HomeMy WebLinkAboutContract 48890CI°i1� SECRETAR� � � � ;1
CONTRACT N0, V
Developer and Project Information Cover Sheet:
Developer Company Name: Rob Riner Companies GP, LLC
Address, State, Zip Code: 6404 Waterview Dr. Arlington, TX 76016
Phone & Email: 972-689-0669, rriner@robriner.com
Authorized Signatory, Title: Robert B. Riner, Jr., Manager
Proj ect Name:
Brief Description:
Project Location:
Carter Distribution Center
Water, Sewer
Northeast of intersection oak Grove Road and Joel East Road
Plat Case Number: FP-16-O55 Plat Name: Carter Distribution
Mapsco: F105-D Council District: 8 City Project Number: 100692
CFA Number: 2017-013 DOE Number: None
To be completed by ff
Received by: J Date: J � �%
_ � ''1
�`' R����
`; , MAR 2 � 'tt111
c�� ��s���� ��
c��
City of Fort Worth, Texas
Standard Community Facilities Agreement - Carter Distribution Center
CFA Official Release Date: 01.03.2017
Page 1 of 11
OFFICIAi. R6'�CQRQ
GITY 5��;����;�
�T. Vdli�l�'i'�1� '�'�
STANDARD COMMUNITY FACILITIES AGREEMENT
T� 5TATE OF TEXAS
COUNTY OF TARRANT
�
�
City Secretary
Contract No. � � l/
WHEREAS, Rob Riner Companies GP, LLC, ("Developer"), desires to make certain
specific improvements as described below and on the e�ibits attached hereto ("Improvements")
related to a project generally described as Carter Distribution Center ("Project") within the City
or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Proj ect.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth, Texas
Standard Community Facilities Agreement - Carter Distribution Center
CFA Official Release Date: 01.03.2017
Page 2 of 11
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the e�iibits attached
hereto.
D. The following checked e�iibits describe the Improvements and are incorporated herein:
Water (A) �;, Sewer (A-1) �; Paving (B) ❑, Storm Drain (B-1) ❑, Street Lights &
Signs (C) L�,'.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
adininistered in conformance with paragraph 8, Section II, of the Policy. Developer shall
ensure its contractor(s) pays the then-current City-esta.blished wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth, Texas
Standard Community Facilities Agreement - Carter Distribution Center
CFA Official Release Date: 01.03.2017
Page 3 of 11
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the conshuction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. T'he City shall be
named as additional insured on aIl insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other state-
approved form) supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to a11ow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submitta.l should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth, Texas
Standard Community Facilities Agreement - Carter Distribution Center
CFA Official Release Date: 01.03.2017
Page 4 of 11
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, speci�cations and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such iniuries, death or damages are
caused, in whole or in nart, by the alleged negliQence of the Citv ofFort Worth, its
o�'�cers, servants, or emvlovees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not sucli iniu�ies, death or damages are caused. in
whole or in nart, bv the alleQed neQligence of the Citv of Fort Worth, its of�cers,
servants, or emnlovees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth, Texas
Standard Comtnunity Facilities Agreement - Carter Distribution Center
CFA Official Release Date: 01.03.2017
Page 5 of 11
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total conshuction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the tota.l cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the tota.l cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth, Texas
Standard Comtnunity Facilities Agreement - Carter Distribution Center
CFA Official Release Date: 01.03.2017
Page 6 of ll
the end of two (2) years from the date of this Agreement (and any extension
period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAIlVDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth, Texas
Standard Community Facilities Agreement - Carter Dish•ibution Center
CFA Official Release Date: 01.03.201'7
Page � of 11
Cost Summary Sheet
Project Name: Carter Distribution
CFA No.: 2017-013 City Project No.: 100692
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific e�chibit is required to support the
following information.
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Signals
TPW Construction Cost Total
Total Construction Cost (excluding the fees)
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub-Total for Water Construction Fees
E. TPW Inspection Fee (4°/a)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Signals Inspection Cost
H. Street Signs Installation Cost
Su6-Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125% w/2vr expiration peric
Developer's Cost
$ 823,175.00
$ 31,688.00
$ 854,863.00
$ -
$ -
$ -
$ -
$ -
$ 854,863.00
$ 17,097.26
$ 17,097.26
$ 34,194.52
$ 34,194.52
Amount
$ 854,863.00
$ 854,863.00
$ 1,068,578.75
$ -
$ 1,068,578.75
City of Fort Woirth, Texas
Standard Community Facilities Agreement - Carter Disiribution Center
CFA Official Release Date: 01.03.2017
Page 8 of 11
Choice
x
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH
_, �
DEVELOPER
Rob Riner Companies GP, LLC
(�, i �(,� L i ( ��' .,, �
� f Jesus J. Chapa �f�,� �L
F , )
Assista�t �ity Manager ''"����/!` , / �� .
Date: � I � l, ;�"� Name: Robert B. Riner r.
Title: Manager
Recommended by:
�'� �
l: -�i � � �_ 5L�
Wendy Chi- abulal, EMBA, P.E.
Development Engineering Manager
Water Department
(�.J. � '
Dougl W. Wiersig, P.E.
Director
Transportation & Public Works Department
Approved as to Form & Legality:
C��C-� �-��'"
Richard A. McCracken
Assistant City Attorney
M&C No. n)/r4
Date: �i�c� �i�
Form 1295: n1��-
ATTEST:
Mary J. Kays�
City Secretary
Date: 5 ` "' �
ATT`EST: (Only if required by Developer)
Signature
Name:
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
! �/ � %1 ) � Gl°'1 ' �
.� , , �u��
Name: /�/ i
�
Title:
City of Fort Worth, Texas �����G��� ���:��Q
Standard Community Facilities Agreement - Carter Disn•ibution Center ��`�''�' $,������X
CFA Official Release Date: 01.03.2017 �e ���„�
Page 9 of 11 ��i�
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
� Attachment 1- Changes to Standard Community Facilities Agreement
� Location Map
1�I Exhibit A: Water Improvements
�'���! Water Cost Estimate
� E�ibit A-1: Sewer Improvements
�''' Sewer Cost Estimate
❑' E�chibit B: Paving Improvements
❑i Paving Cost Estimate
❑ E�ibit B-1: Storm Drain Improvements
❑ Storm Drain Cost Estimate
❑ E�ibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas
Standard Community Facilities Agreement - Carter Distribution Center
CFA Official Release Date: 01.03.2017
Page 10 of i l
ATTACFIlVIENT "1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 100692
None
City of Fort Worth, Texas
Standard Community Facilities Agreement - Carter Distribution Center
CFA Official Release Date: 01.03.2017
Page 11 of 11
VICINITY MAP
LOCATION MAP
MAPSCO NO. F105-D
COUNCIL DISTRICT 8
� P a c h eco Koc h 7�7 RAMBLER ROAD, SUITE 1400
DALLAS, TX 75231 972.235.3031
TX REG. ENqNEEFtING FlRM F-469
TX REG. SURVEIING FlRM LS-10008000
ORAWN BY CHECKED BY SCALE DATE ✓OB NUMBER
AJC CJS 01/26/2017 2685-16.131
CARTER DISTRIBUTION
CEN TER PH ASE I I
VICINITY MAP
WATER EXHIBIT
� � G E (�! � �
EXISTING WATER LINE ,
PROPOSED WATER LINE �' �
C�0 PROPOSED GATE VALVE � �
♦ PROPOSED FIRE HYDRANT - � (
� BLOW—OFF ASSEMBLY
COMBINATION AIR �"�T^�- � �
� HYDRANT � W G�1 <
VALVE ASSEMBLY
/ / � ��u�i�
I LOT 4X, BLOqC A �
cutmt oisrnieunoN
cEN7ER I
� 9.720 ACRES (
� (423,399 SF)
_ _ �
I
I CMiFA�q�� dl �7lIEA
�
I �ew�, ,w�s
e.sm.we s�
AYpI 0. CM7Flt illlDA710l1
PMT OF FRSf 4iICf I
�a. xer. ra m�l
� �rr�snrr aF iaF.�o �mss�)
I
�rum: �rtc��'xao�
I
.
I
ILOT 2R, BLOqC A
cnarn�
I oismieunorr
CENTER
(INST. N0.
I D214117642)
(
�
�
�
I —
�-----
co►aeiN�now �
AIR VALVE �
ASSEMBLY
• INSTALL HYDRANT
IRRICATION
MElER i�i) �
I
DOMESTiC I
MEtER (i4)
I
IRRIGA110N �
MEfEFi i�3)
BLOW—OFF
ASSEMBLY
i
I
•INSTALL HYDRANT
DOMESTiC
METER (�2) �
1
• INSTALL HYDRANT i
IRRIGATION
METER (�t)
COMBINATION
AIR VAWE
ASSE?ABLY
WATERUNE CONNECTION
INSTALL HYDRANT
�
I �I
I 0 300 600 120�
I
e�ow—o� I GRAPHIC SCALE IN FEET
� �sso�a�Y
i
CONNECTING TO �
�-- DaSTING 30' �
WAIERIlNE
OAK GROVE
ROAD
(VARIABLE R.O.W.)
P� C��� O KO C� 7�' RAMBLER ROAD, SUI1E 1400
DALLAS, TX 75231 972.235.3031
TX REG. ENpNEERING FlRM F-4&8 CARTER DISTRIBUTION
- ,� RE�. S�R"�„'"� FlR"" �—,°°°e°°° CENTER PHASE 11
DRAWN BY CNECKEO BY SCALE DATE JOB NUMBER
AJC ��S ,•=600� o,i26��o,� 2685—,6.,3, WATER EXHIBIT
SANITARY SEWER EXHIBIT
'
' 8" SANITARY SEM�ER
� an c�wour
;�
8' SANITARY SEWER
cirr c�nriour
CONNECT 8' SANITARY
SEMiEit TO IXIS7ING
MANHOLE
LOT 3, IOCK A
CARTII2 DISTRIBUTION CENTER
29.431 ACRES
(1,282,038 SF)
AMON G. CARTER FOUNDAiION
PART OF FlRST TRACT
(YOL 3587, PG. 314)
PART OF 194.70 ACRES
(INST. N0. D205085855)
(FlLED: MARCH 30, 2005)
PRIVATE DRIVE
CONNECT 8'
SANITARY SEWER T�D
IXISTINC STUB-OUT
--�--
�
I LOT 4X, BIOCK A
CARTER DISTRIBU710N
CENiEft
9.720 ACRES
(423,399 SF)
B' SANITARY �R
cirr c�wour
CONNECT 8'
SANITARY SEWER TO
IXISTING STUB-OUT
I— E G� I�I �
EXISTING SEWER MAIN
o EXISTING S.S. MANHOLE
O PROPOSED S.S. MANHOLE
� 8" SANITARY SEWER
iarr c�wour
INSTALL MANHOLE
EXISTING 12"
SANITARY SEWER
�
0 150 300 600
GRAPHIC SCALE IN FEET
~ �� C��r C O � O�� 7�7 RAMBLER ROAD, SUITE 1400
DALI.AS, 'iX 7523t 972.235.303t
TX REG. ENGINEQ2ING FlRM F-469 CARTER DISTRIBUTION
TX REG. SURVEIING FlRM LS-10008000 CENTER PHASE 11
ORAWN BY CNECKEO BY SCALE DATE ✓OB NUALBER
AJC ��S ,•=300� o,�26i2o,� 2685—,6.,3, SAN. SEWER EXHIBIT
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
��l�l�i:7:7C��=31�7
0o az as
DAP-BIDPROPOSAL
Pa�e I of 7
Bidder's Application
Project Item Infom�ation Bidder's Proposal
Bidlist Ttem Specification Unit of Bid
No. Descrip[ion Section No. Measure Quantity Unit Price Bid Value
UNIT i: WATER IMPROVEMENTS
1 0170.0100 Mobilization O1 70 00 LS 1 $25,000.00 $25,000.00
_
2 3311.0341 ]0" Water Pipe 33 11 10, 33 11 1 LF 95 $50.00 $4,750.00
-- ._ _
3 331 ].0541 16" Water Pipe 33 11 10, 33 I 1 1 LF 5790 $71.50 $413,985.00
_
4 3305.0109 Trench Safety 33 05 10 LF 5985 $2.00 $11,970.00
__ __
5 3201.0151 As halt Pvmt Re air, Water Service 32 O1 17 LF 904 $85.00 $76,840.00
_.
6 3201.0616 Conc Pvmt Re air, Arterial/Industrial 32 01 29 SY 27 $90.00 $2,430.00
7 3312.0001 Fire Hydrant 33 12 40 EA 8 $5,600.00 $44,800.00
2 3312.4306 30" x 16" Tapping Sleeve & Valve 33 12 25 EA ( $16,500.00 $16,500.00
_ , _. _ .._- --
9 3312.0117 Connection to Existing 4"-12" Water A4ain 33 12 25 EA I $4,000.00 $4,000.00
___ __ - _
10 3312.1002 2" Combination Air Vah�e Assembl for Water 33 12 30 EA 2 $5,000.00 $10,000.00
11 33122203 2" Water Service 33 12 10 EA 5 $3,500.00 $17,500.00
12 3312.6002 6" Blow Off Valve 33 12 60 EA 2 $6,500.00 $13,000.00
13 33123006 16° Gate Valve ���/ Vault 33 12 20 EA 12 $12,500.00 $150,000.00
� . --
14 33123004 10" Gate Valve 33 12 20 EA 2 $1,800.00 $3,600.00
___ _ _ __. _._ _._.
15 3311.0001 Ductile Iron Water Fittings w/ Resh�aint 33 11 ] 1 Ton 5.76 $5,000.00 $28,800.00
16..___
__
_ _. - _ _
17
_ __ _ _
18
19 _ _ _ __ ___
20_ .__ __
__ . _ _. _ _
39
40_ _ _. __ _ _ _ _.
___ __ _ __. __. . _ ___- -_ _.__ _. __ __ _ _. ,
41
42 _ _ _ _ _ _ _ _ __ __
_ __ _ _ _ _ _ _
43
_ _ _. _ _ _ _ . __
44
45 _
TOTAL UNIT I: WATER IMPROVEMENTS $823,175.00
CITY OF FORT \VORTH � - �
STANDARD CONS'IRUCTfON SPECIFICATION DOCUI�NTS - DEVELOPER AWARDED PROJECTS
Fortn Vecsion September 1, 2U15 00 42 d3_Bid Proposnl_DAP cncter_revised
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
0o az as
D.4P - BID PROPOSAL
Page 2 of 7
Bidder's Application
Project Item Infom�ation Bidders Proposal
Bidlist I[em Specification Unit of Bid
No. Description Section Na Measure Quantity Unit Price Bid Value
UNIT II: SANITARY SEWER IMPROVEMENTS
1 3331.41 ] 6 8" Sewer Pipe, CSS Backfill 33 I 1 10, 33 31 1 LF 30 $77.00 $2,310.00
2 3305.0107 Manhole Adjustment, A4inor 33 OS 14 EA 3 $1,000.00 $3,000.00
__ _
3 33313301 8" Sewer Service 33 31 50 EA 4 $1,900.00 $7,600.00
_ _
4 3339.0003 Wastewater Access Chamber 33 39 40 EA 4 $3,200.00 $12,800.00
5 33391001 4' Manhole 33 39 10, 33 39 EA I $4,000.00 $4,000.00
6 3301.0101 Manhole Vacuum Testing 33 Oi 30 EA 6 $150.00 $900.00
7 3301.0002 Post-CCTV Inspection 33 01 31 LF 154 $5.00 $770.00
8 3305.0109 Trench Safety 33 OS 10 LF 154 $2.00 $308.00
9 _ __ __.
_ . _._ _ . _ _
10
11_. _ __ _
12__ . _ __ _ __
_ _ _ __ . __ _.
13
14_ __ _
_. _ _ _. _ __
15
_ _ _ _ _ ___
16
_ � 7 . __ . , . __ _ _ _ . _
18__ _ _ _ . _ _ _ _
19__ _ __ _ _ _
_. __ . __ _ _. .
20
. _.._ __ _ _ _ _ __
21
_. _ . _ _
22
__._ _ . , . _ -- __ . _ . __ _ . __ _. _ . ..
23
__ _ __ _
24
_ __ . _ __ _. .
25
. _ _
26 . _ _
27 _
28 .
29 _
_ _ _ _
30
31
_ _ _ _ _ __ _ __ -.
32
_ _ _. _ . .. _ _ _ _.. _
33
_ ... _. _ . . , _ _ _._ __. _ _ _ ___.. ._ _.. _ . .
34
_ __ __ _. _ _ ___ __ _ _ _
35
36 _. . _ . _.. _ _. . _ . _ _ __ _
--- — _ __ _ -- -- _� . _. __ — _ __ _ __ _. -- -- — ._.
37
�.. _-- __._ __ � __ _ �_ -- -- — __ _. . r._ �
38
39 _ . _ _ _ � � _ __ _ _ _ _ __ — — — � . . __.
_ � --_ _. . .__ . — _ � _ � _ , . __ — — _ . . _ _. _.
40
_._ __ _ � ___ __ _� . � . _ —_ — —. _ � . ,. _ _
41
_ _. _ __. . __ _ __ _. ., _.. _ ___ . __ . _ _
42
__. __ __ _. _ _ . _ _.... . __ _-
43
44 . _ _. ___
_. . __. _ __ _.
45
TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $31,688.00
CI7Y OF FORT WORTH �
STANDARD CONSiRUCTTON SPECIFICATfON DOCUDiENTS - DEVELOPER AWARDED PROJECTS
Fo`m Version September I, 2015 UD 42 43_Bid Proposal_DAP cnrter recised
00 42 43
D.4P - BID PROPOSAL
Page 3 of 7
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID Bidder's Application
CI"IY OF FORT WORTH � �
STANDARD CONSTRUC7iON SPECIF[CAT[ON DOCUM1fEN'1�5 - DEVELOPER AWARDED PROJECi'S
Form Version September 1, 2b15 0042 43_Bid Proposal_DAP caner revised
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAY-BIDPROPOSAL
Page 4 of 7
Bidder's Application
Project Item Infomiation Biddei's Proposal
Bidlist Item Specificatiai Unit of Bid
No. Descrip[ion Section No. Measure Quantity Unit Price Bid Value
UNIT IV: PAVING IMPROVEMENTS
1
_ _
2
_ _ __ _ .
3_
4 _ _
5
6_. _ _ _..
7__ _ _ . _ .
8 _ __ . _ . _ _ _
9 _ . . _ _..
_ . _._ _ _ _ _ _
10
11. __ _ ._ _ _.
_ _. _ _
12
_ _ __ . . __ __ _
13
14 _. _ _ _
_ _ _. _ _ _
15
16_ _
17 . . _.
. . _.. __ . _ __ __.._
18
19_ _ _ __ _ _ .
__ _ _ _ _
20
_ _ _
21
_ . _ _ _
22
_ __ _. _._ _ __._ __ __. . _ _--.
23
24_ _ _ _ __ _ __ _.
25
26
27
28 _
29 __ _
30
31
_ _ _ _ _ _. _. _ __
32
33. _ _ _ . _
34 __ . __ .. _ _ _ _.. __
_ __ _. _. _. _ _
. _
35
_ _ __ __ . _ ___
36
37.. __ _ __ . __ _. _ . _ __
_, __. _ _. . . _. _ _ _..
38
_ _ _ __ . _. _ ___ __ _. .
39
_ _ .. __. _ _ __ __. _ _.. __
40 _
__ _. _ _ _ _._. _.
41
__ _ __ __ __
42
43 - — _ � _ _v. - -- — - - - — _
_ _ _ _ __ _. . _
44
45 . _.
TOTAL UNIT IV: PAVING IMPROVEMENTS
CITY OF FORT WORTH � � � � � '
STANDARD CONSTRUCi70N SPECIFICA'IfON DOCUMENTS - DEVELOPER AWARDED PROJECTS
Focm Version September l, 2b15 004243_Bid Proposal_DAP carter_revised
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
0o az aa
D.4P - BID PROPOSAL
Pnge 5 of7
Bidder's Application
Project Item Infomiation Bidder's Proposa]
Bidlis[ Item Specificatiov Unit of Bid
Descriphon Unit Price Bid Value
No. Section No. Measure Quanti[}�
UNIT V: STREET LIGHTING IMPROVEMENTS
1
2 __ . _ .
3 __
4 .
5
6 _ _ _ _ _. _
7 _._ _ _ _. _ . _
_ _ ,__ __ _ _ _. _
8
9 ._ .
. _ _ _ _
10
__ _
11
_ __ _ _
12 . . _ _
13
14_ . _ __ __ _ __ _ _ _ _
_ _ _ _ _
15
16 _ _ _ __ __ _ _
_ . _. _ _ __ _ _
17 -
18_._ __ __ _ _ _.
19 __ .. .
_ _ _ _ _
20
_ . _ _
21
_ _ __ _. _. _ __.
22
---- _ __ _ _ __. . _ _. _ _ _
23
__ _ _ . _ __ .
24 _ _ _
25.
_ _
26 _
27_
28
_ _ . _
29
30 _
31
_ __ _ _
32
_ __ _ _
33
_. __ _ _ . __. _---
34
_ . _ _ _ __._ _._. _ _ _ _-
35
_ ._._ _ __ _.. _ __ . .
36
_. _ ._ . _ _ _ _ _ _
37
_... , __ ____ . ___ __ _ _ _ _ ._.._
38
___ . _ _. . _ _
39
_ k. _._ _ __ _._. , .� _ __ __ _ - ---- -- --. ._.
40
_ _ __ _ _ _ _._ __. ___ .._
41
_ _.. . _ _ __ __ _ _ _
42
43 _ . _ __ _ _ __ _ _. _ __
44 _. _ _._ _ _ _ __ _ _ _ __.
45 . . . _ _ ___ __ _ _
TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS
CITY OF FORT WOR7H �
STANDARD CONSTRUCT[ON SPECIFICATION DOCUMEN'I'S - DEVELOPER A\VARDED PRO7ECC5
Form Version September 1, 2015 00 42 43_Bid Proposal_DAP caner rerised
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
D.4P - BID PROPOS.4L
Pnae ( o( 7
Bidder's Application
Project Item Inforn�ation Bidder s Proposal
Bidlist I[em Specifica[ion Unit of Bid
No. Description Sec[ion No. Measure Quantity Unii Price Bid Value
UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS
1
2_ . _
3 _ _ . _ _ __ .
4 _ ..
5 __
6. _ _. _
__ _. _.__ _ _ _
7
8 . .. _ ._ _ _ _ _ _
9 _ . _ _. _
_. __ _ _
10 _ . _ _
11_
12_
. _
13
14.. ._ _ _ . _ __.
_ _ __ _
15 _ _ _ _ _
16
17 __ _ _ . _ _ ._. _. _. _
_ _ __ _ ___ _ . _
18
_ _ _ _ _
19
_ . _
20
__ _ _. .
21
_ _ _ .
22
23 . _ . _ __. _. __
__ _ _ _ _.
24
_ _ _ _
25
26
27
28 _
29 _
30 _ _ _
31
32._ _ _ _. _ .
_ . __
33
_ __ _ _ . _.
34
_ _ __. _ _ ___ _. _
35
_ _ ___ _ _ __ . _. __ ___
36
_ _.. _ _ __ . _ __ _ _
37
__.. _ _ _ __.
38
39 ___ _. , _ _ _ _ . _. _
_.. _. __ . _ . __ _. . __
40
_. __ . _.. _ . __.
41
_ _ _ _ _..
42
_ _ __ _. __ _
43
_ _ . _. _.. _
44
45 _ _ __ . __ _ _ . _ __
TOTAL UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS
CI'R' OF FORT WORTH � � �
STANDARD CONSTRUCTION SPECIF[CATION DOC[IAIENTS -DEVEI.OPER AWARDED PROJECTS
Form Version September 1, 2015 00 42 43_Bid Pmposal_DAP carter revised
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
UD d2 d3
D,4P - BiD PROPOSAL
Pa�e 7 0(7
Bidder's Application
Project Item Infonnation Bidder's Proposal
Bidlist 1[em Specification Unit of Bid
Descrip[ion Unit Price Bid Value
No. Sect�on No. Measure Quant�j�
Bid Summa�y
UNIT I: WATER IMPROVEMENTS
UNIT II: SANITARY SEWER IMPROVEMENTS
UNIT III: DRAINAGE IMPROVEMENTS
UNIT IV: PAVING IMPROVEMENTS
UNIT V: STREET LIGHTING IMPROVEMENTS
UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS
Total Conshvction Bid
$823,175.00
_.____�. $31,688.00
$854.863.00
Contractor agrees to complete WORK fm• FINAL ACCEPTANCE within tS da�s calendar days after the date when the
CONTRACT commences ta �vn as provided in the General Conditions.
�Nll OF SECTION
cin� oF FORr wox� r�
ST.4ND,ARD CONSTRUCTION SPEC[FICATION DOCU�4EN"f5 - DEVELOPER ANARDED PROJECTS
Fortn Version Septembzr I, 2U15 �04243_Bid Proposal_DAP carter_recised