HomeMy WebLinkAboutContract 48761�I'iY 3ECRET� �;� `.,
CONTRACT N0. 0 (,�1
Developer and Project Information Cover Sheet:
Developer Company Name: j Prime Rail Interests, LLC
Address, State, Zip Code: � P.O. Box 249 , Colleyville., TX 76034
Phone & Email: 817-310-5595, mike.rader@prime45.net
— �--- -- - -
_i
Authorized Signatory, Title: I Michael E. Rader, President
-' - — -- __- -
Proj ect Name: Transload Drive
Brief Description: Water, Sewer, Paving, Storm Drain
Project Location: i Meacham Boulevard
Plat Case Number: FP-16-0711 Plat Name: i Transload Addition
I - — I
Mapsco: ! 48-Q Council District: 2 City Project Number: I� 100657
1__
� �_ �
CFA Number: ': 2017-022 DOE Number: None
To be
Receive
��R�I�IAfL RECORD
I ��`�X BECRETARY
' C�"�', �RTH, 7'x
City of Fort Worth, Texas `` '- --
Standard Community Facilities Agreement - Transload Drive
CFA Official Release Date: 01.03.2017
Page 1 of 11
... ,. ' i ",> 1 :� y �-
STANDARD COMMUNITY FACII,ITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
0
0
City Secretary
YI''f�j�!
Contract No. �� �,� � �•�� �
WHEREAS, Prime Rail Interests, LLC, ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements") related to
a project generally described as Transload Drive ("ProjecY') within the City or the extraterritorial
jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subj ect to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "AgreemenY') in connection with the collective Improvements for the
Proj ect.
NOW, THEREFORE, for and in consideration of the covenants and conditions contained
herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth, Texas
Standard Community Facilities Agreement - Transload Drive
CFA Official Release Date: 01.03.2017
Page 2 of 11
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and warkmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ;����, Sewer (A-1) `�„�, Paving (B) il�'�, Storm Drain (B-1) '�", Street Lights & Signs
�C) �'
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shail be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shali ensure its
contractor(s) pays the then-current City-estabiished wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To empioy a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth, Texas
Standard Community Facilities Agreement - Transload Drive
CFA Official Release Date: 01.03.2017
Page 3 of 11
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces, to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth, Texas
Standard Community Facilities Agreement - Transload Drive
CFA Official Release Date: 01.03.2017
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, offcers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether o�� not such iniuries, death or dama�es are
caused, in whole of• in part, bv the alle�ed ne�li�ence of the Citv ofFort Worth, its
officers, servants, or emplovees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure contemplated
herein, whether or not such iniuries, death or damages are caused, in whole or in part.
bv the alleged ne�li�ence of the Citv ofFort Worth, its officers, servants, or emplovees.
Further, Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth, Texas
Standard Community Facilities Agreement - Transload Drive
CFA Official Release Date: 01.03.2017
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of ail warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not instaliing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2) years from the date of this Agreement (and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth, Texas
Standard Community Facilities Agreement - Transload Drive
CFA Official Release Date: 01.03.2017
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Ciry of Fort Worth, Texas
Standard Community Facilities Agreement - Transload Drive
CFA Official Release Date: 01.03.2017
Page '7 of 11
Cost Summary Sheet
Proj ect Name: Transload Drive
CFA No.: 2017-022 City Project No.: 100657
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Signals
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub-Total for Water Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Signals Inspection Cost
H. Street Signs Installation Cost
Su6-Total for TPW Construction Fees
Total Construction Fees:
Developer's Cost
$ 79,863.50
$ 74,993.50
$ 154,857.00
$ 172,641.25
$ 161,653.50
$ -
$ -
$ 334,294.75
$ 489,151.75
$ 3,097.14
$ 3,097.14
$ 6,194.28
$ 13,371.79
$ 6,685.90
$ -
$ -
$ -
$ 20,057.69
$ 26,251.97
Choice
Financial Guarantee O tions, choose one Amount Mark one
Bond = 100% $ 489,151.75
Com letion A reement = 100% / Holds Plat $ 489,151.75
Cash Escrow Water/Sanita Sewer= 125% $ 193,571.25
Cash Escrow Pavin /Storm Drain = 125% $ 417,868.44
Letter of Credit = 125% w/2 r ex iration eriod $ 611,439.69 x
City of Fort Worth, Texas
Standard Community Facilities Agreement - Transload Drive
CFA Official Release Date: 01.03.2017
Page 8 of 11
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH
�� 1
esus J. Chapa
Assistant City Mana er
Date: ,Z —�� �"� �
Recommended by:
,
�
G� �',� � � � ; l-�-L� �=
Wendy Cb -Babulal, EMBA, P.E. �
Development Engineering Manager
Water Department
�, �
Dougla W. Wiersig, P.E.
Director
Transportation & Public Works Department
Approved as to Form & Legality:
Richard A. McCracken
Assistant City Attorne
M&C No. N�i4�
Date: Z�i1��'i
Form 1295: n)it�—
, .
ATTEST: . � -��c ���f+���
�..
fD. �:�
,�'Yz�� �� � �.. �� :�
1Vlary J. K�s�
City Secretary
A�'�i%�
�
City of Fort Worth, Texas
Standard Community Facilities Agreement - Transload Drive
CFA Official Release Date: 01.03.2017
Page 9 of 11
DEVELOPER
Prime Rail Interests, LLC
Name: Michael E. Rader
Title: President
Date: !"G-�3/ll,c/YZN �,Zvl7
ATTEST: (Only if required by Developer)
Signature
Name:
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
� ' � �
,
� �` �`� r 1 D� i `I �G.!'r;fii, c.r�� (���
Name:
Title:
e��FIC1Ai, RE�OFt�
CIT1P S�CRETAi�Y
�1". WOR`f'li�'1"X
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
`�' Attachment 1- Changes to Standard Community Facilities Agreement
t�i Location Map
� Exhibit A: Water Improvements
�(�I` Water Cost Estimate
�l� Exhibit A-1: Sewer Improvements
?�' Sewer Cost Estimate
�� Exhibit B: Paving Improvements
�
;I� Paving Cost Estimate
___
u�' Exhibit B-1: Storm Drain Improvements
`.�' Storm Drain Cost Estimate
L7 E�ibit C: Street Lights and Signs Improvements
t�? Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas
Standard Community Facilities Agreement - Transload Drive
CFA Ofiicial Release Date: 01.03.2017
Page 10 of 11
ATTACIIlVIENT "1"
Changes to Standard Agreement
Community Facilities Agreement
City Proj ect No. 10065'7
None
City of Fort Worth, Texas
Standard Community Facilities Agreement - Transload Drive
CFA Official Release Date: 01.03.2017
Page 11 of 11
NOT TO SCALE
• Y• HALFF� DGN: CFA-EXHIBIT-LOCATION.dgn
■�■
�� � THPEFIRM#F-312 DATE: 2/1/2017
3803 PN2KWOOD BLVD., # 800 PRISCO, TEXAS 75034 (274) 618-4570
AVO: 28949
PAGE N0.:1 OF 1
��
,
�
` - -I
� �--
% � � :
PROPOSED 2'
_ DOMESTIC METER �
__
� � �
G
0 50 100 150 200 �T
1\
SCALE: 1 "=100'
PROPOSED 6'
-.._ WATER LINE
� �.«�.
EXISTING 12'
WATER LINE
�l �; �__�_ _ - _ .�_ _ .
_ _� r�
__
� , ; ------___
,,
, ,
,
i_-- _- _---__ _ -
�� i
i
� ��i
i�
i
�� �\S� i
; ; PROPOSED 12'
� ; WATER LINE
��
��
��
��
��
��
PROPOSED 2'
DOMESTIC METER
�
, _
I �--
�
� �
� �
-- --I-1-- -- --�
/�1�
�/ I
/ �
/ �
// I
��% HALFF
■��■ 'BPEFIRMpF�12
WOOD BLVD., p 800 FRISCO, TEXAS 75034 (21
WATER EXHIBIT "A"
TRANSLOAD DRIVE
DGN: CFA-EXHIBIT-WATER.dgn
DATE: 2/1 /2017
AVO: 28949
PAGE N0.:1 OF 1
��
0
a
\
0 50 100 150 200 j�T
lr
SCALE: 1 "=100'
EXISTING 8"
SANITARY SEWER
��`�_.�.
/ r � ` ����
�^ � � _ �
/ _ '�" �
� / �
/ � �- �'
� � �'/
I/ . - / --...._. _---- -�..-
\ 1 /�' ' r---�
/f
/ I
�,yP� � ;' � PROPOSED 8'
� , SANITARY SEWER
�`"��� � i
E i
�` i
`�� i
i �
i �
i �
i �
PROPOSED 6' `
SANITARY SEWER � ��
__ � i
�
i
� -- -- ---
— I �--
i
� / / � i i
�' i i
I ( I
-- --I�-- -- __J
//;--
�/ (
/ �
/ �
/ I
��� HALFF
■��� ■ TBPE FIRM #P-312
3803 PARKWOOD BLVD., # 800 PRISCO, TEXAS 75034 (21
SEWER EXHIBIT "A-1"
TRANSLOAD DRIVE
DGN: CFA-EXHIBIT-SEWER.dgn
DATE: 2/1/2017
AVO: 28949
PAGE N0.:1 OF 1
�
W
�
W
�
W
�
�
�
�
Q
O
J
•
�
�
C
Y
Z
�
�
�
�
D.
PROPOSED TxDOT
HEADWALL
PROPOSED 2-10'x6' RCBC
PROPOSED 2-10'x4' RCBC i �
�/�i:
50 100 150 200
SCALE: 1 "=100'
__ _ --
_ _� .._.
- - _ - -=.: =.._ -.�.
_'_ _
�� PROPOSED ROCK
, � RIP RAP
. �
�
� � � ,
I I (
-- --I-1__ __ __j
�/�—
�/ I
/ i
/ �
/ �
$
�
PROPOSED TxDOT
HEADWALL
DRAINAGE EXHIBIT "B-1"
TRANSLOAD DRIVE
� HALFFI DGN: CFA-EXHIBIT-DRAINAGE.dgn AVO: 28949
■�■
� �`�,� s�,s�„ ,,,�,�„�s,� DATE: 2/1/2017 PAGE N0.:1 OF 1
�Pn co�i�c #n T�cv
I�
11
I�
I�
0