Loading...
HomeMy WebLinkAboutContract 26704AMENDMENT WITHOUT M & C AMENDMENT NO. 1 STATE OF TEXAS COUNTY OF TARRANT CITY SECRETqRY CONTRACT Np , . `j(� � WI3EREAS, the City of Fort Worth (City) and Kimley-Horn and Associates, Inc. (Engineer) made and entered into City Secretary Contract No. 26021, (the Contract) which was authorized by the City Council by M& C G18085 on the 6t�' day of June, 2000; and WHEREAS, the Contract ir�volves engineering services for the following project: Engineerin� AQreement for Desi�n and Construction Management of the Richardson Slough Lift Station Replacement Project No. PS46-070460280020 WHEREAS, it has become necessary to amend said Contract to include an increased scope of worlc and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: l. Article 1, Section 1 of the Contract is amended to include the additional engineering services specified in a proposal letter dated March 21, 2001, a copy of which is attached hereto and incorporated herein. 2. Article 2 of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all wark and seivices shall not exceed the sum of $ 152,900.00. ��'�'��L ���� ���V�S� ��:��ti ti' c��': � � ° Q� � �f�� ���!�`:'u ��o ���.__`- _P.. � All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. APPROVAL RECOMMENDED: , �� , �, �- � �,���- �,�-�-- �_ Dale A. Fisseler, P.E. Water Departinent Director Date: � ��- � APPROVED AS TO FORM AND LEGALITY: � Gary Stem erger Assistant City Attorney Date: A TESTED � Gloria Pe � Date: Ar ROV , � ,. ��- ` Mike roomer Assistant City Manager Date: G� Charles M. Staples, P.E. Senior Vice President Kimley-Horn and Associates, Inc. Date: 3 ~L9 - o/ 's�/ �`�.��. c---�� City Secretary Glenn Gary, P. E. �0 Vice President Kimley-Horn and Associates, Inc. Date: 3-029- O� �1,� `%�') �; C', ��iC l i2 �� Contract Authorization Date: __.� �._.�___ _..- ��--:,_..�.-�...,, � i U��aC���1� G-'�<<<����1�� � C��� ���:� G�G�^�(�: ���r E �IfY/luj�`.���ll S` Ir. ' o .� a p � �..: _..,.. . .� / � Kimley-Horn � � and Associates, Inc. March 21, 2001 Ms. Wendy Chi-Babulal Project Engineer Water Department Engineering Services Division City of Fort Worth 1000 Throckmorton Street Fort �Vortn, 1 ?i 76 i �11 Re: Richardson Slough Replacement Lift Station KHA No. 061018011 Dear Ms. Chi-Babulal: ����� r��' � �� I� d �ti�� � � P� ��'� � ��o` ��� On February 19, 2001, Kimley-Horn and Associates met with the City to address issues regarding compensation for additional engineering services performed for the Richardson Slough Lift Station. We have revised our request to include only additional services associated with the additional generator. At the January 16, 2001 status meeting the City directed KHA to include a 125 kW trailer mounted generator into the scope of work. No provision was made for the generator in the ariginal scope of the contract. Cost for this addition includes time for the electrical consultant to design and specify the generatar, KHA's coordination of design effort and the eventuality for review af shop drawings and related submittals. The total request for additional compensation is $3,400.00. This amount is based on costs associated with our coordination of the additional scope, anticipated shop drawing and submittal review, and additional services rendered by our electrical consultant, McCreary and Associates. The final design documents have been reviewed by the City, comments are currently being addressed and final deliverables will be sent to the City next week. All scope for work indicated in this letter, with exception of product and shop drawing submittal reviews, has been completed. ■ TEL 817 335 6511 MET 817 654 4266 FAX 817 335 5070 . Suite 1100 801 Cherry Street Fort Worlh, Texas 76102•6803 � r-"- �"�� �' � ����O�a�°>>� � ��� �� ��r�c,� �, r� R: �.. �. ��C �' �i � 'a�'r'�;;' � G0� a��':: C(�� �u� u Mf�^j;r�j�f.;l jr�2�'% ' a �7U� �.� .:;.';, ; C� � Kimley-Horn � and Associates, Inc, Ms. Wendy Chi-Babulal, P.E., March 21, 2001, Page 2 Should you require additional information or have any questions please do not hesitate to contact us at (817) 335-6511. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Glenn Gary, P.E. �Ti�v Ui"" rjP t t • i wl.»I'i_ GAG/TKB Copy to: Frank Crumb, P.E., Ciry of Fort Worth Doo Kim, P.E., Ciry of Fort Worth P:\061018.O11Utr\scopechange3.doc ! ���'�0��� �`�'��CJG°� Cl ���'ti' �"�':; °.'��L`�'�l ( jI�� �Ua U��p�J����I��U� �ISU�o