HomeMy WebLinkAboutContract 31097CONIlvIUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COLTNTY OF TARRANT § Contract No.4y��L_�
WHEREAS, Opus West Construction Corporation, hereinafter called
"Developer", desires to make certain improvements to TCN- Railhead Meacham
Boulevard (Lot 3, Block 3, Railhead Addition) Median Opening
Addition, an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through T�rn Kchoe- , its duly
authorized pro�tc-+ m� r, and the City, acting herein by and through Marc Ott, its duly
authorized Assistant City Manager, for� and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts far the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
F__�_:_�
? ., � . , .. �. :l 1 'Sl�'�� :`, _ ;
CFA TCNRAILHEAD.doc 1 � '� ��'� �cl ��i� �
I� ���� �';:��✓;i �'��� ���,'�%�, �
_ �� � .:�. _J
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whetlaer or not sucla i�aiuries, death or damages are caused,
ifa whole or in part, by the alle�ed ne�li�e�zce of the City of Fort Worth,
its officers, servants, or enaployees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof:
�' ���, � ' ;i ' '' _ L '.� 5� , .
,�i ���:,,�=�. "` .
� s�, l .a (c :"� �.; c',,� �
CFA TCN RAILHEAD. doc 2 � � � U L � �� �`�' �'�`''� �� � ' � �
i � 11 '�`i' �✓ �l;, �', � � �il ':'.:��, : s_�
i_y�_ —
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the coiporate seal of the City affixed, and said Developer
has executed this instrument in triplicate, at Fort Worth, Texas this the 4th day of
December, 200�.�'
Approval Recommended:
_ ����`-' --
�Q 'C����C
��.��.t?:��ie. �,ui:l�c,=:�.;.�.,�.iuF�
p �� 7�; F_,
ATTEST:
1 1 �
N�r-� l�n�r�
City Secretary
Approved as to Foim:
Assistant City Attorney
ATTEST:
i�� i �' �� ,,:��
���� %� 1�=r.
Corporate Secretary
CFA-TCN Contract
Transportation and Public Worlcs
Department
G� "�%.
�
Robert Goode, P. E.
Director
City Of Fort Worth
C
B `
Marc Ott
Assistant City Manager
DEVELOPER:
Opus West Construction Corporation
B y:
homas W. Roberts
President & CEO
� � �� >>'1 i r �
� , fti � � '�', vi
'�r; �.-i�l �.:�V�.,�;� `•
,
4 � �.,�'V' _, ,5 �, ��. ��',
';y� � ;-Lr_1;�'1SI�'�-,l'ryt�jl��^
r�, �:`:;``u:l!�� ���'s�, �
oR � �J � � — —�
�
0
>
�
0
�
n
0
m
11/O6/03 THU 15:05 F� 972 235 9544
Pacheco Koch Consult �ng
�WU L►��LI LJ �I.��
0 20 40 SO 120
GRAPHIC SCALE IN FEET
�
0
� �
Z m
Y ��
� z�
Q�
o�� ��
W �
a z
o Z F
�
a�g v�iW
i- o
o�
¢ �3
0
hQ-O�
(n L� Z
aQQ
ZU�
o�
n�
��z
¢z
¢
��o
�
zc��
� � �
D3S0 N CEHTAAL DQ+MIY SUTE 100D
na.unv er c�c,rm av sc.�cF
Rt� DAH �•��.p�
�
� I�7j 002
� � �. ���
DALLAB. TE%AS 7620R 072.23b,10.11
OATE Jpa �R
�ftJLY 2003 ] 877—Q3.0fl3
SHEET 1 Of 2
L�'FT � �'URN LANE �c
11�EDIAN OPENI�V� P�,AN
LOCATED IN THE C(TY OF FORT WORTH, TpCAg
FOR LOT 3, BLOCK 3, RAILHEAp FT. WORTH
MEACH�M BOULEVARD dc N. MAIN -STREET
TARRANr COUNTY, Tp(AS
owc Fi�: 1977-03-033CV.DWG
�'J V L � ,''� 1 ,.
�
'��V!'.';J`i �JUq �''ZGy' i
'... �
' -- -
R-- - .�-�_- _
�
0
U
rn
0
M
0
i
n
�
a�
�^
M �
1M I�
n
iP
vo�
wc�i^
�n�
� \%
mo�
11/06/03 THU 10:09 F.a.i 972 235 9544
0 20 44 80
S9�
S
GRAPMC SCALE IN FEET
Pacheco Koch Consult Eng
��U LI��� LI � D �
�
120�
� �
�a P i
Q'�C' � �,q
�p��@ ti� ��5+6
� V
���`� -
�
�joos
!
� � � f �
6JS0 N CEItTpAL EXPWY SUfTE 1000
ORAMIV RY ClE�KED eY 8+CALE
RHB EMH 1'-40'
DAILAS. 7EX�S6 76�BQ BT22db.3Q1f
OAIE ,lGa M�E,f
JULY 2003 1977-03�93
SHEET 2 OF 2
LEFT T URN
f /M11� l L�t111
LOCJ�TED IN THE CiTY OF �ORT VYORTH, TD(/�S
FOR LOT 3, BLOCK 3, RAILHEAQ FT_ WORTH
MEACHAM BOULEVi4RQ dt N. MAlN S7REET
TARRANT COUMY. TEXAS
r
DVYG FILE: 1977-03-093CV.DWG
11/O6/03 THU 15:12 F.3% 972 235 9544 Pacheco Boch Consult Eag C�004
� (�j� -,� c�%'��'._
,
�, �,?c,�;•,5:��:�
',���I 'ti' v.���;,;; �_d;=`�;.
� ; ��; �?��lf', ``I''
,`� !``�"� '. � :�'J 'I �
r , ;,J; _.
11/Ofi/03 THU 1a.17 F�X 97� 235 9544 Facbeco %och Consult Eag � 005
1_) Opus West ConstruCtion Corporation
15455 North Dallas Parkway, #450
Addison, Texas 75001
(972)480-9787 office
(972)448-06d7 direct line
(972)669-22i6fax
(214)577-4522 cell �
j im. kehoe (� opuswest.com
2.) Jim Kehoe
Project Manager
� ` �' �"L,� 1;- i. .. -
�;,r; .
�,, V l �� �r �.' ? . . , -
� �� ;, � �U' �,,; <' '
.r ���;�;%� l�, � ���• �s
, .... �__—�--
_s—�--