HomeMy WebLinkAboutContract 46740-FP3 Depart t W Const. Services
CPN#2zw Date
/i
Project Manager RTWORTH.,
Risk Management S. Canady Z°° �
D.O.E. Brotherton - CITY SECRETARY7 I,�
Water Dept. Esteban Pere CONTRACT NO. 1�IU- �_
CFA West r an/Scanned
;TATION AND PUBLIC WORKS
The Procectlink people have been Contacted concerning the request OF PROJECT COMPLETION
for final payment&have released this project for such payment. (Developer Projects) dot- 7.:7-61
Clearance Conducted By Etta Bacy I` tI1Ciy Project NQ: 02310e1rn J
0#q6 7`/D
Regarding contract 117261 for LA FRONTERA PH 1 STREET LIGHS as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through
M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project
as complete.
Original Contract Price: $127,716.41
Amount of Approved Change Orders: NQ
Revised Contract Amount: $127,716.41
Total Cost Work Completed: $127,716.43
h0- 44'-P ° e2�-Z'7111
Recomm ded for Acceptance Date
Asst. Director, TPW - Infrastructure Design and Construction
64 ti -7,fz-71
Acceptedo y Date
11M. Director,
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
Asst. dty Manager Date
Comments:
MAILED OFFICIAL RECORD
CITY SECRETARY
MAR 1 2017 FT.WORTH,
Rev.9/22/16 �t�t
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name LA FRONTERA PH 1
Contract Limits
Project Type STREET LIGHT
City Project Numbers 02310
DOE Number 7261
Estimate Number I Payment Number 1 For Period Ending 1/27/2017
CD
City Secretary Contract Number 117261 Contract Time I8CD
Contract Date Days Charged to Date 583
Project Manager Ehia Contract is 100.00 Complete
Contractor BEAN FLECTRICh1,INC
821 E ENON
FORT WORTH, TX 76140
Inspectors LAYER / MEDELLIN
Wednesday,February 1,2017 Page 1 of 4
City Project Numbers 02310 DOE Number 7261
Contract Name LA FRONTERA PH 1 Estimate Number I
Contract Limits Payment Number I
Project Type STREET LIGHT For Period Ending 1/27/2017
Project Funding
STREET LIGHT
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity "Total
I FURNISH/INSTALLGROUND BOX,SMALL 13 EA $500.00 $6,500.00 13 $6,500.00
W/LID W/APRON
2 FURNISH/INSTALL 100W HPS PC LIGHTING 23 EA $406.27 $9,344.21 23 $9,344.21
FIXTURE
3 FURNISH/INSTALL AEL-ATB2-137W-NW-TYPE 8 EA $663.97 $5,311.76 8 $5,311.76
2
4 FURNISH/INSTALL RDWY ILLUM 23 EA $950.00 $21,850.00 23 $21,850.00
FOUNDATION
5 FURNISH/INSTALL RDWY ILLUM 5 EA $1,250.00 $6,250.00 5 $6,250.00
FOUNDATION
6 FURNISH/INSTALL CONDUIT SCH 80 PVC 2 2053 LF $6.00 $12,318.00 2053 $12,318.00
7 #8 ALUM WIRE 20.53 CL $300.00 $6,159.00 20.53 $6,159.00
8 FURNISH/INSTALL RDWAY ILLUM 23 EA $1,779.12 $40,919.76 23 $40,919.76
9 FURNISH/INSTALL RDWAY ILLUM 2 EA $2,482.67 $4,965.34 2 $4,965.34
10 FURNISH/INSTALL RDWAY ILLUM 3 EA $3,666.12 $10,998.36 3 $10,998.36
11 FURNISH/INSTALL TYPE 25 ARM 23 EA $100.00 $2,300.00 23 $2,300.00
12 FURNISH/TNSTALL TYPE 40 ARM 2 EA $100.00 $200.00 2 $200.00
13 FURNISH/INSTALL TYPE 40T ARM 3 EA $200.00 $600.00 3 $600.00
Sub-Total of Previous Unit $127,716.43 $127,716.43
Wednesday,February 1,2017 Page 2 of
City Project Numbers 02310 DOE Number 7261
Contract Name LA FRONCERA PH 1 Estimate Number I
Contract Limits Payment Number I
Project Type STREET LIGHT For Period Ending 1272017
Project Funding
Contract Information Summary
Original Contract Amount $127,716.41
Chanee Orders
Total Contract Price $127,716.43
Dae 7 ° Total Cost of Work Completed $127,716.43
ra
Less %Retained 50.00
D to Z 1,6 Net Earned $127,716.43
Inspection Supervt Earned This Period $127,716.43
�� Retainage This Period $0.00
I Date Z �, Less Liquidated Damages
f�z
agerDays Q /Day $0.00
C—, k�Aq Date LessPavement Deficiency $0.00
st. irector/fPW-In$astructun Design and Const ction Less penalty
Ti $0.00
Date !1 Less Previous Payment $0.00
Director Contracting Departn Plus Material on Hand Less 15% $0.00
Balance Due This Payment $127,716.43
Wednmday,February 1,2017 Page 3 of
City Project Numbers 02310 DOE Number 7261
Contract Name LA FRONTERA PI I Estimate Number 1
Contract Limits Payment Number 1
Project Type STREET LIGHT For Period Ending 1/27/2017
Project Funding
Project Manager Ehia City Secretary Contract Number 117261
Inspectors LAYER / MEDELLIN Contract Date
Contractor BEAN ELECTRICAL,INC Contract Time 180 CD
821 E ENON Days Charged to Date 583 CD
FORT WORTH, TX 76140 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $127,716.43
Less %Retained $0.00
Net Earned $127,716.43
Earned This Period $127,716.43
Retainage This Period $0.00
Less Liquidated Damages
0 Days r@i $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $127,716.43
Wednesday,February 1,2017 Page 4 of 4
CONSENT OF OWNER IN
SURE TY COMPANY ARCHITECT ❑
TO FINAL PAYMENT CONTRACTOR ❑
AIA DOCUMENT G707 SURETY ❑
OTHER ❑ Bond#4401003
PROJECT: La Frontera-Phase I-Street Lights,
(name,address)
TO(Owner)La Frontes Capital Properties,LLC ARCHITECT'S PROJECT NO:
1308 Norwood Drive,#200 CONTRACT FOR:
Bedford,TX 76022 CONTRACT DATE:4/17/2015
CONTI , CTOR: Bean)Electrical,Inc.
In accol dance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(here insert name and address of Surety Company)
SureTee Insurance Company
1330 Post Oak Blvd.,Ste 1100
Houston,77056
,SURETY COMPANY,
on bond of
(here insert name and address of Contractor)
Bean Electrical,Inc.
821 E Enon
Fort Worth,TX 76140 CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall
not relieve the Surety company of any of its obligations to
(here insert natne and address of Owner)
La hro►itera Capital Properties,LLC
1308 Nonvood Drive,4200,Bedford,TX 76022
,OWNER,
as set forth in the said Surety Company's bond
IN WITNESS WHEROF,
The Sway Company has hereunto set its hand this 17th day of January, 2017.
SureTec Insurance Company
Surety Company
t Signature of Authorized Representative
Atte t '
(seal);, Mistie Beck, Attorney-in-Fact
Title
NOTE:This form is to be used ns a compnion document to AIA DOCUMENTG706,CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBT AND CLAIMS,
Current Edition
AIA DOCU,Y,ENTG707•CONSENT OF SURETY COMPANY TO FINAL PAYMENT*APRIL 1970 EDITION'AIA
1970 THE t'MITRICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE.NW WASHINGTON,D.C.2006
'NARNING: Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution.
UNCONDITIONAL WAIVER AND FINAL RELEASE OF LIEN
PROJECT NAME&ADDRESS:
` r p�o�t )- 02s1�O
"La Frontera Phase I" -La Frontera Development LLC '
1000 Texan Trail,Suite 200 7 p -7 Z61
Grapevine,TX 76051
The undersigned has been paid in the total sum of$127,716.41 for labor and services,
equipment,or materials furnished to date, 12/13/16,by the Contractor,Owner or Prime
Subcontractor on the above-described Project.The undersigned does hereby release any
mechanic liens,stop notice or bond rights that the undersigned has on said Project
through the date indicated above.
NOTICE: This document waives rights unconditionally and states that you have been
paid for gMag up those rights. This document is enforceable against you if you sign it,
even if you Ni re not been paid.
LYE,N CLAIMANT: Bean Electrical,Inc.
821 E.Enon Ave.
Fort Worth,TX
I terrify under lven It of rjury ws of the State of Texas that the above is a true
and correct st.t 'ent
i
Signature:
Printed Name:.,
r
Title:1:'e S i ,fi r
tinted✓✓this `'d d,%y of :,11 lUtaru ,20L
At ? t? ih,,
Sworn and subscribed before me this 3 r� day of Qrt K�[r 20/7
E
Notary Public, StateoEexos
_
J;Pu lic,wn and o ate of Texas Comm.Expires 02.29-2020
Nofory ID 1890225
POA N: 4221049
SureTee Insurance Company
LIMITED POWER OF ATTORNEY
Kiitow All Afen by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing uadet the laws of the State of Texas, and having its principal office in Houston,Harris County, Texas, does by these presents
make,constitute and appoint Tony Fierro,Jay Jordan,Johnny Moss,Steven W.Searcey,Robert J.Shuya,
Mistie Beck,Jeremy Barnett,Robert G.Kenuth,Jade Porter,Jennifer Cisneros
its true and lawful Attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute,acknowledge
and deliver any and all bonds,recognisances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for:
Five Million and 00/100 Dollars($5,000,000.00)
and to bifid the.Company thereby as fully and to the same extent as if such bond were signed by the President,sealed with the corporate
seal of the Company and•duly attested by its Secretary,hereby ratifying and confirming all that the said Attorney-in-Fact may do in the
premises. Said appointment shall continue in force until 05/182017 and is made under and by authority of the following
resolutions of the Board of Directrn•s of the SureTec Insurance Company:
Be ii Resolved that the F.esidenr, any Vice-President,any Assistant Vice-President,any Secretary or any Assistant Secretary sha11 be and is
bereby vested with full powor and authority to appoint any one or more suitable persons as Attorneys)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Atiorne)-in-Fact may be given full power and authority for and in the name of and of behalf of the Company,to execute,acknowledge and
deliver,any and all bonds,recogaizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all
notice; and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be N.Ro,wlved that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thoreto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Comptmy with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 100'ofApril.
1999)
In Wlrness Vh2reaf,SURETEC INSURANCE COMPANY has caused these presents to be signed by its President,and its corporate seal
to be hereto affixed this 3rd day of August,A,D. zits
SURETEC INSURANCE COMPANY
�S��MCF
0� BY:
w(w a John lkdox i resident
State ofHTexas ss: s d M 6
County
of Fla,ris
On this 3rd day of August,A.D. :a15 before me personally came John Knox Jr.,to me known,who,being by me duly sworn,did depose and say,that he
resides in Houston, Texas,that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument;thax he mows the seal of said Company;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the
Board of Directors of said Company;and that be signed his name thereto by like order.
E
ij,C)UELYN MALDONADONotary Public
State of Texas APTFAy rumm.Exp.S/1=017 Jacq elyn Maldonado,Notary Public
My commission expires May 18,2017
1,M.Brent Beaty,Assistant Secretary of SURETEC INSURANCE COMPANY,do hereby certify that the above and foregoing is a true and correct copy
of a Powcr of Attorney,executed by said Company,which is still in full force and effect;and finthermore,the resolutions of the Board of Directors,set
out in the,Power of Attorney ars in Pill force and effect, I r�
Given under my hand and the seal of said Company at Houston,Texas this ! l 0 day of CTQ.!?GLt .( Ol 7 A.D.
M.Bre t Beaty,Assistant Secretary
Any Instrument issued In excess of the penalty stated abq.-Vw.s.totaJy.vold'artd wlttrgut any validity.
For verification of the authority of this power you may caiLoib)811.0800 anybust-.90day between 8:00 am and 5:00 pm CST.
I
r
AFFIDAVIT
STATE OF Texas
COUNTY OF Tarrant
Before me,the undersigned authority,a notary public in the state
and county aforesaid,on this day personally appeared Roy E.Bean II,
President Of Bean Electrical Inc.,known to me to be a credible person,
who being by me duly sworn,upon his oath deposed and said;
That all persons,firms,associations,corporations,or other
organizations furnishing labor and/or materials have been paid in full;
That tht wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
La Frontera Phase I -City Project 02 ,DOE 7 61
B J
Roy E. Bean II
Subscribed and sworn before me on this date 24 of January,2017.
..pYp..b� CHERYLE R.ESPREE
i`e' '.�� Notary Public,state of Texas
otary _
��; .'�e Comm.Expifes 02.29-2020
County, State /��FpF� �` Notary ID
15
a90225
Tame(,' —1 s
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
PROJECT INFORMATION Date: 1/25/2017
Name of Contractor Project Name
Bean Electrical,INC. La Frontera Phase I
DOE Inspector Project Manager
Habte Taezaz Fred Ehia
DOENumber Project Doculty Type of Contract
7261 Q Simple Q Routine Q Com7J$127,716.43
[-IWater El Waste Water 0 Street Light ❑Pavement
Initial Contract Amount Final Contract Amount
1$127,716.41
II)PERFORMANCE EVALUATION
0-Inadequate I -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING JELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
I Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of In ctor 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities Z71 3 Applicability of Specifications
4 Displ!y DisplayOf Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowled a And/Or Problem Resolution
ADMINISTRATION 2 Availabili of Pro°cet Manager
I Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3
1340pening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector Al
Signature DOE Inspector's Supervisor
L--ak1-/-;;.-
INSPECTOR'S COMMENTS
TRANSPORTA11ON AND PUBLIC WORKS
(a The City of Fort Worth-1000 Throclunorton Street-Fort Worth,TX 76012-6311
(817)392-7941 -Fax:(817)392-7845
FORTWORTHREV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Bean Electrical,INC. La Frontera Phase I
DOE Inspector DOE Number
Habte Taezaz 7261
DOE Inspector Project Manager
❑Water ❑Waste Water ❑Storm Drainage ❑Pavement Fred Ehia
Initial Contract Amount Project Difficulty
$127,716.41 O Simple OQ Routine Q Complex
Final Contract Amount Date
,$127,716.43 1/15/2017
II)PERFORMANCE EVALUATION
0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 426
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 426
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 gr sum of applicable element score maximums which= 448
Rating([TS/MS]"100%) 426 / 448 a
Performance Category Excellent
<20%=Inadequate 20%to<40%=i9aftcient 40%to<60%-Standard 60%to<80%=Good SBO%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector (,L. 44 ( Signature Contractor
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(a (817)392-7941 •Fax:(817)392-7845
FORTWORTH rev 03/05/07
TRANSPORTATION&PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: La Frtmtem Phase I
PROJECT NO.: 2310 CONTRACTOR: Bean Electrical,INC.
DOE NO.: 7261
PERIOD FROM:05/29/15 TO: 01/30/17 FINAL INSPECTION DATE: 27-Sart-17
WORK ORDER EFFECTIVE:5/29/2015 CONTRACT TIME: 180 WD • CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS
PERIOD 583 583
PREVIOUS
PERIOD
TOTALS
TO DATE 583 583
*REMARKS:
CO C R DATE INSPECTOR DATE
EINGINEERING DEPARTMENT
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845