Developer Company Name: Victory at Heritage, LLC
Address, State, Zip Code: 8001 LBJ Freeway , Ste 400, Dallas, TX 75251
Phone & Email: 972-707-9555, lcris�vg-re.com
'r N'�{
Authorized Signatoiy, Title: F� Ramji , CEO
Project Naine and Brief Heritage Trace Parkway Median Cut
Description:
Project Locatioii: Northwest Corner of Heritage Trace P�rkw�y
Plat Case Number: FP-16-058 Plat Name: Victory at Heritage
Mapsco: Council District: 7 City Project Number:
CFA Number: 2016-063 DOE Number: None
To be completed U�• s7aff.• �
C� , ^ ,� J
Receiveci by: � ���� � �i-' S D�te: (�
City of Fort Wortli, Texas
Standard Con�munity Facilities Agreement
CFA Off'icial Release Date: 10.07.2015
Page 1 of 11
100353
J �PFICIAI� RECORp
{ �.ITY SEG�TARY
;�� �'. WORTH, T�
f
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
.
COLTNTY OF TARRANT § Contract No. �� "`"
WHEREAS, Victory at Herita�e, LLC, ("Developer"), desires to make cei`tain specific
improvements as described below and on the exhibits attached hereto ("Iinprovements") related
to a project generally desci-ibed as Heritage Trace Parlcway Median Cut ("Project") within the
City or the extraterritorial jurisdiction of Fort Woi`th, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improveinents or
Project; and
WHEREAS, any future City pai�ticipation in this CFA is subject to the availability of
City funds and approval by the Foi� Worth City Council and shall be memorialized as an
ainendinent to tl�is Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in coiulection with the collective Improveinents for the
Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Coininunity Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incoiporated into this Agreen�ent as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the perfot-�nance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in comlection
with the work perfot7ned by said contractors.
B. Developer shall provide financial security in confoi7nance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and fl1e City has officially accepted the Improvements. Developer
further aclaiowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth, TeYas
Standard Community Facilities Agreement
CFA Ofiicial Release Date: 10.07.201 _5
Page 2 of 11
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
� the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said constructiou shall be completed in a good and workmanlike
inanner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Ilnprovements and are incorporated herein:
Water (A) ❑, Sewer (A-1) ❑; Paving (B) ❑x , Stoi-�n Drain (B-1) 0, Street Lights &
Signs (C) ❑.
E. The Developer shall award all contracts for the constiuction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in confonnance with paragraph 8, Section II, of the Policy. Developer shall
ensure its contractor(s) pays the then-current City-established wage rates.
F. For all Improvemeuts included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
depai-tmeut having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do worlc in public ways and/or prequalified to perfoi7n
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the naines of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the naine of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) yeais from the date of final acceptance insuring the
inaintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 3 of 11
maintenance bond. All bonds to be furnished before worlc is commenced and to
meet the requirelnents of Chapter 2253, Texas Govei-�iment Code.
iii. To require the contractor(s) it hires to perfoi7n the construction work
conteinplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract docunzents for
developer-awarded infiastructure construction contracts. The City shall be
nained as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurauce (ACORD or other state-
approved fonn) supplied by the contractor's insurance provider and bound in the
construction contract boolc.
iv. To require its contractor to give 48 hours advance notice of intent to comrnence
consh-uction to the City's Const�uction Services Division so that City inspection
persoimel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of inaterials being used as inay be required by the City.
v. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Consh-uction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water maiils and
seivice lines have been completed to the satisfaction of the Water Depai-tinent.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
developinent or to construct the Iinprovements required herein.
City of Fort Worth, Texas
Standard Comn7unity Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 4 of 11
L City shall ilot be responsible for payment of any costs that may be incuned by Developer in
the relocation of any utilities that are or may be in conflict with any of the comrnunity
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminar,y plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer a�•ees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the constiuction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnif,y, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for oi• on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
an,y failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, wlzetlze�� oi� noi suclz inian'ies, deatlz or daf�ta�es a�•e
caused, in �vhole or itz part, bv tlze alle�e�l ne�li�e�tce of tlze City of Fof•t Wot•th, its
officers, se�•vaizts, or eviplovees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, ivltetlie�• oi� �zot suclt i�zjui•ies, �Ieatli or dama�es a�•e caused, i�z
fvliole or i�t part, by tlte alle�ed ne�li�ertce of the Citv of Fort Wo��tlt, its offrcet•s,
se�•va�zts, o►• ernplovees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for an,y losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
Ciry of Fort Worth, Texas
Standard Commui7ity Facilities Agreement
CFA Ofticial Release Date: 10.07.2015
Page 5 of 11
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon coinpletion of all work associated with the construction of the Iinproveinents,
Developer will assign to the City a non-exclusive right to enforce the conh•acts entered into
by the Developer with its contractor along with an assigmnent of all wai-�anties given by the
contractor, whether express or iinplied. Further, Developer agrees that all contracts with
any contractor shall iuclude provisions grauting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total consh-uction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and stonn drain inspection fees equal to four
percent (4%) and inaterial testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the sh•eetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight constiuction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall coinplete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreeinent to cause the completion of the constructiou of the Iinprovements if at
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.0'7.2015
Page 6 of 11
the end of two (2) years from the date of this Agreement (and any extension
period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Coinpletioil Agreeinent. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/ot• constructiou, the conh-actors
and/or suppliers inay put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth, TeYas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 7 of 11
Cost Summary Sheet
Project Name: Heritage,Trace Parkway Median Cut
CFA No.: 2016-063
IS���[:�► .�, -
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Signals
TPW Construction Cost Tofal
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub-Toial for Water Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light inspsection Cost
H. Signals Inspection Cost
H. Street Signs Instailation Cost
Sub-Total for TPW Consfruction Fees
Total Construction Fees:
Financial Guaranfee
Bond = 100%
reement = 100% / Holds Plat
Nater/SanitarY Sewer= 125%
�avina/Storm Drain = 125%
e
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 8 of 11
Developer's Cost
$ 93,445.00
$ -
$
$ -
$ 93,445.00
$ 93,445.00
$ -
$ 3,737.80
$ 1,868.90
$ -
$ -
$
$ 5,606.70
$ 5,606.70
116,806.25
116.806.25
Choice
ACCORDINGLY, the City of Fort Worth and Developer have each caused this insriument to be
executed in quadruplicate in each entity's respective naine by its duly authorized signatories effective as
of the date executed by the City s City Manager or his/her designee.
CITY OF FORT WORTH
�'
Jesus J. Chapa
Assistant City Manager
Date: d �� ��
Reconime��ded by:
DEVELOPER
Victory at Heritage ,
Name: T
Title: Au
i� i r
Repre�e tative
Date: /o�G ��CQ
ATTEST: (Only if required by Developer)
' �-
endy Chi-Babulal, EMBA, P.E.
Development Engineering Manager Signature
Water Department Name:
(.�J, �
Dougla . Wiersig, P.E.
Director
Transportation & Public Works Department
Approvecl as to Fornt & Legalit��:
Richard A. McCracicen 3�7 �ti—�
Assistant City Attorney
M&C No. N I �
Date:
�� �24S ! ���
City of Fort Worth, Texas
Standard Comnnmity Facilities Agreement
CFA Ofticial Release Date: 10.07.2015
Page 9 of 11
���FFICIAL RECORD
� ;.
� cl�nr s�c��ra�r
f
' FT. HlORTH, TX
� - --.����-�—_ � _ �-
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included
�
0
❑
❑
❑
❑
�
Attaclunent
Attachinent 1- Changes to Standard Community Facilities Ab eement
Location Map
Exhibit A: Water Improvments
Water Cost Estimate
Exhibit A-1: Sewer Improvetnents
Sewer Cost Estimate
Exhibit B: Paviug Improvements
Paving Cost Estimate
Elcliibit B-1: Storm Drain Improvements
Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, TeYas
Standard Commui�ity Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 10 of 11
ATTACHMENT "1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 100353
None
City of Fort Worth, Teras
Standard Coimnunity Facilities Agreemeilt
CFA Official Release Date: 10.07.2015
Page 11 of 11
�
NORTH
NOT TO SCALE
HERITAGE TRACE PARKWAY
MEDIAN CUT
OWNER / DEVELOPER:
CENTURION AMERICAN
1800 VA�LEY VIEW LANE, SUITE 300
FARMERS BRANCH, TX 75234
PH: ( 469) 892-7200
���:� PE LOTO N
I�'I' LAXD lOLUTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
0 NORrH 60'
�RAPHIC SCALE
HERITAGE TRACE PARKWAY
MEDIAN CUT
OWNER / DEVELOPER:
CENTURION AMERICAN
1800 VAL�EY VIEW LANE, SUITE 300
FARMERS BRANCH, TX 75234
PH: ( 469) 892-7200
���� PELOTON
I�'I) IAND SO�UTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43_SpecBook Proposal Form
DAP - BID PROPOSAL
Page t of 1
Bidder's Application
Project Item Information Bidder s Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid V1lue
UNIT I: PAVING IMPROVEMENTS
0170.0102 Work Order Mobilization 01 70 00 EA 1 $8,500.00 $8,500.00
_ �. � . _. .., _.... _ _ ... _ ._._
.. ._ _._�
0241.1300 Remove Conc Curb and Gutter 02 41 15 LF � 350 $8.00 $2,800.00
3123.0101 Unclassified Excavation 31 23 16 CY 220 $43.00 $9,460.00
_... _ � ..... ._. . . ..� . . .. .. . . _ _ .... __.
,.
3211.0211 6" Flexible Base, Type�B, GR-1 32 11 23 SY 400 $33.75 $13,500.00
. _ __ . _ _._ _ ._ . __ _ .
3213.0103 8" Conc Pvmt 32 13 13 SY 400 $126.25 $50,500.00
� . _ _ _.__ _ _- _ . __ _
3216.0101 6" Conc Curb and Gutter 32 16 13 LF 380 $5.50 $2,090.00
_._ _ _ __. . . _. _� .. M_
_ _ w_ .. . __... _ �_ ., �. .
3217A203 8" SLD Pvmt Marking Tape (V� 32 17 23 LF 100 � $10.50 $1,050.00
_ _ . — _ . _ _.
3217.2102 REF� Raised Marker TY I-C 32 17 23 EA 6 $18.00 $108.00
_.
3292.0400 Seeding, Hydromulch 32 92 13 LS 1 $2 635 00 $2 635 00
_. . _ . . �._ �
_... t._ _.. � .�_ �_. �
3441.4006 Install Alum Sign Ground Mount 34 41 30 EA 2 $521.00 $1,042.00
3471.0001 Traffic Control 34 71 13 MO 1 $1,760.00 $1,760.00
TOTAL UNIT I: PAVING IMPROVEMENTS $93,445.00
Contractor agrees to complete NORI{ for RINAL ACC�PTANCE within
CONTRr1CT commences to run as provided in the General Conditions.
�ND OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April2, 2014
60 calend�r days after the date when the
Master QTO HTP Median Cul.xls