HomeMy WebLinkAboutContract 31813 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § v/E� Contract No.
f/ tw�.Q./1K �r!/
c//yv/�e✓ �•v . 6P�/B G �ZT7ti', L O� CG/ry� '17-4' 1,E LTQ
WHEREAS ` , ieremafter called "Developer", desires to make certain
improvements to Ab01M,1 Z1A0V1,✓j4 , an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PR' ENT z-7v.
f �c� oar cirY�r��•
That said Developer, acting herein by and through " ' � its�dLully®��iir ��
authorized �9-AU'tland the City, acting herein by and through Marc Ott, its duly
�s!OE
authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth, is hereby incorporated into this Community Facilities Contract
as if copy herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and
obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
kl �� JJ�1� ITV V
IOU y
New CFA 4% and Utilities 12 27 04.doc 1 ,
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
F. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
dams es are caused, i s whole or in part, h y the alleged Negligence of
the City of Fort Worth, its oflIcers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $2 ,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
vr��v
New CFA 4% and Utilities 12 27 04.doc 2
construct current and future improvements provided for in this
agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached.
M. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B. 131, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, 131,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $a 1, 731,34
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
New CFA 4%and Utilities 12 27 04.doc 3
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in triplicate, at Fort Worth, Texas this the /0 day of T#wu*Ly
200
Approval Recommended:
Transportation and Public Works
Department
C') /�
Robert Goode, P. E.
Director
LNOLM&C REQUIRED Wf Wo 4'
Marc Ott
Assistant City Manager
ATTEST:
Marty Hendrix
City Secretary
Approved as to Form:
New CFA 4% and Utilities 12 27 04.doc 4UK
/.,"z
A�4 Z":
G .
A sistant omey
ATTEST: DEVELOPER
r
By:
Corporate Secretary
GTJ.
f�G/T�l�/IiGc// 1NG.
IA-t/l- --,74'ai 1.)l/-7W.
"J
du 61E"AINVII`J��kv
New CFA 4% and Utilities 12 27 04.doc 5 �,
SUMMARY OF COST
Franklin Park Cityview Median Opening
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $19,309.00 $ 19,309.00
2. Storm Drainage $0.00 $ -
3. Street Lights $1,650.00 $ 1,650.00
4. Street Name Signs $0.00 $ -
B. Engineering Design $ -
C. Construction Engineering
and management by DOE (4%) $ 772.36 772.36
TOTALS $ 21,731.36 $ - $ 21,731.36
Change ^rder Request:
Monday, November 22, 2004
Submit Request to: Work Performed at:
Franklin Develpoment Franklin Senior Living Community
2511 North Loop 1604 West Suite 202 Fort Worth, Texas
San Antonio, Texas 78258
Scope of Work: Concrete
City Work:
# 1 Sawcut, Demo, & Hauloff Northern Island Nose $2,173.00
10" Curb, Gutter and Pavement $3,153.00
# 2 Sawcut, Demo, & Hauloff Southern Island Nose $3,910.00
8" Curb, Gutter and Pavement $3,153.00
# 3 Backfill Behind Curbs $680.00
# 4 2 Year Maintenance Bond $930.00
# 5 Electrical ($1,500.00 Not to exceed cost) $1,725.00
# 5 Irrigation ($3,118.00 Not to exceed cost) $3,585.00
Total: $19,309.00
Note:
All 8" & 10" Fort Worth Class C Mix 4500 psi (no ash)
All Temporary Barricades Included
Excludes all Lime Stabilization
Excludes all Landscaping & Landscaping Materials.
Excludes all Electrical & Electrical Materials.
Per Civil Plans Dated: August, 2004- Revised to shorten nose.
Accepted by
Cook Concrete L.P. Franklin Development
Company Company
Uy V Date y Date
I. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00
CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00
RELOCATE EXISTING LIGHT 1 EA $ 11500 $1, 500 . 00
Subtotal $1,500.00
City's Cost $00,000.00
Developer's Subtotal $1 ,500. 00
10% Contingencies $150. 00
Project Total $1 , 650.00
Adjacent Developer's Cost $00,000.00
Developer's Cost $1, 650.00
2% Inspection Fee $00,000.00
CFA CODE #2004089
DEVELOPER' S COST: $1,650.00
FRANKLIN PARK CITYVIEW MEDIAN OPENING
February 1, 2005
Fort Worth, Texas
February 3, 2005
PAGE I OF Exhibit C
II. STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C", immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department.
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of the Director of Transportation and Public Works .
3 . The City will install all the streetlights that use overhead or
underground conductors on residential, and collector streets. the
developer agrees to pay the city the amount shown below prior to the
City starting it' s design efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors .
S . The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for
the installation of any electrical transformers required for the
proper operation of the street lights
6. The estimated cost of this street light installation is detailed on
page 1 of exhibit C and is summarized below, the street lights will
remain the property of, and will be maintained by the City of Fort
Worth.
DEVELOPER' S COST: $1,650.00
FRANKLIN PARK CITYVIEW MEDIAN OPENING
February 1, 2005
FORT WORTH, TEXAS
CFA CODE #2004089
Page II of Exhibit C
I Ai
�U� bsw i
III .
"STREETLIGHTS"
RELOCATION
OVERTON RIDGE BLVD
FRANKLIN PARK CITYVIEW MEDIAN OPENING
Page III of Exhibit C
Iv
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final approval of the street
construction. The street name signs will remain the property of, and will be maintained
by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required for this
development to the extent of$100.00 per intersection. This unit cost will be revised
annually by the Department of Transportation and Public Works to reflect prevailing
costs of materials and labor.
3. This development creates the following zero (0) intersections at a cost to the Developer
of$0.00:
(Median break/opening, no new intersections.)
Franklin Park Cityview Median Opening
CFA code: 2004089 Date: June 28, 2004
,gin U n5r\
vr
56:
_r .—
:y svxat'uNno�iNvaavc ���� .�.•Km ory YaMe.d —
=.=1U1Z;: ..,.. ., =r:m g eiaob1104iov!
•.3uI�solepmw pw ❑_❑ S, E aavna7noa ia Nolaa no
u�H�IW� !QF M31A A11O AHVBYd N173INY83 Aq p�,.a V
.a` NOIIVOIdIQOW NVIQBW
•as
:
�? ei
��97 Q���Epe ���y!yf p°�l�e�•Q�pr:377 fr�Q� r��@t �a�ae�Q re!!y@
Ije®M�BB�Q66�
I
fit
119
pill
I �!
\.,...............
ky'll 'fill 11 !��14°1 44 rs! .G rEi51A 1
................___...�__�
...--_._.u..,,.
Yt _
• -_ 8 fa tE - ��
a
" - Q
J _
i ,....,/....... ... $ y
A �1tr°r� � tSi y
..._.. °tea 11048 °
' Y
i
m
��n�•aik. a
_
I Y
W
— =s
� Q
ff
Y