Loading...
HomeMy WebLinkAboutContract 48850,� CI�Y S��RCI'q� - � CON7RA�T N0. , , RECEIV�� `� �� . �; �� ; ` Developer and Project Information Cover Sheet: CIT`( OF FO" � . �,. . .- r..� ; ,.,,:_..--- --------------- -__ _----- ._..._ .. . . Developer Company Name: Bloomfield Homes, L.P. Address, State, Zip Code: 1050 E. Hwy. 114 Ste.210, Southlake , TX 76092 Phone & Email: 817-416-1572 Authorized Signatory, Title Project Name: Brief Description: . ' Donald J.Dykstra , President _ _ _ _ _ _ __ __ Edgewood Phase 3 Water, Sewer, Paving, Storm Drain, Street Lights Project Location: ', Generally located north of FM 1187 and west of I35W Plat Case Number: None Plat Name: None Mapsco: 118 Council District: 6 City Project Number: : 100513 CFA Number: 2017-009 i DOE Number: None To be cornpleted by staff Received by: ��C:'� ' � � � City of Fort Worth, Texas Standard Community Facilities Agreement - Edgewood Phase 3 CFA Official Release Date: 01.03.2017 Page 1 of 11 Date: � Z � / �FF�C�� ��d� CI1"�' BECIt�',�R1� �'1','�If�R'i"�i, `�''7� STANDARD COMMUNITY FACII..ITIES AGREEMENT THE STAT� OF TEXAS COUNTY OF TARRANT � � City Secretary _� ContractNo. J��� WI�REAS, Bloomfield Homes, L.P., ("Developer"), desires to make certain specific improvements as described below and on the e�ibits attached hereto ("Improvements") related to a project generally described as Edgewood Phase 3 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WI�REAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" ar"Agreement") in connection with the collective Improvements for the Proj ect. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the Ciiy and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth, Texas Standard Community Facilities Agreement - Edgewood Phase 3 CFA Official Release Date: 01.03.2017 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standaxds and the City-approved construction plans, specifications and cost estimates provided for the Project and the e�ibits attached hereto. D. The following checked e�ibits describe the Improvements and are incorporated herein: Water (A) �', Sewer (A-1) fl; Paving (B) ';�; Storm Drain (B-1) �; Street Lights & Signs �C) :� . E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For a11 Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its coniractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of fmal acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth, Texas Standard Community Faciliries Agreement - Edgewood Phase 3 CFA Official Release Date: 01.03.2017 Page 3 of 11 iii. To require the contractar(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer sha11 provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth, Texas Standard Community Facilities Agreement - Edgewood Phase 3 CFA Official Release Date: 01.03.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, wlzetlzer or not suclz iniuries, death or dama�es are caused, in whole or in part, bv the alle�ed ne�li�ence of the Citv ofFort Worth, its offcers, servants, or emploVees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or notsuch iniuries, death or dama�es are caused, in whole or in part, bv the alle�ed ne,�li�ence of tlae Citv of Fort Wortla, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth, Texas Standard Community Facilities Agreement - Edgewood Phase 3 CFA Official Release Date: 01.03.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's fmancial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth, Texas Standard Community Facilities Agreement - Edgewood Phase 3 CFA Official Release Date: 01.03.2017 Page 6 of 11 construction of same before the e�piration of ri�vo (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the fmancial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors andlor suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort VJorth, Texas Standard Community Facilities Agreement - Edgewood Phase 3 CFA Official Release Date: 01.03.2017 Page 7 of 11 Cost Summary Sheet Project Name: Edgewood Phase 3 CFA No.: 2017-009 City Project No.: 100513 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately detenniiie the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific e�iibit is required to support the following information. Items A. Water and Sewer Construcfion 1. Water Construction 2. Sewer Construction Water and Sewer Consiruction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals TPW Construcfion Cost Total Total Construction Cost (exciuding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. WatedSewer Material Testing Fee (2%) Sub-Total for Waier Construction Fees E. TPW Inspection Fee (4%) F. TPW Materiai Testing (2%) G. Street Light Inspsecfion Cost H. Signals Inspection Cost H. Street Signs Installation Cost Sub-Total for TPW Construction Fees Total Construction Fees: Financia/ Guaranfee Bond = 100% = 100% / Holds Plat initary Sewer— 125% orm Drain = 125% d City of Fort Worth, Texas Sta.ndard Community Facilities Agreement - Edgewood Phase 3 CFA Official Release Date: 01.03_2017 Page 8 of 11 Developer's Cost $ 133,950.00 $ 111,150.00 $ 245,100.00 $ 277,840.00 $ 98,270.00 $ 62,�00.00 $ - $ 438,810.00 $ 683,910.00 $ 4,902.00 $ 4,902.00 $ 9,804.00 $ 15,044.40 $ 7,522.20 $ 2,508.00 $ - � - $ 25,074.60 $ 34,878.60 Choice Amount Mark orn $ 683,910.00 $ 683,910.00 x I $ 306,375.00 $ 548,512.50 $ 854.887.50 ACCOR.DINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective na.me by its duly authorized signatories effective as of the date executed by the City's City Manager or hislher designee. CITY OF FORT WORTH �' �— Jesus J. Chapa Assistant City Manager Date: __ --��-1T_ Reconimefuled by: ,, � - � � ndy C -Babulal, EMBA, P.E. Development Engineering Manager Water Department � Doug . Wiersig, P.E. Direct Transportation & Public Works Department" Approved as to Form & Legality: ��� Richard A. McCracken Assistaut City Atto Ne,y� M&C No. � Date: ?! Form 1295: nl ATTEST: �r �� , Mary J. Kay� Ciiy Secretary City of Fort Worth, Te�s Standard Community Facilities A�eement - Edgewood Phase 3 CFA Official Release Date: 01.03.2017 Page 9 of 11 DEVELOPER Bloomfield Homes, L.P. � � �I������ �i� ��.� �� C�� e,�.� � r�-�r � �� ___ _ � � _ � Name: Donald J IIykstra Title: President �, � �- � . � Date: t: �. _ �:f , .. ATTEST: (Only if required by Developer) �/� Signature Name: Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and adminisiration of this contract, including ensuring all performance and reporting requirements. �1� .<< � r�; ���, � ���� h��, ,���.� L�,� Name: -il/�iY'Y� .3� �� �� Title: OFFICIAL RECORQ CITY SECRETARY �'i'. WORTH, TX � Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment � Attachment 1- Changes to Standard Community Facilities Agreement � Location Map � Exhibit A: Water Improvements �! Water Cost Estimate � E�ibit A-1: Sewer Improvements � Sewer Cost Estimate �' E�ibit B: Paving Improvements � Pa�ing Cost Estimate � E�ibit B-1: Storm Drain Improvements �: Storm Drain Cost Esiimate � E�ibit C: Street Lights and Signs Improvements �' Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Standard Community Facilities Agreement - Edgewood Phase 3 CFA Official Release Date: 01.03.2017 Page 10 of 11 ATTACffiV�NT "1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100513 None City of Fort Worth, Texas Standard Community Facilities Agreement - Edgewood Phase 3 CFA Official Release Date: 01.03.2017 Page 11 of 11 � 0 N 0 N N 0 a � �• ,�,•: �•- � �� �c ���t��� � BLOOMFIELD OHOMES 1050 E. IiWY 114, SUTTE 210 S��j'�.l��., � %��. PHONE (972) 877-1508 FAX (81'n 41Cr1397 VlCINITYMAP HT.BI �DD C����OD IPHASE � �.�.>�� , ► ►:►,� ��� C'1T1' (�)1� 1�(�)l�T ��'(�)I�TH. �l�l�`�,���� I1��l:C�]:�1 : l:l�. �'(1) ] (i� �:��::���:, r. C� ���Y�T� �1ff���IL]L 8 CML ENGINEERS — PLANNEFS — SURVEYORS 2405 Mustang Drive, Grapevine, Texas 760.51 MeVo (81� 328-0373 � 0 N 0 � N a � � 0 t � 0 � � 0 0 3 � o� � W � C � � � � O � � W I � m � 0 � w �DC���OOD ���� � ���� ���� vo�ov LEGEND W PROPOSED WATER LINE — W — — EXISTING WATER LINE �- PROPOSED FIRE HYDRANT ASSEMBLY ►� PROPOSED GATE VALVE � EXISTING FIRE HYDRANT ASSEMBLY DQ EXISTING GATE VALVE IU'ltiV Li1Jl/£d.i1N� W 1aS+Eli O,� BLOOMFIELD HOMES 1050 E7�. H7W7Y V1a14T, SVUIT�rEv�210 SOV ii" "l�^r"r lA %W72 PHONE (972) 877-1508 FAX (81'n 416-1397 � : • � �� . •: �. • : :' • �\ ��� �II� I�� IU� I': I \ I . . l�li ��� \ I'. I: �,,.,�.� 63 62 61 60 87X 14 I 13 1 B�OCK H10 I 9 8 � \\ c�> ��� I�� � ���I\ ���, \ 1 � N W�E S cy���o ll �� _ ��9 NOTE; ALL WATER LINES SHOWN ARE 8" IN DIAMETER. 75 76 77 59 I I `-'81 58 14 13 12 11 10 9 8 �82 LOC G 57 �83 56 1 2 3 4 5 6 7 84 � (C (C!![., � — _ 55 —. . —. — — - —., _ - � �: -"-" � - - �� 61 54 14 13 12 ' - � D PN. 2 , Eb6ElN00 53 � : 11 10 : 9 8: � I 60 KB��!'� � ll . CC��IID�< �YfiAIE���C,IG 8 CIVIL ENGINEERS — PLANNERS — SURVEYORS 2405 Mustang Dine, Grapevine, Texes 76051 MeVo (81� 329-4373 � 0 N � � � 0 a M � N O L � 0 � � 0 0 3 � rn a W � c 0 � / O O � w I � m � 0 � w LEGEND _S PROPOSED SANITARY SEWER LINE _ S EXISTING SANITARY SEWER LINE • PROPOSED SANITARY SEWER MANHOLE EXISTING SANITARY � SEWER MANHOLE ����.���%�����: OBLOOMFIELD HOIv1ES 1050 E. HWY 114, SiJTTE 210 S�UTT�LARPi� TX %6092 PHONE (972) 877-1508 FAX (81'n 41Cr1397 EDGEWOO OO D PHASE � �I.\\ I:I� I.\�IIIIII:,II \—I .i _ �. • C � � �� • �S � s' \\ (�l lIN I�� IIII I•� I�. 1. � . � I� ��� � I'.l� _ 64 � 63 62 61 60 87X 59 58 14 13 I 1 B�OCK H10 9 8 � \�\ ��� c�� I�� � ���I\ \\ \ 1 � 14 13 12 11 10 9 8 LOC G 57� '-'83 56 1 2 3 4 5 6 7 84 � (�; (� - 55 � - � _ �_ .-�, . , " 61 _ _ - 54 " - • - ... „ Eb6EWOOD PN. 2 53 ct7: I 14 :13 12 11 10 9 8: 60 N W�E s ���'lU�ldl�de �L v� � ��U/�9 NOTE� ALL PROPOSED SANITARY SEWER LINES SHOWN ARE 8" IN DIAMETER. 75 76 77 � � ���aAn�.� ��: C� ���I1[l�s �Vd��II�ILIL 8 CIVIL ENGINEERS — PUWNERS — SURVEYORS 2405 Muateng Drive, Grapevine, Texas 78051 Metro (81'n 328-0373 � 0 N 0 � N 0 a r�i � � � 0 � � 0 0 3 � o� � W � C O d � � O � � w � � � � 0 � w LEGEND PROPOSED 29'B-B ROADWAY w/ 50' R.O.W. 6" THICK REINFORCED CONCRETE PAVEMENT �li. V 1L:d.JaYBS'..1(i/� W 1V8idl. ,� BLOOMFIELD OHOMES 1050 E. HWY 114, SiTTI'E 210 SOVTHI.f�KE� TX %6092 PHONE (972) 877-1508 FAX (817) 416-1397 BLOCK D I � 65 64 � 63 62 61 60 87X 59 �DC���OOD ���� � ����� 1C�VlLlin7ml�°1�' ov�vo 1GL111111LIU)ll ll 66 67 68 69 �o � 1721 � �I� 14 13 1 B�OCK H10 I g 8 � \�\ 1�) i�) I�) ti l�)1.\ \�\ \ 1 � LOCK 75 .'� �77 58� 14 13 12 11 10 9 8 �82 LOCf G 57 �83 56 1 2 3 4 5 6 7 84 � � � � i. 55 " 54 � 61 Eb6EWOOD PN. Z 53 14 13 12 11 10 9 B;: 60 N W�E S ���-SUl��o � �� � ��9 ����� ��: �u �ID�`�T� �YiI����IL 8 CML ENGINEEflS — PLANNERS — SURVEYORS 2405 Mueteng Dmre, Grapevine, Texes 76051 Metro (81� 32&-0373 � 0 N V � N N 0 a r� � � � � � � 0 0 3 � rn � W � c 0 a. / � 0 0 � w I � m � 0 � w EDGEWOO OO D PHASE � ti l (�)I�\I I�)I" \II LEGEND PROPOSED STORM DRAIN LINE � PROPOSED STORM DRAIN INLET PROPOSED STORM DRAIN HEADWALL PROPOSED STORM DRAIN OUTLET ����.������g$: BLOOMFI_ELD OHOIViES 1050 E. HWY 114, SLJTI'E 210 S�UTEII,AKE� TX %6092 PHONE (972) 877-1508 FAX (81'n 416-1397 I..\�I Illll:i l I I:i - I _I '• . �. • : � � •■ • " 11 �� �■ ' �' • ' ' � v\ l�l(11�1�� UNI" l� . . � � � ��lli ��� � I'.1: r n ��— `I 'INLt 1 10 9 8 4 13 12 11 B OCK H 7 R. .P. 1 2 3 4 5 6 � ,.., �_ � � �� `R.C.P. ?7 R. .P. 14 13 12 11 10 9 8 L�C � G ' 4 ' UN TION BOX 1 2 3 4 5 6 7 OCK 75 � ! 77 78 79 80 EX 27 R. .P. 84 � � �. - �J�J _ 54 • � .:.__. . 61 EI�6EWOOD PN. 2 ! 53 14 13 12 11 10 9 8:. 60 N W�E s ����� ��: C����s �Mf���.,]L 8 CML ENGINEEfiS — PLANNERS — SURVEYORS 2405 Muatang Drive, Grepevine, Texas 78057 Metro (81� 329-0373 � 0 N 0 � N 0 a r�i � 0 � 0 � � 0 0 3 � o� � W � c 0 � / � O O � � W I � � � 0 i w LEGEND 2` PVC CONDUIT PROPOSED LIGHT POLE EXISTING LIGHT POLE TRANSFORMER ON PAD HAND HOLE ���ffi.��E����: BLOOMFIELD 0 HOMES 1050 E. HWY 114, SUITE 210 SQ�.l��.� � %� PHONE (972) 877-1508 FAX (81'n 41Cr1397 I�DG��00D ���� � �����` ]L�(��`� ����ov�vn «., . : � � �� � •: �. � :: � .�\'\ l�l lIN I�l III) I'� I� I' . . c P ���\ 1 1� — BLOCK C 64 75 63 14 13 12 11 10 g 8 �6 B OCK H �� 62 C� �78 61 g 2 3 4 5 6 � 60 � � � A5Y 79 87X 80 59 � 81 58 14 13 12 11 10 9 8 �82 LOC G 57 �83 56 1 2 3 4 5 6 7 84 .. � �. ---�-- 55 " � m _ - a"""."..."."..... �,o-e;: 61 54 ... � - - .. � . Eb6ElNOO'D PN. 2 ; ; 53 14 13 12 11 10 g 8;: 60 N W�E s ��C�11ldL�eo � va � �r�1�119 ���a�� ��: C����Ydi�T` � �I���IL a CIVIL ENGINEERS — PLANNERS — SURVEYORS 24D5 Mualang Drive, Grepevine, Texes 78051 MeVo (81� 329-0373 � 0 N � � � N O d � � � � � n � 0 0 3 � rn v W � c 0 d � 0 0 � � w I � � � 0 � w �DG��OOD ��I��� � S �IEIE7C �IIQsI�� ����+ vo�o¶ tr ll LEGEND --� PROPOSED STREET NAME SIGN � EXISTING STREET NAME SIGN IIZ]f:t1�I.�PEI�/��1�: BLOOMFIELD 0 HOM$S 1050 E. HWY 114, SUTTE 210 S�UTHL.AKE� TX %6092 PHONE (972) 877-1508 FAX (81'n 41Cr1397 , , , .• . �. 1 � •i . . � � �MI� ��� � I' P� �� ��� �II� 1�� U�� 1': I �. I 64 63 62 61 60 87X 59 58 57 14 13 12 �LOCIK G g 8 76 77 78 � :� 56 1 2 3 4 5 6 � 84 " ' . , � � " ' _ " _ ' 55 " 54 .....:.........:.....:.... � : 61 . EI�6ElNOO� PH. 2 ; 53 14 13 12 11 10 9 8: 60 N W�E S dy�+�"1V1a1S'do ll�� � 6r�J�W9 1P&iS��I� IB�: C�rr �II��Y�TB �YIT���ILIL 8 CIVIL ENGINEERS — PLANNERS — SURVEYORS 2405 Mus[eng Dmre, Grepevine, Texas 78051 Metro (81� 329-4373 UNIT PRICE BID 0o az �3 e��cows,�, Page 1 ot 1 SECTION 00 42 43 Dereloper A«arded Pmjeas - PROPOSAL FORM r��«� uem mr �oao� Didders flopoml Hidlist Ikm ��� Unit of No. �1Dn Sp.-ci6cationSectionNo. Mp�e BidQuantity UnitPrice BidVulue WaterfSanitary SewerlStorm Drain Facilities Subtotal $343 370.00 PeKormancelPaymenVMaintenance Bontl S7.180.00 PertormancelPaymenUMaintenance Bond Paving Facilities Subtotal Street Lighting Facilities Subtotai CfTY�FF(NtiR'ORTH SI'ArDARD CbNSIftUCiION SPECIFlCAtiO\ pOCU\ffS.'IS Fum�RnuW MIMt3) EdqeuoW yh3Cu}}{'pidR.pmil