INTERLOCAL AGREEMENT BETWEEN THE
FORT WORTH INDEPENDENT SCHOOL DISTRICT
AND THE CITY OF FORT WORTH
STATE OF TEXAS §
§ SYCAMORE SCHOOL ROAD
COUNTY OF TARRANT §
This Agreement is entered into by between the Fort Worth Independent School
District, acting by and through Joe Ross, its duly authorized Interim Superintendent,
hereinafter referred to as FWISD, and the City of Fort Worth, acting by and through
Marc A. Ott, its duly authorized Assistant City Manager hereinafter referred to as Fort
Worth, both of Tarrant County, State of Texas.
WHEREAS, this Agreement is made under the authority of Sections 791.001 -
791.029, Texas Government Code; and
WHEREAS, each governing body, in performing governmental functions or in
paying for the performance of governmental functions hereunder, shall make that
performance or those payments from current revenues legally available to that party; and
WHEREAS, each governing body finds that the performance of this Agreement
is in the common interest of both parties, that the undertaking will benefit the public and
that the division of costs fairly compensates the performing party for the services or
functions under this agreement; and
WHEREAS, each governing body agrees to share in the cost of the services as
stated below.
NOW THEREFORE, FWISD and Fort Worth agree as follows:
1. Project. Fort Worth and FWISD agree to cooperate as described herein
for the design and construction of a 480-foot section of Sycamore School Road, from
Trail Lake Drive to Star Ridge Drive, hereinafter referred to as the "Project".
2. Design of the Project. Fort Worth shall be responsible for the design of
the Project and the preparation of the contract documents. FWISD understands that Fort
Worth has retained the services of HDR Engineering, Inc. to prepare the design for the
Project at a cost of$21,953. FWISD has reviewed the plans so prepared and approves
the plans, not as to engineering but as to concept. `UNRIJ,R pexob
�1R
3. Award of Contract, Construction, and Maintenance. Fort Worth shall be
responsible for:
a. The competitive bidding and award of the construction contract for the
Project;
b. Inspection of the Project;
c. Operation and maintenance of Sycamore School Road after
completion and acceptance of the Project.
4. Cost. FWISD agrees to participate in the cost of the Project in the sum
$54,108. Fort Worth will be responsible for any and all costs required in excess of such
FWISD participation.
5. Nothing in the performance of this Agreement shall impose any liability
for claims against FWISD other than claims for which the Texas Tort Claims Act may
impose liability.
6. Nothing in the performance of this Agreement shall impose any liability
for claims against the City other than claims for which the Texas Tort Claims Act may
impose liability.
7. The parties to this Agreement do not intend for any third party to obtain a
right by virtue of this Agreement.
8. By entering into this Agreement, the parties do not intend to create any
obligations express or implied other than those stated in the Agreement; further, this
Agreement shall not create any rights in any party not a signatory to the Agreement.
9. This Agreement shall automatically terminate upon completion of the
projects or one (1) year from the date of this agreement, which ever occurs first.
10. This Agreement shall become effective immediately upon its execution
both parties.
Irk
FWISD FORT WORTH INTERLOCAL AGREEMENT Cl 1�e� J'2 6It1:1!
SYCAMORE SCHOOL ROAD
Page 2of3 �':r7q� i� � ✓(
EXECUTED this J day of.IYYIvI, 2005.
FORT TH INDEP NT
SCH006L ISTRICT
By:
Joe Ross
Interim Superintendent
Appre o eg ity:
ertha Whatley, At rney
J
ATTEST: CIT F ORT W H
B
City Secretary Marc A. Ott
Assistant City manager
Approved as to form and legality: Approval Recommended:
Department of Transportation and
Public Works
s
Assistant ty Attorney Robert Goode, P. E.
Director
,i- act Authorization
FWISD FORT WORTH INTERLOCAL AGREEMENT
SYCAMORE SCHOOL ROAD wPage
3 of3
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 1/25/2005
DATE: Tuesday, January 25, 2005
LOG NAME: 20SYCAM SCH RD REFERENCE NO.: **G-14658
SUBJECT:
Authorize Execution of an Interlocal Agreement with the Fort Worth Independent School District for
the Construction of Sycamore School Road
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute an agreement with the Fort
Worth Independent School District for the construction of the northern two lanes of Sycamore School Road
from Trail Lake Drive to Star Ridge Drive including an adjacent sidewalk and a left turn lane at Trail Lake
Drive.
DISCUSSION:
This 480 foot section of Sycamore School Road is the only two-lane section remaining for this four-lane
roadway. Construction of this portion of Sycamore School Road will eliminate the bottleneck at this location
and improve traffic flow and safety in the area.
The City initiated discussion concerning the joint funding of this project with the Fort Worth Independent
School District (FWISD) in May 2003 since they own property adjacent to this section of roadway. Though
the FWISD is not planning to develop the site in the near future, it has agreed to participate in the cost of
construction of the roadway now.
On December 14, 2004, the FWISD Board of Education approved FWISD participation for the section of
roadway adjacent to its property in the amount of $54,108. The remaining cost of the project including
design, engineering services and the remaining construction is estimated to be $56,000 and is being funded
through City Council District 6 undesignated funds.
On June 22, 2004 (M&C C-20119), the City Council approved an engineering contract with HDR
Engineering, Inc. for the design of this project. The design is complete and the project is ready to go to
construction.
This project is located in Council District 6, Mapsco 103J.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds will be collected by the Transportation and Public Works
Department.
Logname: 20SYCAM SCH RD Page 1 of 2
TO Fund/AccounVCenters FROM Fund/AccounVCenters
C111 488100 020111040628 $54,108.00