HomeMy WebLinkAboutContract 46288-FP5 .RcYni-s ent OI 1 Jr W Const.Services
,PN# „Date
'rojectManage
AS.
tisk Managemeana '
2
W.E. Brotherton d 0 RT WORTH,
Nater Dept. Esteban Perez CITY SECRETARY
,FA W st r an canned CONTRACT � �
ORTATION AND PUBLIC WORKS
lie Pro�e(ing people ha been Contacted concerning the request �E OF PROJECT COMPLETION
jr final payment&have released this project for such payment.
learance Conducted ByEtta Bacy D.O.E.NO: 7358� �� (QN 02411
Regarding contract 117358 for OLD DENTON RD-PAVING as required by the L'-s'Af--c 4AA`
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through
M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project
as complete.
Original Contract Prices: $351,864.75
Amount of Approved Change Orders: Ns 1
Revised Contract Amount: $351,864.75
Total Cost Work Completed: $351,864.75
Less Deductions:
Liquidated Damages: Days @$210.00/Day
Pavement Deficiencies:
Total Deduction Amount: $0.00
Total Cost Work Completed: $351,864.75
Less Previous Payments:
Final Payment Due $351,864.75
2 �
Recomm ded for Acceptance Dat
Asst. Director, TPW - Infrastructure Design and Construction
4 �0 -7/1121:2
Accepted Date
4M. Director,
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
Asst. Ci y Manager Date
Comments:
EMA��►ED �I�l��l�y � I��:s
MAR 2017 CITY 6ECRETAR'Y
If'.WORTNo TX
Init
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name OLD DENTON RD
Contract Limits
Project Type PAVING
City Project Numbers 02411
DOE Number 7358
Estimate Number I Payment Number 1 For Period Ending 6/30/1016
W
City Secretary Contract Number 117358 Contract Time 4W
Contract Date Days Charged to Date 191
Project Manager Buckley Contract is 100.00 Complete
Contractor STABILE do WINN,INC.
P.O.BOX 79380
SAGINAW, TX 76179-0380
Inspectors LAYER / TAEZAZ
Friday,June 24,2016 Page I of 4
City Project Numbers 02411
DOE Number 7358
Contract Name OLD DENTON RD Estimate Number I
Contract Limits Payment Number 1
Project Type PAVING For Period Ending 6/30/2016
Project Funding
PAVING
Item Description of Items Estimated Unit Unit Cast Estimated Completed Completed
No. Quanity Total Quanity Total
1 10"CONC PVMT 1406 SY $59.25 $83,305.50 1406 $83,305.50
2 10"CONC PVMT 2192 SY $76.75 $168,236.00 2192 $168,236.00
3 8"LIME TREATMENT 3887 SY $3.75 $14,576.25 3887 $14,576.25
4 HYDRATED LIME 78 TN $145.00 $11,310.00 78 $11,310.00
5 BARRIER FREE RAMP 4 EA $850.00 $3,400.00 4 $3,400.00
6 5'CONC SIDEWALK 3926 SF $5.50 $21,593.00 3926 $21,593.00
7 4"ASPHALT PVMT TYPE D 74 SY $40.00 $2,960.00 74 $2,960.00
8 4"SLD PVMT MARKING PAINT 686 LF $1.50 $1,029.00 686 $1,029.00
9 REFL RAISED MARKER 36 EA $15.00 $540.00 36 $540.00
10 REMOVE ASPHALT PVMT 2403 SY $5.00 $12,015.00 2403 $12,015.00
11 REMOVE CONC PVMT 175 SY $9,00 $1,575.00 175 $1,575.00
12 REMOVE 4"PVMT MARKING 1 LS $4,250.00 $4,250.00 1 $4,250.00
13 REMOVE EXISTING BARRICADE I EA $200.00 $200.00 1 $200.00
14 FURNISH/INSTALL ALUM SIGN GROUND 4 EA $650.00 $2,600.00 4 $2,600.00
MOUNT CITY STD
15 TEMP TRAFFIC SIGNAL l LS $5,550.00 $5,550.00 1 $5,550.00
16 EXCAVATION/GRADING WAN RIGHT OF WAY 1 LS $15,500.00 $15,500.00 1 $15,500.00
LIMITS
17 4"BROKEN WHITE THERMO SKIPS 250 LF $1.50 $375.00 250 $375.00
18 4"YELLOW SOLID THERMO 1100 LF $1.50 $1,650.00 1100 $1,650.00
19 RELOCATE EXIST DOUBLE POST SIGN 1 EA $1,200,00 $1,200.00 1 $1,200.00
Sub-Total of Previous Unit $351,864.75 $351,864.75
Friday,June 24,2016 Page 2 of 4
City Project Numbers 02411 DOE Number 7358
Contract Name OLD DENTON RD Estimate Number I
Contract Limits Payment Number 1
Project Type PAVING For Period Ending 6/30/2016
Project Funding
Contract Information Summary
Original Contract Amount $351,864.75
Change Orders
Total Contract Price $351,864.75
Dae ro 1b Total Cost of Work Completed $351,864.75
Less %Retained $0.00
4e
2 2 a 2 d 1? Net Earned $351,864.75
Date Earned This Period 5351,864.75
Ins ctio cry'
r
Retainage This Period $0.00
t Man
F Date Less Liquidated Damages
c
Days Q /Day $0.00
Pro)
LessPavement Deficiency $0.00
DireCtr/TPW- nf(r'astructure Design and Cons uction Less Penalty $0.00
Date Z t� �7 Less Previous Payment $0.00
Di to Contracting Departm t Plus Material on Hand Less 15% S0.00
Balance Due This Payment $351,864.75
Friday,June 24,2016 Page 3 of 4
City Project Numbers 02411 DOE Number 7358
Contract Name OLD DENTON RD Estimate Number I
Contract Limits Payment Number l
Project Type PAVING For Period Ending 6/30/2016
Project Funding
Project Manager Buckley City Secretary Contract Number 117358
Inspectors LAYER / TAEZAZ Contract Date
Contractor STABILE&WINN,INC. Contract Time 40 W
P.O.BOX 79380 Days Charged to Date 191 W
SAGINAW, TX 76179-0380 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $351,864.75
Less %Retained $0.00
Net Earned $351,864.75
Earned This Period $351,864.75
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $351,864.75
Friday,June 24,2016 Page 4 of 4
CONSENT OF
SURETY COMPANY
TO FINAL PAYMENT Bond #CA 3953946
Project: Paving Improvements to Serve Old Denton Road
To (Owner):
City of Fort Worth,Texas and
CTMGT Valley Ridge II,LLC
1000 Throckmorton St. Contract For: See above
Ft Worth,TX 76102
Contract Date:
Contractor:
Stabile& Winn,Inc.
P O Box 79380
Saginaw,TX 76179-0380
In accordance with the provision of the Contract between the Owner and the Contractor as
defined above,the Great American Insurance Company of New York
301 E Fourth Street
Cincinnati,OH 45202
,Surety Company,
on bond of Stabile&Winn,Inc.
P O Box 79380
Saginaw,TX 76179-03 80
,Contractor
hereby approves of the final payment to the contractor and agrees that final payment to the
contractor shall not relieve the Surety Companies of any of their obligations to the
City of Fort Worth,Texas and CTMGT Valley Ridge II,LLC
1000 Throckmorton St.
Ft Worth,TX 76102
,Owner
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
the Surety Companies have hereunto set their hand this 28th day of June,2016.
Great American Insurance Company of
New York
Witness: Surety Com
racy Tucke ,Attorney-in-Fact
GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
New York
Administrative Office:301 E 4TH STREET • CINCINNATI,OHIO 45202 a 513-369-5000 • FAX 513-723-2740
The number of persons authorized by
this power of attorney Is not more than FIVE No.0 14893
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS:That the GREATAMERICAN INSURANCE COMPANY OF NEW YORK,a corporation
organized and existing under and by virtue of the laws of the State of New York,does hereby nominate,constitute and appoint the
person or persons named below Its true and lawful attorney-In-fact,for it and in Its name,place and stead to execute on behalf of
the said Company,as surety,any and all bonds,undertakings and contracts of suretyship,or other written obligations in the nature
thereof;provided that the liability of the said Company on any such bond,undertaking or contract of suretyship executed under this
authority shall not exceed the limit stated below.
Name Address Limit of Power
TRACY TUCKER STEVEN TUCKER ALL OF ALL
W.LAWRENCE BROWN BENNETT BROWN FORT WORTH, $100,000,000.00
KEVIN J.DUNN TEXAS
This Power of Attorney revokes all previous powers issued on behalf of the attorneys)-In-fact named above.
IN WITNESS WHEREOF,the GREATAMERICAN INSURANCE COMPANY OF NEW YORK has caused these presents to be signed
and attested by its appropriate officers and its corporate seal hereunto affixed this 25TH day of JUNE 9 2015
Attest GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
ED 4 Ag'.
"e....�
Assistant swwory r]rrtdaroaf Seunr r�)C.Priatdm►
DAVID a arrcteN pnan-2"
STATE OF OHIO,COUNTY OF HAMILTON-ss:
On this 25TH day of JUNE 2015 ,before me personally appeared DAVID C.KITCHIN,tome known,
being duly sworn,deposes and says that he resides in Cincinnati,Ohio,that he is a Divisional Senior Vice President of the Bond
Division of Great American Insurance Company of New York,the Company described In and which executed the above Instrument;
that he knows the seal;that it was so affixed by authority of his office under the By-Laws of said Company, and that he signed
his name thereto by like authority.
&=A.k0rft
Nol�r�►PIIbIG�dOhb fi..�
trip CaarNplon 61pia 0lF11�20
This Power of Attorney Is granted by authority of the following resolutions adopted by the Board of Directors of Great
American Insurance Company of New York by unanimous written consent dated May 14,2009.
RESOLVED: That the Divisional President the several Divisional Senior Vice Presidents,Divisional Vice Presidents and Divisional
Assistant Vice Presidents,or any one of them,be and hereby is authorized,from time to time,to appoint one or more Attomeys-in-Fact
to execute on behalf of the Company,as surety,any and aN bonds,undertakings and contracts of suretyship,or other written obligations
In the nature thereof,•to prescribe their respective duties and the respective limits of their authority,and to revoke any such appointment
at any time.
RESOLVED FURTHER:That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant
Secretary of the Company may be affixed by facsimile to any power of attomey or certificate of either gAw for the execution of any bond,
undertaking,contract of suretyship,or other written obligation in the nature thwwf,such signature and seal when so used being hereby
adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the
Company with the same force and effect as though manually affixed.
CERTIFICATION
I,STEPHEN C.BERAHA,Assistant Secretary of Great American Insurance Company of New York,do hereby certify that
the foregoing Power of Attorney and the Resolutions of the Board of Directors of May 14,2009 have not been revoked and are
now In full force and effect.
Signed and sealed this 28th day of June 2016
'419�ce. '-?"'
SEAL 1
Assistant Sectwary
811itiL(fid)
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me,the undersigned authority,a notary public in the state
and county aforesaid, on this day personally appeared Jerry Henderson,
Vice President Of Stabile& Winn,Inc.,known to me to be a credible
person, who being by me duly sworn,upon his oath deposed and said;
That all persons,firms,associations,corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
OLD DENTON ROAD -DOE#7358
BY
erry enderson,Vice President
Subscribed and sworn before me on this date 29 of June,2016
Tarr t,Tex
o Yl p� YES,EENyy �I�AASALAZAR
,
Caffm E6gArn 12-16.2019
', p Notary ID 13047082.7
�
�
/
CTM= VALLEY = ° LLC
^
1800 Valley View Lane, 8uite 300
Farmers Branch' TX 7�5234
Office:469-892-72PO
Fax:469-891-7201
June 22th. 1
VIA EMAIL DELIVERY
City of Fort Worth
Attn: David Rolls |
8B51Camp Bowie West
Fort Worth, Texas 7G110 ! |
|
Re: Riverside Place(City Project 024111 DOE#7358)
Please accept this letter as our formal,acknowledgement to the City of Fort
Worth that CTMGT Valley Ridge 11, LLC will not.pursue liquidated damages against
Stabile &Winn, Inc-, our Paving Contractor for Rive de Place-
regardsi to this matter feel free to contact
mo. \
/
1�hris Hodgson
Project Manager
Centurion American
(P72)824-6334
`
. |
.�
/ |
� |
!
|
�
>
/ |
i
|
/
�
!
FORTWORTH REV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 6/24/2016
Name of Contractor Project Name
Stabile&Winn Old Denton Road
DOE Inspector Project Manager
Tommy McKinnon Aaron Long
DOE Number Project Difflculty Type of Contract
7358 P Simple O Routine O Complex O Water O Waste Water O Storm Drainage O Pavement
Initial Contract Amount Final Contract Amount
5351,874.75 $351,874.75
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector At 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector Af 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager 2-
1 Change Order Processing Time 3 Communication Z-
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts Z.
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
wr
Signature DOE Inspector
Signature DOE Inspcetor's Supervi or
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
gat The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TK 76012-6311
(817)392-7941 -Fax:(817)392-7845
FORTWORTHRE":02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Stabile&Winn Old Denton Road
DOE Inspector DOE Number
Tommy McKinnon 7358
DOE Inspector Project Manager
❑ Water ❑ Waste Water ❑ Storm Drainage Ul Pavement Aaron Long
Initial Contract Amount Project Diriculty
$351,874.75 O Simple O Routine O Complex
Final Contract Amount Date
$351,874.75 6!23/2016
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
I Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 N
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 N
I I Property Restoration 5 N
12 After Hours Response 5 N
13 Project Completion 5 Y 4 20 1 20
TOTAL ELEMENT SCORE(A) 328
BONUS POINTS(25 Maximum)(B)—�
TOTAL SCORE(TS) 328
III)CONTRACTOR'S RATING
Maximum Score(MS)–448 or sum of applicable element score maximums which= 328
Rating(ITS/MS]• 100%) 328 / 328 – 100%
Performance Category Excellent
<20%–htadeguate 20%to<40%=Deficient 40%to<60°:6=Sta►rdard 60%to<80%=Good 2:80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
pz--"r�
Signature DOE InspectorSignature Contractor
Signature DOE Inspe upervisor
CONTRACTOR'S COMMENTS
_ TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth-1000 Thtockmorton Street-Fort Worth,TX 76012-6311
(817)392-7941 -Fax:(817)392-7845
i
rev 03/05/07
TRANSPORTATION& PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: Old Denton Road
PROJECT NO.: 2411 CONTRACTOR: Stabile&Witm
DOE NO.: 7358
PERIOD FROM:12/16/15 TO: 06/23/16 FINAL INSPECTION DATE: 23-Jun-16
WORK ORDER EFFECTIVE: 77 # - /;�_ CONTRACT TIME: 40 Working Days
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
S. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
THIS 191 191
PERIOD
PREVIOUS
PERIOD
TOTALS
TO DA191 191
TE
*REMARKS:
( 2- 2016 °- •S'�/
Ce6NOKCTOR DATE SPECTOR
- DATE
ENGINEERI EPARTAIENT
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TZ 76012-6311
(817)392-7941 •Fax:(817)392-7845