HomeMy WebLinkAboutContract 31840 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT (
§ Contract No.
WHEREAS, Duvestco, Inc. hereinafter called "Developer", desires to make
certain improvements to Ash Meadow Addition, an addition to the City of Fort Worth,
Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through David Skinner, its duly
authorized President, and the City, acting herein by and through Marc Ott, its duly
authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Polic .
FJ i + '•�9
a
CFA ASH MEADOW ADDN 1
AtM• A...
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused,
in whole or in part, by the alleged negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof.
L u
CFA ASH MEADOW ADDN 2 �,
Water(A)None; Sewer(A-1)None; Paving(B) attached; Storm Drain(B-
1) attached; Street Lights and Signs (C) attached.
11. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B B 1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $489,151.00.
Item Developer City Cost Total Cost
Cost
A. Construction
1. Streets $ 355,024.00 $ - $ 355,024.00
2. Storm Drainage $ 113,850.00 $ - $ 113,850.00
3. Street Lights $ - $ 10,500.00 $ 10,500.00
4. Street Name Signs $ - $ 400.00 $ 400.00
B. Engineering Design $ - $ - $
C. Construction Engineering
and Management by DOE 2% $ 9,377.00 $ 9,377.00
TOTALS $ 478,251.00 $ 10,900.00 $ 489,151.00
Notes:
1. All Preliminary Plats filed after July 2000, will require sidewalks on all streets.
Sidewalk cost is included under street cost. The developer is responsible for
installation of sidewalk.
2. Developer's column for Item C represents two percent (2%) cost for construction
inspection fees and materials testing less 10% for contingency cost.
(*) Represents City participation for construction fees based on actual cost.
3. City not preparing plans and specifications.
CFA ASH MEADOW ADDN 3
er. Aw►
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Develo er
has executed this instrument in triplicate, at Fort Worth,Texas this the 12�1day of
, 209
Approval Recommended:
Transportation and Public Works
Department
NO M&C REQUIRED j
Robert Goode, P. E.
Director
City Of Fort Worth
�I
By
G� � iq x Mar O
Of
City Manager
Approved as to Form:
Assistant ity Attorney
ATTEST: DEVELOPER
Duvestco, Inc.
Corporate Secretary David Skinner, res nt
-.1:L�
CFA ASH MEADOW ADDN 4
E. STREET LIGHTS:
1. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 4 EA $ 2 , 000 $8, 000 . 00
MID-BLOCK RESIDENTIAL 2 EA $ 2, 000 $4, 000 . 00
CHANGE OF DIRECTION RESIDENTIAL 1 EA $ 2, 000 $2, 000 . 00
MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 200 $0, 000 . 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 200 $0, 000 . 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00
Subtotal $14 , 000 .00
City' s Cost $10, 500 . 00
Developer' s Subtotal $0, 000 .00
10% Contingencies $0, 000 .00
Project Total $14, 000 . 00
Adjacent Developer' s Cost $0 , 000 . 00
Developer's Cost $0, 000 .00
2% Inspection Fee $0, 00 . 00
Developer' s Responsibility See PG
III-1, "Line 7"
ASH MEADOW ADDITION
DECEMBER
Fort Worth, Texas _ v~
A
I�t i I1�1 � V�:v 1•! �':1•
a'►
III- 1
2 . STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C" , immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department .
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of the Director of Transportation and Public Works .
3 . Streetlights on arterial streets shall be installed with underground
conduit and conductors .
4 . The Developer shall provide for the installation of a 2-inch
schedule 40 PVC conduit at a depth not less than 30 inches and at
least 18-inch behind the curb, "clear from all other utilities" .
S . The Developer shall provide for the installation of a 2-inch
schedule 40 PVC conduit between streetlights proposed for
installation and the power source to become operational .
6 . A 3-inch schedule 80 PVC conduit is required when crossing streets
at a depth not less than 30 inches, unless indicated otherwise on
the plans concrete pull boxes shall be provided at the crossing
points .
7 . Street light conduit and footings shall be installed by the
developer' s contractor as part of and at the time of street
construction. The city will obtain electric service and complete the
street light construction in accordance with approved plans .
8 . The developer or their contractor shall contact City' s street light
division 48 hours prior to starting any installation of conduit
and/or streetlights at (817) 871-8100 to insure proper inspection of
work.
9 .The procedure for installing conduit and footings will be with the
inspector on the job site or you can request a copy by calling 817-
871-6596.
ASH MEADOW ADDITION
al�.1,.
V
A011hk .r►
III- 2
"STREETLIGHTS"
INTERSECTIONS
ASH MEADOW TRL & MEADOWBROOK DR 1
ASH GROVE TRL & MEADOWBROOK DR 1
ASH MEADOW TRL & ASH GROVE TRL 1
ASH MEADOW TRL & WHITNEY LN 1
MID - BLOCK
ASH MEADOW TRL 1
ASH GROVE TRL 1
CHANGE OF DIRECTIONS
ASH MEADOW TRL 1
ASH MEADOW ADDITION
Epee
...k
IV
STREET NAME SIGNS
1 . The City will install the street name signs upon final approval
of the street construction. The street name signs will remain
the property of, and will be maintained by, the City.
2 . The City will pay for the street name sign installations required
for this development to the extent of $100 . 00 per intersection.
This unit cost will be revised annually by the Department of
Transportation and Public Works to reflect prevailing costs of
materials and labor.
3 . This development creates the following four (4) intersections at
a cost to the City of $400 .00 :
Ash Meadow Trail and Whitney Lane
Ash Meadow Trail and Meadowbrook Drive
Ash Grove Trail and Whitney Lane
Ash Grove Trail and Meadowbrook Drive
ASH MEADOW ADDITION
Fort Worth, Texas
IV-1
SARTAIW
a
E
_ LO WATER
BL CARRIAGE
Y ANDERSON
BLUE CARRIAGE
Creek
EDERVILLE WmTM
H CIS
c uo x a +� S PSE o9
o m U c, o g o� v Harrison �-
Cen
LAURIE < u ENTVO STAIR ~ p
V SSA COV£ u
YOLANDA /v
MADEIRA
UCERN
S-* CARRIAGE ey`t g MEADOW BROOK 02 PHIAp1N
Park ✓
G o�
��� + x SNELTON = OG
MEADOWBROOK r ` SL p
LOCATt
ACAPULCO CUT Lnrt ,To1 uQ a. W
tZ BERMEJO c
x CASTILLO CAST NADA
PORTMAN
VOODFIELD
KINGSMILL F te4V rd School
LISA c'
f'1
KELL z p j
r Q
x a
c� a �
CRAIG w
DIVISION
1 w RR �r
ASH MEADOW ADDITION
LOCATION MAP
I � /
• ■
I
U ■
m
w I
■ ■ ■ s
I �
■ w s * ■
I ■ E
■
� M /
BERMEIO ROAD
®29' Developers Cost
Sidewalk (By Builders)
ASH MEADOW ADDITION
STREET IMPROVEMENTS
EXHIBIT "B"
f
f
w
wI 4
C9 t p r t -
X F A F f Q
v r a X
l
a r
I `
s w • w r
it t B I
t 1
■
n w w ■ w ■ ■ i
I
I
i
BBR)4110 RORD
® 27' Developers Cost
I
i� Sidewalk
ASH MEADOW ADDITION
MEADOWBROOK & COOKS
STREET IMPROVEMENTS
EXHIBIT " B "
w w
w
•
R R * • I
m
f
* E
s
BERMIJO ROAD
a
ASH MEADOW ADDITION
STORM DRAIN IMPROVEMENTS
EXHIBIT "B-I"
• w �
w
•
1
L L ■
p
L w s r M
• 8
w
� r
IRS -21j'ftCP 11
BERMIJO ROAD
ASH MEADOW ADDITION
MEADOWBROOK & COOKS
STORM DRAIN IMPROVEMENTS
EXHIBIT "B-1" 1
x.
L
� ® r
A
w �
� w W
I V w • I
• ^3 • ■ w
Q W
IC
i • r ■ = i
iC
� ■ a x
w ■ A a i
A
1p
O B
�! .0 r r r
e r s r
BBR=O ROAD
ASH MEADOW ADDITION
STREET LIGHT IMPROVEMENTS
EXHIBIT "C"
-� ��—a�vic•�cz 7nn¶7¶'' �y.�.,^ 1lII++Ips � `4(
�YO •:�n'l��.y JY� ��GVO
ASH MEADOW ADDITIOty
EXHIBIT "B°
STREET IMPROVEMENTS
PAY APPROXIMATE DESCRIPTION ODF ITEMS WITH UNIT AMOUNT
ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID
SECTION B - STREETS
1. 7,287 S.Y. 6" Lime Stabilized Subgrade $2.25 $16,395.75
2. 109.31 TON Lime for Subgrade $105.00 $11,477.55
3. 6,800 -S.Y. 5" Reinforced Concrete Pavement $21.00 $142,800.00
4. 277 L. F. Saw Cut & Remove Exist Asph $20.00 $5,540.00
5. 2 Ea. Barrier Free Ramps $550.00 $1,100.00
6. 1 L.S. Testing $2,500.00 $2,500.00
7. 7 Ea. Adjust Manholes $350.00 $2,450.00
8. 5 C.Y. Adjust Gate Valves $300.00 $1,500.00
9. 1 L.S. Traffic Control $2,500.00 $2,500.00
10. 1 C.Y. Storm Water Management $1,000.00 $1,000.00
SUBTOTAL SECTION B - STREET SYSTE $187,263.30
PAY APPROXIMATE DESCRIPTIONBODF ITEMS WITH UNIT AMOUNT
ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID
SECTION B - STREETS MEADOWBROOK DRIVE & COOKS LANE
1. 5412 S.Y. Lime Stabilized Subgrade $2.25 $12,177.00
2. 61 TON Lime for Subgrade $105.00 $8,505.00
3. 5037 S.Y. Reinforced Concrete Pavement $25.00 $125,925.00
4. 1511 L.F. Sidewalk $14.00 $21,154.00
SUBTOTAL SECTION B - STREET SYSTEM $167,761.00
PAY APPROXIMATE DESCRIPTION BODF ITEMS WITH UNIT AMOUNT
ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID
SECTION B - STREETS SIDEWALKS TO BE CONSTRUCTED BY THEE BUILDER
1. 1 2630 L.F. 4' Sidewalk $14. (1' .la =$38209
SUBTOTAL SECTION B - SIDEWALQ.®
.w
ASH MEADOW ADDITION
EXHIBIT "B-1"
STORM DRAIN IMPROVEMENTS
PAY APPROXIMATE DESCRIPTION
DF ITEMS WITH UNIT AMOUNT
ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID
SECTION B -1 STORM DRAIN
1. 266 L.F. 21" Class III R.C. Pipe $40.00 $10,640.00
2. 6 Ea. Headwalls $2,200.00 $13,200.00
3. 266 L.F. Trench Safety System $0.60 $159.60
4. 1 L.S. Trench Compaction Test $500.00 $500.00
5. 1 L.S. Storm Water Management $100.00 $100.00
SUBTOTAL SECTION B -1 STORM DRAIN SYSTE $24,-599.60
PAY APPROXIMATE DESCRIPTION
DF ITEMS WITH UNIT AMOUNT
ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID
SECTION B -1 STORM DRAIN MEADOWBROOK DRIVE
1. 350 L.F. 21" Class III R.C. Pipe $40.00 $14,000.00
2. 120 L.F. 30" Class III R.C. Pipe $52.00 $6,240.00
3. 3 Ea. Inlets $2,200.00 $6,600.00
SUBTOTAL SECTION B -1 STORM DRAIN SYSTE $26,840.00
Aft
ASH MEADOW ADDITION
EXHIBIT "C°
STREET LIGHT IMPROVEMENTS
PAY APPROXIMATE
DESCRIPTION F ITEMS WITH
IDUNIT AMOUNT
ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID
SECTION B - STREETS LIGHTS
1. 400 L.F. 2" P.V.C. Schedule 40 Conduit $5.30 $2,120.00
2. 8 Ea. Street Light Foundations $650.00 $5,200.00
SUBTOTAL SECTION C - STREET LIGHT4 $7,320.00