Loading...
HomeMy WebLinkAboutOrdinance 6659 same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. WHEREAS,-by sundry proceedings heretofore passed by the City Council of the City of Fort Worth, Texas, including Ordinance No, 6526 , a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and_public places and_a�s�nst_ / �q �at. ORDINANCE N0. (��_ CRDIUNCVACCEPTIITG IMPROV-1MNTS ON A PORTION OF [i_ I_LLTZRk AND PCRTIONS OF SUNNY OTHER STRV2TS, AVEN1ZS AND PC9tIC FLACZ IN THE CITY OF FORT WCRTH, TEXAS; LECLARING TXrCOMACT WITH _ GLADE, INC. FOR THE CONSTRUCTION OF SAID IMPROV?MNTS FULLY COMPLT-M) AND PERFORMED, DIRECTING THE ISSUANC$, MCUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESS- MENTS LEVIED AFTER GIVING EFM_ T TO SUNIRY CREDITS HEBE'IN AUTH0RIZED AND ALLOWED AGAINST SOME' OF SAID ASSESSM'TNTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND EMOLL THIS OFDI??ANCE BY COPYING THE CAP- TION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FC1tT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AND E371FVTIVE DATE. WTIME'AS, the City of Fort Worth, Texas, has heretofore entered into a contract with _ GLAD$ INC- for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public plaoee in said City, to-wit: UNIT 1: WILLIE STREET From Edgexood Terrace to Langston .Street, known and designated as Unit 1, Project No. 104-24000-209. UNIT 2: DANNER STREET From Ramey Avenue to Chapman Street, known and designated as Unit 2, Project No. 104- 24000-209. UNIT 3: MACEO LANE From Carverly Avenue to Ransom Terrace, known and designated as Unit 3, Project No. 104-24000-209. UNIT 4: HANDLEY DRIVE (Deleted) UNIT 5: COWAN STREET From Langston Street to Amanda Street, known and designated as Unit 5, Project No. 104-24000-209. UNIT 6: LANGSTON STREET From Ramey Avenue to Chapman Street, known and designated as Unit 6, Project No. 104- 24000-209. a WHEREAS,-by sundry proceedings heretofore passed by the City Council of the City of Fort Worth, Texas, including Ordinance No. 6526 , a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and, WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No. 6526 J. and WHEREAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOW, THEREFORE, BE IN ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; and the contract with reference thereto be, and it is hereby, found and declared fully completed and perfozmed. II. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro— perty assessed andshall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on the respective certificates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows: III. When each of the certifiactes has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. ` PASSED AND APPROVED THIS Al day of C a 191/r� . APPROVED AS TO FORM AND LEGALITY: .05• I � City Attorney FAMCI NO, 104-24000-209 UNIT to WILLIE STREET FROM EDGEWOUD TERRACE TO ][ANGSTON STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen- inch wide concrete gutter, so that the finished roadway will be thirty feet wide, and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF EDGEWOOD TERRACE AND WILLIE STREET NORTH SIDE OF STREET I. E. STOUTS SUBDIVISION Georgie Belle Carr W. 120' 120' Owner Occupied 1825 S. Edgewood of S. h Comm. 120' Pavement $4.07 $488.40 Terrace W. k of 120' Gurb & Gutter 2.37 284.40 76105 4 $772.80 Georgia Belle Carr E. 155.6' 155.6' Pavement $3.03 $471.47 1825 Edgewood Terr. of S. k Res. 155.6' Curb & Gutter 2.37 368.77 76105 W. j of 4 $840.24 Georgia Belle Carr S. h 275.6' Side Lot Cr. 1825 S. Edgewood of E. Res. 175.6' Pavement $3.03 $532.07 Terrace of 4 175.6' Curb & Gtr. 2.37 416.17 76105 $948.24 LANGSTON STREET INTERSECTS SOUTH SIDE OF STREET I. E. STOUTS SUBDIVISION Zella Houtchens 5-I 133.25' Pavement $3.03 $403.75 2019 Ward Parkway 5-H Res. 133.25' Curb & Gtr. 2.37 315.80 76110 $719.55 Cram & McElyea 5-G 60' Pavement $3.03 $181.80 701 Sinclair Bldg. Res. 60' Curb & Gtr. 2.37 142.20 106 W. 5th Street 85 Sq. Ft. Driveway .96 81.60 76102 $405.60 1 PROJECT NO. 104-24000-209, UNIT 2: DANNER STREET FROM RAMEY AVENUE TO CHAPMAN STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by construct- ing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF RAMEY AVENUE AND DANNER STREET WEST SIDE OF THE STREET W. R. HOWARD ADDITION Mrs . L. M. Marshall 8 4 135' Side Lot Credit 4775 Ramey Avenue Res . 100' Pavement $3 .03 $303 .00 76105 100' Curb & Gutter 2.37 237 .00 52 Sq. Ft. Drive .96 49.92 $589.92 Upper Zion Baptist 7 4 50' Pavement $3 .03 $151.50 Church, Trustees Res . 50' Curb & Gutter 2.37 118.50 2124 Danner Street 95 Sq . Ft. Drive .96 91.20 76105 $361.20 Jessie V. Johnson 6 4 50' Pavement $3.03 $151.50 2120 Danner Res . 50' Curb & Gutter 2.37 118.50 76105 52 Sq. Ft. Drive .96 49.92 $319.92 Roy Robertson 5 4 50' Pavement $3 .03 $151.50 2116 Danner Res . 50' Curb & Gutter 2.37 118.50 76105 52 Sq. Ft. Drive .96 49.92 $319.92 Constance Grigsby 4 4 50' Pavement $3.03 $151.50 1513 E. Leuda Res . 50' Curb & Gutter 2.37 118.50 76104 $270.00 3 ----- -- -a++ .•v+�+•...+...+ vv+u.au� V1' '%' LL'L nY L'LVU Li L-11L LCLL\LIl L. ✓LLXIilJ. WEST SIDE OF THE STREET W. R. HOWARD ADDITION Mrs . L. M. Marshall 8 4 135' Side Lot Credit 4775 Ramey Avenue Res. 100' Pavement $3 .03 $303.00 76105 100' Curb & Gutter 2.37 237.00 52 Sq. Ft. Drive .96 49.92 $589.92 Upper Zion Baptist 7 4 50' Pavement $3 .03 $151.50 Church, Trustees Res . 50' Curb & Gutter 2.37 118.50 2124 Danner Street 95 Sq . Ft. Drive .96 91.20 76105 $361.20 Jessie V. Johnson 6 4 50' Pavement $3.03 $151.50 PROJECT NO. 104-24000-209, UNIT 1: WILLIE STREET FROM EDGEWOOD TERRACE TO LANGSTON STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF THE STREET I . E. STOUTS SUBDIVISION John W. Horne 5-F 60' Pavement $3 .03 $181.80 4720 Willie Res . 60' Curb & Gutter 2.37 142.20 76105 52 Sq. Ft. Drive .96 49.92 $373 .92 James A. Williams 5-E 60' Pavement $3.03 $181.80 4716 Willie Res . 60' Curb & Gutter 2.37 142.20 76105 85 Sq. Ft. Drive .96 81.60 $405.60 Azor Lister, Jr. 5-D 60' Pavement $3 .03 $181.80 4712 Willie Res . 60' Curb & Gutter 2 .37 142.20 76105 85 Sq. Ft. Drive .96 81.60 $405.60 L. C. Osby 5-C 60' Pavement $3 .03 $181.80 4708 Willie Res . 60' Curb & Gutter 2,37 142.20 76105 85 Sq. Ft. Drive .96 81.60 $405.60 Zel.la Houtchens 5-A 120' Pavement $5.10 $612.00 2019 Ward Parkway Comm. 120' Curb & Gutter 2.37 284.40 761.10 $896.40 COST TO PROPERTY OWNERS UNIT 1 . . . . . . . . . . $ 6,173.55 COST TO CITY OF FORT WORTH UNIT 1 . . . . . . . , . 4,286.74 TOTAL ESTIMATED CONSTRUCTION COST UNIT 1 . . . . . . $10,460.29 2 PROJECT NO. 104-24000-209, NIT 20 DANN'ER STREET FUS WMEY AVENUE TO CHAPMAN STREET, CONTINUED RiOCK OWNER LOT ZONING ERONTAG0 RATE AMC'UNT ASSESSMENT WEFT SIDE OF STREET W. R. HOWARD ADDITION D. 1. McKenzie 3 4 50° Pavement $3,02 $151050 21008 Danner Rea p 50° Curb & Un 207 118.50 76105 52 Sq. Ft, Drive 36 49092 $-319092 Ruby Faye Harper 2 4 50° Pavement $3.03 $151,50 2104 Danner Res, 50° Curb & Ctro 207 118050 76105 52 Sq. Et. Drive .96 49321, $319091 onto Johnson 1 & No 4 65° Frontage 2100 Danner 15° of Rea. 50° Pavement. $3003 8151050 76105 Easement 50° Curb & Gtr, 20.37 1.18050 52 Sq. F t. Drive .96 49.92 $319092 Royal Tatnull So 15° 5 65° Frontage 2:0317 Langston of Res. 50' ]Pavement $3.03 $151050 76105 Easement 40° Curb a Gtr. 2037 94.80 & Lot 10 52 Sq. Ft, Drive .96 4909: $296.22 Mt. Mariah Miss- 9 5 50' Pavement $3003 $151050 ionary Baptist Res, 50° Curb & Gtr, 2,37 118,50 Church 52 Sq. Ft. Drive o96 49092 76105 $319.92 2026 Danner Clifford McCoy 8 5 50° Pavement $.3003 $151,50 2001 Danner Ran 50° Curb 6 metro 2037 118.50 76105 52 Sq. Et. Drive .96 49092 $319.92 4 PROJECT NO. 104-24000-209, UNIT 2: DANNER STREET FROM RAMEY AVENUE TO CHAPMAN STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF THE STREET W. R. HOWARD ADDITION Narcisis Sneed 7 5 50' Pavement $3.03 $151.50 Smith & Louis M. Res . 50' Curb & Gutter 2 .37 118.50 Smith 52 Sq . Ft. Drive .96 49.92 2020 Danner 76105 $319.92 Henrietta Lewis 6 5 50' Pavement $3.03 $151 .50 2016 Danner Res . 50' Curb & Gutter 2.37 118.50 76105 52 Sq. Ft. Drive .96 49.92 $319.92 Lewis C. Sipho 5 5 50' Pavement $3 .03 $151.50 2012 Danner Res . 50' Curb & Gutter 2 .37 118.50 76105 104 Sq. Ft. Drive .96 99.84 $369.84 Annie B. Raven 4 5 50' Pavement $3 .03 $151.50 6024 Vel Drive Res . 50' Curb & Gutter 2.37 118.50 76112 52 Sq. Ft. Drive .96 49.92 $319.92 L. C. Baker 3 5 50' Pavement $3 .03 $151.50 2008 Danner Res . 50' Curb & Gutter 2.37 118.t0 76105 52 Sq. Ft. Drive .96 49.92 $319.92 Joe Robertson 2 5 50' Pavement $3 .03 $151.50 2004 Danner Res . 50' Curb & Gutter 2.37 118.50 76105 52 Sq. Ft. Drive .96 49.92 $319.92 Clifford McCoy 1 5 45' Pavement $3.03 $136.35 2001 Danner Res . 29' Curb & Gutter 2.37 68.73 76105 52 Sq. Ft. Drive .96 49.92 $255.00 5 PROJECT NO. 104-24000-209, UNIT 2: DANNER STREET FROM RAMEY AVENUE TO CHAPMAN STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF THE STREET W. K. HOWARD ADDITION CHAPMAN STREET INTERSECTS Lillie Johnson 20 2 95' Pavement $3.03 $287 .85 2001 Danner & 19 Res . 79' Curb & Gutter 2.37 187 .23 76105 52 Sq. Ft. Drive .96 49.92 $525.00 Clifford McCoy 18 2 50' Pavement $3 .03 $151.50 2001 Danner Res . 50' Curb & Gutter 2.37 118.50 76105 52 Sq. Ft. Drive .96 49.92 $319.92 Pernice Miller 17 2 100' Pavement $3.03 $303 .00 405 Marina Vista & 16 Res . 100' Curb & Gutter 2 .37 237 .00 Martinez, Calif. $540.00 94553 Alice Gray 15 2 50' Pavement $3.03 $151 .50 Rt. 2, Box 38 Res . 50' Curb & Gutter 2.37 118.50 Kerens, Texas 75144 52 Sq. Ft. Drive .96 49.92 $319.92 M. T. Taylor 14 2 50' Pavement $3 .03 $151.50 2021 Danner Res . 50' Curb & Gutter 2.37 118.50 76105 52 Sq. Ft. Drive .96 49.92 $319.92 Lester Jones 13 2 50' Pavement $3.03 $151.50 4824 Willie Res . 50' Curb & Gutter 2.37 118.50 76105 105 Sq. Ft. Drive .96 100.80 $370.80 6 PROJECT NO. 104-24000-209, UNIT 2: DANNER STREET FROM RAMEY AVENUE TO CHAPMAN STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF THE STREET W. R. HOWARD ADDITION Raymond Jones 12 2 50' Pavement $3 .03 $151.50 205 Egger Res . 50' Curb & Gutter 2.37 118.50 Waxahachie, Tex. 24 Sq. Ft. Drive .96 23.04 75165 $293.04 Charles E. Barnes 11 2 65' Frontage 909 Ross Trail Res . 50' Pavement $3.03 $151.50 Arlington, Texas 40' Curb & Gutter 2.37 94.80 76011 52 Sq. Ft. Drive .96 49.92 $296.22 Charles D. Preston 20 & 3 65' Frontage 2824 Walton Avenue E.50' Res . 50' Pavement $3.03 $151.50 76133 of 19 50' Curb & Gutter 2.37 118.50 $270.00 Ed Baker W. 125' 3 50' Pavement $3 .03 $151.50 2013 Danner of 19 Res . 50' Curb & Gutter 2 .37 118.50 76105 52 Sq. Ft. Drive .96 49.92 $319.92 Lucile Monday 18 3 50' Pavement $3.03 $151.50 2105 Danner Res . 50' Curb & Gutter 2.37 118.50 76105 52 Sq. Ft. Drive .96 49.92 $319.92 Rosana Hunter 17 3 50' Pavement $3 .03 $151.50 2412 Cartwright Res . 50' Curb & Gutter 2.37 118.50 Tyler, Texas 52 Sq. Ft. Drive .96 49.92 75701 $319.92 7 PROJECT NO. 104-24000-209, UNIT 2: DANNER STREET FROM RAMEY AVENUE TO CHAPMAN STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF THE STREET W. R. HOWARD ADDITION Mae Belle Washington 16 3 50' Pavement $3.03 $151.50 1116 Morningside Dr. ,E. Res. 50' Curb & Gutter 2.37 118.50 76104 $270.00 Oscar Bracken 15 3 50' Pavement $3.03 $151.50 2121 Danner Res . 50' Curb & Gutter 2.37 118 .50 76105 52 Sq. Ft. Drive .96 49.92 $319.92 Lottie Chalmers 14 3 50' Pavement $3.03 $151 .50 2125 Danner Res . 50' Curb & Gutter 2.37 118.50 76105 52 Sq. Ft. Drive .96 49.92 $319 .92 Ella Dunlavy 13 3 135' Side Lot Credit 923 Irma Res . 100' Pavement $3 .03 $303.00 76104 100' Curb & Gutter 2.37 237 .00 $540.00 COST TO PROPERTY OWNER UNIT 2 . . . . . . . . . . . . . . . . . . . . $11,645.64 COST TO CITY OF FORT WORTH UNIT 2 9,764.80 TOTAL ESTIMATED CONSTRUCTION COST UNIT 2 . . . . . . . . . . . ,$21,410.44 8 PROJECT NO. 104-24000-209, UNIT 3: MACEO LANE FROM CARVERLY AVENUE TO RANSOM TERRACE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete gutter and eighteen-9nch wide concrete gutter, so that the finished roadway will be thirty feet wide, and by construct- ing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF MACEO LANE AND CARVERLY AVENUE NORTH SIDE OF THE STREET ROSEDALE PARK N0. 2 Anderson A. Griffin 12 12 130' Side Lot Credit 1913 Carverly Avenue Res . 100' Pavement $3.03 $303.00 100' Curb & Gutter 2.37 237 .00 $540.00 CARVER HEIGHTS ADDITION J. H. Jones 1 Y 130' Frontage 5709 Maceo Lane Res . 33' Pavement $3.03 $ 99.99 76112 33 ' Curb & Gutter 2.37 78.21 $178.20 RANSOM TERRACE INTERSECTS SOUTH SIDE OF THE STREET Henry L. Spencer 2 & 1 0 129' Frontage 5712 Maceo Lane Res . 37 ' Pavement $3 .03 $112 .11 76112 37 ' Curb & Gutter 2.37 87 .69 $199.80 ROSEDALE PARK NO. 2 Legal Security 1 13 130' Side Lot Credit Life Insurance Res . 100' Pavement $3.03 $303.00 P. 0. Box 8476 100' Curb & Gutter 2.37 237 .00 Dallas, Texas 75205 $540.00 COST TO PROPERTY OWNERS, UNIT 3 . . . . . , , , , _ . $1,458.00 COST TO CITY OF FORT WORTH, UNIT 3 . . . . . , . , , 2,528.21 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 3 . . . . . , $3,986.21 9 PROJECT NO. 104-24000-209, UNIT 5: COWAN STREET FROM LANGSTON STREET TO AMANDA STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be twenty-six feet wide, and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF LANGSTON STREET AND COWAN STREET NORTH SIDE OF THE STREET J. L. GASSOWAY ADDITION Ronald J. Miller 24 122' Side Lot credit 1413 Langston Res . 100' Pavement $4.13 $413 .00 76105 100' Curb & Gutter 2.37 237 .00 $650.00 Marvin West, Jr. 32 60' Pavement $4.13 $247 .80 4809 Cowan Street Res . 60' Curb & Gutter 2.37 142.20 76105 151 Sq. Ft. Drive .96 144.96 Less Credit for Existing Driveway -131.14 $403.82 C. W. COONROD SURVEY Bertha Anderson W. 105' S . 59 .5' z 104' Owner Occupied 4811 Cowan Street of Tract 7E 104' Pavement $4.22 $438.88 76105 Comm. 104' Curb & Gutter 2.37 246.48 52 Sq. Ft. Drive .96 49.92 $735.28 George Alexander E. 105' S . 59.5' z 101.34' Frontage Adjusted to 913 E. Stella of Tract 7-D 93 ' Pavement $4.31 $400.83 76104 Comm. 93' Curb & Gutter 2.37 220.41 $621.24 AMANDA STREET INTERSECTS SOUTH SIDE OF THE STREET John Pulliam Tract 9 808.53' Frontage Adjusted to 3500 Horne Comm. 80' Pavement $4.31 $344.80 76107 80' Curb & Gutter 2.37 189.60 $534.40 10 PROJECT NO. 104-24000-209, UNIT 5: COWAN STREET FROM LANGSTON STREET TO AMANDA STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF THE STREET G. W. COONROD SURVEY Cora Strider Tract 8 104.9' Adjusted to c/o Leader Savings & Loan Comm. 95' Pavement $4.31 $409.45 434 W. Kiest Blvd. 95' Curb & Gutter 2.37 225.15 Dallas, Texas 75224 86 Sq. Ft. Drive .96 82.56 $717 .16 J. L. GASSOWAY ADDITION Lena Shelby E.z of 87 ' Pavement $4.13 $359.31 4804 Cowan 23 Res. 87 ' Curb & Gutter 2.37 206.19 76105 52 Sq. Ft. Drive .96 49.92 $615.42 Ethylene C. Cavanah E.2 of 87 ' Frontage 1501 Langston 23 Res . 82' Pavement $4.13 $338.66 76105 82' Curb & Gutter 2.37 194.34 86 Sq. Ft. Drive .96 82 .56 $615.56 COST TO PROPERTY OWNERS, UNIT 5 . . . . . . . . . , , . $42892.88 COST TO CITY OF FORT WORTH, UNIT 5 . . . . . . . . . 2,510.65 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 5 . . . . . . . $72403.53 11 PROJECT NO. 104-24000209, UNIT 6e LANGSTON STREET FROM RAMEY AVENUE TO CHAPMAN STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and tighteen--inch wide concrete gutter, so that the finished roadway will be thirty feet wide, and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSEtSMENT BEGINNING AT THE NORTHWEST CORNER OF RANEY AVENUE AND LANGSTON STREET WEST SIDE OF THE STREET W. R. HOWARD ADDITION Jeff Wood 8 7 135° Side Lot Credit Rt. 2, Box 117B Res. 100° Pavement $4.13 $413.00 Mansfield, Texas 100` Curb & Gutter 2,37 237000 76063 52 Sq. Ft. Driveway .96 49092 $ 699.92 Ophelia _& James 7 & 6 7 100° Pavement $4013 $413,00 Willis Res. 100° Curb & Gutter 2037 237.00 2128 Langston 52 Sq. Ft. Driveway .96 49.92 76105 $ 699092 Willie Rarper 5 7 50° Pavement $4013 $206,50 c/o G. W. Harris Res, 50° Curb & Gutter 2037 118.50 51.35 Meadowbrook Dr. 52 Sq. Ft. Driveway o96 49092 76112 $ 374.92 Ed Pointer 4 7 50° Pavement $4013 $206.50 2114 Langston Res. 50' Curb & Gutter 2.37 118.50 76105 52 Sq. Ft. Driveway .96 49092 $ 374092 Cora & Lem Jackson 3 7 50° Pavement $4.13 $206050 2108 Langston Res. 50° Curb & Gutter 2,37 118x50 76105 $ 325.00 Cora Jackson 2 7 50° Pavement $4013 $206050 2108 Langston Res. 50° Curb & Gutter 2,37 118.50 76105 $ 325.00 12 PROJECT NO, 104b24000-209,, UNIT 6. LANGSTON STREET FROM RAMEY AVENUE TO CHAPMAN STREET CO'NTINED BLOCK aesoR LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF THE STREET W. R. HOWARD ADDITION Gracie Tutt 1 7 508 Pavement $4.13 $206.50 c/o C. F. Gilchrist, Estate Res. 508 Curb & Gutter 2.37 118050 319 W. T. Waggoner Bldg. $ 325000 76102 Timothy A. Love 10 6 508 Pavement $4.13 $206.50 2101 S. Edgewood Terr. Res. 508 Curb & Gutter 2.37 118.50 c/o International 52 Sq. Ft. Driveway o96 49.92 Fidelity Ins. Co. $ 374x92 3621 W Seventh 76107 Cora Belle Fuller 9 6 508 Pavement $4013 $206,50 2029 South Res. 508 Curb.& Gutter 2.37 118.50 Edgewood Terrace $ .325.0.0 76105 Low ie L. Donn 8 6 508 Pavement $4.13 $206.50 c/o Fred D. Dunn, -Sr. Res. 508 Curb & Gutter 2.37 118.50 3303 Carpenter Avenue $ 325.00 .Dallas, Texas Perry Walker 7 6 508 Pavement $4.13 $206.50 1224 East 19th St. Res, 508 Curb & Gutter 2,37 118.50 76102 $ 325000 Leroy Akins 6 6 508 Pavement _ $4013 $206.50 1830 E. Roberts Res, 508 Curb & Gutter 2.37 118.50 Apt. 34 52; Sq. Ft. Driveway o96 49.92 76104 $ 374.92 . Estella Johnson 5 6 508 Pavement $4x13 $206x50 1426 E. 42nd Street Res. 508 Curb & Gutter 2.37 118.50 Lois Angeles, Calif. 52 Sqo Ft. Driveway o96 49.92 90011 $ 374092 13 PROJECT NO,, 104-24000-209, UNIT 60 LANGSTON STREET FROM RAMEY AVENUE TO CHAPMAN STREET CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET Wo R. HOWARD ADDITION Jo To Taylor 4 6 50' Pavement $4,13 $206050 2012 Langston Res, 50° Curb & Gutter 2037 118050 76105 52 Sq. Ft. Driveway .96 49092 $ 374092 Bentford Starling 3 6 50' Pavement $4013 $206050 2008 Langston Res. 50' Curb & Gutter 2037 118.50 76105 52 Sq. Ft. Driveway o96 49,92 $ 374.92 Wtll ,Harris 2 6 50° Pavement $4013 $206050 2004 Langston Res. 50° Curb & Gutter 2037 118050 76105 52 Sq. Ft. Driveway o96 49092 $ 374.92 Hattie McMillian 1 6 45° Pavement $4013 $185085 2000 Langston Res, 45' Curb & Gutter 2,37 106065 76105 $ 292050 CHAPMAN STREET INTERSECTS EAST SIDE OF STREET Maxine Tisby 20 5 45° Pavement $4,13 $185.85 2001 Langston Res. 45° Curb & Gutter 2.37 106,65 76105 52 Sq. Ft, Driveway o96 49092 $ 342,42 To Jo Fair 19 5 50° Pavement $4,13 $206. 50 2004 Langston Res, 50° Curb & Gutter 2037 118.50 76105 52 Sq. Ft, Driveway o96 49,92 $ 374.92 14 PROJECT NO, 104-24000-209, UNIT 6e LANGSTON STREET FROM RAMEY AVENUE TO CHAPMAN STREET CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF THE STREET W. R. HOWARD ADDITION S. Williams 18 5 501 Pavement $4013 $206050 2009 Langs m n Res, 50° Curb & Gutter 2,37 118050 76105 52 Sq. Ft. Driveway .96 49.92 $ 374.,92 Ho Bo Sessions 17 5 50` Pavement $4013 $206050 2013 Langston Res. 50° Curb & Gutter 2037 118050 76105 52 Sq. Ft. Driveway o96 49092 $ 374,92 Lillie Mae Crittendon 16 5 50° Pavement $4013 $206050 642 Eo 109th St. Res. 50` Curb & Gutter 2037 118050 Los Angeles, Calif. 52 Sqo Ft. Driveway o96 49092 90059 $ 374092 Estella Johnson 15 5 50° Pavement $4013 $206050 31426 Eo 42nd St. Res. 50° Curb & Gutter 2037 118050 Los Angeles, Calif. 52 Sq, Ft. Driveway o96 49,92 90011 $ 374092 Thelma' Vera Thomas 14 5_ 50° Pavement $4013 $206050 2025 Langston Res. 50° Curb & Gutter 2037 118.50 76105 52 Sq. Ft. Driveway .96 49.92 $ 374092 Joseph Locklin 13 & 12 5 100° Pavement $4,13 $413000 5517 Eisenhower Drive Res. 100® Curb & Gutter 2,37 237000 76112 104 Sq. Ft. Driveway ,96 99,84 $ 749,84 15 PROJECT NO. 104-24000-209 UNIT 6: LANGSTON STREET FROM RAMEY AVENUE TO CHAPMAN STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF THE STREET W. R. HOWARD ADDITION Royal Tatnull 11 & 15' S 65' Frontage 2037 Langston Easement on Res . 50' Pavement $4.13 $206.50 76105 South Side 50' Curb & Gutter 2.37 118.50 104 Sq. Ft. Drive .96 99.84 $424.84 Augusta Quigley 21 & 15' 4 65' Frontage 2101 Langston Easement on Res . 50' Pavement $4.13 $206.50 76105 North Side 40' Curb & Gutter 2.37 94.80 $301.30 Lawrence Clark 20 4 50' Pavement $4.13 $206.50 1306 Stewart Res . 50' Curb & Gutter 2.37 118.50 $325.00 George & Mary Daniel 19 4 50' Pavement $4.13 $206.50 c/o Vivian U. Haynes Res . 50' Curb & Gutter 2.37 118.50 1019 N. Lawrence $325.00 South Bend, Ind. 46617 Eugene Cummings 18 4 50' Pavement $4.13 $206.50 1020 E. Mulkey Res . 50' Curb & Gutter 2.37 118.50 76104 52 Sq. Ft. Drive .96 49.92 $374.92 Beatrice Moore 17 4 50' Pavement $4.13 $206.50 304 Mayflower Res . 50' Curb & Gutter 2.37 118.50 76104 $325.00 16 PROJECT N0. 104-24000-209, UNIT 6: LANGSTON STREET FROM RAMEY AVENUE TO CHAPMAN STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF THE STREET W. R. HOWARD ADDITION Michel Cooper 16 4 50' Pavement $4.13 $206.50 2121 Langston Res . 50' Curb & Gutter 2.37 118.50 76105 52 Sq. Ft. Drive .96 49.92 $374.92 Chester A. Cannon 15 4 50' Pavement $4.13 $206.50 2123 Langston Res . 50' Curb & Gutter 2.37 118.50 76105 52 Sq. Ft. Drive .96 49.92 $374.92 Jacob Rolla 14 4 135' Side Lot Credit 4751 Ramey Res . 100' Pavement $4.13 $413 .00 76105 100' Curb & Gutter 2.37 237 .00 138 Sq. Ft. Drive .96 132.48 $782.48 COST TO PROPERTY OWNERS, UNIT 6 . . . . . . . . . . . . $13,591.86 COST TO CITY OF FORT WORTH, UNIT 6 . . . . . . . . . 7,242.54 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 6 . . . . . . . $20,834.40 17 UNE City of Fort Worth, Texas DOSS& Mayor and Council Communication GRAMM DATE REFERENCE SUBJECT: Final Payment - Assessment Paving PAGE NUMBER at 6 Locations on the East Side 4/10/72 FP-870 -Project 104-24000-209 1 o 1 Final Council action on the project described below is requested: Proiect Description Name: Assessment Paving at 6 Locations on the East Side Contractor: Glade, Inc. Contract Awarded: July 12, 1971 (M&C C-2032) Work Order Issued: August 12, 1971 Work Order Effective: August 23, 1971 Work Began: August 23, 1971 Date of Final Inspection: January 14, 1972 Working Time Bid: 85 Days Working Time Used: 65 Days Proiect Cost and Financing Original Bid Price: $89,693,55 Change Order No. 1: + $ 63.70 (A.R. 1-15, 2.3.1, 9-10-71) Change Order No. 2: - $ 60.00 (A.R. 1-15, 2.2, 9-10-71) Change Order No. 3: - $ 810.00 (A.R. 1-15, 2.2, 10- 7-71) Change Order No. 4: - $ 305.00 (A.R. 1-15, 2.3.1, 10-21-71) Revised Bid Price: $88,582.25 Final Contract Cost: $81,276.16 Partial Payments Previously Made: 6 Amount $73,148.54 Final Payment Due: $ 8,127.62 Sufficient funds are available for the final payment to be made from Project Number 104-24000-209. Deviation from Bid Price: The Final Contract Cost of this project is $7,306.09 under the revised bid price. A major portion of the savings, $5,040, occurred because six inch metal pipe sub-drain was found to be unnecessary. The re- maining cost difference, $2,266.09, is attributed to variations between quantities estimated in the con- tract d4uments and quantities measured and used at the job site. Compliance with Specifications Tests made during construction show that materials used and required thicknesses were in compliance with contract specifications. Recommendations It is recommended that the project described above be acepted by the adoption of an ordinance and that final payment of $8,127.62 b? authomed to Glade, Inc. RNL:mhg SUBMITTED BY: DISPOSITION OUNCIL: PROCESSED BY APPROVED�/, ❑ OTHER� (DESCRIBE) F( jb� d/^(1�/,l��i��i✓7A"� f�C ' 6 1 rI CITY SECRETARY DATE CITY MANAGER �` ,