Loading...
HomeMy WebLinkAboutContract 46976-CO5�,` �_- _;h� � :: � �Ec�1V� � � ��,�i � t ,P 'i c-, ft:; �,'I,�� � , CIZY �� �ORtW�R1'Et ' G1iYSECR� , FORT WORTH�� City Of Fort Worth Change Order Request cinr sECREr� i�7(�" �C�� conm��r nto. Facility and Project North Service Center, Phase 1& 2 City Sec No. 46976 Descriplion: , - Funding (FID) 304014-0200431-5740010—0O2105-000780-2015-14060199 City Proj. No. 02105 No.(s) Conlractor. Ridgemont Commercial Construction Change Order#�5 Date: 3/1/2017 City Projecl Mgr. Ronnie Clements City Inspector: Mike Milam Phone Number: (817) 392- 8014 Phone Number: (817) 392- 2297 Original ConlractAmount Extras to Dale------------------------ --------------------------------------- Credits to Dale ------------------------ Pending Change Orders (in M&C Process) Coniract Cost to Dale — Amount of Proposed Change Order- Revised Contract Amount ----------------------------- Original Funds Available for Change Orders Remaining Funds Available for this CO ---------------------------- Additional Funding (if necessary) CHAN6E ORDERS to DATE (INCLUDING THIS ONE) AS % OFORIGINAL CONTRACT MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTR.4CT COST+ 25%) Contract Time (CD) $25,462,398.00 660 $847,906.00 0 $0.00 0 $0.00 0 $26,310,304.00 660 $7,827.00 0 $26,318,131.00 660 50.00 $o.00 So.00 3.34 % $31,827,997.50 � JUSTIFICATION (REASONS) FOR CHANGE ORDER The purpose of Change Order No. 5 is to add breakers in the elecfrical panel, install new conduif, add electrical wiring, and new receptacles at the Covered Storage Building per Architecfs Supplemental Instruction (ASI) # 24. This requiremenl is to provi�ie-TPW 5✓ithbullets to be able to plug in equipment that is needetl to keep material warm for sUeet repairs. The lotal of Change Ord�s�� 5 results in an•increase;to the original contract amount by 3.4%. � �' ' • i �� �� � ' }}� . � �. ' �� A{�W$$� �jls � � � ' ��" ' � ( �S`� 3���/ ��'r ll� 5' C �$i�!' bt ``' .. ,��� i �:'�.��'� .,a`� It is understood and agreed fhat the acceptance of this Change Order by Ihe contractor consitutes an accord and payment in full (bolh time and money) for all cosls arising out of, or incindenlal fo lhe above Change Order. ensuring all performance and reporting requirements. Architectural Services Manager Proposeci Change Order Reques� Ridgemont Commercial Construction 1520 W Walnut Hill Lane Irvinq, TX 75038 R I D G E M O N T Phone:214492-8900 commercial construction Owner : City of Fort Worth Project: 1500609- / Fort Worth North Service Center 200 Texas Street 301 Hillshire Drive Fort Worth, TX 76102-6314 Fort Worth, TX 76052 Change Order Request #: 37 Covered Storage Added Receptacles Includes upgradediadded breakers at panel CSW, new conduit to transformer, added wire, and receptacles to be installed at TPW Covered Storage per ASI #24 Item Phase Description Covered Storage Added Receptacles 26-00- Electrical lncludes upgraded/added breakers at panel CSW, new conduit to transformer, added wire, and receptacles to be installed at TPW Covered Storage perASl #24 Submitted By: Ridgemont Commercial Construction Signed: Kevin Brannum�` � ���-� Date: Reviewed By: Quorum Architects, Inc Signed: Date: Overhead Bond insurance Fee Requested Total For Item Total For Chancre Order Approved By: City of Fort Worth Signed: Date: � Estimated Cost 7,115.00 4.00% 285.00 1.00% 77.00 1.00% 71.00 4.00% 285.00 7, 827.00 7 827.00