Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 31819
AMENDMENT NO. 3 STATE OF TEXAS § CITY SECRETARY CONTRACT NO.LLIq (No-N nFe'" :49 R CIV C COUNTY OF TARRANT § WHEREAS, the City of Fort Worth, a municipal corporation situated in Tarrant County, Texas hereinafter called "City" and Camp Dresser & McKee Inc., here after called "Engineer" made and entered into City Secretary Contract No. 24832, (the Contract) which was authorized by the City Council by M&C C-17322 on the 160' day of March, 1999; amended by City Secretary Contract No. 26776 (Amendment No. 1) which was authorized by the City Council by M&C C-18275 on the 10th day of October, 2000; and amended by City Secretary Contract No. 29212 (Amendment No. 2) which was authorized by the City Council M&C C-19805 on the 7th day of October, 2003, WHEREAS, the Contract involves engineering services for the following project: Engineering Contract for the Cantrell-Sansom Pump Station and associated pipelines and the Northside Ground Storage Reservoir, Project Number PW-77-060770160160 WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement,which amends the Contract: 1. Article I, of the Contract is amended to include the additional engineering services listed below and specified in documentation dated April 7, 2005, which are attached hereto and incorporated herein. Add the following Item number 6.0 to Attachment "A-1" Supplemental Scope of Services. Additional Construction Phase Services The Engineer will provide additional construction services including additional shop drawing review, functional demonstration testing, landscape and irrigation plan for Northside II Pump Station. The Cost to the City for the listed additional services to be performed by the Engineer totals $20,090.00 2. Article H of the Contract is amended to provide for an increase in the ax u e ©4 baq C paid to the Engineer for all work done and services performed under the Co , so that the total fee paid by the City for all work and services shall not ex eet •$'• 1,061,720.08 1Y. ; ��� 3. All other provisions of the Contract, which are expressly amended herein shall remain in full force and effect. Page Iof2 ORIGINAL EXECUTED on this the i h day of , 2005 in Fort Worth,Tarrant County, Texas. ATTEST: CITY OF FORT WORTH wa4 t" r Marty Hendrix Marc Ott City Secretary Assistant City Manager NO M&C REQUIRED APPROVED: S. Frank Crumb,P.E. Acting Director, Water Department .APPROVED AS TO FORM AND CAMP DRESSER&MCKEE INC. LEGALITY ENGINEER (' By: Gary Steinberger Richard S wey,P.E Assistant City Attorney Vice President CIS Eli a:�nn4 ^ Page 2 of 2 �� 8�� YEN. Documentation for Amendment No. 3 7-Apr-05 Additional Construction Phase Services Northside Pump Station and GSR Spent to date 1 Additional Shop Drawing Review $12,113 2 Landscaping and Irrigation Plan $3,399 3 FDT $1,785 4 Additional communications $3,609 $20,905 The following is a revised Project Fee Summary to include Amendment Original Contract(Total) $775,415.00 Amendment Number 1 $75,000.00 Amendment Number 2 $190,400.00 Subtotal $1,040,815.00 Amendment Number 3 $20,9777F 1,061,720.08 Notes 1 Incomplete shop drawings submitted in phases,eight Shop Drawings were resubmitted and reviewed 3 times,two shop drawings were reviewed 4 or more times. Multiple reviews for"or equal"equipment(Bridge Crane, Flap Valve.Three O&M manuals resubmitted and reviewed. 2 Prepared Landscaping and Irrigation Plan 3 Attended Functional Demonstration Testing 4 Excess communications(over 900 emails received and addressed)