SPECIFICATIONS
CITY SEr9ETARN CIlYBEG(IEGoJt1l
CONTRACT NO. AND _______CRY MANAGER'S OffiCE
_._ENGINEERING DIV.
CONTRACT DOCUMENTS ---,TOW—FILE COPY
FOR
MICRO-SURFACING 2005-17
1 AT VARIOUS LOCATIONS
IN THE CITY OF FORT WORTH, TEXAS
PROJECT NO. GS93-020930511170
2005
MIKE MONCRIEF CHARLES R. BOSWELL
MAYOR CITY MANAGER
ROBERT D. GOODE, P.E., DIRECTOR
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
A. DOUGLAS RADEMAKER, P.E., DIRECTOR
DEPARTMENT OF ENGINEERING
PREPARED BY TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
ENGINEERING COORDINATION
OFFICIAL PRO EXHIBIT"A" +
FT. yNTb, TEX.
04-0-9,
1
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 3/1/2005
DATE: Tuesday, March 01, 2005
LOG NAME: 20MICRO05-17 REFERENCE NO.: "C-20544
SUBJECT:
Authorize Execution of Contract with Viking Construction, Inc. for Micro-Surfacing 2005-17 at
Various Locations
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a contract with Viking
Construction, Inc. in the amount of$753,352.00 for 55 working days for Micro-Surfacing 2005-17 at Various
Locations.
DISCUSSION:
In the FY2004-2005 Contract Major Maintenance Program, various types of street maintenance techniques
are grouped into specific contract packages. Micro-Surfacing 2005-17 at various locations provides
surface rehabilitation for asphalt streets funded from the Contract Street Maintenance Fund.
The funding for this project was appropriated February 8, 2005 under M&C G-14577.
The attached list details the limits for each of the streets included in this project.
The City also reserves the right to increase or decrease quantities of individual pay items within the
contract, provided that the total contract amount remains within plus or minus 25% of the contract award.
This project was advertised for bid on December 9 and 16, 2004. On January 13, 2005, the following bids
were received:
BIDDERS AMOUNT
Viking Construction, Inc. $753,352.00
Ballou Construction Co., Inc. $767,028.00
Viking Construction, Inc. is in compliance with the City's M/WBE Ordinance by committing to 25% M/WBE
participation. The City's goal on this project is 10%.
This project is located in Council Districts 2,3,4,5,6,7, and 8.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds-are available in the current capital budget, as appropriated, of the
Contract Street Maintenance Fund.
TO Fund/AccounUCenters FROM Fund/Account/Centers
GS93 541200 020930511170 $753.352.00
Submitted for City Manager's Office W. Marc Ott (8476)
Originating Department Head: Robert Goode (7804)
Additional Information Contact: George Behmanesh (7914)
SPECIFICATIONS
AND
CONTRACT DOCUMENTS
FOR
MICRO-SURFACING 2005-17
AT VARIOUS LOCATIONS
IN THE CITY OF FORT WORTH, TEXAS
PROJECT NO. GS93-020930511170
2005
A. DOUGLAS RADEMAKER, P.E. DATE
DIRECTOR, DEPARTMENT OF ENGINEERING
0 Z' C-�
r
GEORG DATE
ASSISTANT DIRECTOR
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
n
DOO KIM, P.E. DATE
CAPITAL PROJECT ENGINEER
TABLE OF CONTENTS
1. Notice to Bidders
2. Special Instructions to Bidders
3. Prevailing Wage Rates
4. Proposal
5. Vendor Compliance
6. Disadvantaged Business Enterprise
7, Special Provisions
8. Contractor Compliance with Workers Compensation Law
9. Certificate of Insurance
10. Performance Bond
11. Payment Bond
12. Maintenance Bond
13. Contract
14. Project Designation Sign
15. Locations
NOTICE TO BIDDERS
Sealed proposals for the following project:
MICRO-SURFACING 2005-17
AT VARIOUS LOCATIONS
PROJECT NO. GS93-020930511170
Addressed to Mr. Charles R. Boswell, City Manager of the City of Fort Worth, Texas will be
received at the Purchasing Office until 1:30 P.M., January 13, 2005 and then publicly opened
and read aloud at 2:00 P.M. Plans, Specifications and Contract Documents for this project may be
obtained at the office of the Department of Engineering, Municipal Office Building, 1000
Throckmorton Street, Fort Worth, Texas 76102.
A pre-bid conference will be held at 9:00 A.M. January 4, 2005 in the Transportation and Public
Works Conference Room, 2nd Floor, Municipal Building.
One set of documents will be provided to prospective bidders for a deposit of twenty dollars
($20.00), such deposit is non-refundable. Additional sets may be purchased on a non-refundable
basis for twenty dollars ($20.00) per set.
For additional information, contact Ms. Susan L. Schwinger, P.E. at (817) 392-6529.
Charles R. Boswell Robert Goode, P.E., Director
City Manager Transportation and Public Works Department
r � 1
a4-
PUBLICATION:PUBLICATION: By: L h ^ / 2`
December 09, 2004 Najib Fares, P.E.
December 16, 2004 Street Program Manager, TPW
oft
SPECIAL INSTRUCTIONS TO BIDDERS
1. BID SECURITY: Cashier's check or an acceptable bidder's bond payable to the City of
Fort Worth, in an amount of not less than 5 percent of the largest possible total of the bid
submitted must accompany the bid, and is subject to forfeit in the event the successful
bidder fails to execute the contract documents within ten days after the contract has been
awarded.
To be an acceptable surety on the bid bond, the surety must be authorized to do business
in the state of Texas. In addition, the surety must (1) hold a certificate of authority from
the Untied States secretary of the treasury to qualify as a surety on obligations permitted
or required under federal law; or(2) have obtained reinsurance for any liability in excess
of S100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of
Texas and is the holder of a certificate of authority from the Untied States secretary of the
treasury to qualify as a surety on obligations permitted or required under federal law.
Satisfactory proof of any such reinsurance shall be provided to the City upon request.
The City, in its sole discretion,.rill determine the adequacy of the proof required herein.
.m 2. PROPOSAL: After proposals have been opened and read aloud, the proposals will be
tabulated on the basis of the quoted prices, the quantities shown in the proposal, and the
application of such formulas or other methods of bringing items to a common basis as
may be established in the Contract Documents.
The total obtained by taking the sum of the products of unit prices quoted and the
estimated quantities plus any lump sum items and such other quoted amounts as may
enter into the cost of the completed project will be considered as the amount of the bid.
Until the award of the contract is made by the Owner, the right will be reserved to reject
any or all proposals and waive technicalities, to re-advertise for new proposals, or to
proceed with the work in any manner as maybe considered for the best interest of the
Owner.
The quantities of work and materials to be furnished as may be listed in the proposal
forms or other parts of the Contract Documents will be considered as approximate only
and will be used for the purpose of comparing bids on a uniform basis. Payment will be
made to the Contractor for only the actual quantities of work performed or materials
furnished in strict accordance with the Contract Documents and Plans. The quantities of
work to be performed and materials to be furnished may be increased or decreased as
hereinafter provided, without in any way invalidating the unit prices bid or any other
*" requirements of the Contract Documents.
3. ADDENDA: Bidders are responsible for obtaining all addenda to the Contract
Documents prior to the bid receipt. Information regarding the status of addenda may be
obtained by contacting the Department of Engineering Construction Division at(817)
871-7910. Bids that do not acknowledge all applicable addenda will be rejected as non-
responsive
�,. SPECIAL INSTRUCTIONS TO BIDDERS
- I -
4. AWARD OF CONTRACT: The contract, if awarded, will be awarded to the lowest
responsive bidder. The City reserves the right to reject any or all bids and waive any or
all irregularities. No bid may be withdrawn until the expiration of forty-nine(49) City
business days from the date that the M/WBE UTILIZATION FORM, PRIME
CONTRACTOR WAIVER FORM and'or the GOOD FAITH EFFORT FORM
("Documentation") is received by the City.
5. PAYMENT PERFORMANCE AND MAINTENANCE BONNDS: The successful bidder
entering into a contract for the work will be required to give the City surety in a sum
equal to the amount of the contract awarded. The successful bidder shall be required to
furnish bonding as applicable in a sum equal to the amount of the contract awarded. The
form of the bond shall be as herein provided and the surety shall be acceptable to the
City. All bonds furnished hereunder shall meet the requirements of Chapter 2253 of the
Texas Government Code, as amended.
A. If the total contract price is S25,000 or less, payment to the contractor shall be
made in one lump sum. Payment shall not be made for a period of 45 calendar
dans from the date the work has been completed and accepted by the City.
B. If the contract amount is in excess of 525,000, a Payment Bond shall be
executed, in the amount of the contract, solely for the protection of all claimants
supplying labor and material in the prosecution of the work.
C. If the contract amount is in excess of S100,000, a Performance Bond shall be
executed, in the amount of the contract conditioned on the faithful performance of
the work in accordance with the plans, specifications, and contract documents.
Said bond shall solely be for the protection of the City of Fort Worth.
D. A Two-year Maintenance Bond is required for all projects to insure the prompt,
full and faithful performance of the general guarantee as set forth in Paragraph 7
of the Special Provisions.
To be an acceptable surety on the performance, payment and maintenance bonds, the
surety must be authorized to do business in the state of Texas and meet all requirements
of Texas Insurance Code, section 7.19-1. In addition, the surety must (1) hold a
certificate of authority from the Untied States secretary of the treasury to qualify as a
surety on obligations permitted or required under federal law; or (2) have obtained
reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and
admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority
from the Untied States secretary of the treasury to qualify as a surety on obligations
permitted or required under federal law. Satisfactory proof of any such reinsurance shall
be provided to the City upon request. The City, in its sole discretion, will determine the
adequacy of the proof required herein.
No sureties will be accepted by the City that are at the time in default or delinquent on
any bonds or which are interested in any litigation against the City. Should any surety on
the contract be determined unsatisfactory at any time by the City, notice will be given to
the contractor to that effect and the contractor shall immediately provide a new surety
satisfactory to the City
SPECIAL INSTRl;CTIO\S TO BIDDERS
-2-
6. LIQUIDATED DAMAGES:_ The Contractor's attention is called to Part 1 - General
Provisions. Item 8, Paragraph 8.6, Standard Specifications for Street and Storm Drain
Construction of the City of Fort Worth, Texas, concerning liquidated damages for late
completion of projects.
7. EMPLOYMENT AND NON-DISCRIMINATION: The Contractor shall not
discriminate against any person(s)because of sex, race, religion, color or national origin
and shall comply with the provisions of sections 13A-21 through 13A-29 of the Code of
the City of Fort Worth(1986), as amended, prohibiting discrimination in employment
practices.
8 WAGE RATES: All bidders will be required to comply with provision 5159a of
"Vernons Annotated Civil Statutes" of the State of Texas with respect to the payment of
prevailing wage rates as established by the City of Fort Worth. Texas, and set forth in
Contract Documents for this project.
9. FINANCIAL STATEMENT: A current certified financial statement may be required by
the Department of Engineering Director for use by the CITY OF FORT WORTH in
determining the successful bidder. This statement, if required, is to be prepared by an
independent Public Accountant holding a valid permit issued by an appropriate State
Licensing Agency.
10. INSURANCE: Within ten days of receipt of notice of award of contract, the Contractor
must provide, along with executed contract documents and appropriate bonds, proof of
insurance for Workers Compensation(statutory); Comprehensive General Liability
(S1,000,000 per occurrence, $2,000,000 aggregate); and Automobile Insurance
(S 1,000,000 each accident on a combined single basis or S250,000 property
damage!$500,000 bodily injury per person per occurrence. A commercial business
policy shall provide coverage on"any auto', defined as autos owned, hired, and non-
owned). Additional lines of coverage may be requested. If such a request is made after
bid opening, Contractor shall be entitled to additional compensation equal to 110%of the
additional premium cost. For worker's compensation insurance requirements. see Special
Instructions to Bidders - Item 16.
ADDITIONAL INSURANCE REOUIREMENTS:
A. The City, its officers, employees and servants shall be endorsed as an additional
insured on Contractor's insurance policies excepting employer's liability insurance
coverage under Contractor's workers'compensation insurance policy.
B. Certificates of insurance shall be delivered to the City of Fort Worth, contract
administrator in the respective department as specified in the bid documents, 1000
Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on
the contracted project.
C. Any failure on part of the City to request required insurance documentation shall
not constitute a waiver of the insurance requirements specified herein.
D. Each insurance policy shall be endorsed to provide the City a minimum thirty
days notice of cancellation, non-renewal, and/or material change in policy terms
low SPECIAL INSTRUCTION'S TO BIDDERS
-3-
or coverage. A ten days notice shall be acceptable in the event of non-payment of
premium.
E. Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A: VII or equivalent measure of financial strength and
solvency.
F. Deductible limits, or self-funded retention limits, on each policy must not exceed
510,000,00 per occurrence unless otherwise approved by the City.
G. Other than worker's compensation insurance, in lieu of traditional insurance, City
may consider alternative coverage or risk treatment measures through insurance
pools or risk retention groups. The City must approve in writing any alternative
coverage.
H. Workers' compensation insurance policy(s) covering employees employed on the
project shall be endorsed with a waiver of subrogation providing rights of
recovery in favor of the City.
I. City shall not be responsible for the direct payment of insurance premium costs
for contractor's insurance.
J. Contractor's insurance policies shall each be endorsed to provide that such
insurance is primary protection and any self-funded or commercial coverage
maintained by City shall not be called upon to contribute to loss recovery.
K. In the course of the project, Contractor shall report, in a timely manner, to City-'s
officially designated contract administrator any known loss occurrence which
could give rise to a liability claim or lawsuit or which could result in a property
loss.
L. Contractor's liability shall not be limited to the specified amounts of insurance
required herein.
M. Upon the request of City, Contractor shall provide complete copies of all
insurance policies required by these contract documents.
11. NON-RESIDENT BIDDERS: Pursuant to Texas Government Code, art. 2252.002, the
City of Fort Worth will not award this contract to a non-resident bidder unless the non-
resident's bid is lower than the lowest bid submitted by a responsible Texas resident
bidder by the same amount that a Texas resident bidder would be required to underbid a
non-resident bidder to obtain a comparable contract in the state in which the non-
'' resident's principal place of busincss is located.
"Non-resident bidder" means a bidder whose principal place of business is not in
this state, but excludes a contractor whose ultimate parent company of majority
owner has its principal place of business in this state.
SPECIAL IN'STRL:C` IONS TO BIDDERS
-4-
"Texas resident bidder" means a bidder whose principal place of business is in this
state, and includes a contractor whose ultimate parent company or majority owner
has its principal place of business in this state.
This provision does not apply if the project is funded in whole or in part with federal
funds.
The appropriate blanks of the Proposal must be filled out by all non-resident bidders in
order for its bid to meet specifications. The failure of a non-resident contractor to do so
will automatically disqualify that bidder.
12. MINORITY/WOMEN BUSINESS ENTERPRISE: In accordance with City of Fort
Worth Ordinance No. 11923, as amended by Ordinance No. 13471, the City of Fort
Worth has goals for the participation of minority business enterprises and women
business enterprises in City contracts. You may obtain a copy of the Ordinance from the
Office of the City Secretary.
The M/WBE Utilization Form, Prime Contractor Waiver Form and the Good Faith Effort
Form, as applicable, must be submitted no later than 5:00 p. in. five (5) City business
days after the bid opening date, exclusive of the bid opening date. The bidder shall
submit the documentation at the reception area of the Department of Engineering
("Managing Department"), 2nd floor, City Hall, and shall obtain a receipt. Failure to
comply shall render your bid non-responsive,
Upon contract execution between the City of Fort Worth and the successful bidder, now
known as Contractor, a pre-construction meeting will be scheduled at which time the
Contractor is required to submit either Letters of Intent or executed agreements with the
M/WBE firm(s)to be utilized on this project. Such Letters of Intent or executed
agreements shall include the following information:
1. Name of Contract
2. Name of M/WBE firm utilized
3. Scope of Work to be performed by the M/WBE firm
4. Monetary amount of work to be performed by the M/WBE firm
5. Signatures of all parties
A notice to proceed will not be issued until the signed letter(s) or executed
agreement(s) have been received.
Throughout the duration of this project, the Contractor comply with the MAN'BE
Ordinance by complying with the following procedures:
• A M/VbBE Participation Report Form must be submitted monthly until the contract is
completed. The first report will be due 30 days after commencement of work. The
monthly report MUST have an original signature to ensure accountability for audit
purposes.
• Reports are to be submitted monthly to the M/WBE Office, regardless of whether or
not the M/WBE firm has been utilized. If there was no activity by an MAVBE in a
particular month,place a "0" or "no participation" in the spaces provided, and provide
SPECIAL.INSTRUCTIONS TO BIDDERS
-5-
a brief explanation.
• The Contractor shall provide the M/WBE Office proof of payment to the M/WBE
subcontractors and suppliers only. The M/WBE Office ,rill accept the following as
proof of payment:
,. 1. Copies of submitted invoices with front and back copies of canceled check(s), OR
2. A notarized letter explaining, in detail:
a Subcontractor/supplier Scope of Work
b. Date when services were received from subcontractor/supplier
c. Amounts paid to the subcontractor/supplier
d. Original signatures from both parties must be included on this letter.
• If the Contractor foresees a problem with submitting participation reports and/'or
proof of payment on a monthly basis, the "BE Office should be notified.
If the Contractor wishes to change or delete an MlWBE subcontractor or supplier, adhere
to the following:
1. Immediately submit a Request for AnQroval of Change Form to the INVABE
Office explaining the request for the change or deletion.
2. If the change affects the committed M/WBE participation goal, state clearly how
and why in documentation.
a. All requests for changes must be reviewed and pre-approved by the 1v ANBE
Office.
b. If the Contractor makes change(s)prior to approval, the change will not be
considered when performing a post compliance review on this project.
• Upon the Contractor's successful completion of this project, and within ten days after
receipt of final payment from the City of Fort Worth, The Contractor will protide the
MJWBE Office with a Final Particil2ation Report Form to reflect the total
participation from ALL subcontractors!suppliers utilized on the project.
• All forms are available at the MiWBE Office, 3rd floor- City Hall. For additional
information regarding compliance to the M/WBE Ordinance, call (817) 871-6104.
Upon request, Contractor agrees to provide to Owner Complete and accurate information
regarding actual work performed by a Minority/Women Business Enterprise (M/WBE)
on the contract and payment therefore. Contractor further agrees to permit an audit and,or
examination of any books, records or files in its possession that will substantiate the
actual work performed by an M/WBE. The misrepresentation of facts(other than a
negligent misrepresentation) and/or the commission of fraud by the Contractor will be
grounds for termination of the contract and/or initiating action under appropriate federal,
state or local laws or ordinances relating to false statements; further, any such
misrepresentation(other than a negligent misrepresentation) and/or commission of fraud
SPECIAL INSTRUCTIONS TO BIDDERS
-6-
will result on the Contractor being determined to be irresponsible and barred from
participating in City work for a period of time of not less than three years.
13. AMBIGUITY: In case of ambiguity or lack of clearness in stating process in the
proposal, the City reserves the right to adopt the most advantageous construction thereof
or to reject the proposal.
14. PROGRESS PAYMENTS FINAL PAYMENT PROJECT ACCEPTANCE AND
WARRANTY:
a. The contractor will receive full payment (less 5% retainage) from the city for each pay
period.
b. Payment of the retainage will be included with the final payment after acceptance of the
project as being complete.
c. The project shall be deemed complete and accepted by the City as of the date the final
punch list has been completed, as evidenced by a written statement signed by the
�. contractor and the City.
d. The warranty period shall begin as of the date that the final punch list has been
completed.
e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment
becoming due and payable.
f. In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the
city and there is a dispute regarding(i) final quantities, or(ii) liquidated damages, city
shall make a pFegr-ess payment in the amount that city deems due and payable.
g. In the event of a dispute regarding either final quantities or liquidated damages, the
parties shall attempt to resolve the differences within 30 calendar days.
15. AIR POLLUTION WATCH DAYS: The Contractor shall be required to observe the
following guidelines relating to working on City construction sites on days designated as
"AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON, within the
Metroplex area, runs from May 1, through October 31, with 6:00 a.m. - 10:00 a.m. being
critical because emissions from this time period have enough time to bake in the hot
atmosphere that leads to early afternoon ozone formation.
The Texas Commission on Environmental Quality(TCEQ), in coordination with the
National Weather Service, will issue the AIR POLLUTION WATCH by 3:00 p.m. on the
afternoon prior to the WATCH day. On designated AIR POLLUTION WATCH DAYS.
the Contractor shall bear the responsibility of being aware that such days have been
designated AIR POLLUTION WATCH DAYS and as such shall not begin work until
10:00 a.m. whenever construction phasing requires the use of motorized equipment for
periods in excess of 1 hour.
However, the Contractor may begin work prior to 10:00 a.m. if use of motorized
equipment is less than 1-hour, or if equipment is new and certified by EPA as"Low
SPECIAL INSTRUCTIONS TO BIDDERS
-7-
Emitting". or equipment burns Ultra Low Sulfur Diesel (ULSD) diesel emulsions or
alternative fuels such as CNG.
If the Contractor is unable to perform continuous work for a period of at least seven hours
between the hours of 7:00 a.m. - 6:00 p.m., on a designated AIR POLLUTION WATCH
DAY, that day will be considered as a weather day and added onto the allowable weather
,. days of a given month.
16. WORKERS CONDENSATION INSURANCE COVERAGE: Contractors compliance
with Workers Compensation shall be as follows:
A. Definitions:
Certificate of coverage ("certificate") - A copy of a certificate of insurance, a
certificate of authority to self-insure issued by the commission, or a coverage
agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory
workers' compensation insurance coverage for the person's or entity employees
providing services on a project, for the duration of the project.
Duration of the project - includes the time from the beginning of the work on the
project until the contractor's/person's work on the project has been completed and
accepted by the governmental entity.
Persons providing services on the project("subcontractor" in 406.096) - includes all
persons or entities performing all or part of the services the contractor has undertaken
to perform on the project, regardless of whether that person has employees. This
includes, without limitation, independent contractors, subcontractors, leasing
companies, motor carriers,owner-operators, employees of any such entity, or
employees of any entity which furnishes persons to provide services on the project.
"Services" include, without limitation, providing, hauling, or delivering equipment or
" materials, or providing labor, transportation, or other service related to a project.
"Services" does not include activities unrelated to the project, such as food beverage
vendors, office supply deliveries, and delivery of portable toilets.
B. The contractor shall provide coverage, based on proper reporting of classification
codes and payroll amounts and filing of any coverage agreements,which meets the
' statutory requirements of Texas Labor Code, Section 401.011(44) for all employees
of the contractor providing services on the project, for the duration of the project.
C. The Contractor must provide a certificate of coverage to the governmental entity prior
to being awarded the contract.
D. If the coverage period shown on the contractor's current certificate of coverage ends
during the duration of the project,the contractor must,prior to the end of the
coverage period, file a new certificate of coverage with the governmental entity
showing that coverage has been extended.
E. The contractor shall obtain from each person providing services on a project, and
provide to the City:
SPECIAL I\STRCCTIO\S TO BIDDERS
-8-
(1) a certificate of coverage, prior to that person beginning work on the project, so
the City will have on file certificates of coverage showing coverage for all
persons providing services on the project; and
(2) no later than seven days after receipt by the contractor, a new certificate of
coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project.
E. The contractor shall retain all required certificates of coverage for the duration of the
project and for one year thereafter.
G. The contractor shall notify the governmental entity in writing by certified mail or
personal delivery, within ten days after the contractor knew or should have known, of
any change that materially affects the provision of coverage of any person providing
services on the project.
H. The contractor shall post on each project site a notice, in the text, form and manner
prescribed by the Texas Workers' Compensation Commission, informing all persons
providing services on the project that they are required to be covered, and stating how
a person may verify coverage and report lack of coverage.
I. The contractor shall contractually require each person with whom it contracts to
provide services on a project, to:
(1) provide coverage, based on proper reporting on classification codes and payroll
amounts and filing of any coverage agreements, which meets the statutory
requirements of Texas Labor Code, Section 401.011(44) for all of its employees
providing services on the project, for the duration of the project;
(2) provide to the contractor, prior to that person beginning work on the project, a
?� certificate of coverage showing that coverage is being provided for all employees
of the person providing services on the project, for the duration of the project;
(3) provide the contractor,prior to the end of the coverage period, a new certificate
° of coverage showing extension of coverage, if the coverage period shown on the
current certificate of coverage ends during the duration of the project;
(4) obtain from each other person or entity with whom it contracts, and provide to
the contractor:
(a) a certificate of coverage, prior to the other person or entity beginning work
on the project; and
(b) a new certificate of coverage showing extension of coverage, prior to the end
of the coverage period, if the coverage period shown on the current certificate
of coverage ends during the duration of the project;
(5) retain all required certificates of coverage on file for the duration of the project
and for one year thereafter.
SPECIAL INSTRUCTIONS TO BIDDERS
-9
(6) notify the governmental entity in writing by certified mail or personal delivery,
within ten days after the person knew or should have known, of any change that
materially affects the provision of coverage of any person providing services on
the project; and
(7) contractually require each person with whom it contracts, to perform as required
by paragraphs (1) - (7), with the certificates of coverage to be provided to the
person for whom they are providing services.
,w. J. By signing this contract or providing or causing to be provided a certificate of
coverage, the contractor is representing to the governmental entity that all employees
of the contractor who will provide services on the project%vill be covered by workers'
compensation coverage for the duration of the project, that the coverage will be based
on proper reporting of classification codes and payroll amounts, and that all coverage
agreements will be filed with the appropriate insurance carrier or, in the case of a Self-
insured, with the commission's Division of Self-Insurance Regulation. Providing
false of misleading information may subject the contractor to administrative penalties,
criminal penalties, civil penalties or other civil actions.
K. The contractor's failure to comply with any of these provisions is a breach of contract
by the contractor which entitles the City to declare the contract void if the contractor
does not remedy the breach within ten days after receipt of notice of breach from the
City.
"The contractor shall post a notice on each project site informing all persons
providing services on the project that they are required to be covered, and stating how
a person may verify current coverage and report failure to provide coverage. This
notice does not satisfy other posting requirements imposed by the Texas Workers'
Compensation Act or other Texas Workers'Compensation commission rules. This
notice must be printed with a title in at least 30 point bold type and text in at least 19
*` point normal type, and shall be in both English and Spanish and any other language
common to the worker population. The text for the notices shall be the following
text, without any additional words or changes:
REQUIRED WORKERS'COMPENSATION COVERAGE
"The law requires that each person working on this site or providing services related
to this construction project must be covered by workers' compensation insurance.
This includes persons providing, hauling, or delivering equipment or materials, or
providing labor or transportation or other service related to the project, regardless of
the identity of their employer or status as an employee."
*" "Call the Texas Workers' Compensation Commission at (512) 440-3789 to receive
information on the legal requirement for coverage, to verify whether your employer
has provided the required coverage. or to report an employer's failure to provide
" coverage."
17. AGE DISCRIMINATION: In accordance with the policy("Policy") of the Executive
Branch of the federal government, contractor covenants that neither it nor any officers,
members, agents or employees who engage in the performance of this contract shall, in
SPECIAL INSTRUCTIONS TO BIDDERS
- 10-
connection with such employment, advancement or discharge of employees or in
connection with the terms, conditions or privileges of their employment, discriminate
against any person because of their age except on the basis of a bona fide occupational
qualification, retirement plan or statutory requirement.
Contractor further covenants that neither it nor its officers, members, agents or employees
acting on their behalf, shall specify in solicitations or advertisements for employees to
work on those contract a maximum age limit for such employment unless the specified
maximum age limit is based upon a bona fide occupational qualification, retirement plan
or statutory requirement.
Contractor warrants that it will fully comply with the Policy and will defend, indemnify
and hold City harmless against any and all claims or allegations filed by third parties
against City arising out of Contractor's alleged failure to comply with the Policy in the
performance of this contract.
18. DISCRIMINATION DUE TO DISABILITY: In accordance with the provisions of the
Americans with Disabilities Act of 1990 ("ADA"), Contractor warrants that it will not
,�• unlawfully discriminate on the basis of disability in the provision of services to the
general public, nor in the availability, terms or conditions of employment for applicants
for employment with, or current employees of, Contractor. Contractor warrants that it
will fully comply with the ADA's provisions and any other applicable federal, state, or
local laws concerning disability and will defend, indemnify and hold City harmless
against any and all claims or allegations filed by third parties against City arising out of
Contractor's alleged failure to comply with the ADA in the performance of this contract.
END OF SECTION
olo SPECIAL INSTRUCTIONS TO BIDDERS
- 11 -
CITY OF FORT WORTH
HIGHWAY CONSTRUCTION
PREVAILING WAGE RATE FOR 2000
CLASSIFICATION HOURLY RATE
Asphalt Raker S10.32
Asphalt Shoveler S9.75
Batching Plant Weigher S9.65
Carpenter(Rough) $13.64
Concrete Finisher-Paving $10.16
Concrete Finisher Helper (Paving) $9.70
Concrete Finisher-Structures $13.44
Flagger $7.00
Form Builder-Structures $13.44
Form Setter-Paving & Curbs $10.25
Form Setter-Structures $9.75
Laborer-Common $7.64
Laborer-Utility $8.64
Mechanic $13.25
Servicer $10.13
Pipe Layer $7.35
Pipe Layer Helper $6.75
Asphalt Distributor Operator $11.45
Asphalt Paving Machine Operator $11.09
Concrete Paving Saw $10.53
Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (< 1 1/2 $10.00
CY)
Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (> 1 1/2 $11.52
CY)
Front End Loader(2 1/2 CY & less) $9.94
Front End Loader(over 2 1/2 CY) $9.32
Milling Machine Operator $8.00
Mixer $11.00
Motor Grader Operator (Fine Grade) $12.31
Motor Grader Operator $13.75
Pavement Marking Machine $11.00
Roller, Steel Wheel Plant-Mix Pavements $9.88
Roller, Steel Wheel Other Flatwheel or Tamping $12.12
Roller, Pneumatic, Self-Propelled Scraper $8.02
Traveling Mixer $10.00
Reinforcing Steel Setter (Paving) $9.75
Truck Driver-Single Axle (Light) $8.00
Truck Driver-Tandem Axle Semi-Trailer $10.22
Truck Driver-Lowboy/Float $10.54
Truck Driver-Transit Mix $10.63
Truck Driver-Winch $9.80
PROPOSAL
TO: MR. CHARLES R. BOSWELL Fort Worth, Texas
City Manager
Fort Worth, Texas
FOR: MICRO-SURFACING 2005-17
(POLYMER MODIFIED)
_ AT VARIOUS LOCATIONS
PROJECT NO. GS93-020930511170
Pursuant to the foregoing "Notice to Bidders", the undersigned has thoroughly examined the
plans, specifications and the site, understands the amount of work to be done, and hereby
proposes to do all the work and furnish all labor, equipment, and materials necessary to fully
complete all the work as provided in the plans and specifications, and subject to the inspection
and approval of the Director of the Department of Engineering of the City of Fort Worth.
Total quantities given in the bid proposal may not reflect actual quantities; however, they are given
for the purpose of bidding on and awarding the contract. The City reserves the right to add, delete
or substitute streets in this contract. The City also reserves the right to increase or decrease
quantities of individual pay items within the contract provided that the total contract amount
remains within plus or minus (±) 25% of the contract award. The contractor is not entitled to any
additional compensation or renegotiation of individual pay item bid prices.
Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract
and furnish Performance and Payment Bond approved by the City of Fort Worth for performing
and completing the said work within the time stated and for the following sums, to-wit:
SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM jgpd QUANTITY PRICFS WRITTFN IN WORDS PRICE AMOUNT BID
S.P. 1 2 Ea. Project Designation Sign @
Two-Hundred Dollars &
No Cents Per Ea. 200.00 $ 400.00 _
S.P. 2 4822 TON. Micro-Surfacing "Polymer
Modified" @
OfI£ OUNOPt&4 FouRTy SAY Dollars & 00
U00
_Cents Per TON `�' $ 404 60
300 3 120 C.Y. H.M.A.C. Base Repair @
312 orq liuoglao bwfl l SEVEOu Dollars & cd o
S.P. Nd Cents Per C.Y. $ (8 $
VIKING CONSTRUCTION, INC.
2592 SHELL ROAD P-1
GEORGETOWN,TX 78628
300 4 25 Ton H. .A.C. Level-Up @
312 o N Er 1��+�9(LEo Fouy-VA Dollars & m
S.P. Ny Cents Per Ton $� ' 53 3CO O
S.P. 5 50,000 L.F. Crack Sealing @
;y C Dollars & co
f 0unT`1 S �X Cents Per L.F. S �� '
a
TOTAL BID $ '
IJ
VIKING CONSTRun%, INC.
2592 SHELL ROAD
GEORGETOWN,TX 78628
1
P-2
This contract is issued by an organization which qualifies for exemption pursuant to the provisions
of Article 20.04 (F)of the Texas Limited Sales, Excise and Use Tax Act.
Taxes. All equipment and materials not consumed by or incorporated into the project
construction, are subject to State sales taxes under House Bill 11, enacted August 15, 1991.
The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort
Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in, employment
practices.
The undersigned agrees to complete all work covered by these contract documents within Fifty -
Five -(55)- Working Days from and after the date for commencing work as set forth in the written
Work order to be issued by the Owner, and to pay not less than the "Prevailing Wage Rates for
Street, Drainage and Utility Construction" as established by the City of Fort Worth, Texas.
Within ten (10) days of receipt of notice of acceptance of this bid, the undersigned will execute the
formal contract and will delivery an approved Surety Bond for the faithful performance of this
contract. The attached deposit check in the sum of
S c> or- �i-�CsR�A -bi fln�o��. g• +C�
Dollars ($ ) is to become the
property of the City of Fort Worth, Texas, or the attached Bidder's Bond is to be forfeited in the
event the contract and bond are not executed within the time set forth, as liquidated damages for
delay and additional work caused thereby.
I (we), acknowledge receipt of the following addenda to the plans and specifications, all of the
provisions and requirements of which have been taken into consideration in preparation of the
foregoing bid:
Addendum No. 1 (Initials) Respectfully Nbmitted Q
Addendum No. 2 (Initials) V 11�11`1 C3 h1S-
Addendum No. 3 (Initials) Company Name
VI
.MIJOT10N INC. By; —
KING CONS
Signature
2592 gHE1.L TX 78628 B
ROAD ARN H
GEO�GETONNN, Printed Name of Principal
Address: 2SCC-
(seal) �5 �
Date: 1� Telephone:
P-3
VENDOR COMPLIANCE TO STATE LAW
The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of
contracts to non-resident bidders. This law provides that, in order to be awarded a
contract as low bidder, non-resident bidders (out-of-state contractors whose corporate
offices or principal place of business are outside of the State of Texas) bid projects for
construction, improvements, supplies or services in Texas at an amount lower than the
lowest Texas resident bidder by the same amount that a Texas resident bidder would be
required too underbid a non-resident bidder in order to obtain a comparable contract in
the State in which the non-resident's principal place of business is located. The
appropriate blanks in Section A must be filled out by all out-of-state or non-resident
bidders in order for your bid to meet specifications. The failure of out-of-state or non-
resident contractors to do so will automatically disqualify that bidder. Resident bidders
must check the box in Section B.
A. Non-resident vendors in (give State), our principal place of
business, are required to be percent lower than resident bidders
by State law. A copy of the Statute is attached.
Non-resident vendors in (give State), our principal
place of business, are not required to underbid resident bidders.
i"
B. Our pripcipal place of business or corporate offices are in the State of Texas.
VIKING CONSTRUCTION,INC.
Bidder: 2592 SHELL ROAD 78628
GEORGETOWN'
t .t (I1J�' u�-i��W �`� �, i Nle
y
Company By: (Please print)
Address Signature
City State Zip title.(Please print)
THIS FORM MUST BE RETURNED WITH YOUR QUOTATION
*.
FORT W(3 RT H
City of Fort Worth
Minority and Women Business Enterprise Specifications
SPECIAL INSTRUCTIONS FOR BIDDERS
APPLICATION OF POLICY
If the total dollar value of the contract Is$25,000 or more,the M/WSE goal is applicable.
If the total dollar value of the contract is less than $25,000,the M/WBE goal is not applicable.
POLICY STATEMENT
It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business
Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. All requirements
and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid
MIWBE PROJECT GOALS
The City's MBE/WBE goal on this project is %of the base bid value of the contract.
COMPLIANCE TO BID SPECIFICATIONS
On City contracts of S25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordirance by
either of the following:
1. Meet or exceed the above stated MfWBE goal,or
2. Good Faith Effort documentation, or;
3. Waiver documentation, or;
4. Joint Venture.
SUBMITTAL OF REQUIRED DOCUMENTATION
The applicable documents must be received by the Managing Department, within the following times allocated in order
for the entire bid to be considered responsive to the specifications.
1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid
met or exceeded: opening date, exclusive of the bid opening date.
2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid
- Utilization Form, if participation is less than opening date,exclusive of the bid opening date.
statedgoal:
3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid
Utilization Form, if no M/WBE participation: ' Opening date,exclusive of the bid opening date.
4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid
perform all subcontracting/supplier work: opening date,exclusive of the bid opening date.
5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid
to met or exceed goal. opening date,exclusive of the bid opening date.
FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED
NON-RESPONSIVE TO SPECIFICATIONS
Any questions, please contact the M/WBE Office at(817)392-6104.
OW Rev.5/30103
ATTACHMENT to
Page 1 of 4
FORT WORTH City of Fort Worth RECEIVED JAN 2 1 2O-11
Subcontractors/Suppliers Utilization Form
PRIM COMPANY N" E Check applicable block to describe prime ,
l ► 1 N G
', PROJECT NAME: MNWDBE 'r NON-M!W/DBE
BID DATE
Citys M/WBE Project Goal: Prime's MMBE Project Utilization: PROJECT NUMBER
10 % yo
1
Identify all subcontractors/suppliers you will use on this project
Failure to complete this form, in its entirety with requested documentation, and received by the Managing
Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date,
will result in the bid being considered non-responsive to bid specifications.
The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this
utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional
and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the
bid being considered non-responsive to bid specifications
r
M/WBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or
currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant,
Parker,Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties.
Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct
payment from the prime contractor to a subcontractor is considered 15t tier, a payment by a subcontractor to
its supplier is considered 2n°tier
i
ALL MIWBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD.
Certification means those firms, located or doing business at the time of bid opening within the Marketplace,that have
been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification
�. Agency(NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business
Enterprise(DBE)is synonymous with Minority/Women Business Enterprise(MIWBE).
If hauling services are utilized, the prime will be given credit as long as the M/WBE listed owns and
J' operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease
1 trucks from another M/WBE firm, including M/WBE owner-operators, and receive full M/WBE credit. The ,
u M/WBE may lease trucks from non-M/WBEs, including owner-operators, but will only receive credit for the
fees and commissions earned by the M/WBE as outlined in the lease agreement.
�i
� Rev.5130/03
VIKING CONSTRUCTION,INC.
2592 SHELL ROADi
GEQRGETOWN,TX 78628 ATl 4CFlMENT f 4
Faxr� ��'ORTN Page 2 of 4
Primes are required to identity ALL suboDnntractorsfsuppliers,regardless of status;i.e.,Minority.Women and non-101MBEs.
■ Please list MNVBE firms first,use additional sheets if necessary. M
Certification N
IF i,SUBCONTRACTOR/SUPPLIER T (chedc one) n
Company Name i N T Detail Detail
Address a rd WC X M Subcontracting Work Supplies Purchased Dollar mount
A
r hone/Fax
Tele T D W E
P E E R O B i
: C T E
A i
hoyNa ?PQ 1061,NG — `�3 i•�o c� i3ws� �, 3� a,
o leo �O�S a i 01 MEPa10-t'rr�,t�rC.0 �
4 vwlo,
SP rt,w6 %xAPcA t-')QCT \ G� d tj -15' TON O`er
i �qy Q3o 1:)& J 860 Nkrt
�.1 $O OOb L�
S Rbcs 2I EGG �v
i cf2Au S€Pra
C.
SiPUcOC
Po$����� �� �iS�t•IrA�,i�.fiu�.S�
f Pw S3(:) 833 S:;S3 .0 q'B1: %'j
%3o $33 S )"w
t
gcv�
oa
V a
lei 1 -0dZ'
p F V\o �F - of Eyo 8A6S C�fq6��
.eap�o�
g �C�,
P►&J-r-Qw%o �`I G Vj Ci 13
'
PP a.(*
6-' ; F y Zoo S49 0560 `� 0
i
� f
i, Rev.5/30/03
ATTACHMENT to
FORT WORTH Page a V.a
Total Dollar Amount of M/WBE Subcontractors/Suppliers $ ! �� + •'L3C7
Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $
TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ -33C> d X72 ,
The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval'
of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a;
Request for Approval of ChangelAddition. Any unjustified change or deletion shall be a material breach of
contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor
shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed)
M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination.
By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request,
complete and accurate information regarding actual work performed by all subcontractors, including
M/W/DBE(s) arrangements' submitted with the bid. The Offeror also agrees to allow an audit and/or
examination of any books, records and files held by their company. The bidder agrees to allow the
transmission of interviews with owners, principals, officers, employees and applicable
subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work
performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any
intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment
from'City work for a period of not less than three (3) years and for initiating action under Federal, State or
Local laws concerning false statements. Any failure to comply with this ordinance and create a material
breach of contract may result in a determination of an irresponsible Offeror and barred from participating in
City work for a period of time not less than one (1)year.
Authorized Signature Printed Signature
TitM Contact NameMtle Of different
S X1%0
Company Nam Telephone and/or Fax
Address E-mail Address
CWStatOOP Late
Rev.5130103
CITY OF FORT WORTH, TEXAS
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
SPECIAL PROVISIf�pS
MICRO-SURFACING 2005-17
(POLYMER MODIFIED)
AT VARIOUS LOCATIONS
PROJECT NO. GS93-020930511170
SCOPE OF WORK: The work covered by these details and specifications consists of the
Micro-Surfacing of existing pavement. A layer of "Polymer Modified" shall be installed as
described in the Technical Specifications of these Special Provisions. Included, in addition
to the micro-surfacing process, will be the removal (only) of all traffic buttons and pavement
markings, removal and replacement of base repair, sealing of existing large cracks.The
work shall include all other miscellaneous items of construction to be performed as outlined
in the details and specifications which are necessary to satisfactorily complete the work.
The contractor is encouraged to conduct site visits and survey all these possibilities. The
contractor shall verify these locations with the Construction Engineer. For street locations,
see list at the back of this document.
At the sole discretion of the City, the City reserves the right to add, delete or substitute
streets in this contract. The City also reserves the right to increase or decrease quantities of
individual pay items within the contract provided that the total contract amount remains
within plus or minus (±) 25% of the contract award. The contractor is not entitled to any
additional compensation or renegotiation of individual pay item bid prices.
Total quantities given in the bid proposal may not reflect actual quantities, but represent the
best accuracy based on a reasonable effort of investigation; however, they are given for the
purpose of bidding on and awarding the contract.
The Contractor shall mobilize within ten (10) calendar days of the notice given by the
Construction Engineer for any locations. If the contractor fails to begin the work
within ten (10) calendar days, a $200 dollars liquidated damage will be assessed per
Block per day.
2. Contract will be awarded to the lowest responsible and responsive bidder.
P
3. The Contractor agrees to complete the Contract within the allotted number of days. If the
Contractor fails to complete the work within the number of days specified, liquidated
damages shall be charged, as outlined in Part 1, Item 8, Paragraph 8.6, of the "General
SP-1
Provisions"of the Standard Specification for Construction of the City of Fort Worth, Texas.
4. The City reserves the right to abandon, without obligation to the Contractor, any part of the
project, or the entire project, at any time before the Contractor begins any construction work
authorized by the City.
5. This contract and project are governed by the two following published specifications, except
as modified by these Special Provisions:
STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION-CITY OF
FORT WORTH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION-NORTH
CENTRAL TEXAS. General Provisions shall be those of the Fort Worth document rather
than Division 1 of the North Central Texas document.
A copy of these specifications may be purchased at the office of the Department of
Engineering, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort Worth, Texas
76102. The specifications applicable to each pay item are indicated in the call-out for the
pay item by the designer. If not shown, then applicable published specifications in any of
these documents may be followed at the discretion of the Contractor.
6. Bidders shall not separate, detach or remove any portion, segment or sheets from the
contract documents at any time. Failure to bid or fully execute contract without retaining
contract documents intact may be grounds for designating bids as "non-responsive" and
rejecting bids or voiding contract as appropriate and as determined by the Director of the
Transportation and Public Works Department.
7. The Contractor shall be responsible for defects in this project due to faulty materials and
workmanship, or both, for a period of two (2) years from date of final acceptance of
this project by the City of Fort Worth and will be required to replace at his expense any part
or all of the project which becomes defective due to these causes. See Special Instruction
to Bidders Item No. 14 for further requirements.
8. TRAFFIC CONTROL: The contractor will be required to obtain a "Street Use Permit" prior
to starting work. As part of the "Street Use Permit" a traffic control plan is required. The
Contractor shall be responsible for providing traffic control during the construction of this
project consistent with the provisions set forth in the "Latest Edition Texas Manual on
Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the
"State of Texas Uniform Act Regulating Traffic on Highways", codified as Article 6701d
Vernon's Civil Statues, pertinent sections being Section Nos. 27, 29, 30 and 31.
A traffic control plan shall be submitted for review to Mr. Charles R.
Burkett, City Traffic Engineer @817-871-8770 at least 10 working days
prior to the pre-construction conference. Although work will not begin
until the traffic control plan has been reviewed, the Contractor's time will
begin in accordance with the time frame established in the Notice to the
SP-2
i.
Contractor.
The Contractor will not remove any regulatory sign, instructional sign, street name sign, or
other sign which has been erected by the City. If it is determined that a sign must be
removed to permit required construction, the Contractor shall contact the Transportation
and Public Works Department, Signs and Markings Division (phone number 871-7738), to
remove the sign. In the case of regulatory signs, the Contractor must replace the
permanent sign with a temporary sign meeting the requirements of the above referenced
manual and such temporary sign must be installed prior to the removal of the permanent
sign. If the temporary sign is not installed correctly or if it does not meet the required
specifications, the permanent sign shall be left in place until the temporary sign
requirements are met. When construction work is completed to the extent that the
permanent sign can be re-installed, the Contractor shall again contact the Signs and
Markings Division to re-install the permanent sign and shall leave his temporary sign in
place until such re-installation is completed.
The Contractor shall limit his work within one continuous lane of traffic at a time to minimize
interruption to the flow of traffic upon approval of the City Traffic Engineer.
Work shall not be performed on certain locations/streets during "peak traffic periods" as
determined by the City Traffic Engineer and in accordance with the applicable provision of
the "City of Fort Worth Traffic Control Handbook for Construction and Maintenance Work
Areas."
See Special Instructions to Bidders Item No. 15, for further work time restrictions on "Air
Pollution Watch Days"with substantial use of motorized equipment.
9. PAYMENT: The Contractor will receive bi-weekly payment (minus 5% retainage) from the
City for all work for each pay period. Payment of the remaining amount shall be made with
the final payment, and upon acceptance of the project. See Special Instruction to Bidders
Item No. 14 for further requirements.
10. DELAYS: The Contractor shall receive no compensation for delays or hindrances to the
work, except when direct and unavoidable extra cost to the Contractor is caused by the
failure of the City to provide information or material, if any, which is to be furnished by the
City. When such extra compensation is claimed a written statement thereof shall be
presented by the Contractor to the Engineer and if by him found correct shall be approved
and referred by him to the Council for final approval or disapproval; and the action thereon
by the Council shall be final and binding. If delay is caused by specific orders given by the
Engineers to stop work, or by the performance of extra work, or by the failure of the City to
provide material or necessary instructions for carrying on the work, then such delay will
entitle the Contractor to an equivalent extension of time, his application for which shall,
however, be subject to the approval of the City and no such extension of time shall release
SP-3
the Contractor or the surety on his performance bond from all his obligations hereunder
which shall remain in full force until the discharge of the contract.
11. DETOURS AND BARRICADES: The Contractor shall prosecute his work in such a manner
as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of
vehicular and pedestrian traffic within the project area. Contractor shall protect
construction, as required by Engineer, by providing barricades.
Barricades, warning and detour signs shall conform to the Standard Specifications "Barriers
and Warning and/or Detour Signs", Item 524, and/or as shown on the plans.
Construction signing and barricades shall conform with the latest edition of the "Texas
Manual on Uniform Traffic Control Devices, Vol. No. 1".
12. D1,91?0SAL OF SPOT IFI MATERIAL: Prior to the disposing of any spoil/fill material, the
contractor shall advise the Director of the Department of Engineering acting as the City of
Fort Worth's Flood Plain Administrator("Administrator'), of the location of all sites where the
contractor intends to dispose of such material. Contractor shall not dispose of such
material until the proposed sites have been determined by the Administrator to meet the
requirements of the Flood Plain Ordinance of the City of Fort Worth (Ordinance No. 10056)
and a flood plain permit issued. All disposal sites must be approved by the Administrator to
ensure the filling is not occurring within a flood plain without a permit. A flood plain permit
can be issued upon approval of necessary engineering studies. No fill permit is required if
disposal sites are not in a flood plain. Approval of the contractors disposal sites shall be
evidenced by a letter signed by the Administrator stating that the site is not in a known flood
plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses
associated with obtaining the fill permit, including any necessary engineering studies, shall
be at contractors expense. In the event that the contractor disposes of spoil/fill material at a
site without a fill permit or a letter from the administrator approving the disposal site, upon
notification by the Director of the Department of Engineering, Contractor shall remove the
spoil/fill material at its expense and dispose of such materials in accordance with the
Ordinance of the City and this section.
13. During the construction of this project, the Contractor shall comply with present zoning
requirements of the City of Fort Worth in the use of vacant property for storage purposes.
14. Final cleanup work shall be done for this project as soon as the work has been completed.
No more than five days shall elapse after completion of construction before the roadway
and right-of-way is cleaned up to the satisfaction of the Engineer.
15. PROPERTY ACCESS: Access to adjacent property shall be maintained at all times unless
otherwise directed by the Engineer.
SP-4
16. CONSTRUCTION SCHEDLILE: It shall be the responsibility of the Contractor to furnish the
Construction Engineer, prior to construction, a schedule outlining the anticipated time each
phase of construction will begin and be completed, including sufficient time being allowed
for cleanup.
17. SAFETY RESTRICTIONS-WORK NEAR HIGH VOLTAGE LINES:
The following procedures will be followed regarding the subject item on this contract:
(1) A warning sign not less than five inches by seven inches, painted yellow with black
letters that are legible at twelve feet shall be placed inside and outside vehicles such
as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or
similar apparatus. The warning sign shall read as follows:
"WARNING —UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET
OF HIGH VOLTAGE LINES."
(2) Equipment that may be operated within ten feet of high voltage lines shall have an
insulating cage-type of guard about the boom or arm, except back hoes or dippers,
and insulator links on the lift hood connections.
(3) When necessary to work within six feet of high voltage electric lines, notification
shall be given the power company (TU Electric Service Co.) which will erect
temporary mechanical barriers, de-energize the line, or raise or lower the line. The
work done by the power company shall not be at the expense of the City of Fort
Worth. The notifying department shall maintain an accurate log of all such calls to
TU Electric Service Company, and shall record action taken in each case.
i
(4) The Contractor is required to make arrangements with the TU Electric Service
Company for the temporary relocation or raising of high voltage lines at the
Contractor's sole cost and expense.
(5) No person shall work within six feet of a high voltage line without protection having
been taken as outlined in Paragraph (3).
18. RIGHT TO AUDIT:
Contractor agrees that City shall, until the expiration of three (3) years after final payment
under this contract is made by City, have access to and the right to examine and photocopy
any directly pertinent books, documents, papers and records of Contractor involving
transactions relating to this contract. Contractor agrees that City shall have access during
normal working hours to all necessary Contractor facilities and shall be provided adequate
and appropriate workspace in order to conduct audits in compliance with the provisions of
SP-5
this section.
Contractor further agrees to include in all its subcontracts hereunder a provision to the
effect that the subcontractor agrees that City shall, until the expiration of three (3) years
after final payment under the subcontract, have access to and the right to examine any
directly pertinent books, documents, papers and shall be provided adequate and appropri-
ate work space, in order to conduct audits in compliance with the provisions of this article
together with Article VI. City shall give the subcontractor reasonable advance notice of
intended audits.
Contractor and subcontractor agree to photocopy such documents as may be requested by
City. City agrees to reimburse Contractor and/or subcontractor for the cost of copies at the
rates as contained in the Texas Administrative Code at the time payment is made.
CONSTRUCTION
NON-PAY ITEM NO. 1 - SPRINKLING FOR DUST CONTROL:
All applicable provisions of Standard Specifications Item No. 200, "Sprinkling for Dust
Control" shall apply. However, no direct payment will be made for this item and it shall be
considered incidental to this contract.
NON-PAY ITEM NO_ 2 - REMOVAL OF TRAFFIC BUTTONS AND PAVEMENT
MARKINGS AND INSTALLATION OF TEMPORARY LANE TAPE-
All traffic buttons shall be removed from the existing asphalt surface before micro-surfacing
begins. The contractor shall be responsible for the removal of all buttons and pavement
markings on the streets listed in the back of this document. Upon completion of the job the
City will install new buttons after proper notification.
The contractor shall also be responsible for all materials, equipment and labor to place
temporary adhesive lane marking tape, at locations as directed by the Construction
Engineer, to direct traffic flow until permanent markers are installed.
The contractor shall notify the Construction Engineer to arrange for the replacement of the
buttons and adhesive lane markers (arrows, etc.). All costs to the contractor shall be
figured as subsidiary to this contract.
PAY ITEM NO. 1 - PRO IECT DESIGNATION SIGN:
The Contractor shall construct and install two (2) Project Designation Signs and it will be the
responsibility of the Contractor to maintain the signs in a presentable condition at all times
on each project under construction. Maintenance will include painting and repairs as
SP-6
directed by the Engineer.
It will be the responsibility of the Contractor to have the individual project signs lettered and
painted in accordance with the enclosed detail.
The quality of the paint, painting, and lettering on the signs shall be approved by the
Engineer.
The height and arrangement of the lettering shall be in accordance with the enclosed detail.
The sign shall be constructed of 3/4"fir plywood, grade A-C (exterior)or better.
These signs shall be installed on barricades or as directed by the Engineer, and in place at
the project site upon commencement of construction.
The work, which includes the painting of the signs, installing and removing the signs,
furnishing the materials, supports and connections to the support, and maintenance shall
be to the satisfaction of the Engineer.
The unit price pre bid per each will be full compensation for all labor, material, equipment,
tools, and incidentals necessary to complete the work.
PAY ITEM NO. 2- MICRO-SURFACING (POLYMER MODIFIED):
This item shall consist of (3/8" to 1/7) three-eighths to one-half-inch layer of "Polymer
Modified" as described in the Technical Specifications.
The unit price bid per ton of Micro-Surfacing "Polymer Modified" complete and in place,
shall be full compensation for asphalt emulsion, aggregate, additives, all labor, cleaning,
materials, equipment, tools, and incidentals necessary to complete the work.
PAY ITEM NO. 3 - REMOVAL AND REPLACEMENT OF H_M.A_C_ PAVEMENT AND
BASE:
The contractor is to remove all existing deformed H.M.A.C. pavement and/or bad base
material that shows surface deterioration and/or complete failure. The Construction
Engineer will identify these areas upon which time the contractor will begin work. The failed
area shall be saw cut, or other similar means, out of the existing pavement in square or
rectangular fashion. The side faces shall be cut vertically and all failed and loose matenal
excavated. As a part of the excavation process, all unsatisfactory base material shall be
removed, if required, to a depth sufficient to obtain stable sub-base. The total depth of
excavation could range from a couple of inches to include the surface-base-some sub-base
removal for which the Construction Engineer will select the necessary depth. The remaining
SP-7
good material shall be leveled and uniformly made ready to accept the fill material. All
excavated material shall be hauled off site, the same day as excavated, to a suitable dump
site.
After satisfactory completion of removal as outlined above, the contractor shall place the
permanent pavement patch, with Type "D" surface mix. This item will always be used even
if no base improvements are required. The proposed H.M.A.C. repair shall match the
existing pavement section or the depth ,of the failed material, whichever is greater.
However, the patch thickness shall be a minimum of 2 inches. Generally the existing
H.M.A.C. pavement thickness will not exceed 6". Before the patch layers are applied, any
loose material, mud and/or water shall be removed. A liquid asphalt tack coat shall be
applied to all exposed surfaces. Placement of the surface mix lifts shall not exceed 3 inches
with vibrator compactions to follow each lift. Compactions of the mix shall be to standard
densities of the City of Fort Worth, made in preparation to accept the recycling process.
All applicable provisions of Standard Specification Item Nos. 300 "Asphalts, Oils, and
Emulsions", 304 "Prime Coat", and 312"Hot-Mix Asphaltic Concrete" shall govern work.
The unit price bid per cubic yard shall be full compensation for all materials, labor,
equipment and incidentals necessary to complete the work.
PAY ITEM NO. 4 - H_M_A.C_JLEVEL UP:
This item shall be used to fill ruts, depression with Type "D" surface mix prior to placing the
Micro-Surfacing layer where needed as directed by the Engineer in the field.
All applicable provisions of Standard Specification Item Nos. 300 "Asphalts, Oils, and
Emulsions", 304 "Prime Coat", and 312"Hot-Mix Asphaltic Concrete" shall govern work.
The unit price bid per ton shall be full compensation for all materials, labor, placing,
equipment, cleaning and incidentals necessary to complete the work.
PAY ITEM NO. 5—CRACK SEALING-
Contractor shall seal existing large cracks, 1/4-inch or greater, by using hot poured rubber
type joint sealer as directed by the Engineer. Standard Specification Item No. 314.2(11)
"Joint Sealing Material" shall apply.
The unit price bid per linear foot shall be full compensation for all labor, material,
equipment, supplies, and incidentals necessary to complete the work.
SP-8
TECHNICAL SPECIFICATIONS
MICRO-SURFACING
(POLYMER MODIFIED)
1. DESCRIPTIONS:
A. This item shall consist of a micro-surfacing system which shall be a mixture of cationic
modified asphalt emulsion, mineral aggregate, mineral filler, water, and other additives
mixed and spread on the paved surface in accordance with these specifications.
B. All testing required by these specifications is to be performed using Texas Department
of Transportation (TxDOT)testing methods and their bulletins.
2. MATERIALS:
A. Asphaltic Materials: The asphalt material, designed as CSS-1 P, shall be a cationic slow
setting emulsion modified with an approval polymer. The polymer shall be incorporated
by blending with the base asphalt prior to emulsification or it shall be co-milled with the
asphalt to produce the finished emulsion. The distillation residue of the modified
emulsion shall contain a minimum of 3.0 percent polymer by weight, as determined by
an analytical method approved by the Engineer. The emulsion supplier shall furnish the
Engineer samples of the base asphalt and polymer used in the finished emulsion.
In addition, the emulsion shall be homogeneous, shall show no separation of polymer
and shall comply with the following requirements:
Odin. Max.
Viscosity, Saybolt Furol at 77=F, Sec. 20 100
Storage Stability Test, One Day, Percent -- 1
Particle Charge Test Positive
Sieve Test, Percent-- 0.1
*Distillation:
Oil Distillate, by Volume of Emulsion, Percent 90
Residue, Percent 62 --
Tests on Residue from Distillation:
Penetration, 77--F, 100 g, 5 seconds 55 90
Ductility, 77=F, 5 cm/min, cm 70 --
Solubility in Trichloroethylene, Percent 97 --
SP-9
Softening Point, R. & B., F 135 --
*The standard distillation procedure shall be modified as follows:
The temperature on the lower thermometer shall be borough slowly to 350 degrees
plus or minus 10 degrees F and maintained at this point for 20 minutes. Complete
the total distillation in 60 plus or minus 5 minutes from the first application of heat.
B. Mineral g9Mgaj __:
The mineral aggregate shall be composed of clean, tough, and durable particles of
crushed traprock, crushed granite, or crushed sandstone. A sand equivalent of 65 or
higher is required. The aggregate shall have a weighted loss of not more than 12
percent when sodium sulfate is used or 25 percent when magnesium sulfate is used
in accordance with Test Method Tex-411-A.
The polish value for the aggregate shall not be less than 40 when tested in
accordance with Test Method Test-438-A. If the traprock is used, the polish value
requirement is waived.
1. Grad .s: When tested by Test Method Tex-200-F, Part I, the
gradation requirements shall be as follows:
Grade 2 Percent Aggregate Passing
(Course Graded Surface Course) By Weight
Passing 3/8" sieve 99-100
_ Passing No. 4 sieve 86-94
Passing No. 8 sieve 45-65
Passing No. 16 sieve 25-46
Passing No. 30 sieve 15-35
Passing No. 50 sieve 20-25
Passing No. 200 sieve 5-15
2. Mineral Filler: Mineral filler shall be non-air-entrained Portland
cement which is free of lumps of foreign matter.
C. Water- The water shall be potable and shall be free of harmful soluble salts.
D. Madifin : An approved latex modifier, such as Dynatex Latex or other approved
equal, along with special emulsifiers shall be milled into the asphalt emulsion. The
distillation residue of the modified emulsion shall contain a minimum of 2.0 percent
rubber solids by weight, as determined by an analytical method approved by the
Engineer. The emulsion supplier shall furnish the Engineer samples of the base
SPA 0
asphalt and latex modifier used in the finished emulsion.
The modified emulsified asphalt shall be so formulated that when the paving mixture
is applied with the relative humidity at not more than 50 percent and ambient air
temperature of at least 75 degrees F, it will cure sufficiently that rolling traffic can be
allowed in one hour with no damage to the surface.
E. Other Additives: Additives supplied by the emulsion manufacturer may be added to
the emulsion mix or to any component materials to provide control of the set time in
the field.
3. PAVING MIXTURE:
A. Mixture Desmon: The mix shall be designed by the Contractor in accordance
with Texas Department of Transportation Bulletin C-14 and Test Method
Tex-204-F, using Test Method Tex-227-F to supplement Test Method Tex-
201-F and Tex-202-to conform with the requirements herein. The above
laboratory mixing and curing procedures may be modified as approved by
the Engineer. The emulsified asphalt content will be selected by the
Engineer to provide an optimum laboratory compacted density within the
range of 94-97 percent. A minimum HVEEM stability of 35 is required for
placement exceeding a depth of twice the maximum aggregate size.
This is a mix design requirement, to be verified by testing of trail batch
material prior to placement of project material. HVEEM stability testing will
be performed by the City. The frequency of job control density and stability
testing will be determined by the Engineer. The Contractor shall be
responsible for payment of all testing, prior to materials being placed.
The Contractor shall furnish the mix design for the type of mixture specified
together with applicable design work sheets and date. The Bulk Specific
Gravity will be determined for each aggregate to be used in the design
mixture. If the determined values vary by 0.300 or more, the mixture design
will be by the Volumetric Methods, Test Method Tex-204-F, Pat Il. To
substantiate the design, trial mixtures will be produced and tested using all
the proposed project materials and equipment prior to any placement. The
Engineer may waive trial mixtures if the same design has been proven to be
in conformance with these requirements.
B. Composofinn of Mixture: The Engineer shall approve the design mix and all
micro-surfacing materials and methods prior to use and shall designate the
proportions to be used within the following limits.
SP-11
Residual Asphalt- 6.0 to 9.0 percent by weight of dry aggregate or 13.5
to 23 percent volume of the aggregate.
Mineral Filler- 1.5 to 3.0 percent of dry weight of aggregate.
Modifier- As required to provide the specified properties.
Water- As required to provide proper consistency.
C. Jypa: The paving mixture shall consist of a uniform mixture of coarse aggregate,
fine aggregate, and asphaltic material. Mineral filler and/or additives may also be
required.
The mixture shall be designed so that the mineral aggregate will produce a
gradation which conforms to the limitations for the master grading for the type
specified herein. The gradation will be determined in accordance with Test Method
Tex-200-F (Dry Sieve Analysis) and shall be based upon aggregate only. The
amount of asphaltic material shall conform to the limitation for the type specified.
D. Tal _ran .Ps: The aggregate portion of the paving mixture produced shall not vary
from the design gradation by more than the tolerances which follow. The material
passing the No. 200 sieve is further restricted to conform to the limitations for the
master grading for the type specified.
The asphaltic material portion of the paving mixture shall not vary from the design
amount by more than the allowed tolerance is also restricted to conform to the
master limits. The methods of test for determining the aggregate gradation and
asphalt content of the mixture shall be Test Method Tex-21 0-F or other methods of
proven accuracy.
Percent By
Weight or Volume
As Ap IijZ cable
Passing 3/8" sieve, retained on No. 4 sieve Plus or minus 5
Passing No. 4 sieve, retained on No. 8 sieve Plus or minus 5
" Total Retained on No. 8 sieve Plus or minus 5
Passing No. 8 sieve, retained on No. 16 sieve Plus or minus 3
Passing No. 30 sieve, retained on No. 50 sieve Plus or minus 3
Passing No. 50 sieve, retained on No. 200 sieve Plus or minus 3
Passing No. 200 sieve Plus or minus 2
Asphalt Material Plus or minus 0.5
SP-12
by weight or 1.2
by volume
4. FOUIPMENT: All equipment for the handling of all materials and mixing and placing of the
mixture shall be maintained in good repair and operating condition and subject to the
approval of the Engineer. Any equipment found to be defective and potentially affecting the
quality of the paving mixture will be replaced by the Contractor, at no cost to the City.
This material shall be mixed by a self-propeller micro-surfacing mixing machine which shall
be a continuous flow mixing self-contained unit able to accurately deliver and proportion
the aggregate, emulsified asphalt, mineral filler, and water to a revolving multi-blade mixer
and discharge the mixed product on a continuous flow basis. The machine shall have
sufficient storage capacity for aggregate, emulsified asphalt, mineral filler, and water to
maintain an adequate supply to be proportioning controls. The machine shall be equipped
with self-loading devices, which provide for the loading of all materials while continuing to
lay micro-surfacing, thereby minimizing construction joints. Upon approval by the
Engineer, a truck-mounted micro-surfacing unit may be used on cul de sacs or small
residential streets.
Individual volume or weight controls for proportioning each material to be added to the mix
shall be provided. Each material control device shall be calibrated and properly marked.
The aggregate feed to the mixer shall be equipped with a revolution counter or similar
do device so the amount of aggregate used may be determined at any time.
The emulsion pump shall be a positive displacement type and shall be equipped with a
revolution counter or similar device so that the amount of aggregate used may be
determined at any time.
The mixing machine shall be equipped with a water pressure system and nozzle type
spray bar to provide a water spray immediately ahead of and outside the spreader box.
The mixing machine shall be equipped with an approved fines feeder that shall provide a
uniform, positive, accurately metered, predetermined amount Of the specified mineral
filler. The mixing machine shall have a driver station located on each side.
5, STOCKPIt ING AND STO A
A. Agp=ate Storage: If the mineral aggregates are stored or stockpiled, they shall be
handled in such a manner as to prevent segregation, mixing of the various materials
or sizes, and contamination with foreign materials. The grading of aggregates
proposed for use and as supplied to the mixing plan shall be uniform. Suitable
equipment of acceptable size shall be furnished by the Contractor to work the
SP-13
stockpiles and prevent segregation of the aggregates. The mineral aggregate shall
be screened prior to being weighted for a job site delivery. This weight shall be done
by means of a scale approved by the Engineer.
B. Storage and Heating of Asphaltic Materials: The asphaltic material storage shall be
ample to meet the requirements of the plant. Asphalt shall not be heated to a
temperature in excess of that specified in the Item "Asphalts, Oils, and Emulsions."
All equipment used in the storage and handling of asphaltic material shall be kept in
a clean condition at all times and shall be operated in such a manner that there will
be no contamination with foreign matter.
C. Storage o a ion: It shall be the responsibility of the Contractor to provide storage
locations for materials, at no cost to the City.
6. CONSTRUCTION METHODS:
A. General: It shall be the responsibility of the Contractor to produce, transport, and
place the specified paving mixture in accordance with those specifications and as
Ir` approved by the Engineer.
B. Weather Limitations: The material shall be spread only when the atmospheric
temperature is at least fifty (50) degrees F and rising and the weather is not foggy or
rainy.
C. ,Surface Preparation:
a' 1. The area to be sealed shall be thoroughly cleaned of all vegetation, loose
aggregate, and soil.
2. Water used shall be applied at a rate to dampen the entire surface without
any free flowing water ahead of the spreader box.
3. Any ruts, utility cuts, depression in excess of 1/2" shall be filled using a rut
box prior to placing final surface treatment.
4. All manholes and water valves will be covered with plastic prior to placing
micro-surfacing.
5. The Contractor shall remove all raised pavement markers in a manner
i; which will protect and ensure no damage to the existing pavement. Any
pavement damaged by the Contractors operations shall be repaired at no
cost to the City. Any excess debris shall be removed by the Contractor at no
SP-14
cost to the City.
6. All 2 ft. x 8-ft. longitudinal crosswalk bars shall be removed from the existing
pavement prior to placing micro-surfacing.
D. Spreading Equi ant: The paving mixture shall be spread uniformly by means of a
mechanical type squeegee box attached to the mixer, equipped with paddles to
agitate and spread the materials throughout the box. A front seal shall be provided
to ensure no loss of the mixture at the road contact surface. The rear seal shall act
as a final strike-off and shall be adjustable. The mixture shall be spread to fill cracks
and minor surface irregularities and leave a uniform skid resistant application of
aggregate and asphalt on the surface.
The spreader box and rear strike-off shall be so designed and operated that a
uniform consistency is achieved to produce a free flow of material to the rear strike-
off. The seam where two spreads join shall be neat appearing and uniform.
E. Workmanship: No excessive buildup, uncovered areas or unsightly appearance will
be permitted on longitudinal or transverse joints. Longitudinal joints shall be placed
on lane lines. Excessive overlap will not be permitted. Care shall be taken to insure
straight liens along the roadway centerline, lane lines, shoulder or curb lines. Lines
at intersections will be kept straight to provide a good appearance.
Areas which cannot be reached with the mixing machine shall be surfaced using
hand tools to provide complete and uniform coverage. The area to be handworked
shall be lightly dampened prior to mix placement. Care shall be exercised in areas
that require handwork so that the finished surface is uniform in texture, dense and of
overall good appearance comparable to that produced by the spreader box. Micro-
surfacing material required to repair deficiencies due to unsatisfactory workmanship
` shall not be paid for but shall be entirely at the Contractor's expense.
F. Notification: It shall be the responsibility of the Contractor to notify all residents
adjacent to the project of micro-surfacing operation and schedules. Such notice
shall be given at least 48 hours before the work begins.
G. Traffic Control: It shall be the responsibility of the Contractor to provide adequate
traffic control measures, such as barricades, flagment, cones, etc., to protect the
uncured micro-surface from all types of traffic and provide traffic safety in the
construction area. Advance warning signs and barricades will be necessary. This
shall be in accordance with the City of Fort Worth Work Area Traffic Control Manual
and those requirements specified in the Special Prnyicionc, Item No 8_, Traffic
Control_
SP-15
PW
w+
CONTRACTOR COMPLIANCE WITH
WORKERS' COMPENSATION LAW
■
Pursuant to V.T.C.A. Labor Code §406.96 (2000), as amended, Contractor certifies that
it provides workers' compensation insurance coverage for all of its employees employed
on City of Fort Worth Project Micro-Surfacing 200547 at Various Locations and
City of Fort Worth Project No. GS93-020930511170.
-C�NTRAC T OR:
By:
Name:
Title: t
Date:
STATE OF TEXAS §
COUNTY OF TARRANT §
Before me, the undersigned authority, on this day personally appeared
I31ARRill 14, bmh/
known to me to be the person whose name is subscribed to the foregoing instrument,
and acknowledged to me that he executed the same as the act and deed of
W for the purposes and consideration therein expressed and in the capacity therein stated.
Given Under My Hand and Seal of Office this l-�7N day f /tifH 20 QS
RusnreowMM NNotaryPiublip in and for the State of
MY COMMISSION EXPIRES Texas
''`;pt December 18,2008
Bond# 213 57 06
PERFORMANCE BOND
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
That we, (1) Vikina Construction. Inc. , as Principal herein, and
(2) INDEPENDENCE CASUALTY AND SURETY COMPANY ,
a corporation organized under the laws of the State of(3) TSS
and who is authorized to issue surety bonds in the State of Texas, Surety herein, are
held and firmly bound unto the City of Fort Worth, a municipal corporation located in
t Tarrant and Denton Counties, Texas, Obligee herein, in the sum of Seven Hundred
Fifty Three Thousand, Three Hundred Fifty Two Dollars and No Cents Dollars
a ( $753.352.00 ) for the payment of which sum we bind ourselves, our heirs, executors,
administrators, successors and assigns,jointly and severally, firmly by these presents.
WHEREAS, Principal has entered into a certain written contract with the Obligee
dated the 1°t day of March , 2005, a copy of which is attached hereto and
made a part hereof for all purposes, for the construction of MICRO-SURFACING
i
2005-17 AT VARIOUS LOCATIONS Proi,ect No. GS03-020830511170.
NOW, THEREFORE, the condition of this obligation is such, if the said Principal
I
shall faithfully perform the work in accordance with the plans, specifications, and
contract documents and shall fully indemnify and hold harmless the Obligee from all
costs and damages which Obligee may suffer by reason of Principal's default, and
reimburse and repay Obligee for all outlay and expense that Obligee may incur in
making good such default, then this obligation shall be void; otherwise, to remain in full
force and effect.
PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of
the Texas Government Code, as amended, and all liabilities on this bond shall be
determined in accordance with the provisions of such statute, to the same extent as if it
were copied at length herein.
IN WITNESS WHEREOF, the duly authorized representatives of the Principal
and the Surety have executed this instrument.
SIGNED and SEALED this 1st day of March —, 2005.
VIKING CONSTRUCTION, INC.
�! P CIPAL
` ATTEST: By:
Name: BARRY H DUNN
(Principal) Secretary
Title: PRESIDENT
(S E A L) Address: 2592 SHELL ROAD
GEORGETOWN, TX 78628
S
Witness as to Prin pal
INDEPENDENCE CASUALTY AND SURETY COMPANY
SURE
IATTEST: BY "is
r
rv,
r . Name: LINDA EDWARDS
Secre ry Attorney in Fact
u i
(S E A L) Address: P.O. BOX 164077
AUSTIN. TX 78716
Witness as Surety Telephone Number: 512/421=2540
k
NOTE: (1) Correct name of Principal (Contractor).
(2) Correct name of Surety.
(3) State of incorporation of Surety
i�
Telephone number of surety must be stated. In addition, an original copy of
Power of Attorney shall be attached to Bond by the Attorney-in-Fact.
The date of bond shall not be prior to date of Contract.
No. 0004660
ICW GROUP
Power of Attorney
Insurance Company of the West
The Explorer Insurance Company Independence Casualty and Surety Company
KNOW ALL MEN BY THESE PRESENTS: That hmrance Company of the West,a Corporation duly organized under the laws of the State of California,The
Explorer Insurance Company,a Corporation duly organized under the laws of the State of Arizona,and Independence Casualty and Surety Company,a Corporation
duly organized under the laws of the State of Texas,(collectively referred to as the"Companies"),do hereby appoint
LINDA EDWARDS,ROBERT C.FRICKE,JAMES F.SIDDONS,TOMMY NELSON,ROBERT C.SIDDONS,
STEVEN B.SIDDONS AND DOUGLAS J.WEALTY,BENJAMIN A.SIDDONS
their true and lawful Attomey(s)-in-Fact with authority to date,execute,sign,seal,and deliver on behalf of the Companies,fidelity and surety bonds,undertakings.
and other similar contracts of suretyship,and any related documents.
In witness whereof;the Companies have caused these presents to be executed by its duly authorized officers this 16th day of January,2001.
E�OIIA{yYaR �1iS(/q M'O co INSURANCE COMPANY OF THE WEST
�oa►nw,�ri c���on•Oym THE EXPLORER INSURANCE COMPANY
>'g SEAL n INDEPENDENCE CASUALTY AND SURETY
COMPANY
cusaun► �'1't x�+a
John H.Craig,Assistant Secretary John L.Hannum,Executive Vice President
State of California
} ss.
County of San Diego
On December 5,2003,before me,Mary Cobb,Notary Public,personally appeared John L.Hannum and John H.Craig,personally known to me to be
the persons whose names are subscribed to the within instrument,and acknowledged to me that they executed the same in their authorized capacities,and that by
their signatures on the instrument,the entity upon behalf of which the persons acted,executed the instrument.
Witness my hand and official seal.
MARY COBB
+ C COMM.#1321341 A
U NOTARYPUBLtC-CALIFORNIA (A
DIEGO COUNTY
M$yAC mmtss Expires
SEPTEMBER 20.2005
Mary Cobb,Notary Public
RESOLUTIONS
This Power of Attorney is granted and is signed,sealed and notarized with facsimile signatures and seals under authority of the following resolutions adopted by
the respective Boards of Directors of each of the Companies:
"RESOLVED: That the President,an Executive or Senior Vice President of the Company,together with the Secretary or any Assistant
Secretary,are hereby authorized to execute Powers of Attorney appointing the person(s)named as Attomey(s)-in-Fact to date,execute,sign,
seal,and deliver on behalf of the Company,fidelity and surety bonds,undertakings,and other similar contracts of suretyship,and any related
documents.
RESOLVED FURTHER: That the signatures of the officers making the appointment,and the signature of any officer certifying the validity
and current status of the appointment,may be facsimile representations of those signatures;and the signature and seal of any notary,and the
seal of the Company,may be facsimile representations of those signatures and seals,and such facsimile representations shall have the same
force and effect as if manually affixed. The facsimile representations referred to herein may be affixed by stamping,printing,typing,or
photocopying-"
CERTIFICATE
1,the undersigned,Assistant Secretary of hrsurance Company of the West,The Explorer Insurance Company,and Independence Casualty and Surety Company,do
hereby certify that the foregoing Power of Attorney is in full force and effect,and has not been revoked,and that the above resolutions were duly adopted by the
aw
respective Boards of Directors of the Companies,and now in full force.
IN WITNESS WHEREOF,I have set my hand this viT day of 05.
John H.Craig,Assistant Secretary
To verify the authenticity of this Power of Attorney you maycaQ 1-800-877-1111 and ask for the Surety Division. Please refer to the Power of Attorney Number,
the above named individual(s)and details of the bond to wbiol+We power is attached. For information or filing claims,please contact Surety Claims,ICW Group,
11455 El Camino Real,San Diego,CA 92130-2045 or call:85§)150-2400.
«w
Bond# 213 57 06
PAYMENT BOND
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
That we, (1) Mina Construction. Inc. , as Principal herein,
and (2) INDEPENDENCE CASUALTY AND SURETY COMPANY ,
a corporation organized and existing under the laws of the State of(3) Tis ,
as surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation
j 1 located in Tarrant and Denton Counties, Texas, Obligee herein, in the amount of Seven
Hundred Fifty Three Thousand, Three Hundred Fifty Two Dollars and No
# Cents Dollars ($753.352.00) for the payment whereof, the said Principal and Surety
bind themselves and their heirs, executors, administrators, successors and assigns,
jointly and severally, firmly by these presents:
WHEREAS, the Principal has entered into a certain written contract with the
r� Obligee dated the 114 day of March , 2005, which contract is hereby referred to
7I and made a part hereof as if fully and to the same extent as if copied at length, for the
iJ following project: MICRO-SURFACING 2005-17 AT VARIOUS LOCATIONS Project
No. GS93-020930511170.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if
the said Principal shall faithfully make payment to each and every claimant (as defined
in Chapter 2253, Texas Government Code, as amended) supplying labor or materials in
the prosecution of the work under the contract, then this obligation shall be void;
otherwise, to remain in full force and effect.
PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of
J the Texas Government Code, as amended, and all liabilities on this bond shall be
determined in accordance with the provisions of said statute, to the same extent as if it
ILA were copied at length herein.
IN WITNESS WHEREOF, the duly authorized representatives of the Principal
and the Surety have executed this instrument.
SIGNED and SEALED this 1't day of March , 2005.
VIKING CONSTRUCTION, INC.
P CIPA
ATTEST: By:
Name: BARRY H DUNN
(Principal) Secretary
Title: PRESIDENT
(S E A Q Address: 2592 SHELL ROAD
..' GEORGETOWN, TX 78628
Witness as to Prin ipai
I
INDEPENDENCE CASUALTY AND SURETY COMPANY
SURETY -
ATTER By: �o S?,,
' Name: LINDA EDWARDS
Secretary Attorney in Fact
A
(S Address: P.O. BOX 164077
AUSTIN, TX 78716
` .
Witne as#'o S rety Telephone Number:
512/421-2540
NOTE: (1) Correct name of Principal (Contractor).
(2) Correct name of Surety.
(3) State of incorporation of Surety
Telephone number of surety must be stated. In addition, an original copy of
Power of Attorney shall be attached to Bond by the Attomey-in-Fact.
J The date of bond shall not be prior to date of Contract.
� a
LA
No. 0004660
ICW GROUP
Power of Attorney
Insurance Company of the West
The Explorer Insurance Company Independence Casualty and Surety Company
KNOW ALL MEN BY THESE PRESENTS: That Insurance Company of the West,a Corporation duly organized under the laws of the State of California,The
Explorer Insurance Company,a Corporation duly organized under the laws of the State of Arizona,and Independence Casualty and Surety Company,a Corporation
duly organized under the laws of the State of Texas,(collectively referred to as the"Companies"),do hereby appoint
LINDA EDWARDS,ROBERT C.FRICKE,JAMES F.SIDDONS,TOMMY NELSON,ROBERT C.SIDDONS,
STEVEN B.SIDDONS AND DOUGLAS J.WEALTY,BENJAMIN A.SIDDONS
their true and lawful Attomey(s)-in-Fact with authority to date,execute,sign,seal,and deliver on behalf of the Companies,fidelity and surety bonds,undertakings,
and other similar contracts of suretyship,and any related documents.
In witness whereof;the Companies have caused these presents to be executed by its duly authorized officers this 16th day of January,2001.
4E,01APAvror, tNBUq �� INSURANCE COMPANY OF THE WEST
sJ�a�uarour�.i o�F.4oNVO���Ay� THE EXPLORER INSURANCE COMPANY
SEAL n INDEPENDENCE CASUALTY AND SURETY
4wm1.0% `6,+y. �. 0 9 i COMPANY
tOMA D� `A
John H.Craig,Assistant Secretary John L.Hannum,Executive Vice President
State of California
County of San Diego
�w
On December 5,2003,before me,Mary Cobb,Notary Public,personally appeared John L.Hannum and John H.Craig,personally known to me to be
the persons whose names are subscribed to the within instrument,and acknowledged to me that they executed the same in their authorized capacities,and that by
their signatures on the instrument,the entity upon behalf of which the persons acted,executed the instrument.
Witness my hand and official seal.
MARY COBE
... .' ''+�C• COMM.#1321341 n
U NOTARY PUKIC-CAUFORNIA 0 vy-oat 010�
SAN DIEGO COUNITV 0
V } M Comrnisswn expirm
SEPTEMBER 20.2005 Mary Cobb,Notary Public
* RESOLUTIONS
This Power of Attorney is granted and is signed,sealed and notarized with facsimile signatures and seals under authority of the following resolutions adopted by
the respective Boards of Directors of each of the Companies:
"RESOLVED: That the President,an Executive or Senior Vice President of the Company,together with the Secretary or any Assistant
Secretary,are hereby authorized to execute Powers of Attorney appointing the person(s)named as Attomey(s)-in-Fact to date,execute,sign,
seal,and deliver on behalf of the Company,fidelity and surety bonds,undertakings,and other similar contracts of suretyship,and any related
documents.
RESOLVED FURTHER: That the signatures of the officers making the appointment,and the signature of any officer certifying the validity
and current status of the appointment,may be facsimile representations of those signatures;and the signature and seal of any notary,and the
seal of the Company,may be facsimile representations of those signatures and seals,and such facsimile representations shall have the same
force and effect as if manually affixed. The facsimile representations referred to herein may be affixed by stamping,printing,typing,or
photocopying."
C'ERTIFICATE
I,the undersigned,Assistant Secretary of Insurance Company of the West,The Explorer Insurance Company,and Independence Casualty and Surety Company,do
hereby certify that the foregoing Power of Attorney is in full force and effect,and has not been revoked,and that the above resolutions were duly adopted by the
respective Boards of Directors of the Companies,and are now infull force.
IN WITNESS WHEREOF,I have set my hand this I4r day of �^
John H.Craig,Assistant Secretary
To verify the authenticity of this Power of Attorney you may cam U496 11.1 at�d�k gr the Surety Division. Please refer to the Power of Attorney Number,
the above named individual(s)and details of the bond to wbidI the power is attached.Jew information or filing claims,please contact Surety Claims,ICW Group,
11455 El Camino Real,San Diego,CA 92130-2045 or calf 85�}350,7400.
ar
4
Bored# 213 57 06
MAINTENANCE BOND
1
.! THE STATE OF TEXAS §
§
COUNTY OF TARRANT §
r
KNOW ALL BY THESE PRESENTS:
That Viking Construction. Inc. ("Contractor"), as principal, and,
JINDEPENDENCE CASUALTY AND SURETY COMPANY a
corporation organized under the laws of the State of TEXAS ("Surety"), do hereby
acknowledge themselves to be held and bound to pay unto the City of Fort Worth, a Municipal Corporation
chartered by virtue of Constitution and laws of the State of Texas, ("City") in Tarrant County, Texas, the sum
of Seven Hundred Fifty Three Thousand, Three Hundred Fifty Two Dollars and No Cents
Dollars ($753.352.00), lawful money of the United States, for payment of which sum well and truly be made
unto said City and its successors, said Contractor and Surety do hereby bind themselves, their heirs,
executors, administrators, assigns and successors, jointly and severally.
s
This obligation is conditioned, however, that:
WHEREAS, said Contractor has this day entered into a written Contract with the City of Fort Worth,
dated the 4`t of March , 20 05, a copy of which is hereto attached and made a part hereof, for the
performance of the following described public improvements: MICRO-SURFACING 2005-17 AT
VARIOUS LOCATIONS the same being referred to herein and in said contract as the Work and being
designated as project number(s) GS93-020930511170 and said contract, including all of the specifications,
conditions, addenda, change orders and written instruments referred to therein as Contract Documents being
incorporated herein and being made a part hereof; and,
WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct the work
that it will remain in good repair and condition for and during a period of after the date of the final acceptance of
the work by the City; and
WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term
a of 2 (Two)Years ; and
WHEREAS, said Contractor binds itself to repair or reconstruct the Work in whole or in part at any time
within said period, if in the opinion of the Director of the City of Fort Worth Department of Engineering, it be
necessary; and,
WHEREAS, said Contractor binds itself, upon receiving notice of the need therefore to repair or
reconstruct said Work as herein provided.
NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or
reconstruct said Work in accordance with all the terms and conditions of said Contract, these presents shall be
null and void, and have no force or effect. Otherwise, this Bond shall be and remain in full force and effect, and
the City shall have and recover from Contractor and Surety damages in the premises as prescribed by said
Contract.
j This obligation shall be a continuing one and successive recoveries may be had hereon for successive
breaches until the full amount hereof is exhausted.
IN WITNESS WHEREOF, this instrument is executed in 6 counterparts, each of which shall be
f
deemed an original, this 1"t day of March , A.D. 2005.
VIKING CONSTRUCTION, INC.
PRI CIPAL
ATTEST: By:
Y
Name: BARRY H DUNN
(Principal) Secretary
Title:_ PRESIDENT
(S E A L) Address: 2592 SHELL ROAD
GEORGETOWN, Tx 78628
Witness as to Principal
I
INDEPENDENCE CASUALTY AND SURETY COMPANY
i SURE
ATTEST: By: 20 aL'4=MVz_
' Name: LINDA EDWARDS
Secretary Attorney in Fact
A LAddress: P.O. Box 164077
AUSTIN, TR 78716
Witness tosurety Telephone Number: 512/421-2540
r
NOTE: (1) Correct name of Principal (Contractor).
(2) Correct name of Surety.
(3) State of incorporation of Surety
j Telephone number of surety must be stated. In addition, an original copy of Power of
Attorney shall be attached to Bond by the Attorney-in-Fact.
The date of bond shall not be prior to date of Contract.
No. 0004660
ICW GROUP
Power of Attorney
Insurance Company of the West
The Explorer Insurance Company Independence Casualty and Surety Company
KNOW ALL MEN BY THESE PRESENTS: That Insurance Company of the West,a Corporation duly organized under the laws of the State of California,The
a Explorer Insurance Company,a Corporation duly organized under the laws of the State of Arizona,and Independence Casualty and Surety Company,a Corporation
duly organized under the laws of the State of Texas,(collectively referred to as the"Companies"),do hereby appoint
LINDA EDWARDS,ROBERT C.FRICKE,JAMES F.SIDDONS,TOMMY NELSON,ROBERT C.SIDDONS,
STEVEN B.SIDDONS AND DOUGLAS J.WEALTY,BENJAMIN A.SIDDONS
their true and lawful Attomey(s)-in-Fact with authority to date,execute,sign,seal,and deliver on behalf of the Companies,fidelity and surety bonds,undertakings,
and other similar contracts of suretyship,and any related documents.
In witness whereof the Companies have caused these presents to be executed by its duly authorized officers this 16th day of January,2001.
t,q*PA'r¢e �Nstl9 INSURANCE COMPANY OF THE WEST
Q'R4o00*4lc+ THE EXPLORER INSURANCE COMPANY
aO a
SEAL r" INDEPENDENCE CASUALTY AND SURETY
— � n
Mwy,At► +�'�, �.: a COMPANY
HylNA
tD
J .
C�
John H.Craig,Assistant Secretary John L.Hannum,Executive Vice President
State of California
} ss.
County of San Diego
On December 5,2003,before me,Mary Cobb,Notary Public,personally appeared John L.Hannum and John H.Craig,personally known to me to be
the persons whose names are subscribed to the within instrument,and acknowledged to me that they executed the same in their authorized capacities,and that by
their signatures on the instrument,the entity upon behalf of which the persons acted,executed the instrument.
Witness my hand and official seal.
MARY COBE
""'+! � COMM.#1321341 AA vel,
to NOTARYC-CdIA
to SAN DIEGO COUNTY
�
V r My Commission Expires
SEPTEMBER 20 2005
Mary Cobb,Notary Public
RESOLUTIONS
• This Power of Attorney is granted and is signed,sealed and notarized with facsimile signatures and seals under authority of the following resolutions adopted by
the respective Boards of Directors of each of the Companies:
"RESOLVED: That the President,an Executive or Senior Vice President of the Company,together with the Secretary or any Assistant
+" Secretary,are hereby authorized to execute Powers of Attorney appointing the person(s)named as Attorney{s)-in-Fact to date,execute,sign,
seal,and deliver on behalf of the Company,fidelity and surety bonds,undertakings,and other similar contracts of suretyship,and any related
documents.
RESOLVED FURTHER: That the signatures of the officers making the appointment,and the signature of any officer certifying the validity
*^ and current status of the appointment,may be facsimile representations of those signatures;and the signature and seal of any notary,and the
seal of the Company,may be facsimile representations of those signatures and seals,and such facsimile representations shall have the same
force and effect as if manually affixed. The facsimile representations referred to herein may be affixed by stamping,printing,typing,or
photocopying."
CERTIFICATE
I,the undersigned,Assistant Secretary of Insurance Company of the West,The Explorer Insurance Company,and Independence Casualty and Surety Company,do
hereby certify that the foregoing Power of Attorney is in full force and effect,and has not been revoked,and that the above resolutions were duly adopted by the
respective Boards of Directors of the Companies,and now m full force.
WITNESS IN WHEREOF,I have set my hand this_ day of
John H.Craig,Assistant Secretary
To verify the authenticity of this Power of Attorney you may call 1877-1111 and ask for the Surety Division. Please refer to the Power of Attorney Number,
the above named individual(s)and details of the bond to which the power is attached. For information or filing claims,please contact Surety Claims,ICW Croup,
11455 El Camino Real,San Diego,CA 92130-2045 or call(858)350-,4(10.
I.C.W. GROUP
Insurance Company of The West
The Explorer Insurance Company
Independence Casualty and Surety Company
11455 El Camino Real, San Diego,CA 92130-2045
P.O.BOX 85563,San Diego,CA 92186-5563
(858)350-2400 FAX(858)350-2707
www.icwgroup.com
Bond Number: 213 57 06
Terrorism Risk Rider
This rider addresses the requirements of the Terrorism Risk Insurance Act of 2002.
In accordance with the above Act, we are providing this disclosure notice for all bonds on which
one or more of the above identified companies is a surety.
Coverage for certified acts of terrorism is included in the attached bond and will be partially
reimbursed by the United States under a formula established by the Act. The United States will
pay 90% of covered terrorism losses in excess of a statutory established deductible to the
insurance company issuing the bond.
In no way will the payment for loss on this bond exceed the limit of liability under this bond.
This rider does not provide coverage for any loss that would otherwise be excluded by the terms
of this bond.
The portion of the premium, for this bond, attributable to coverage for certified acts of terrorism
under the Act is One Dollar($1.00).
Important Notice: The cost of terrorism coverage is subject to change on any bond that
premium is charged annually.
CITY OF FORT WORTH, TEXAS
CONTRACT
THE STATE OF TEXAS
KNOW ALL MEN BY THESE PRESENTS:
COUNTY OF TARRANT
This agreement made and entered into this the 1" day of March , 20 05 by and
between the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and
existing under and by virtue of a special charter adopted by the qualified voters within said City on the
11th day of December, A.D., 1924, under the authority (vested in said voters by the "Home Rule"
provision) of the Constitution of Texas, and in accordance with a resolution duly passed at a regular
meeting of the City Council of said city, and the City of Fort Worth being hereinafter termed Owner, and
Viking Construction, Inc. HEREINAFTER CALLED Contractor.
WITNESSETH: That said parties have agreed as follows:
W
1.
That for and in consideration of the payments and agreements hereinafter mentioned to be made
f and performed by the Owner, and under the conditions expressed in the bond bearing even date
herewith, the said Contractor hereby agrees with the said Owner to commence and complete the
construction of certain improvements described as follows:
MICRO-SURFACING 2005-17
AT VARIOUS LOCATIONS
Designated as project number, GS93-020930511170
2.
That the work herein contemplated shall consist of furnishing as an independent contractor all
labor, tools, appliances and materials necessary for the construction and completion of said project in
accordance with the Plans and Specifications and Contract Documents prepared by the Department of
Engineering for the Transportation and Public Works Department of the! City of Fort Worth adopted by the
City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are hereto
attached and made a part of this contract the same as if written herein.
C-1
3.
The Contractor hereby agrees and binds himself to commence the construction of said work within
r ten (10) days after being notified in writing to do so by the Department of Engineering of the City of Fort
Worth.
.1
4.
14 The Contractor hereby agrees to prosecute said work with reasonable diligence after the
commencement thereof and to fully complete and finish the same ready for the inspection and approval of
the Department of Engineering of the City of Fort Worth and the City Council of the City of Fort Worth
within a period of 55 (Fifty-Five) working days.
If the Contractor should fail to complete the work as set forth in the Plans and Specifications and
11 Contract Documents within the time so stipulated, plus any additional time allowed as provided in the
General Conditions, there shall be deducted from any monies due or which may thereafter become due
him, the sum of $ 315.00 per working day, not as a penalty but as liquidated damages, the
y
Contractor and his Surety shall be liable to the Owner for such deficiency.
5.
Should the Contractor fail to in the work herein provided for within the time herein fixed or to
� �9
carry on and complete the same according to the true meaning of the intent and terms of said Plans,
Specifications, and Contract Documents, then the Owner shall have the right to either demand the surety
to take over the work and complete the same in accordance with the Contract Documents or to take
charge of and complete the work in such a manner as it may deem proper, and if, in the completion
thereof, the cost to the said City shall exceed the contract price or prices set forth in the said Plans and
Specifications made a part hereof, the Contractor and/or its Surety shall pay said City on demand in
writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost.
1
�r 6.
Contractor covenants and agrees to indemnify City's engineer and architect, and their
personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and
agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants
and employees, from and against any and all claims or suits for property loss, property damage,
personal injury, including death, arising out of, or alleged to arise out of, the work and services to be
performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or
invitees„ whether or not any such injury, damage or death is caused, in whole or rn part, by the
ne_gliQence or alleged nepli_aence of Owner, its officers, servants, or employees. Contractor
likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and
all injuries to Owner's officers, servants and employees and any damage, loss or destruction to
s property of the Owner arising from the performance of any of the terms and conditions of this
C-2
:
Contract, whether or not any such iniury or damage is caused in whole or in part by the
nepl/pence or alleged ne_ali_pence of Owner, its officers, servants or employees.
:
In the event Owner receives a written claim for damages against the Contractor or its subcontractors
prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner
satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or
(b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been
referred to the insurance carrier.
r
The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public
work from a Contractor against whom a claim for damages is outstanding as a result of work
performed under a City Contract.
7.
I
' The Contractor agrees, on the execution of this Contract, and before beginning work, to make,
execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful
f performance of the terms and stipulations of the Contract and for the payment to all claimants for labor
and/or materials furnished in the prosecution of the work, such bonds being as provided and required in
Texas Govemment Code Section 2253, as amended, in the form included in the Contract Documents,
i and such bonds shall be 100 percent (100%) of the total contract price, and the said surety shall be a
surety company duly and legally authorized to do business in the State of Texas, and acceptable to the
i
City Council of the City of Fort Worth.
:
8.
Said City agrees and binds itself to pay, and the said agrees to receive, for all of the aforesaid
work, and for all additions thereto or deductions therefrom, the price shown on the Proposal submitted by
the successful bidder hereto attached and made a part hereof. Payment will be made in monthly
installments upon actual work completed by contractor and accepted by the Owner and receipt of invoice
j from the Contractor. The agreed upon total contract amount (including/excluding) alternates N/A
shall be
I
SEVEN HUNDRED FIFTY THREE THOUSAND, THREE HUNDRED FIFTY TWO DOLLARS
AND NO CENTS
753,352.00
C-3
s.
It is further agreed that the performance of this Contract, either in whole or in part, shall not be
sublet or assigned to anyone else by said Contractor without the written consent of the Director of the
Department of Engineering.
10.
The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is
classified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is attached hereto
and made a part hereof the same as if it were copies verbatim herein.
l� 11.
The Contractor shall procure and shall maintain during the life of this contract insurance as
# specified in paragraph 8 of Special Instruction to Bidders of this contract documents.
�t
12.
It is mutually agreed and understood that this agreement is made and entered into by the parties
hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of
the State of Texas with references to and goveming all matters affecting this Contract, and the Contractor
agrees to fully comply with all the provisions of the same.
IN WITNESS WHEREOF, the City of Fort Worth has caused this instrument to be signed in Six 6
M counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the
corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through
its duly authorized officers in Six 6 counterparts with its corporate seal attached.
rU
C-4
Done in Fort Worth, Texas, this the 1'` day of March , 20 05 .
RECOMMENDED: 7777%
DIRECTOR, DEPARTMENT OF SIST NT ITY MANAGER
° ENGINEERING
APPROVED:
Ar
DIRECTO9, TRANSPORTATION AND
" PUBLIC WORKS
VIKING CONSTRUCTION, INC. ATTEST:
(Contractor)
CITY SECR RY
(SEAL)
BY: ) e—rJo,
4q-
(Representative) Contract Authoria-atiox
PRESIDENT Date
(TITLE)
2592 SHELL ROAD APPROVED AS TO FORM &
(Address) LEGA
GEORGETOWN, TX 78628
(City/State/Zip) A T CITY A ORNEY
November 1960
Revised May 1986
i Revised September 1992
Revised January 1993
Revised April 1999 OFFICIA1 Bob
Revied June 199
Revised June 2001 CITY SK(�RgTARY
L.Fy. FORTH, TEX.
C-5
Q
CD cn
v � o
COO, . _ - z
Ld
Q w
w z °°
U
M-" ::DQ
! z z
w 0
w 0 z b---4
O co
z Q w
' Q F- w
.72z w
F-- U _ U
W W
W -�D
00-0, p
F- cl�
(A CL
MICROSURFACING (2005-17)
Street Proiect From To Procedure OuantiriCD %Iao
C
NW 24TH ST ELLIS AVE REFUGIO A\E \t1C 1 06 2 62F
ALEMEDA CT ACADEMY-BLVD NAV CUL-DE-SAC \11C 0 16 -2C
ALICI.A DR SILVERIDGE DR PAMPAS DR \11C 0 38 6 14_1
ALICI.A DR MEADOWLARK DR GRASSLAND DR MIC 0.22 6 1031
AMBER DR SOUTHPARK LN AMBER DR 5 MIC 0.28 6 104A
APPLEWOOD RD SONGBIRD LX CREEKMOOR DR MIC 0.65 6 1031
.ARLAN LN SARITA DR HILDRING DR W MIC 0.:9 - 89G
ARROYO RD RANCH VIEW RD TRAILS EDGE RD MIC 0.98 3 89C
BARBERRY DR COLUMBUS TRL MEADOWLARK DR MIC 0.-6 6 1031
BEE TREE LN COLUMBUS TRL EVENING STAR DR MIC 0.6? 6 103L
BELCROSS LN PEAR TREE LN YELLOWLEAF DR MIC 0.18 6 Ii131(
BIRDELL ST KUT\IAN CT ELGIN ST MIC 0.69 5 -91-
BLACK OAK LN SAM CALL0IVAY RD W CUL-DE-SAC MIC 0.45 64R
BLUE SAGE CIR N CUL-DE-SAC JOY MEADOV- DR M[C 0..1 6 104J
rtt _
BOND ST NORMA DR DOUGLAS ST MIC 0.39 60R
BOULDER CIR N CUL-DE-SAC JOYME.ADOW DR MIC 0.13 6 104J
BOULDER RUN S T S HULEN ST LANDS END ST MIC 0.61 89B
BRIDALXVREATH DR WHIRLWIND DR EVENING STAR DR MIC 0.61 6 1031-
N BUGLE DR WHITE SETT=EMENT RD N CHAPEL CREEK BLVD \11C 0.48 - 58X
W BUTLER ST S LNIVERSITY DR PARK RIDGE BLVD Mic 0.29 3 90.A
CANTON DR CRAIG ST E LANCASTER AVE \tIC 0.30 5 '79H
\V CLEBURNE RD MC CART AVE SYCAMORE SCHOOL RD \I1C 2.-1 6 1031-1
COCKRELL AVE BINYON ST SADLER AVE \t1C 1.11 -11 9-)N
CORAL LN N CUL-DE-SAC RUSSET TRL MIC 0.10 8 106N
CRAVENS RD VAN NATTA LN BEATY ST MIC 0.:9 5 -9H
CREEKNIOOR DR SYCAMORE SCHOOL RD ALICLA DR MIC 031 6 ' :ir31
CRIMSON LN SHELBY RD S DEAD END Mic 0'8 8 106P
CRI\LX CRIMSON LN SCARLET WAY' MIC 024 8 106P
DOUGLAS ST E CUL-DE-SAC W CUL-DE-SAC MIC 0-4 7 6011
EAGLE ROCK DR SOUTHPARK LN AMBER DR S M1C 0.36 6 104A
ENCANTO DR TRAIL LAKE DR BELLAIRE CIR \t1C 1.36 - 89H
ENNIS AVE LA SALLE ST S RETTA ST Mic 0.67 8 63Y
FARRIERS BRANCH ST .ACADEMY BLVD FLAXSEED LN \tIC 0-18 - 58Y"
FERNWOOD ST S DEAD END CARS%%ELL ACCESS RD \tic I.05 - Wit
FLAXSEED LN WHITE SETTLEMENT RD N CHAPEL CREEK BLVD MIC 0.31 - 58\
Tuesday.December V.'_1104 Transportation and Public Works Pact o`3
Infrastructure Division
:ate
Street Proiect From To procedure OuantiCD NUD
GALWAY INVERNESS AVE SOUTH DR MIC 0.42 3 89L
GILLHAM RD BLACK OAK LN CARSWELL ACCESS RD MIC 0.49 7 60R
GLEN HAVEN DR MEADOW RIDGE DR SYCAMORE SCHOOL RD MIC 0.46 6 104E
GLENWOOD DR HARL-\N%%'OOD DR OVERTON PARK DR E \1(C 1.26 3 "51'
GOLDFINCH DR SUTTONWOOD DR STONEY BRIDGE RD MIC 0.29 7 581'
GRASSLAND DR SYCAMORE SCHOOL RD COLUMBUS TRL MIC 0.63 6 1031
GREEN RIDGE SOUTH MEADOW DR E MC CART AVE MIC 1.31 6 104E
GREENLEE ST PUTNAM ST EAST LOOP 820 MIC 0.35 5 '91-1
HANDLEY DR MEAD WBROOK DR CRAIG ST MIC 2.90 5 80E
HIGHLAVIX TER SOUTH MEADOW DR E MC CART AVE MIC 1.31 6 SOME
HILLDALE RD ROSEMONT AVE CAMP BOWIE BLVD MiC 0.38 3 '4Q
HOLLYBERRY CT N CUL-DE-SAC COLUMBUS TRL \11C 0 07 6 103 NI
JOYMEADOW DR BLUE SAGE CIR ARBOR DR MIC 048 6 104:
LORA CT SOUTH MEADOW DR S CUL-DE-SAC Mic 0.06 6 104E
LITTLE FOX CT LITTLE FOX LN S CUL-DE-SAC MIC 014 7 '2B
LONGMEADOW WAY S HULEN ST SWEETGUM WAY MIC 041 6 103K
LOVING AVE NAV 20TH ST SW 28TH ST MIC 211 2 621
MAHONIA DR SYCAMORE SCHOOL RD ALICIA DR MIC 0.33 6 1031
MAHONIA DR BARBERRY DR COLUMBUS TRL MIC 0.31 6 1031
MARKO CT SOUTH MEADOW DR S CUL-DE-SAC MIC 0.05 6 104F
MEADOW CREEK DR MEADOW RIDGE DR SYCAMORE SCHOOL RD Mic 0.45 6 104E
MEADOW RIDGE DR SOUTH MEADOW DR E RIDGE RD\\' MIC 0.38 6 104L
MEADOWLARK DR ALICIA DR COLUMBUS TRL MIC 0.26 6 1031
MERIDA AVE BILGLADE RD MARTIN LYDON AVE \tic 0.27 3 90K
MILAM ST ELLIS RD NOTTINGHAM BLVD MIC 0.48 4 80B
NANNETTE ST COSTEN LN WALNUT DR MIC 0.13 7 60U
t NORMA DR BOND ST SAM CALLOWAY RD MIC 0'8 7 60R
NORMANDY RD JANICE LN SANDY LN MIC 0.40 4 80C
er
PEAR TREE L\ SYCAMORE SCHOOL RD YELLOWLEAF DR MIC 0.50 6 103K
PERRY LN FRANCISCO DR FULLER CIR MIC 0.3' 6 103F
PILOT POINT ST ACADEMY BLVD RUNNYMEADE PL \tic 0.'_3 7 72C
PINEHURST DR PEBBLEFORD RD CAMELOT RD MIC 0.41 6 104H
POLLARD ST MEADOWBROOK DR VAN NATTA LN MIC 0.80 5 79H
QUEENSBURY CIR N CUL-DE-SAC SYCAMORE SCHOOL RD MIC 0.10 6 103F
RIDGE RD 1 SOUTH MEADOW DRE RIDGE RD 1L' MIC 0.41 6 104E
RIDGE RD W RIDGE RD N SYCAMORE SCHOOL RD MIC 0.;2 6 104E
RIDGLEA AVE CURZON AVE CAMP BO�\'IE BLVD MIC 0.65 3 74L
RINGOLD DR SONGBIRD LN COLUMBUS TRL MIC 0.41 6 :03K
Tuesday,December 0-.2004 Transportation and Public Works Page 2 o
Infrastructure Division
Street Project From To Procedure Ouantih CD AUD
RUNNYMEADE 1'I, ACADEMY BLVD ANNAPOLIS DR MIC 0.31 7 72C
RUSSET TRL S RACE ST E DEAD END 4110 0 13 8 106N
RUSTIC FOREST RD WICHITA ST TIFFANY MEADOWS LN MIC 016 8 1068
SANDY RIDGE SOUTH MEADO%V DR RIDGE RD N MIC 0-115 6 101E
- SOUTH HILLS CIR BELLAIRE CIR BELLAIRE CM MIC 072 3 89D
SOUTH MEADOW DR SOUTH MEADOW DR E «'ILLO«1•IE'.\' MIC 0 87 6 101E
STAMPS AVE S DEAD END DOUGLAS ST MIC 0.26 7 6011
SUFFOLK DR TRAIL LAKE DR WINSLOW DR MIC 0.31 3 89H
SUNDOWN DR SAM CALLOWAY RD NANNETTE ST MIC U 67 6011
SUNFLOWER CT N CUL-DE-SAC COLUMBUS TRL MIC 0.07 6 103M
SUTTONWOOD DR PLAINFIELD DR GOLDFINCH DR MIC 0.12 58Y
SUTTONIVOOD DR FLAXSEED LN STONEY BRIDGE RD MIC 0.21 7 58Y
SWEETGUM WAY S HELEN ST COLUMBUS TRL MIC 0.55 6 103K
TIERNEY RD E LANCASTER AVE PANOLA AVE MIC 0.31 5 '9F
TIERNEY RD PANOLA AVE VINSON ST MIC 0.29 5 79F
TIFFANY MEADOWS LN E ALTAMESA BLVD WICHITA ST MIC 0.52 8 106B
VAN NATTA LN POLLARD ST CRAVENS RD MIC 0.15 5 79H
WALNUT DR SAM CALLOWAY RD NANNETTE ST MIC 0.66 60R
WESTCREEK DR SOUTHPARK LN SOUTH MEADOW DR 411C 0.51 6 104A
WESTFIELD AVE WESTCREEK DR SOUTH RIDGE TER MIC 0.13 3 90N
WESTLAKE DR WESTDALE DR SOUTHWEST LOOP 820 MIC 0.38 3 89K
WHITFIELD AVE SOUTH DR WESTLAKE DR MIC 0.62 3 89K
WINDCREST LN SOUTHPARK LN AMBER DR S MIC 0.38 6 104A
YELLOWLEAF DR S HULEN ST SILVERIDGE DR MIC 0.90 6 103K
Total Lone 4files 50.08
IP
Tuesday.December 07.2.1U1 Transportation and Public Works Page 3 of 3
Infrastructure Division