HomeMy WebLinkAboutContract 31748 A
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARR.ANT § Contract No.5,74—,
WHEREAS, Ironwood Ranch Townhomes Limited Partnership hereinafter called
"Developer", desires to make certain improvements to Ironwood Crossing, an addition to
the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Western Center Boulevard
Associates, L.L.C, its duly authorized sole general partner, and the City, acting herein by
and through Marc Ott, its duly authorized Assistant City Manager, for and in
consideration of the covenants and conditions contained herein, do hereby agree as
follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of t
/% N
CFA-TPW 1 �C6' �sC1NnU
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such iniuries, death or damages are caused,
in whole or in Part, by the alleged negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof:
CFA-TPW 2
Water (A) None; Sewer(A-1) None; Paving(B) attached; Storm Drain (13-
1) attached; Street Lights and Signs (C) attached.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, 131,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $188,020.95.
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
04,RK
CFA-TPW 3
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in triplicate, at Fort Worth, Texas this the 12th day of March,
2004.
Approval Recommended:
Transportation and Public Works
Department
NO M&C REQUIRED Robert Goode, P. E.
Director
ATTEST: City O ort Worth
B
mG.rk-y REVOCAL Marc Ott
City Secretary Assistant City Manager
Appro as to Form:
0�avq
ssist#/Citxtorney,)(t
IRONWOOD RANCH TOWNHOMES L.P.
ATTEST: DEVELOPER
Corporate Secretary By: WESTERN CENTER BOULEVARD
ASSOCIATES, L.L.0
a Delaware limited liability company, its
general partner
BY: RCC Managing Member LLC,
a Xe: Marc
law re limited liability
coma gin ember
BYC
Na D. Schnitzer
Title: Member
UCFA
-TPW 4 yti°OUR, YEN.
SUMMARY OF COST
Ironwood Crossing
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $98,751.75 $ 98,751.75
2. Storm Drainage $89,269.20 $ 89,269.20
3. Street Lights $0.00 $ -
4. Street Name Signs $0.00 $
B. Engineering Design $ -
C. Construction Engineering
and Management by DOE (2%) 1 $ 3,760.42 3,760.42
TOTALS $ 191,781.37 1 $ - $ 191,781.37
FT. Wokffl, YEN,
J p p p p p p p m Cl p ti
C) p p p p I— p p
Q p p M m r— O O M p p LO
O p i p c'M LO p p p LO p
Q O M N p — N p co I� N p
H U L Ln � — LO co LO CN o0
U3U3
� � U3�
C) m p m p p p p p m Cl p
p N p r p It) p p p N p
w O N p p CD -i m O c0 m p p
~ U p EH — EH (*M — EH p ba EH LO p0
Z c EH EH EH p N _-
L6 C\i
H
U- N N P I— p M CDM
0 M N M M M p m U
r Z }. M CO In CO I�
N H
W Z
S O
N U
J
Q
F- H
} Z } } >- LL. fn >- LL. Q Q O
L) ? J fn 0( n fn fn J J U 0 w wCD m
CD w M
T- ~ m M
LLI o
(A J Q O
ti m
Q LLjfQQn w Z
U J X a 0LL 0 w
p
Q V 2 w D p C=7
QQW Q
o m
� o C7 w
Q D D z
Z H w V U) V F-
w �' fA C O C7 J w F-
Q Z N D Z > a
LL C _ Z N
CD w O d w H a Z
U' C c H 0 w Z > J w O
Z ( y U) Z w O x Q Q D oD
w > o U w > - w U Q U)
U N Z Q U) Z W w w vwj
N o 0 o w p U a Z - o o Q
N C C 0 H U H w LL m
0 CN
C) N 3 ti HNaO � UZJ
c
N m o o H Q =' U U Q Q v~i w a
a m �i
W Z z 2 z a w Z _
_ S
2 w U O a W Q a z O m
Z w Z w - U G H _LL -JU _U O w U Q w
m Z m H 2 w S 2 2 J W 2 a W
F- m H H J >
O D is Q � w L Q D
Z w 0 N M Itt 0 to ►- W 0 O r N
Q H Z
a.
LO
0 0 0 0 0 c rn
J O
O C4 O 0) O LO N O
O w LO �
LO C4 L6 C-i 00
69 b3 b9 d 00
� T-
C) O CD O O
w O O 10 O O
U O O co O U')
_ r O O f—
Z CO LO 69
N d!
�- b3 b3
N O r
N
Q �- U') O
a C� z0 U
U F-
J U)
Q z
~ O
J W Cn W Cn m Q
F-
U O
H
z
0
Z Cl) Qa
M w W
w Q LU
U " z w LU
3
U) U 0 N Z WR'
Q W =
a z
U) w z w o)
z �- W0_ 'Q
W — N Jm
m g z Q o
CD
LU
V 0 Y 2 M
U Y
� U
U
a o 0
co is x
W
Q
zW O r N M LO
0
I. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00
CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00
Subtotal $0,000.00
City's Cost $0 ,000.00
Developer's Subtotal $0,000. 00
10% Contingencies $0,000 .00
Project Total $0,000 . 00
Adjacent Developer's Cost $0,000.00
Developer's Cost $0,000 .00
2% Inspection Fee $0,000.00
CFA CODE #2002118
DEVELOPER' S COST: $0,000 . 00
IROPNWOOD CROSSING, LOT I, BLK I
March 14 , 2005
Fort Worth, Texas
March 28 , 2005
PAGE I OF Exhibit C
II . STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C", immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department.
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of the Director of Transportation and Public Works .
3 . The City will install all the streetlights that use overhead or
underground conductors on residential, and collector streets. the
developer agrees to pay the city the amount shown below prior to the
City starting it' s design efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors .
S . The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for
the installation of any electrical transformers required for the
proper operation of the street lights
6. The estimated cost of this street light installation is detailed on
page 1 of exhibit C and is summarized below, the street lights will
remain the property of, and will be maintained by the City of Fort
Worth.
DEVELOPER' S COST: $0,000.00
IRONWOOD CROSSING, LOT I, BLK I
March 14, 2005
FORT WORTH, TEXAS
CFA CODE 2002118
Page II of Exhibit C
III.
"STREETLIGHTS"
IRONWOOD CROSSING, LOT I, BLK I
Page III of Exhibit C
IV
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $100.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following zero (0) intersections at a cost
to the Developer of $0.00:
(Private {Apartments})
Ironwood Crossing, Lot 1, Blk 1
CFA code: 2002118 March 19, 2005
RE
W >
H �
Q
mL NG EAF
d WATAUGA
J
0
0
U W
U
W
F �
z 0Sl
w CLUBGAT
z z z 0
I w SWEETW00
z Vn 0 z
¢ zw 0
Z of (nw z m CIO
q q z = Z�lF. ��� CHADWICK �� 0 Z
¢ q�� McAD00 �� 0 a�
DANCY ��� 0 ti� A N.
T C•
C NTRELL V /. J
0 GLEN H NEYCOMB FOSSIL CREEK
SAMSOM
w
OJEC7
SITE o
¢
z
I.8
¢ NORTHEAST
NORTHEAST P
p NORTHEROfN
L < 0
0
N z
N > MELODY HILLS
Y
< MI D T N
GREAT SOUTHWEST J o z
z Fn 0 >
W Y
LEAMSIDE
EF
�r
FRANKUIN POLARIS CR
VICINITY MAP
1AVONWOOD C17O,SSING
11
DUNAWAY ASSOCIATES, Inc.
ENGINEERS - PLANNERS - SURVEYORS
FORT WORTH, TEXAS
N
_ a
L _
oi
II S a
I o z
0 o
W NSU 13 41 `p � Jmo Q
_0
O S i U 5 w
WY N Z �iP �Q Cn n z AV
J0. 3v d �JJ z
W 2 io 2 c w
2 G fir.
i
v7��C'G JI�i
6d
J �P�
v�
C,
4°,
t _
IL IC
ci 11
LQ
-1=
v +�q q
o�
6 I In Q U =U=
� U
tila I' (5 KIN
_- �,,,,�,,,,,, ,, ., ,,�„ate •,,ncl,nn('wa AC:99:7. i7nn?,/Z/b 'JNIAVd '6nnp•elD LbUlned\elD\6ZLZOOZ\Zo\ublsaa\:I
Nr~wn��►eorw�rd
_ u
— 4
/ a
a < y �
LJ
0
�/- z
ddo�,� I / w
O /
6m� �W
4aV
o �
K8
~e 1 �eCCQ
�~ Cc c]o
���
CE o spar CREe ti p
VW aid a�
1u11111
Z
1 1111, �
f -II
TOW�
,t\
1;u1 1v
-
d , 11111�1
Od. ,
i
Ih\
1 r �
I I J
F— --i
I I I
I I ; omari *,Aw
I I
CITY Wllffij RY a
I I
FT. '�;,.lff f Ex.
i I
'saieloossw Aemeunn 'L:L 'J9u8'1 'uosllnnf'Wd LE:9E:Z tOOZ/Z/t'NlVHG WaOlS '61 P`elO uleJP w.aoks\el--\6ZLZ00Z\ZO\u6lsaQ\:I
I:\Design\02\2002129\cfa\STREET LIGHTS cfa.dwg, PAVING, 4/5/2004 9:21:59 AM,jwilson, Letter, 1:1, uunaway Associates, m
�z !.
I
is
y
t
Rv
tl�S
9
.y
s.
. r
Y f
c N Jr,
o y z p D. i-
m j
oro >
z -N-
a > II
y� I W
C: 5
o — --------------— p+aM*rrg XMAO uwypq
y
M