HomeMy WebLinkAboutContract 48849cmr sEc�Er� � � �
CONTRACT N0.
Developer and Project Information Cover Sheet:
Developer Company Name: TCRG Construction, LLC/TCRG Opportunity IX, LLC
Address, State, Zip Code: 5201 Camp Bowie Blvd, Fort Worth, TX, 76107
Phone & Email: 817-626-9898, patton@tcrg.ocm
Author•ized Signatoiy, Title: Robert L. Patton, Jr.
Project Name: Synergy Tract Public Improvements
Brief Description: Water, Sewer, Paving , Storm Drain, Street Lights
Project Location: Haimon Road from Golden Triangle to Keller Hicks
Plat Case Numbei: FP-16-092,93 Plat Name: Synergy West
Mapsco: 21K-F Council Dish•ict: 7 City Project Number: 100750
CFA Numbei : 2017-011
DOE Number: <DOE #>
To be completed by , f f
�
Received by: � Date: � ��
OFFiCIA� REC�RD
CI"1'Y SECftETARY
�T. �Vl1RT'H, TX
City of Fort Warth, Texas
Standard Conununity Facilities Agreement - Synergy Tract Public Improvements
CFA Official Release Date: 01.03.2017
Page 1 of 11
STANDARD COMNIUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COiTNTY OF TARRANT § Cantract No. � J l
WHEREAS, TCRG Construction, LLGTCRG Opportunity IX, LLC ,("Developer"),
desues to make certain specific improvements as described below and on the exhibits attached
hereto ("Improvements") related to a project generally described as Snerg. Tract Public
I�nprovements ("Project") within the City or the extratei�7torial jurisdiction of Foi�t Worth, Texas
("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memoi�ialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desue to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improveinents for the
Proj ect.
NOW, THEREFORE, for and in consideration of the covenants and conditions contained
herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incoiporated
into this Agreetnent as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the perfoi�rnance of its duties and obligations hereunde� and to
cause all cont�actors hired by Developer to comply with the Policy in connection with the
work perfoi�ned by said contractors.
B. Developer shall provide fmancial security in confoimance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has ofFicially accepted the Improvements. Developer
City of Fort Worth, Texas
Standard Coi�unity Facilities Agreement - Synergy Tract Public Improvements
CFA Official Release Date: 01.03.2017
Page 2 of 11
fui-ther acknowledges that said acceptance process requires the Developer's contractor(s)
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided und�r this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the e�ibits attached hereto.
D. The following checked e�iibits describe the Improvements and are incoiporated herein:
Water (A) �, Sewer (A-1) 0, Paving (B) �, Stoi�n Drain (B-1) �, Street Lights & Signs
(C) � •
E. The Developer shall awaid all cont�acts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the cont�acts shall be administered
in confoi�nance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s) pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
constiuction contract(s), Developer agrees to the following:
i. To employ a construction cont�actor who is approved by the duector of the
department having jurisdiction over the infiastructtue to be const��ucted, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perfoi7n water/wastewater
construction as the case may be.
ii. To requue its con�iactor to furnish to the City a payment and perfoimance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastiuchue, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insiuing the maintenance
and repair of the constructed infiastruchue during the term of the maintenance
City of Foi�t Worth, Texas
Standard Community Facilities Agreement - Synergy Tract Public Improvements
CFA Official Release Date: O l.03.2017
Page 3 of i l
bond. All bonds to be furnished before work is com�nenced and to meet the
requirements of Chapter 2253, Texas Govei�unent Code.
iii. To requi�e the contractor(s) it hires to perform the consh-uction work contemplated
herein to provide instuance equal to or in excess of the amounts required by the
City's standard specifications and cont�act documents for developer-awarded
infiastructure constiuction cont�acts. The City shall be named as additional instued
on all insivance requued by said documents and same will be evidenced on the
Certificate of Insivance (ACORD or other state-approved foi�n) supplied by the
contractor's insurance provider and bound in the construction cont�:act book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
constiltction to the City's Constiuction Services Division so that City inspection
personnel will be available; to require the contractor to allow the conshuction to be
subject to inspection at any and all times by City inspection forces, to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
v. To requi�e its contractor to have fully executed conhact documents submitted to
the City in order to schedule a Pre-Const�•uction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
constiuction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to seivice lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
seivice lines have been completed to the satisfaction of the Water Department.
G. Developer sha11 provide at its expense, unless otherwise agreed to by �ity, a11 engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to seive the
development or to const�uct the Improvements requu•ed herein.
I. City sha11 not be responsible for payment of any costs that may be incut�ed by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth, Texas
Standard Community Facilities Agreement - Synergy Tract Public Improvements
CFA Official Release Date: 01.03.2017
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the constiuction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or assQrted, brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the canstruction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such iniuries, death or d�ma�es are
caused, in whole or in part, by the alle�ed ne�li�ence of the L`ity ofFort Wortli, its
offcers. serv[[nts. or emploVees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure contemplated
herein, whether or not such inluries, death or dama�es are caused, in whole or in part,
bV the alle�ed ne�li�ence of the City of Fort Worth, its of�cers, servants, or employees.
Further, Developer will require its contractors to indemnify, and hold harmless the City
for aay losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Foi�t Worth, Texas
Standard Community Facilities Agreement - Synergy Tract Public Improvements
CFA Official Release Date: 01.03.2017
Page 5 of 11
N. Upon completion of all work associated with the constiuction of the Improvements,
Developer will assign to the City a non-exclusive i�ight to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all wai�anties given by the
contractor, whether express or implied. Fi.u�ther, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the i-ight to _enforce such contracts as
an express intended third pas-ty beneficiary of such contaacts.
O. Inspection and material testing fees are requued as follows:
i. Developer sha11 pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total consh-uction cost as stated in the const�uction contract.
ii. Developer shall pay in cash paving and stoi�rn drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total const�uction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's shase
of the st�eetlight conshuction cost as stated in the const�-uction conhact.
iv. Developer sha11 pay in cash the total cost of st�eet signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) yea.rs, provided,
however, if construction of the Improvements has started within the two yeas
period, the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its fmancial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's fmancial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2) years from the date of this Agreement (and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Foi4 Worth, Texas
Standard Community Facilities Agreement - Synergy Tract Pnblic Improvements
CFA Official Release Date: 01.03.2017
Page 6 of 11
const�uction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or const�uction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAIl�TllER OF PAGE INTENTIONALLY LEFT BLANK}
City of Fort Worth, Texas
Standard Community Facilities Agreement - Synergy Tract Public Improvements
CFA Official Release Date: 01.03.2017
Page 7 of 11
Cost Snmmary Sheet
Project Name: Synergy Tract Public Improvements
CFA No.: 2017-011 City Project No.: 100750
An Engineer's Estimate of Probable Cost is acceptable. However, the const�-uction cont�•act price
will ultimately detei7nine the amount of CFA fees and financial guas•antee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-consti-uction meeting.
An itemized estimate coi7esponding to each project-specific e�ibit is reqtured to support the
following infoimation.
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Tota!
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights installed by Developer
4. Signals
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub-Total for Water Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Signals Inspection Cost
H. Street Signs Installation Cost
Sub-Total for TPW Construction Fees
Total Construction Fees:
one
Bond = 100%
Cash Escrow Water/S�
Cash Escrow Paving/S
Letter of Credit = 125%
Developer's Cost
$ 284,438.00
$ 104,377.00
$ 388,815.00
$ 1,638,937.70
$ 860,632.00
$ 226,036.61
$ -
$ 2,725,606.31
$ 3,114,421.31
$ 7,776.30
$ 7,776.30
$ 15,552.60
$ 99,982.79
$ 49,991.39
$ 9,041.46
$ -
$ -
$ 159,015.65
$ 174,568.25
Amount
3,114,4
3.114.4
3
Choice
Mark on�
21.31 x
21.31
18.75
D7.89
City of Fort Worth, Texas
Standard Community Facilities Agreement - Synergy Tract Public Improvements
CFA Official Release Date: 01.03.2017
Page 8 of 11
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Managei• or his/her designee.
CITY OF FORT WORTH
�
��—
Jesus J. Chapa
Assistant C� � ager
Date: � '/��
—�
Recommended by:
� ` ��� : �
Wendy C -Babulal, EMBA, P.E.
Development Engineering Manager
Water Department
(� , V
Douglas Wiersig, P.E.
D'u•ector
Transpoi�tation & Public Works Department
Approved as to For•m & Legality.•
Richard A. McCracken
Assistant City Attoine
M&C No. � ��
Date: 3 � �%
Foim 1295: � � � r' � � � �
✓ � �. � ye.�t�.
� �. � ��.... ��
A�ST: .�
; � � :�
,%�%� �; �'� . . ��
ISlary J Y��ys�er ���.���
City Secretary � .
DEVELOPER
TCRG Const�uction, LLC/TCRG Opportuniry
IX, LLC
Name: Robert L. Patton, Jr.
Title: President
Date: %`� Z� z�' ,� r�L1i j,,
—� ,
ATTEST: (Only if required by Developer)
Signature
Name:
Cont�act Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administ�•ation of this cont�act, including
ensuring all perfoi�rnance and reporting
requu•ements.
i ?
�1 � C,� f�� /i � � �; � � ������ ��,�
Name: �-� '1
Title:
City of Fort Worth, Texas
Standard Community Facilities Agreement - Synergy Tract Public Improvements
CFA Official Release Date: 01.03.2017
Page 9 of 11
4FFICIA4 R��OR�
CI`TY B�Ca�'iA1�Y'
FT'. IMfJit'il#, TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included
�
�
�
�
�
'�
'�
Attachment
Attachment 1- Changes to Standard Community Facilities Agreement
Location Map
E�ibit A: Water Improvements
Water Cost Estimate
E�ibit A-l: Sewer Improvements
Sewer Cost Estimate
Exhibit B: Paving Improvements
Paving Cost Estimate
E�ibit B-1: Storm Drain Improvements
Storm Drain Cost Estimate
E�ibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas
Standard Community Facilities Agreement - Synergy Tract Public Improvements
CFA Official Release Date: 01.03.2017
Page 10 of 11
ATTACIiMENT "1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 100750
None
City of Fort Worth, Texas
Standard Community Facilities Agreement - Synergy Tract Public Improvements
CFA Official Release Date: 01.03.2017
Fage 11 of 11
m
S
X
W
Q
L�
U
w
�
Q
�
a
0
�
J
>
8
r
w
�
�
a
�
VICINITY MAP
VIC/NITY MAP
(NOT TO SCALE)
� ■ Gi����O Koch 6100 WESTERN PLACE, SUITE 1001
FORT WORTH, TX 76107 817.412.7155
TX REG. ENGINEERING FIRM F-14439
TX REG. SURVEYING FIRM LS-10193824
ORAWN BY CHECKED BY SCALE DATE ✓OB NUMBER
HPB JCM NTS 01/13/2017 3734-16.249
SYNERGY HARMON ROAD
CFA EXHIBITS
LOT 2, BLOCK 1
SYNERGY WEST
LOCATED IN THE CITY OF FORT WORTH, TEXAS
W.M. MCCOWEN SURVEY, ABSTRACT N0. 999,
TARRANT COUNTY, TEXAS
l� lA I.f11 � o�� aD /l aD o VIJ L�1 �� W
G=�
0 250 500 1000
GRAPHIC SCALE IN FEET
I
' CONNECT TO EXISTING
i
12" WATER MAIN
6 G KELLER H/CK I91aA� � s
PROPOSED
FIRE
HYDRANT
i
� ��� PROPOSED EXISTING 12" WATER LINE
a�—" � FIRE PLAN N0. 16623
w I� I HYDRANT
�
¢ —�� I NpR pp �
" PROPOSED 0
� — FIRE a PROPOSED CONCRETE
� HYDRANT ENCASEMENT FOR 12"� — �
� �– — � —� PUBLIC WATER LINE �
�
� ��- _ � �
~ PROPOSED � PROPOSED 12" PUBLIC ��
m – FIRE WATER LINE
W HYDRANT J/
Q �
U
N PROPOSED 12" PUBLIC // 3
= WATER LINE y
' — — PROPOSED PROPOSED� �
� FIRE FIRE
N PROPOSED HYDRANT � 2
� PROPOSED FIRE PROPOSED NYDRANT �
" FIRE HYDRANT 10" FIRE �
> HYDRANT LINE �
� PROPOSED �
o FIRE
� HYDRANT - PROPOSED = PROPOSED � �4
� Z � � PROPOSED 2" FIRE FIRE Q
� O DOMESTIC SERVICE HYDRANT HYDRANT aj
' O�e PROPOSED 2" I
� � IRRIGATION TAP CONNECT TO �
� PROPOSED = � EXISTING 24" yt
; FIRE WATER LINE
� HYDRANT PROPOSED 12" ' �
o PUBLIC WATER LINE
i �
PROPOSED EXISTING 24" WATER LINE
FIRE PLAN N0. 16623
HYDRANT ° ° ° '
a PROPOSED 2" �
� IRRIGATION TAP — � �
� ��
' GOLDEN TR/ANGLE BOULEVARD
� — — CONNECT TO EXISTING
� 12" WATER LINE
� i ' �/
� 6700 WESTERN PLACE, suiTE tooi SYNERGY HARMON ROAD
� Pacheco Koch FORT WORTH, TX 76107 817.412J155 CFA EXHIBITS
TX REG. ENGINEERING FIRM F-14439 LOT 2, BLOCK 1
} TX REG. SURVEYING FIRM LS-10193824 SYNERGY WEST
``' LOCATED IN THE CITY OF FORT WORTH, TEXAS
� ORAwN BY CHECKED BY SCALE DA7E ✓OB NUMBER y�r,M. MCCOWEN SURVEY, ABSTRACT N0. 999,
m HPB JCM 1"=500' 01/17/2017 3734-16.249 TARRANT COUN7Y, TEXAS
a
DWG FILE: 3734-16.249 CFA WATER.DWG
X
W
Q
U
Q
S
/
�
O
�
M
U
N
�
i
�
M
n
M
/
�
EXHI = IT "A1" - SEWERi
PROPOSED PROPOSED 8" SEWER SERVICE
CSS BACKFILL
OF 8" PROPOSED 4' DIAMETER
SANITARY SANITARY SEWER MANHOLE
SEWER LINE
PROPOSED 8" PUBLIC
0
SANITARY SEWER LINE
0 100 200 400
GRAPHIC SCALE IN FEET �j
� // /
�
\ '
— — � — — — — — PROPOSED 4' DIAMETER SANITARY —
0 � SEWER MANHOLE. CONNECT TO
I EX. 8" SANITARY SEWER
� - =- = �-= -= -= -= -= _�--= -= -= �;
I PROPOSED 8"
ISEWER SERVICE
° � END AND CAP 8"
I ( SEWER LINE
�,
PROPOSED 4' DIAMETER
SANITARY SEWER MANHOLE
EXISTING 8" SANITARY SEWER
PLAN N0. 16623
CONNECT TO EX.
SANITARY SEWER
MANHOLE
PROPOSED 16" PUBLIC
SANITARY SEWER
PROPOSED 4' DIAMETER
� � � SANITARY SEWER MANHOLE -
_ � — ��— — — �
�
a
� � — e
�
,� 60LDEN TR/ANGLE BOULEVARD
0
N
\
�7
\
O
� P a c h e c o Ko C� 6100 WESTERN PLACE, SUITE 1001
FORT WORTH, TX 76107 817.412J155
TX REG. ENGINEERING FIRM F-14439
y TX REG. SURVEYING FIRM LS-10193824
w
� ORAWN BY CHECKED BY SCALE OA 7E ✓OB NUMBER
m HPB JCM 1"=200' 01/17/2017 3734-16.249
a
48
I/
/
REMOVE 216LF OF 15"
SANITARY SEWER AND
EXISTING MANHOLES (2)
PROPOSED CONCRETE
ENCASEMENT FOR
EXISTING 24" WATER LINE
SYNERGY HARMON ROAD
CFA EXHIBITS
LOT 2, BLOCK 1
SYNERGY WEST
LOCATED IN THE CITY OF FORT WORTH, TEXAS
W.M. MCCOWEN SURVEY, ABSTRACT N0. 999,
TARRANT COUNTY, TEXAS
DWG FILE: 3734-16.249 CFA SEWER.DWG
EXHI=IT "=" - PAVING
� PROPOSED CONCRETE PAVEMENT � PROPOSED HMAC
1RAN9TION
PROPOSED CONCRETE SIOEWAIX � PROPOSED CONCRETE ORIVEWAY
i i
I I
� �
� PROPOSED 35'
WIDE STREET
_
X
W
Q
U
� --
0
0
�
U
-' PROPOSED
� PRIVATE
�? DRfVEWAYS
N \�
�
�
r
� OC
� PROPOSED
�
� PRIVATE _ �
i
DRIVEWAYS
W DOPO D WA�K �P���
0 250 500 1000
GRAPHIC SCALE IN FEET l�
KELLER H/CK ROAD
oa
�
�
� COMMERCIAL CONNECTOR PER
� MASTER THOROUGHFARE PLAN
� �
_ - �
PROPOSED 10' �� � � �
WIDE SIDEWALK � �
PROPOSED 23'
WIDE STREET
PROPOSED 10'
WIDE SIDEWALK
�
�
�1 PROPOSED
INDUSTRIA�
� � � � — — DRIVEWAY
Q
� _ — — —
N �
O C� O
� � _ fsOLDEN TR/AN!'sLE BOULEVARD
0
N
�
� '
� 6100 WESTERN PLACE, SuiTE tool SYNERGY HARMON ROAD
Pacheco �OV� FORT WORTH, TX 76107 817.412.7155 CFA EXHIBITS
TX REG. ENGINEERING FIRM F-14439 LaT 1 R2, BLOCK 1
} TX REG. SURVEYING FIRM LS-10193824 SYNERGY WEST
W IOCATED IN THE CITY OF FORT WORTH, TEXAS
ORAWN BY CHECKED BY SCALE DATE ✓OB NUMBER
� W.M. MCCOWEN SURVEY, ABSTRACT NO. 999,
m NPB JCM 1"=500' 01/17/2017 3734-16.249 TARRANT COUN7Y, TEXAS
a
OWG FILE: 3734-16.249 CFA SEWER.DWG
m
_
X
w
a
�
U
Q
0
N
0
U
J
>
N
�
i
�
�
�
�
�
EXHI = IT "D" - STORM DRAIN
� ---�-��— — —
PROPOSED 5'X4' PUBLIC STORM DRAIN
PROPOSED CONCRETE
HEADWALL
PROPOSED 15' RECESSED
CURB INLET D-1
PROPOSED 10' RECESSED
CURB INLET B-2
PROPOSED 21" PUBLIC
STORM DRIAN
PROPOSED 15' RECESSED �
CURB INLET B-4
PROPOSED 24" PUBLIC
STORM ORAIN
PROPOSED 3-4'
DIAMETER STACKED
MANHOLE
INSTALL PROPOSED
PW-1 WINGWAL�
PROPOSED 3-4'
DIAMETER STACKED
MANHOLE
PROPOSED 3-10'X4'
RCB STORM DRAIN
Q PROPOSED 3-4'
� DIAMETER STACKED
o MANHOLE
�
0 250 500 1000
GRAPHIC SCALE IN FEET �I
PROPOSED 10' RECESSED CURB INLET C-1
KELLER H/CKS ROAD
PROPOSED 4' JUNCTION BOX
PROPOSED 24" PUB�IC STORM DRAIN
� �
�',�0�� PROPOSED 6' JUNCTION BOX
PROPOSED FW-0 WINGWALL
�
� PROPOSED 18" PROPOSED
STRAIGHT HEADWALLS -- DRAINAGE
� � �� CHANNEL
� v— — — — —
PROPOSED 18"
PUBLIC STORM DRAIN
PROPOSED 36" PUBLIC
STORM DRAIN
PROPOSED 4' PROPOSED 10' RECESSED CURB INLET B-1
JUNCTION BOX PROPOSED 10' RECESSED CURB INLET B-3
PROPOSED 21" PUBLIC STORM DRAIN
PROPOSED 10' RECESSED
CURB INLET A-5 PROPOSED 8'X4'
CONNECT TO 21" RCP � PUBLIC RCB --
STORM DRAIN STORM DRAIN
PROPOSED 10' RECESSED
CURB INLET A-4
PROPOSED 10' RECESSED
CURB INLET A-3 PROPOSED 12'X4' RCB
PUBLIC STORM DRAIN
PROPOSED 10' RECESSED �
CURB INLET A-2 1
�PROPOSED 10' RECESSED
CURB INLET A-1
INSTALL PROPOSED
PW-1 WINGWALL _
N � �I ,.�
�
0
Pacheco KO�jh 6100 WESTERN PLACE, SUITE 1001
FORT WORTH, TX 76107 817.412.7155
TX REG. ENGINEERING FIRM F-14439
r TX REG. SURVEYING FIRM LS-10193824
w
� ORAWN BY CHECKED BY SCALE DATE ✓OB NUMBER
a HPB JCM 1"=500' O1/17/2017 3734-16.249
CONNECT TO PROPOSED 10'X5 PRIVATE RCB
SYNERGY HARMON ROAD
CFA EXHIBITS
LOT 1R2, BLOCK 1
SYNERGY WEST
LOCATED IN THE CITY OF FORT WORTH, TEXAS
W.M. MCCOWEN SURVEY, ABSTRACT NO. 999,
TARRANT COUNTY, TEXAS
DWG FILE: 3734-16.249 CFA STORM DRAIN.DWG
�ln�lfll� o Q� VD�VD o��Ltll��� L���1W��
0 250 500 1000
GRAPHIC SCALE IN FEET l�
i i
I I �
�
_ � L � � _ �
KELLER H/CK ROAD
,p
�, PROPOSED PUB�IC
o STREET LIGHT
�' � POLE
� PROPOSED PUBUC
� — PO�EET LIGHT �P�� Q
� I
¢ a
�
� �
� I �
�
N --
� � � --
� PROPOSED UNDER GROUND
� 2" SCHEDULE 80 CONDUIT �
� I FOR PATHWAY FOR FEEDERS ��
m p — PROPOSED (TYP.)
X
Q ELECTRICAL //
� SERVICE
w //
�
¢ 3_
i y
"' -- — / �!
0
N
� PROPOSED PUBLIC �
� STREET LIGHT
> POLE ��
U
� _ — _ _ _ — �
3 — — �
� �/ — _ � — — `
O� . . . . . — — — — ^
� �3�� �
N `
� ^
I ��
� �r�l `
n ^
� O I 2
i
�
� �
� �
% _
� PROPOSED PUBLIC
STREET LIGHT
POLE � �
— � �
� — — — — — � �
Q
M O�'
� �
I
� — — � GOLDEN TR/ANGLE BOI/LEVARD
0
N
�
0
N
� 6100 WESTERN PLACE, SUITE 1001 SYNERGY HARMON ROAD
�, Pa�he�O KO�h FORT WORTH, TX 76107 877.412.7155 CFA EXHIBITS
TX REG. ENGINEERING FIRM F-14439 LOT 2, BLOCK 1
r TX REG. SURVEYING FIRM LS-10193824 SYNERGY WEST
� LOCATED IN THE CITY OF FORT WORTH, TEXAS
� ORAwN BY CHECKED BY SCA�E DATE ✓OB NUMBER yy,M. MCCOWEN SURVEY, ABSTRACT N0. 999,
a HPB JCM 1"=500' O1/17/2017 3734-16.249 TARRANT COUNIY, TEXAS
DWG FILE: 3734-16.249 CFA LIGHTING.DWG
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP-BIDPROPOSAL
Page 1 of 7
Bidder's Application
Project Item information Bidder's Proposal
Bidlist Item Specification Section Unit of Bid
Description Unit Price Bid Value
No. No. Measure Quantity
UNIT L• �VATER IMPROVEl�IENTS
1 3305.0109 Trench Safety 33 OS 10 LF 6196 $1.00 $6,196.00
2 3305.0116 Concrete Encasement for Utility Pi es 33 OS 10 CY 4 $125.00 $500.00
3 331 I.0001 Ductile Iron Water Fittings w/ Restraint 33 11 11 TON 6.36 $2,500.00 $15,900.00
4 3311.0161 6" PVC Water Pipe 33 11 12 LF 257 $24.00 $6,168.00
5 3311.0261 8" PVC Water Pipe 33 I 1 12 LF 10 $26.00 $260.00
6 3311.0361 10" PVC Water Pipe 33 11 12 LF 10 $28.00 $280.00
7 3311.0461 12" PVC Water Pipe 33 11 12 LF 5887 $32.00 $188,384.00
8 33 t 1.0451 12" DIP Water 33 11 10 LF 42 $50.00 $2,100.00
9 3312.0001 Fire Hydrant 33 12 40 EA 13 $1,900.00 $24,700.00
10 3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 2 $500.00 $1,000.00
11 3312.2203 2" Water Service 33 12 10 EA 3 $750.00 $2,250.00
12 3312.3003 8" Gate Valve 32 12 20 EA 1 $1,000.00 $1,000.00
13 33123004 10" Gate Valve 33 12 20 EA 1 $1,200.00 $1,200.00
14 33123005 12" Gate Valve 33 12 20 EA IS $1,800.00 $27,000.00
IS 3312.4108 12" x 10" Tapping Sleeve & Valve 33 12 25 EA 1 $2,000.00 $2,000.00
16 3312.4209 24" x 8" Tapping Sleeve & Valve 33 12 25 EA 1 $2,500.00 $2,500.00
17 3312.4211 24" x 12" Tapping Sleeve & Valve 33 12 25 EA 1 $3,000.00 $3,000.00
TOTAL UNIT I: �VATER IMPROVEMENTS $284,438.00
CITY OF FORT WORTH
STANDARD CONSTRUCT[ON SPECIFICATION DOCUMENTS - DEVELOPER A�VARDED PROIECTS
Form Version September I, 2015 0042 43_Bid Pmposal_DAP.xIs
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
0o az as
DAP - BID PROPOSAL
Page 2 of 7
Bidder's Application
Project Item Infoanation Bidder's Proposal
Bidtist Item Specification Section Unit of Bid
Description Unit Price Bid Value
No. No. Measure Quantity
UNIT IL• SANITARY SEWER IMPROVEMENTS
1 0241.2016 Remove 15" Sewer Line 02 41 14 LF 216 $10.00 $2,160.00
2 0241.2201 Remove 4' Sewer Manhole 02 41 14 EA 2 $750.00 $1,500.00
3 3301.0002 Post-CCTV Ins ection 33 O1 31 LF 1554 $1.00 $1,554.00
4 3301.0101 Manhole Vacuum Testin 33 O1 30 EA 8 $100.00 $800.00
5 3305.0109 Trench Safe 33 OS 10 LF 1554 $1.00 $1,554.00
6 33313301 8" Sewer Service 33 31 50 EA 2 $ I,000.00 $2,000.00
� 33 ll 10, 33 31 12,
3331.4115 8" Sewer Pipe 33 31 20 LF 1247 $26.00 $32,422.00
8 333 L4119 8" DIP Sewer Pi e 33 11 10 LF 36 $45.00 $1,620.00
9 3331.4222 16" DIP Sewer Pipe 33 11 10 LF 271 $65.00 $17,615.00
10 3339.1001 4' Manhole 33 39 10, 33 39 20 EA 8 $4,394.00 $35,152.00
1 I 3339.1003 4' Extra Depth Manhole 33 39 10, 33 39 20 VF 32 $250.00 $8,000.00
TOTAL UNIT II: SANITARY SEWER IVIPROVENiENTS $104,377.00
CITY OF FORT WORTFI
STANDARD CONS7RUCTION SPECIFiCATTON DOCUMENTS - DEVELOPER A�VARDED PROJECTS
Fortn Version Sep[ember I, 2015 0042 43_Bid Proposal_DAP.xis
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - B(D PROPOSAL
Pa�e 3 of 7
Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Section Unii of Bid
Description Unit Price Bid Value
No. No. Measure Quantity
UNIT IIL• DRr1INAGE IMPROVEMENTS
I 3137.0102 Large 3tone Riprap, Dry 31 37 00 SY 255 $25.00 $6,375.00
2 3305.0109 Trench Safety 33 OS 10 LF 5506 $1.00 $5,506.00
3 3341.0103 18" RCP, Class III 33 41 10 LF 308 $55.00 $16,940.00
4 3341.0201 21" RCP, C(ass III 33 41 10 LF 522 $60.00 $31,320.00
5 3341A205 24" RCP, Class III 33 41 10 LF 960 $65.00 $62,400.00
6 3341.0309 36" RCP, C(ass III 33 41 10 LF 362 $75.00 $27,150.00
7 3341.1202 Sx4 Box Culvert 33 41 10 LF 146 $100.00 $14,600.00
8 3341.1303 6x4 Box Culvert 33 41 10 LF 18 $I10.00 $1,980.00
9 3341.1501 8x4 Box Culvert 33 41 10 LF 88 $125.00 $I1,000.00
10 3341.2001 lOx4 Box Culvert 33 41 10 LF 2427 $165.00 $400,455.00
I1 3341.2201 12x4 Box Culvert 33 41 10 LF 930 $180.00 $167,400.00
]2 3349.0001 4' Stonn Junction Box 33 49 10 EA 2 $2,500.00 $5,000.00
13 3349.0003 6' Stonn 7unction Box 33 49 10 EA 3 $4,500.00 $13,500.00
]4 3349.1000 Headwall, Box Culvert 33 49 40 CY 85 $450.00 $38,250.00
I S 3349.0102 4' Manhole Riser 33 49 ] 0 EA 9 $800.00 $7,200.00
16 33493001 18" Straight Headwall, 1 pipe 33 49 40 EA 2 $1,000.00 $2,000.00
17 3349.6001 10' Recessed Inlet 33 49 20 EA 8 $2,200.00 $17,600.00
18 3349.6002 15' Recessed Inlet 33 49 20 EA 3 $3,500.00 $10,500.00
19 9999.0000 4" Pilot Channel 32 13 13 SY 596 $36.00 $21,456.00
TOTAL UNIT III: DRAINAGE IMPROVEMENTS $860,632.00
CITY OF FORT WORTR
STANDARD CONSTRUCTION SPECiFICATTON DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Versimi Sep[ember 1, Z015 0042 43_Bid Proposal_DAP.xis
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - BiD PROPOSAL
Page 4 of 7
Bidder's Application
Project Item Information Bidders Proposal
Bid(ist Item Specification Section Unit of Bid
Description Unit Price Bid Value
No. No. Measure Quantity
UNIT IV: PAVING IMPROVEMENTS
1 0170.0100 Mobilization Ol 70 00 LS I $2,500.00 $2,500.00
2 3110.0101 Site Cleazing 31 10 00 L5 I $242,962.00 $242,962.00
3 3123.0103 Borrow by Plan 31 23 23 CY 3700 $22.00 $81,400.00
4 3125.0101 SWPPP> 1 acre 31 25 00 L5 I $25,000.00 $25,000.00
5 3211.0401 Commercial Lime Slurry 32 11 29 TN 233 $162.40 $37,839.20
6 3211.0501 6" Lime Treatrnent 32 I 1 29 SY 12950 $4.68 $60,606.00
7 3212.0401 HMAC Transition 32 12 16 TN 241 $43.55 $10,495.00
8 3212.0503 6" Asphalt Base Type B- Temporary Roadway 32 12 16 TN 1450 $70.00 $101,500.00
9 3213.0102 7" Conc Pvmt 32 13 13 SY 12213 $41.60 $508,060.80
10 3213.0402 7" Concrete Driveway 32 13 20 SF 8295 $7.55 $62,627.25
11 3213.0301 4" Conc Sidewalk 32 13 20 SF 52450 $5.90 $309,455.00
12 3213.0506 Barrier Free Ramp, Type P-1 32 13 30 EA 10 $1,566.00 $15,660.00
13 3217.0002 4" SLD Pvmt Marking HAS (Y) 32 17 23 LF 7590 $1.50 $11,385.00
14 3217.0004 4" BRK Pvmt Marking HAS (Y) 32 17 23 LF 3276 $1.50 $4,914.00
15 3217.0201 8" SLD Pvmt Mazking HAS (W) 32 17 23 LF I50 $3.00 $450.00
16 3217.0501 24" SLD Pvmt Marking HAE (W) 32 17 23 LF 75 $12.50 $937.50
17 3217.2103 REFL Raised Mazker TY tI-A-A 32 17 23 EA 50 $7.00 $350.00
18 3223.0101 Unclassified Excavation by Plan 31 23 16 CY 4500 $5.32 $23,940.00
19 3291.0100 Topsoil (4") 32 91 19 CY 569 $14.50 $8,250.50
20 3292.0100 Block Sod Placement 32 92 13 SY 5037 $2.85 $14,355.45
21 3441.4003 Furnish/Install Alum Sign Ground Mount City 34 41 30 EA 6 $375.00 $2,250.00
22 3471.0001 Traffic Control 34 71 13 MO 6 $10,000.00 $60,000.00
23 9999.9999 Pedestrian Rail 32 31 13 LF 200 $270.00 $54,000.00
TOTAL UNIT IV: PAVING IMPROVEMENTS $1,638,937.70
CITY OE FORT WORTFI
STANDARD CONSTRUCT[ON SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version September I, 2015 004243_Bid Proposal_DAPxIs
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 d2 43
DAP - BID PROPOSAL
Page 5 of 7
Bidder's Application
Project Item Information Bidder's Proposa!
Bidlist item Specification Section Unit of Bid
No. Description No. Measure Quantity Unit Price Bid Value
UNIT V: STREET LIGHTING IMPROVEviENTS
1 2605.0122 Install Elec Serv Pole Mnt 26 OS 00 EA 1 $5,396.74 $5,396.74
2 2605.2101 Conduit Box 26 OS 33 EA 3 $1,000.00 $3,000.00
3 2605.3012 2° Condt PVC SCH 80 (B) 26 OS 33 LF 5300 $13.55 $71,815.00
4 3441.1408 No 6 Insulated Elec Condr 34 41 10 LF 50 $0.87 $43.50
5 3441.3002 Rdwy Illum Assmbly TY 18 with 33 Arms 34 41 20 EA 19 $5,476.04 $104,044.76
6 3441.3201 LED Lighting Fixture 34 41 20 EA 19 $850.00 $ I6,150.00
7 9999.9999 No 2-2-2-4 Alum Conductor 26 OS 19 LF 5300 $4.71 $24,963.00
8 9999.9999 Photocell 26 27 26 EA 1 $130.36 $13036
9 9999.9999 Pole Contactor 26 27 26 EA I $49325 $493.25
TOTAL UNIT V: STREET LIGHTING Ii�iPROVEMENTS $226,036.61
CITY OF FORT WORTH
STANDARD CONSTRUCTTON SPECIFiCATiON DOCi7MENT5 - DEVELOPER ANARDED PROJECTS
Form Version September 1, 20t5 0042 43_Bid Proposal_DAP.xIs
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - BID PROPOSAL
Page 6 of 7
Bidder's Application
Project Item Information Bidder's Proposat
Bidlist Item Specification Section Unit of Bid
Description Unit Price Bid Value
No. No. Measure Quantity
UNIT VL• TRAFFIC SIGNAL IMPROVEMENTS
I
_ _ _ _ _ _ .
2
_ _
3 _ _
4 _. _ _ _.
5 . _ _ .
6 _
_
7
8 _ .
9 ._ _ _ _ _ _..
_ _ . __ _.
10
ll ._ __ _ _ _ _ _. _ _
12 _
13 _ _ . _ _
14 . _ _ _
_. _ _
15 _ _
_ _ __
16
_.
17 _ _. _ _ _
__. _ _ __ _
18 _
19 . _ _ _ _
_ . _ _ __ __.
20
21 _ _ _ __
22 _ _ _ __ __ _
23 _ _ _ _ _
_ __ _
24 _ _ _
25 _
26 _ _ _ _ __ _ _
_. _ _. _ _
27
28 _ _ _ __ _ _
29 _ _
30 _ ._
_
31
32 _
33 _ _ _ _ _
34 _ _ . __
_
35
36 _
37 _
38 _ _
. _ _. __ _
39
40 _
41
42 _ _ . . _
43 _. _ _
�4 _ _
45 _ _
_ 46 _ _
TOTAL UNIT VI: TRAFFIC SIGNAL iMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSIRUCTION SPECIFICATTON DOCUMENTS - DEVELOPER AWARDED PROJECTS
Fortn Version September l, Z015 0042 43_Bid Proposal_DAP.xis
s�cxYotv oo az as
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - BID PROPOSAL
Pnge 9 uF9
Eidder's Application
Project ltem Informa[iou Biddei's Proposal
Bidlist Item 5pecification Section Unit of Bid
No. 1�escription No. Measure Quanflty UnitPrice Bid Valtte
Bid Summezy
UNFT I: WATER IMPROVEMEN`I'S
UN[T II: SANITARY SEWER IMPROVEIvIEIVTS
UNI'P IIT: DRATNAGE LMPROVEMBNTS
UNIT N: PA�IING IMPROVEIviENTS
UNIT V: STREET LIGHTING IMPR�VFMENTS
UNIT VI: TItAFFIC SIGNAL IIYIPI20VF..MENTS
Contractar agrces to complete WORK for FINAL ACCEP`I'ANC� tivithin
CONTRA,CT commencos to ran as provided in the Genera[ Canditions.
F.ND OF SECTTON
Totat ConstrucNon
��iQ calendar days af'ter thr date when the
�
�7.OQ
CITY OF PORT WORTH
STANPARD CONS7'llUCl'fON SPECIFICATION DOCUMEiVTS - DEVELOPER AWARbED PAOIEG7S
Fonn Vuisian Septcmbcr 1, 20I5 Cnpy nf DD 42 #3 Bid Propuxul_DAP [iL Uptlated O1-362Q17.xls