HomeMy WebLinkAboutContract 31710-A3 A14ENDM NT NO. 3
STATE OF TERAS S CITY SECRETARY CONTRACT NO.
(M&C Required)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and Kimley--Horn and
Associates, Inc. , (Engineer) made and entered into City Secretary
Contract No. 31710, (the Contract) which was authorized by the City
Council by M&C C-20632 on the 25th day of April 2005 and :subsequently
revised by two amendments; and
WHEREAS, the Contract involves engineering services for the
following project:
Water and Sanitary Sever Relocations for SH-121T (Southwest
Parkway) , Par2 from SoJ�th Hulen Street to Alta Mesa
Boulevard JT ll �. ✓�
WHEREAS, it has became necessary to execute Amendment No. 3 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1.
Article I, of the Contract is amended to include the additional
engineering services specified in M&C C-25118, adopted by the City
Council on the 23rd day of August 2011, and further amplified in a
proposal letter dated August 1, 2011, copies of which are both attached
hereto and incorporated herein. The cost to City for the additional
services to be performed by Engineer total $315,905.50.
2.
Article II, of the Contract is amended to provide for an increase
in the maximum fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid by
the City for all work and services shall not exceed the sum of
$1,635,506.50.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
3.
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
EXECUTED on this the 0 day of , 2011, in Fort
Worth, Tarrant County, Texas.
q Q°°oo°0 V
ATTEST: a�°° 04,
U
p LL
oIfto o
am 0
Marty Hendrix o
City Secretary' ��*%-0 o° Icy
°° ooa°° {Y"
APP RECOM+t�AiDED: �AipRovED
S. Frank Crumb, P.E. Fernando Costa
Director, Water Department Assistant City Manager
R HLEY-HORN AND ASSOCIATES, INC.
Engineer
Name:Glenn Gary, P.E.
Senior Vice-President
801 Cherry Street, Suite 1100
Fort Worth, TB 76102
7FORM AND LEGALITY:
Assistant City Attorney
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
-2-
Kimley-Horn
and Associates, Inc.
August 1, 2011 ■
Suite 950
801 Cherry Street,Unit 11
Mr. Liam Conlon Fat worm,Texas
76102
Project Manager
City of Fort Worth Water Department
1000 Throckmorton St.
Fort Worth,TX 76102
Re: Water and Sanitary Sewer Relocations for SH-121T(Southwest Parkway),
Part 2
Additional Services—Amendment No. 3
KHA No. 061018028
City Project No. 00204
Dear Liam:
Due to additional services requested by the City as part of the Water and Sanitary
Sewer Relocations for SH-121T (Southwest Parkway), Part 2, Kimley-Horn has
performed or will perform the work outlined in the following items:
Item 1 (Coordination Meetings)
With Amendment 2, the original contract was revised for Kimley-Horn to attend
a total of one hundred twenty five (125) coordination meetings with the City,
NTTA, or franchise utilities for this project. This amendment will add an
additional fifty(50)coordination meetings.
Item 2 (Additional Water and Sanitary Sewer Design)
The City has requested Kimley-Horn to perform the following additional water
and sanitary sewer relocations for the SH-121 T project:
• Part 13 Alta Mesa / Dirks 24-inch water line — To coordinate with the
City Dirks Road paving improvements, Kimley-Horn prepared additional
water and traffic control plans (a total of 2 sheets) associated with a 16-
inch water line extension at the intersection of Dirks and Bryant Irvin.
The City also requested Kimley-Horn to revise the USMD Hospital
domestic and fire services. These items required additional coordination
with NTTA, the City and their consultants.
• Part 21 Overton Ridge 16-inch water line — The changes in the NTTA
Section 3 project, required the redesign the Overton Ridge 16-inch water
■
TEL 817 335 6511
FAX 817 335 5070
Kimley-Horn Mr.Liam Conlon,August I,2011,Page 2
S and Associates, Inc.
line (900 LF) and traffic control plans. These changes also required
additional coordination and submittals for approval with NTTA, TxDOT,
the City and their consultants.
• Part 23 M-311 36-inch Sanitary Sewer — Provide alternative gravity
sanitary sewer alignments to relocate the existing M-311 sanitary sewer
line. The City current gravity sanitary sewer line is not a viable option
and requires a lift station. The lift station will be designed as a package
that will serve the Lockheed Martin Recreational Facility and will not
include future sanitary sewer capacity for the development of the
Edwards Geren Riverhills or redevelopment of the Lockheed Martin
Recreational Facility. Kimley-Horn will provide the following tasks for
the design of the lift station:
1. Evaluate three (3) possible locations for a proposed lift station and
provide a letter recommendation.
2. The City will obtain a right-of-entry from the property owner.
Kimley-Horn will perform survey and SUE that includes the
following:
a. Establish project control using City provided control points.
b. Topographical survey of the lift station site and up to 50 feet
in each direction beyond the site boundary.
C. Establish property boundary of a 50 x 50 foot site located on
the selected site and will include the following:
i. Drawing with legal description
ii. Area of the site
iii. Scaled location of the flood hazard area from FIRM
iv. Area of the remainder of the parent tract of land
V. Name of the CITY of the parent tract
vi. Legal description of 8.5" x I l" paper and any recorded
easements and easements of record.
d. Provide a one (1) property exhibit to be used in lift station
property acquisition.
e. Provide one (l) temporary construction easement.
'_ Kimley-Horn Mr. Liam Conlon,August I,2011,Page 3
and Associates, Inc.
3. Perform a geotechnical analysis of the proposed lift station site
utilizing a qualified geotechnical laboratory to determine
subsurface conditions and provide recommendations regarding the
lift station structure, embedment, and backfill parameters. The
geotechnical services will include:
a. Subsurface exploration for two (2) sample bore at the
proposed lift station site.
b. Laboratory tests for classification purposes and strength
characteristics.
C. Engineering services that address soil and groundwater
conditions.
4. Prepare design calculation for sizing pumps, wet wells, pipes,
valves, electrical gear, and electrical supply. Kimley-Horn will
provide these calculations to convey flow from the existing
Lockheed Martin Recreation Association only.
5. Prepare engineering plans, specifications, and construction contract
documents for project bidding and regulatory approval. Kimley-
Horn will provide the following:
• Civil sheets
— General Construction Notes
— Overall Location maps of proposed and existing utilities
— Site plan
— Grading and Drainage Plan
— Piping Plan
— Gravity sewer and force main plan and profiles
— Security fence
— Profiles
— Traffic control plans
— Details
■ Electrical sheets
— Site plan
— Sections
— Control and Instrumentation
— Details
6. Prepare technical specifications for materials and installation of the
proposed facilities.
PP'- Kimley-Horn Mr.Liam Conlon,August I,2011,Page 4
and Associates, Inc.
7. Perform electrical engineering services for the proposed lift
station. The electrical design will include the following:
a. General electrical design.
b. Instrumentation and control schemes.
C. Site lighting.
8. Prepare traffic control plans in accordance with current MUTCD
standards if the selected site is next to a City street.
9. Submit to the City 95% complete plans, specifications, contract
documents, and Opinion of Probable Construction Cost (OPCC)
for review and comments.
10. Submit to the City complete final plans, specifications, contract
documents, and OPCC.
11. Kimley-Horn will prepare and submit a letter to the Executive
Director of the Texas Commission on Environmental Quality
(TCEQ) notifying the Commission of the proposed lift station
project and make available one (1) set of construction plans for the
TCEQ's review upon the Executive Director's request.
• M-186 Sanitary Sewer — NTTA has requested the City to remove the
existing M-186 sanitary sewer that is on TRWD and under the SH-121T
bridges that cross the Trinity River west of Bryant Irvin. TRWD will not
permit the City to remove this line, but will allow the existing manholes
to be abandoned per the City's standards. Kimley-Horn will prepare an
abandonment plan to be added to Part 23.
• City Lake Blvd. 10-inch Water Line—The changes in the NTTA Section
3A project, required a design for the City Lake Blvd. 10-inch water line
and coordination for the traffic control. These changes also required
additional coordination with NTTA, TxDOT, the City and their
consultants
Item 3 (Survey, Easements,and SUE)
The City has requested Kimley-Horn to prepare sixteen (16) water and sanitary
sewer easements for the relocations and easement abandonments within the
NTTA right-of-way.
PPP' Kimley-Horn Mr. Liam Conlon,August I,2011,Page 5
and Associates, Inc.
Item 4(Design and Project Management)
Kimley-Horn will perform an additional eight (8) months of Design and Project
Management.
Item 5(SH-121T Master Schedule and OPCC)
Provide periodic updates of the SH-121T Project Master OPCC spreadsheet and
exhibits for each of the water and sanitary sewer projects.
Item 6(Additiona: Bidding and Construction Phase Services)
Perform the additional bidding and construction phase services which include:
• Part 3 SH-183 water line — Coordination with the Country Day school
and Bonnell's restaurant.
• Part 5 IH 20 24-inch water line — Coordination with NTTA Section 3A
contractor damaging the relocated water line.
• Part 11 16-inch water line — Provide exhibits, schedules and other
documentation associated with the pavement repair on Dutch Branch and
Granbury Road.
• Clearfork Raw Water Pump Station —Coordination with the Oncor
relocation and shut down of the Clearfork Raw Water Pump Station.
• Provided one (1) additional bid package and construction phase service
for the Part 21 Overton Ridge redesign.
• Provide one (1) additional bid packages for the Part 23 M-311 Lift
Station.
• Provide one (1) additional construction phase services for the City Lake
Blvd. 10-inch waterline.
Kimley-Horn Mr.Liam Conlon,August 1,2011,Page 6
and Associates, Inc.
Scope of Services
The scope of services for this amendment is divided into the following tasks:
Item 1 (Coordination Meetings): $23,900 (Water$6,000 Sewer$17,900)
• Task 1 — Forty (45) completed additional coordination meetings.
$22,000
• Task 2 — Five (5) additional coordination meetings that Kimley-Horn
will be responsible for preparing the meeting agenda and meeting notes.
$1,900
Item 2 (Additional Water& Sewer Design): $100,100 Kimley-Horn
$ 5,000 Survey
$ 4,750 Geotechnical
$ 6,000 Reproduction
$ 31,000 Structural/Elec.
$ 46,500 Civil Design
$ 850 Corrosion
$ 9,410 10% Sub Fee
$203,610 Total
(Water$51,085 Sewer$152,525)
• Task 1 — Design changes for Part 13 Alta Mesa / Dirks 24-inch Water
Line. $22,300
• Task 2 —Design changes for Part 21 Overton Ridge 16-inch Water Line.
$25,200
• Task 3 — Design of Part 23 lift station and abandonment of M-311
sanitary sewer. This task includes coordination with developer and
developer's engineer, preparation of alternatives, review of developer's
alternatives, site selection report, design calculations to size pumps, wet
well, and plan and specification preparation. $43,600
• Task 4—Abandonment of M-186 sanitary sewer. $2,100
• Task 5—Design of City Lake Blvd Water Line. $6,900
i
PP'_ Kimley-Horn Mr.Liam Conlon,August I,2011,Page 7
and Associates, Inc.
Item 3 (Survey,Easements,and SUE):
($9,368) Survey
($ 937) 10% Sub Fee
($10,304.50) Total
(Water($8,349.50) Sewer($1,955))
• Task 1 — Prepare sixteen (16) water and sanitary sewer easements for the
relocations and easement abandonments within the NTTA right-of-way.
$16,000
• Task 2—Credit for previous projects. ($25,368)
Item 4(Design Management): $24,500(Water$6,100 Sewer$18,400)
• Task I — Provide schedules and status reports in accordance with the
City's Design Management initiative for thirty months. $24,500
Item 5(SH-121T Master Schedule and OPCC): $7,500
(Water$1,800 Sewer$5,700)
• Task 1 —Provided updates to the Master OPCC and schedule for each
water and sanitary sewer projects. $7,500
Item 6(Additional Bidding and Construction Phase Services): $66,700
(Water$46,900 Sewer$19,800)
• Task 1 — Additional construction phase services associated with Parts 3,
5, and 11 and the Clear Fork Pump Station. $29,500
• Task 2 — Pre-construction assistance and construction phase services for
the Part 21 Overton Ridge water line redesign. $14,900
• Task 3 — Pre-construction assistance and construction phase services for
Part 23 M-31 1 Lift Station. $19,800
• Task 4 —Construction phase services for City Lake Blvd. 10-inch water
line. $2,500
r Kimley-Horn Mr.Liam Conlon,August 1,2011,Page 8
r and Associates, Inc.
We recommend that the City increase the budget by $315,905.50 for these
additional services. From the additional services listed above, the recommended
breakdown for water and sewer services is as follows:
Description Water Sewer Total
Item 1 —Coordination Meetings $6,000 $17,900 $23,900
Item 2—Additional Design $51,085 $152,525 $203,610
Item 3—Survey, Easements,and
SUE ($8,349.50) ($1,955) ($10,304.50)
Item 4—Design Management $6,100 $18,400 $24,500
Item 5—SH-121 T Master
Schedule and OPCC $1,800 $5,700 $7,500
Item 6—Additional Bidding and
Construction Phase Services $46,900 $19,800 $66,700
Total $103,535.50 $212,370 $315,905.50
The following table summarizes the Fee per Work Phase breakdown:
Work Phase Water Sewer Total
31 $31,060.65 $63,711.00 $94,771.65
32 $62,121.30 $127,422.00 $189,543.30
33 $10,353.55 $21,237.00 $31,590.55
51
Total $103,535.50 $212,370.00 $315,905.50
Kimley-Hom Mr.Liam Conlon,August 1,2011,Page 9
and Associates, Inc.
The following table summarizes our recommended budget revisions by Item
(please see attached Fee Breakdown for an hourly breakdown of each item):
Description Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 Total
Pre-Engineering $ - $- $- $- $- $- $-
Conceptual $ - $58,400
En ineerin ($10,304.50) $ - $ - $ - $48,095.50
Preliminary
Construction $ - $31,010 $- $ - $ - $- $31,010
Plans
Final
Construction $23,900 $114,200 $- $24,500 $7,500 $- $170,100
Plans
Pre-
Construction $- $- $- $- $- $8,100 $8,100
Services
Construction $- $- $- $ - $ - $58,600 $58,600
Phase Services
Total $23,900 $203,610 ($10,304.50) $24,500 $7,500 $66,700 $315,905.50
The following table summarizes our recommended budget revisions and shows
the revised contract amount:
Description Original Fee Amend Amend Amend Revised
No. I No.2 No.3 Contract
Pre-Engineering $89,000 _ $- $- $- $89,000
Conceptual Engineering $172,850 $173,630 $71,245 $48,095.50 $465,820.50
Preliminary Construction $96,450 $90,272 $18,690 $31,010 $236,422
Plans
Final Construction Plans $226,460 $180,840_ $129,425 $170,100 $706,825
Pre-Construction Services $13,359 $23,150 $5,830 $8,100 $50,439
Construction Phase $15,800 $25,500 $5,100 $58,600 $105,000
Services
Total Project $613,919 $493,392 $230,290 $315,905.50 $1,653,506.50
Kimley-Horn will subcontract a portion of these services to Alpha Graphics #83,
Gorrondona and Associates, Inc., Gojer McCreary, Civil Consulting Group, and
HVJ Associates, Inc., MJWBE subconsultants. The amount we will be
subcontracting is $83,882. This represents an M/WBE participation percentage
of 26.6% for these additional services. With these Additional Services, our
PPI- Kimley-Horn Mr.Liam Conlon,August 1,2011,Page 10
e and Associates, Inc.
revised contract amount will be$1,653,506.50. This will revise our total contract
M/WBE participation from $282,980(20.5%)to$366,862 (22.2%).
The water and sewer design fees for this amendment are $103,535.50 and
$212,370 respectively. Our revised project water and sewer design fees will be
$1,021,567.50 and $631,939 respectively.
We appreciate the opportunity to be of continued service to the City. Please
contact us if we need to provide any further information.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
Glenn A. Gary, P.E.
Sr. Vice President
GAG/CTD:ctd
Attachments:
K.TTW Utilities\061018028\PPPWiA Contract\Amendment 3\KHA Contra\061018028-Amend3-Ltr.doc
M&C Review Page 1 of 2
Official site of the City of Fort Worth,Teas
CITY COUNCIL AGENDA Forttl
COUNCIL ACTION: Approved on 8/23/2011
DATE: 8/23/2011 REFERENCE NO.: *'C-25118 LOG NAME: 60121TP2A3-KHA
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of Amendment No. 3 in the Amount of$315,905.50 for a Total
Contract Amount of$1,653,506.50 to City Secretary Contract No. 31710 with Kimley-
Hom and Associates, Inc., for Water and Sanitary Sewer Relocations for State Highway
121T Chisholm Trail Parkway Formerly Known as Southwest Parkway, Part 2 from the
Hulen Bridge, South to Alta Mesa Boulevard (COUNCIL DISTRICTS 3 and 6)
RECOMMENDATION:
It is recommended that the City Council authorize execution of Amendment No. 3 to City Secretary
Contract No. 31710 with Kimley-Hom and Associates, Inc., in the amount of$315,905.50 for Water
and Sanitary Sewer Relocations for State Highway 121T Chisholm Trail Parkway formerly known as
Southwest Parkway, Part 2 from the Hulen Bridge, South to Alta Mesa Boulevard, thereby increasing
the contract amount to $1,653,506.50.
DISCUSSION:
On April 5, 2005, (MSC C-20632) City Council authorized the City Manager to execute an
engineering Agreement with Kimley-Horn and Associates, Inc., in the amount of$613,919.00 for
water and sanitary sewer relocations for State Highway 121T Chisholm Trail Parkway formerly known
as Southwest Parkway, Part 2 from the Hulen Bridge, south to Alta Mesa Boulevard.
The Agreement provided for the preparation of plans and specifications for water and sanitary sewer
relocations to facilitate the construction of State Highway 121T Chisholm Trail Parkway formerly
known as Southwest Parkway from Hulen Street to Alta Mesa Boulevard.
The Agreement was subsequently revised by two previous amendments totaling $723,682.00 that are
further described as follows:
Amendment No. 1 (M&C C-22300, August 9, 2007) in the amount of $493,392.00 provided design
services for the installation and relocation of additional water and sanitary sewer mains within the
limits of the project.
Amendment No. 2 (M&C C-22965, August 5, 2008) in the amount of $230,290.00 provided for
additional coordination meetings, updates to the master schedule, bidding and construction phase
assistance.
Amendment No. 3 will provide compensation for the following:
Redesign of the Overton Ridge 16-inch water main and the City Lake Boulevard 12-inch water
main due to changes in the North Texas Tollway Authority (NTTA) Section 3, project.
Design for the abandonment of sanitary sewer main M-186 crossing underneath the proposed SH-
121T as requested by NTTA.
Design for the relocation of sanitary sewer main M-311 to eliminate conflict with the piers of the
SH-121T bridge crossing at Trinity River and a temporary lift station to maintain sewer service to
Lockheed Martin Recreational Facility after M-311 is abandoned.
Design of a 16-inch water main extension southerly from the Alta Mesa Boulevard/Dirks Road
intersection to facilitate the proposed paving improvements to Dirk Road.
Additional coordination meetings with NTTA, Texas Department of Transportation (TXDot) and
http://apps.cfwnet.org/council_packet/mc—review.asp?I1=15 512&counci ldate=8/23/2011 8/23/2011
M&C Review Page 2 of
consultants of both agencies.
Additional project management and bidding/construction phase services.
Additional traffic control plans, easement preparations, subsurface utility exploration and
geotechnical investigation.
Kimley-Hom and Associates, Inc., proposes to provide the necessary additional work for a lump sum
fee of$315,905.50. Staff considers this amount to be fair and reasonable.
Kimley-Hom and Associates, Inc., is in compliance with the City's M/WBE Ordinance by committing to
28 percent M/WBE participation on this amendment No. 3. The City's goal on this amendment is 20
percent.
The project is located in COUNCIL DISTRICTS 3 and 6.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budgets, as appropriated, of the Water Capital Projects Fund and Sewer Capital Projects Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
P265 531200 603170020433 $10.353.55
P275 531200 703170020431 $63.711.00
P275 531200 703170020432 $127.422.00
P275 531200 703170020433 $21.237.00
P265 531200 603170020431 $62.121.30
P265 531200 603170020432 $31.060.65
Submitted for City Managers Office by:_ Fernando Costa (6122)
Originating Department Head: S. Frank Crumb (8207)
Additional Information Contact: Liam Conlon (6824)
ATTACHMENTS
60121TP2A3-KHA MAP 01.E
60121 TP2A3-KHA MAP 02.Ddf
60121TP2A3-KHA MAP03.pdf
http-//apps.cfwnet.org/counciI_packet/mc_review.asp?fD--I 5512&counci(date=8/23/2011 8/23/2011