HomeMy WebLinkAboutContract 26704AMENDMENT WITHOUT M & C
AMENDMENT NO. 1
STATE OF TEXAS
COUNTY OF TARRANT
CITY SECRETqRY
CONTRACT Np , . `j(� �
WI3EREAS, the City of Fort Worth (City) and Kimley-Horn and Associates, Inc.
(Engineer) made and entered into City Secretary Contract No. 26021, (the Contract)
which was authorized by the City Council by M& C G18085 on the 6t�' day of June,
2000; and
WHEREAS, the Contract ir�volves engineering services for the following project:
Engineerin� AQreement for Desi�n and Construction Management of the
Richardson Slough Lift Station Replacement Project No. PS46-070460280020
WHEREAS, it has become necessary to amend said Contract to include an
increased scope of worlc and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
l.
Article 1, Section 1 of the Contract is amended to include the additional
engineering services specified in a proposal letter dated March 21, 2001, a copy of which
is attached hereto and incorporated herein.
2.
Article 2 of the Contract is amended to provide for an increase in the maximum
fee to be paid to Engineer for all work and services performed under the Contract, as
amended, so that the total fee paid by the City for all wark and seivices shall not exceed
the sum of $ 152,900.00.
��'�'��L ���� ���V�S�
��:��ti ti' c��': � � ° Q�
� �f�� ���!�`:'u ��o
���.__`- _P..
�
All other provisions of the Contract which are not expressly amended herein shall
remain in full force and effect.
APPROVAL RECOMMENDED:
, �� , �, �-
� �,���- �,�-�-- �_
Dale A. Fisseler, P.E.
Water Departinent Director
Date: � ��- �
APPROVED AS TO FORM AND LEGALITY:
�
Gary Stem erger
Assistant City Attorney
Date:
A TESTED
�
Gloria Pe �
Date:
Ar ROV
,
� ,.
��- `
Mike roomer
Assistant City Manager
Date:
G�
Charles M. Staples, P.E.
Senior Vice President
Kimley-Horn and Associates, Inc.
Date: 3 ~L9 - o/
's�/ �`�.��. c---��
City Secretary Glenn Gary, P. E.
�0 Vice President
Kimley-Horn and Associates, Inc.
Date: 3-029- O�
�1,� `%�') �; C', ��iC l i2 ��
Contract Authorization
Date:
__.� �._.�___ _..- ��--:,_..�.-�...,,
� i
U��aC���1� G-'�<<<����1�� �
C��� ���:� G�G�^�(�: ���r E
�IfY/luj�`.���ll S` Ir. '
o .� a p �
�..: _..,.. . .�
/ � Kimley-Horn
� � and Associates, Inc.
March 21, 2001
Ms. Wendy Chi-Babulal
Project Engineer
Water Department Engineering Services Division
City of Fort Worth
1000 Throckmorton Street
Fort �Vortn, 1 ?i 76 i �11
Re: Richardson Slough Replacement Lift Station
KHA No. 061018011
Dear Ms. Chi-Babulal:
�����
r��'
� ��
I�
d �ti�� � �
P� ��'�
� ��o`
���
On February 19, 2001, Kimley-Horn and Associates met with the City to
address issues regarding compensation for additional engineering services
performed for the Richardson Slough Lift Station. We have revised our request
to include only additional services associated with the additional generator.
At the January 16, 2001 status meeting the City directed KHA to include a
125 kW trailer mounted generator into the scope of work. No provision
was made for the generator in the ariginal scope of the contract. Cost for
this addition includes time for the electrical consultant to design and specify
the generatar, KHA's coordination of design effort and the eventuality for
review af shop drawings and related submittals.
The total request for additional compensation is $3,400.00. This amount is
based on costs associated with our coordination of the additional scope,
anticipated shop drawing and submittal review, and additional services rendered
by our electrical consultant, McCreary and Associates.
The final design documents have been reviewed by the City, comments are
currently being addressed and final deliverables will be sent to the City next
week. All scope for work indicated in this letter, with exception of product and
shop drawing submittal reviews, has been completed.
■
TEL 817 335 6511
MET 817 654 4266
FAX 817 335 5070
.
Suite 1100
801 Cherry Street
Fort Worlh, Texas
76102•6803
� r-"- �"�� �' �
����O�a�°>>� � ��� �� ��r�c,�
�, r� R: �.. �. ��C
�' �i � 'a�'r'�;;' �
G0� a��':: C(�� �u� u
Mf�^j;r�j�f.;l jr�2�'% '
a �7U� �.� .:;.';, ;
C� � Kimley-Horn
� and Associates, Inc,
Ms. Wendy Chi-Babulal, P.E., March 21, 2001, Page 2
Should you require additional information or have any questions please do not
hesitate to contact us at (817) 335-6511.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
Glenn Gary, P.E.
�Ti�v Ui"" rjP t
t • i wl.»I'i_
GAG/TKB
Copy to: Frank Crumb, P.E., Ciry of Fort Worth
Doo Kim, P.E., Ciry of Fort Worth
P:\061018.O11Utr\scopechange3.doc