 69' Sidewalk 2.67 184.23 85 Sq. Ft. Driveway.80 68.00 $ 684.23 2 PROJECT NO. 104-24000-198, UNIT 1, BLACKSTONE DRIVE FROM CHURCHILL DRIVE TO ISBELL ROAD - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET BROOKSIDE ACRES ADDITION Pearl S. Powell 38 80' Pavement $2.96 $236.80 4512 Blackstone Res. 80' Curb & Gutter 2.44 195.20 69' Sidewalk 2.67 184.23 85 Sq. Ft. Driveway .80 68.00 $ 684.23 F. L. Wyatt 37 80' Pavement $2.96 $236.80 4510 Blackstone Res. 80' Curb & Gutter 2.44 195.20 69' Sidewalk 2.67 184.23 85 Sq. Ft. Drive .80 68.00 $ 684.23 Clarence B. Green 36 97.4' Pavement $2.96 $288.30 301 Isbell Road Res. 97.4' Curb & Gtr. 2.44 237.66 79.4' Sidewalk 2.67 212.00 140 Sq. Ft. Drive .80 112.00 $ 849.96 ISBELL ROAD INTERSECTS SOUTH SIDE OF STREET J. WATSON SURVEY 504.2 Adjusted to Jay Watts Tract 2-C _ 404.2' Pavement $2.96 $1,196.42 209 Isbell Road & Lots Res. 389.2' Curb & Gtr. 2.44 949.65 90 & 91 504.2' Sidewalk 2.67 1,346.21 $3,492.28 BROOKSIDE ACRES ADDITION A. F. Wiggins 89 90' Pavement $2.96 $266.40 4531 Blackstone Dr. Res. 90' Curb & Gtr. 2.44 219.60 68' Sidewalk 2.67 181.56 171 Sq. Ft. Drive .80 136.80 $ 804.36 3 TOTAL ESTIMATED CONSTRUCTION COST $37,229.23 4 PROJECT NO. 104-24000-198, UNIT 2, TIDWELL DRIVE FROM BANKS STREET TO SPRINGER STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide con- crete gutter, so that the finished roadway will be thirty feet wide and by constructing six- inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE INTERSECTION OF BANKS STREET AND TIDWELL DRIVE NORTH SIDE OF STREET TIDWELL SUBDIVISION Arthur L. Gresham 31 111' Side Lot Adjusted to 1016 Banks Res. 100' Pavement $2.69 $269.00 93' Gutter Only 1.22 113.46 140' Sq. Ft. Drive .80 112.00 $ 494.46 Miss Gladys E. Kay 10 166.3' Side Lot Adjusted to 1017 Springer Res. 100' Pavement $2.96 $296.00 $ 296.00 SPRINGER STREET INTERSECTS TIDWELL SUBDIVISION �p SOUTH SIDE OF STREET ) M. L. Swaim 11 166.3' Side Lot Adjusted to 1009 Springer Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 $ 540.00 WESTSIDE ACRES FHA 49 270233 2 D 92.6' Pavement $2.69 $249.09 Asst. Commissioner Res. 92.6' Curb & Gutter 2.44 225.94 Washington, 25, D. C. $ 475.03 TOTAL COST TO PROPERTY OWNERS $1,805.49 TOTAL COST TO CITY OF FORT WORTH . . . . 6,669. 19 TOTAL ESTIMATED CONSTRUCTION COST $8,474.69 5 PROJECT NO. 104-24000-198. UNIT 3. QUAIL TRAIL FROM SHENNA BOULEVARD TO OHIO GARDEN ROAD, to be improved by constructing a seven-inch thick hot-mix asphaltic concrete pavement on a six- inch thick cement subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick driveways where specified, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE INTERSECTION OF QUAIL TRAIL AND SHENNA BOULEVARD NORTH SIDE OF STREET ROCKWOOD TERRACE THIRD FILING N. E. Dennington 9 15 145' Pavement $2.96 $429.20 1300 Quail Trail Res. 145° Curb & Gutter 2.44 353.80 85 Sq. Ft. Driveway.80 68.00 $ 851.00 J. E. Scarborough 10 15 110° Pavement $2.96 $325.60 c/o Southland Life Res. 110° Curb & Gutter 2.44 268.40 901 Summit 140 Sq. Ft. Driveway.80 112.00 $ 706.00 Floyd Eagan 11 15 121' Pavement $2.96 $358.16 4520 White Oak Lane Res. 121' Curb & Gutter 2.44 295.24 $ 653.40 Charles D. McClafin 12-A & 12-B 15 249° Pavement $2.96 $737.00 704 Roberts Cut-Off Res. 249' Curb & Gutter 2.44 607.56 $1,344.56 Leon Mahan 12-C 15 224.5° Pavement $2.96 $664.52 1304 Park Avenue Res. 224.5' Curb & Gutter2.44 547.78 $1,212.30 SOUTH SIDE OF STREET ROCKWOOD TERRACE 819.1' Adjusted Elton I. Burks 1, 2, & 3 20 758 ' Pavement $2.96 $2,243.68 1227 Ohio Garden Road Res. 758 ' Curb & Gutter 2.44 1,849.52 85 Sq. Ft. Driveway.80 b6.00 $4,161.20 6 PROJECT NO. 104-24000-198, UNIT 3. QUAIL TRAIL FROM SHENNA BOULEVARD TO OHIO GARDEN ROAD - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET FAIR HILLS ADDITION John B.Honts 4 20 80' Pavement $2.96 $236.80 1225 Ohio Garden Road Res. 80' Curb & Gutter 2.44 195.20 $ 432.00 TOTAL COST TO PROPERTY OWNERS -$ 9,36&.46 TOTAL COST TO CITY OF FORT WORTH 102365.32 TOTAL ESTIMATED CONSTRUCTION COST $19,725.78 7 PROJECT NO. 104-24000-198, UNIT 4, ROBINSON STREET FROM NW. 23rd STREET to NW. 24th STREET, to be improved by constructing a seven-inch thick hot-mix asphaltic concrete pavement ona six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by con- structing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF NW. 23rd* AND ROBINSON STREET NORTH SIDE OF STREET ROSEN HEIGHTS SECOND FILING Leon Friedman 24 177 140' Adjusted to 4107 Columbia Res. 100' Pavement $2.96 $296.00 Texarkana, Texas 100' Curb & Gutter 2.44 244,00 140' Sidewalk 2.67 373.80 $ 913.80 W. C Saunders 1 177 140 ' Adjusted to 3101 NW 24th Res. 100° Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 129' Sidewalk 2.67 344.43 85 Sq. Ft. Drive .80 68.00 $ 952.43 NW. 24TH STREET INTERSECTS SOUTH SIDE OF STREET Salvation Army 12 168 140° Adjusted to c/o S/Capt. J. R. Tritton Res. 100' Pavement $2.96 $296.00 920 Monroe 40° Curb & Gutter 2.44 97.60 45' Sidewalk 2.67 120.15 $513.75 Mrs_ Mollie Walker 13 168 140' Adjusted to 3022 NW. 23rd Res. 100° Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 129° Sidewalk 2.67 344.43 85 Sq. Ft. Driveway.80 68.00 $ 952.43 TOTAL COST TO PROPERTY OWNERS $3,332.41 TOTAL COST TO CITY OF FORT WORTH 5,562.19 TOTAL ESTIMATED CONSTRUCTION COST $8,894.60 8 PROJECT NO. 104-24000-198, UNIT 5, ROBINSON STREET FROM NW. 24th STREET TO NW. 26TH STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four foot wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF NW. 24th STREET AND ROBINSON NORTH SIDE OF STREET ROSEN HEIGHTS SECOND FILING Mary Lou Kemp 24 178 140' Adjusted to 3006 NW. 24th Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 129' Sidewalk 2.67 344.43 85 Sq. Ft. Driveway.80 68.00 $ 952.43 Orville T. Gillispie 1 178 140' Adjusted to 3101 NW. 25th Res. 100' Pavement $2.96 $296.00 1001 Curb & Gutter 2.44 244.00 129' Sidewalk 2.67 344.43 85 Sq. Ft. Driveway.80 68.00 $ 952.43 NW. TWENTY-FIFTH STREET INTERSECTS Curtis Young 24 179 140' Adjusted to 1301 Grand Avenue Res. 100° Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 122' Sidewalk 2.67 325.74 140 Sq. Ft. Driveway.80 112.00 $ 977.74 W. B. McLeod, Sr. 1 179 140' Adjusted to 3103 NW. 26th Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 140' Sidewalk 2.67 373.80 $ 913.80 NW. 26th STREET INTERSECTS SOUTH SIDE OF STREET Roy D. Rodden 12 166 140° Adjusted to 3023 NW. 26th Res. 100' Pavement $2.96 $296.00 100° Curb & Gutter 2.44 244.00 140' Sidewalk 2.67 373.80 $ 913.80 9 PROJECT NO. 104-24000-198, UNIT 5, ROBINSON STREET FROM NW. 24TH STREET TO NW. 26TH STREET- CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET ROSEN HEIGHTS SECOND FILING Claude & Mrs. Everett Smith 166 140' Adjusted to 3020 NW. 25th 13 Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 140' Sidewalk 2.67 373.8n $913.80 Joseph Fewell 12 167 140' Adjusted to 3023 NW. 25th Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 140' Sidewalk 2.67 373.80 $913.80 I. A. Dingier 13 167 140' Adjusted to 2709 Rosen Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 129' Sidewalk 2.67 344.43 85 Sq. Ft. Drive .80 68.00 $952.43 TOTAL COST TO PROPERTY OWNERS $ 7,490.23 TOTAL COST TO CITY OF FORT WORTH 13,876.72 TOTAL ESTIMATED CONSTRUCTION COST $21,366.95 10 PROJECT NO. 104-24000-198, UNIT 6, McCANDLESS STREET FROM NORTHWEST LORAINE TO NORTHWEST 32nd STREET. to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high curb and eighteen-inch concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF McCANDLESS STREET AND NW LORAINE NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING W. A. Rutherford 24 214 140° Adjusted to 3300 W. Loraine Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 118 Sq. Ft. Drive .80 94.40 $ 634.40 George Germain 1 214 140' Adjusted to 3301 NW 29th Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 118 Sq. Ft. Drive .80 94.40 $ 634.40 NW 29th STREET INTERSECTS Tabernacle Baptist 24 215 140' Adjusted to Church Res. 100' Pavement $2.96 $296.00 3300 NW 29th St. 100' Curb & Gutter 2.44 244.00 140' Sidewalk 2.67 373.80 $ 913.80 Robert Wooten 1 215 140' Pavement $5.64 $789.60 3218 NW 30th Comm. 140' Curb & Gutter 2.44 341.60 118 Sq. Ft. Drive .80 94.40 $1,225.60 NW 30th STREET INTERSECTS Mrs. John Dickey 24 216 140' Pavement $5.64 $789.60 3016 Conejos Drive Comm. 140' Curb & Gutter 2.44 341.60 $1,131.20 11 PROJECT NO. 104-24000-198, UNIT 6, McCANDLESS STREET FROM NORTHWEST LORAINE TO NORTHWEST 32nd STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING Morris E. Thomason 1 216 140' Adjusted to 3301 NW 31st Res. 100' Pavement $2.96 $296.00 100° Curb & Gutter 2.44 244.00 118 Sq. Ft. Drive .80 94.40 $ 634.40 NW 31st STREET INTERSECTS G. R. Gordon 24 217 140° Adjusted to Rt. 8, Box 681-H Res. 100° Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 118 Sq. Ft. Drive .80 94.40 $ 634.40 Rosen & Rosen Tract C 200' Pavement $2.96 $592.00 P.O. Box 4454 Res. 200' Curb & Gtr. 2.44 488.00 $1,080.00 NW 32nd STREET INTERSECTS C. H. Howell 12 190 140° Adjusted to 3223 NW 32nd Res. 100' Pavement $2.96 $296.00 100° Curb & Gtr. 2.44 244.00 $ 540.00 W. D. Tallant 13 190 140' Adjusted to 3224 NW 31st Res. 100' Pavement $2.96 $296.00 100' Curb & Gtr. 2.44 244.00 $ 540.00 NW 31st STREET INTERSECTS H. L. Krantz 12 191 140° Adjusted to 4419 Wichita Res. 100° Pavement $2.96 $296.00 100' Curb & Gtr, 2.44 244.00 118 Sq. Ft. Drive .80 94.40 $ 634.40 12 PROJECT NO. 104-24000-198, UNIT 6, McCANDLESS STREET FROM NORTHWEST LORAINE TO NORTHWEST 32nd STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING Paul Howell 13 191 140° Pavement $5.64 $789.60 2122 Loving Comm. 140° Curb & Gtr, 2.44 341.60 $1,131.20 NW 30th STREET INTERSECTS E. C. Underwood 12 192 140° Pavement $4.30 $602.00 3223 NW 30th Comm. 140° Curb & Gtr. 2.44 341.60 $ 943.60 W. M. Clark 13 192 140° Adjusted to 3222 NW 29th Res. 100° Pavement $2.96 $296.00 100° Curb & Gtr. 2.44 244.00 118 Sq. Ft. Drive .80 94.40 $ 634.40 NW 29th STREET INTERSECTS A. P. Ticknor 12 193 140° Adjusted to 2013 Rockridge Res. 100° Pavement $2.96 $296.00 100° Curb & Gtr, 2.44 244.00 118 Sq. Ft. Drive .80 94.40 $ 634.40 Ed Rhody 13 193 140° Adjusted to 3iPt• NW Loraine Res. 100° Pavement $2.96 $296.00 100° Curb & Gtr. 2.44 244.00 $ 540.00 TOTAL COST TO PROPERTY OWNERS $12,486.20 TOTAL COST TO CITY OF FORT WORTH . . . $21,033.55 TOTAL ESTIMATED CONSTRUCTION COST . . . $33,519.75 13 PROJECT NO. 104-24000-198, UNIT 7, 29th STREET FROM McCANDLESS STREET TO TITUS AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide con- crete gutter so that the finished roadway will be thirty feet wide and by constructing six- inch thick concrete driveways and four-foot wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF NW 29th STREET AND McCANDLESS STREET SOUTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING George Germain 1 & 214 100° Pavement $2.96 $296.00 3301 NW 29th 2 Res. 100' Curb & Gtr, 2.44 244.00 $540.00 Lavernc Boolen 3 214 50' Pavement $2.96 $148.00 3315 NW 29th Res. 50° Curb & Gtr. 2.44 122.00 $270.00 Bert M. Lambert 4 214 50' Pavement $2.96 $148.00 1609 Norman Res. 50° Curb & Gtr. 2.44 122.00 $270.00 Etta May Johnson 5 214 50' Pavement $2.96 $148.00 3309 NW 29th Res. 50° Curb & Gtr. 2.44 122.00 $270.00 H. R. York 6 & 214 100° Pavement $2.96 $296.00 316 Bailey 7 Res. 100° Curb & Gtr. 2.44 244.00 Suite 112 $540.00 Ace Connell 8 214 50° Pavement $2.96 $148.00 3315 NW 29th Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 14 PROJECT NO. 104-24000-198, UNIT 7, 29th STREET FROM McCANDLESS STREET TO TITUS AVENUE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING W. E. Hill 9 214 50' Pavement $2.96 $148.00 3317 NW 29th Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 James E. Collins 10 214 50' Pavement $2.96 $148.00 253 Spreading Oak Res. 50' Curb & Gtr. 2.44 122.00 Houston, Texas 70022 118 Sq. Ft. Drive .80 94.40 $364.40 Frank A. Blair 11 214 50' Pavement $2.96 $148.00 3321 NW 29th Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 Orville S. Looper 12 214 50' Pavement $2.96 $148.00 3323 NW 29th Res. 50' Curb & Gtr. 2.44 122.00 $270.00 TITUS STREET INTERSECTS NORTH SIDE OF STREET Odell Carver 13 215 50' Pavement $2.96 $148.00 3322 NW 29th Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 Sally Harris 14 215 50' Pavement $2.96 $148.00 3720 Earle Drive Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 15 PROJECT NO. 104-24000-198, UNIT 7, 29th STREET FROM McCANDLESS STREET TO TITUS AVENUE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING Alvie T. Stegall 15 215 50' Pavement $2.96 $148.00 3316 NW 29th Res. 50' Curb & Gtr. 2.44 122.00 $270.00 Thelma Epp Stegall 16 215 50' Pavement $2.96 $148.00 3316 NW 29th Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 W. D. Andrews 17 215 50' Pavement $2.96 $148.00 3310 NW 29th Res. 50' Curb & Gtr. 2.44 122.00 $270.00 W. D. Andrews 18, 19 215 150' Pavement $2.96 $444.00 3310 NW 29th & 20 Res. 150' Curb & Gtr. 2.44 366.00 118 Sq. Ft. Drive .80 94.40 $904.40 Midway Savings Assn. 21 215 50' Pavement $2.96 $148.00 P.O. Box 869 Res. 50' Curb & Gtr. 2.44 122.00 Arlington, Texas 118 Sq. Ft. Drive .80 94.40 $364.40 Arlington Savings 22 215 50' Pavement $2.96 $148.00 Association Res. 50' Curb & Gtr. 2.44 122.00 P.O. Box 869 118 Sq. Ft. Drive .80 94.40 Arlington, Texas $364.40 16 PROJECT NO. 104-24000-198, UNIT 7, 29th STREET FROM McCANDLESS STREET TO TITUS AVENUE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING Tabernacle Baptist 23 & 215 100' Pavement $2.96 $296.00 Church 24 Res. 100' Curb & Gtr. 2.44 244.00 3300 NW 29th 100' Sidewalk 2.67 267.00 $807.00 TOTAL COST TO PROPERTY OWNERS $ 7,691.00 TOTAL COST TO CITY OF FORT WORTH . . . . $ 7,356.45 TOTAL ESTIMATED CONSTRUCTION COST . . . $15,047.45 17 PROJECT NO. 104-24000-198, UNIT 8, NORTHWEST LORAINE STREET FROM TITUS AVENUE TO SHERMAN AVENUE, to be improved by constructing six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen- inch wide concrete gutter so that the finished roadway will be thirty feet wide and by con- structing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING BEGINNING AT THE SOUTHWEST CORNER OF TITUS AVENUE AND NW LORAINE STREET Louise Watson 1 & 224 100' Pavement $2.96 $296.00 3305 NW Loraine 2 Res. 100' Curb & Gtr. 2.44 244.00 $540.00 Jesse Smith 3 224 50' Pavement $2.96 $148.00 3204 Prospect Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 C. B. McWhirter 4 224 50' Pavement $2.96 $148.00 3407 NW Loraine Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 Johnson-Campbell 5 224 50' Pavement $2.96 $148.00 Lumber Co. Res. 50' Curb & Gtr. 2.44 122.00 P.O. Box 10248 118 Sq. Ft. Drive .80 94.40 $364.40 World Baptist 6 224 50' Pavement $2.96 $148.00 Fellowship Res. 50' Curb & Gtr. 2.44 122.00 3001 W. Division 118 Sq. Ft. Drive .80 94.40 Arlington, Texas $364.40 18 PROJECT NO. 104-24000-198, UNIT 8, NORTHWEST LORAINE STREET FROM TITUS AVENUE TO SHERMAN AVENUE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING Eldon Beam 7 224 50' Pavement $2.96 $148.00 3413 NW Loraine Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 J. A. Clark 8 224 50' Pavement $2.96 $148.00 3415 NW Loraine Res. 50' Curb & Gtr. 2.44 $122.00 $270.00 W. L. Sisk 9 224 50' Pavement $2.96 $148.00 1403 Sloan Street Res. 50' Curb & Gtr. 2.44 122.00 Weatherford, Texas 118 Sq. Ft. Drive .80 94.40 $364.40 M. W. Sturdivant 10, 11 224 150' Pavement $2.96 $444.00 3423 NW Loraine & 12 Res. 140' Curb & Gtr. 2.44 341.60 $785.60 SHERMAN AVENUE INTERSECTS NORTH SIDE OF STREET Mrs. R. Long 13 & 223 100' Pavement $2.96 $296.00 3307 NW Loraine 14 Res. 100' Curb & Gtr. 2.44 244.00 $540.00 I. C. Canup 15 & 223 100' Pavement $2.96 $296.00 3416 NW Loraine 16 Res. 90' Curb & Gtr. 2.44 219.60 118 Sq. Ft. Drive .80 94.40 $610.00 19 PROJECT NO. 104-24000-198, UNYT 81 NORTHWEST LORAINE STREET FROM TITUS AVENUE TO SHERMAN AVENUE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING J. W. Barnes 17 223 50' Pavement $2.96 $148.00 c/o H. R. York Res. 50' Curb & Gtr. 2.44 122.00 Investment Co. 118 Sq. Ft. Drive .80 94.40 316 Bailey $364.40 J. C. Uselton 18 223 50' Pavement $2.96 $148.00 c/o Midway Savings Res. 50' Curb & Gtr. 2.44 122.00 Arlington, Texas 118 Sq. Ft. Drive .80 94.40 $364.40 J. T. Patman 19 223 50' Pavement $2.96 $148.00 2808 NW 30th Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 Ruth Whiteman 20 223 50' Pavement $2.96 $148.00 544 Brown Terrace Res. 50' Curb & Gtr. 2.44 122.00 Hurst, Texas 118 Sq. Ft. Drive .80 94.40 $364.40 Ray Fowler 21 223 50' Pavement $2.96 $148.00 3406 NW Loraine Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 Warren Myers 22 & 223 100' Pavement $2.96 $296.00 3404 NW Loraine 23 Res. 100' Crub & Gtr. 2.44 244.00 118 Sq. Ft. Drive .80 94.40 $634.40 20 PROJECT NO. 104-24000-198_, UNIT 8, NORTHWEST LORAINE STREET FROM TITUS AVENUE TO SHERMAN AVENUE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING Cal R. Rice 24 223 50' Pavement $2.96 $148.00 3400 NW Loraine Res. 50' Curb & Gtr. 2.44 122.00 118 Sq. Ft. Drive .80 94.40 $364.40 TOTAL COST TO PROPERTY OWNERS $ 7,752.80 TOTAL COST TO CITY OF FORT WORTH . . . $ 8,930.90 TOTAL ESTIMATED CONSTRUCTION COST . . . . $16,683.70 21 lk McMANANC ad of Fort ♦�' orth, T✓as lL LINE ///j �° and /� //7/// /� MORPHIS Mayor aU IVWV Council Communication R.a B. sss111��� DATE REFERS CE SUBJECT: Adjustment of Assessments for PAGE GRAHAM 5/11/70 Paving - 8 Locations on North- i of 2 G-1553 west Side, Unit 6 On March 9, 1970, the Benefit Hearing was closed and assessments levied for paving at 8 Locations on the Northwest Side, Project No. 104-24000-198, (M&C G-1516) . This project included properties along McCandless Street (Unit 6) , which at the time were zoned "E" Commercial, but were in the process of being re-zoned to "B" Two-Family, since the property was never used for commercial purposes. On April 6, 1970, the City Council adopted Ordinance No. 6274 changing the zon- ing of the following property from "E" Commercial to "B" Two-Family: Z-70-41 Lots 13 & 14, Block 191; Lots 11 & 12, Block 192; Lots 1 & 2, Block 215; Lots 23 & 24, Block 216, Rosen Heights, 2nd Filing (McCandless Street at NW 30th Street) Standard Assessment Policies Under standard street construction policies, property owners along McCandless Street were assessed as follows: North Side of Street Rosen Heights 2nd Filing Robert Wooten 1 215 140' Pavement $5.64 $789.60 3218 NW 30th Comm. 140' Curb & Gutter 2.44 341-60 118 Sq.Ft.Driveway .80 94.40 $1,225.60 NW 30th Street Intersects Mrs. John Dickey 24 216 140' Pavement $564 $789.60 3016 Conejos Drive Comm. 140' Curb & Gutter 2.44 341.60 $1,131.20 South Side of Street Paul Howell 13 191 140' Pavement $5.64 $789.60 2122 Loving Comm. 140' Curb & Gutter 2.44 341.60 $1,131.20 E. C. Underwood 12 192 140' Pavement *$4.30 $602.00 3223 NW 30th Comm. 140' Curb & Gutter 2.44 341.60 $ 943.60 Total $4,431.60 * Owner Occupied Re-evaluation of Enhancement Two of the lots affected by the zoning change are vacant and two contain dwell- ings, one of which is owner-occupied, and the change in zoning was in process at the time of the Benefit Hearing. The surrounding area is all residential. /Oak 41111b4 DATE REFERENCE SUBJECT: Adjustment of Assessments for PAGE NUMBER 5/11/70 Paving - 8 Locations on North- 2 2 G-1553 west Side, Unit 6 of Recommendations It is recommended that: 1) The assessments be reduced to residential rates as follows: North Side of Street Rosen Heights 2nd Filing Robert Wooten 1 215 140' Adjusted to 3218 NW 30th Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 118 Sq.Ft.Driveway .80 94.40 $ 634.40 NW 30th Street Intersects Mrs. John Dickey 24 216 140' Adjusted to 3016 Conejos Drive Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2044 244.00 $ 540.00 South Side of Street Paul Howell 13 191 140' Adjusted to 2122 Loving Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 $ 540.00 NW 30th Street Intersects E. C. Underwood 12 192 140' Adjusted to 3223 NW 30th Res. 100' Pavement $2.96 $296.00 100' Curb & Gutter 2.44 244.00 $ 540.00 Total $2,254.40 2) Revolving Fund 042-10424-198 be reduced by $2,177.20, the difference between the original and adjusted assessments, and the City's cost be increased in Project Number 104-24000-198 by the same amount. HDM/je SUBMITTED BY: DISPOSITION CIL: PROCESS B ��� PPROVED ❑ OTHER (DESCRIBE) �/��GO�'G4i/ CITY SECRETARY y4/ DATE CITY MANAGER // City of Fort Worth, Texas ftwomm UNE Mayor and Council Communication MORPHIS DATE REFERENCE SUBJECT: Benefit Hearing - Assessment PAGE 0.a B. NUMBER 3/9/70 Paving at 8 Locations on the Northwest 2 G-1516 Side for MANNA On February 9, 1970, a contract was awarded for the Assessment Paving of 8 Locations on the Northwest Side, and March 9, 1970, was set as the date for the Benefit Hearing (M&C C-1663) . Project Description Roadway Unit Street Limits Width R.O.W. 1 Blackstone Drive Churchill Road to 30 feet 50 feet Isbell Road 2 Tidwell Drive Banks Street to 30 feet 50 feet Springer Street 3 Quail Trail Shenna Boulevard to 30 feet 50 feet Ohio Garden Road 4 Robinson Street NW. 23rd Street to 30 feet 60 feet NW. 24th Street 5 Robinson Street NW. 24th Street to 30 feet 60 feet NW. 26th Street 6 McCandless Street NW. Loraine Street to 30 feet 60 feet NW. 32nd Street 7 NW. 29th Street McCandless Street to 30 feet 60 feet Titus Street 8 NW. Loraine Street Titus Street to 30 feet 60 feet Sherman Street It is the opinion of the Public Works Department that each parcel of property is enhanced in an amount equal to or in excess of the amount recommended for assessment, with the exception of that property adjacent to Units 4 and 5. Due to the low land value of properties adjacent to Units 4- and 5, it is not believed that the. iu,tallation and assessment- of-aidexralks till enhance the property by an amount equal to or greater than the full assessment. Sidewalks on Unit 4 and 5 Since Robinson Street leads directly to the northwest corner of W. J. Turner Elementary School, sidewalks are included in the proposed assessments on Unit 4 and 5. However, because it is, difficult to justify enhancement to adjacent property because of low land value in the area, it is recommended that assessments for sidewalks be deleted from these two units. • DATE REFE ERCE SUBJECT: Benefit Hearing - Assessment PAGE NUM 3/9/70 -1516 Paving at 8 Locations on the Northwest 2 of 2 Side An observation of the pedestrian flow of children attending and leaving the elementary school indicates that a sidewalk is needed on the south side of Robinson Street between NW. 25th and NW. 26th Streets. It has been observed that a large percentage of the children walking to or from school use this side of the street and turn off onto 25th Street without proceeding further west on Robinson Street. Therefore, it is further recommended that sidewalks be installed on the south side of Robinson Street between 25th and 26th Streets at City expense. This would involve a total of 330 feet of sidewalk at $2.67 per foot or a total cost of $881,10. It is further recommended that the remainder of the sidewalks on these units be deleted from the project. Recommendation It is recommended that an ordinance be adopted closing the benefit hearing and levying the assessments as proposed with the exception of the sidewalks on Units 4 and 5 as described above. HDM/je Attachments: "A" - Resume of Project "B" - Location Maps and Percentage Sheets "C" - Engineers' Preliminary Rolls SUBMITTED BY: DISPOSITION COUNCIL: PROCESSED BY / (J PPROVEDD 0 OTHER (DESCRIBE) 2/40, 6,410.„___ dd /- l �L Ch47a /?( ) Jc7 S9 CITY SECRETARY 2 .4 4 '-. DATE CITY MANAGER i �f �� fJSJ,4 .( 9