HomeMy WebLinkAboutContract 33383 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.3111�'
WHEREAS, Kimball Hill Chadwick Farms, LP, hereinafter called "Developer",
desires to make certain improvements to Chadwick Farms, Section IV, an addition to the City
of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work
in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy herein
verbatim. Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor of
this Agreement.
C. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount of
financial security prior to project completion and acceptance by the City.
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section ii, paragraph 7 of the Policy.
F. The contracts for the construction of the public infrastructure shall be
administered in confonnance with paragraph 8, Section II, of the Policy.
1
UK
03-30-05 AJ3 : 1 : IIV
G. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such iniuries, death or
damakes are cattsed, in whole or in part, by the alleged nexlixence of the
City of Fort Worth, its officers, servants, or employees.
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees that no
street construction or storm drainage will begin prior to City Council approval
of this Community Facilities Agreement. (Article 104.100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
K. Developer hereby releases and agrees to indemnify and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer required to construct current
and future improvements provided for in this agreement.
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof.
Water (A) None; Sewer (A-1) None; Paving (B) Attached; Storm Drain
(B-1) Attached; Street Lights and Signs (C) Attached.
N. City shall not be responsible for any costs that may be incurred by Developer
in the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street, storm
drainage, street lighting, street name sign and other community facilities
improvements shown as "current improvements" on the attached Exhibits B, BI,
and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities",
the Developer shall fund its share of"current improvements" and shall pay to the
City for its share of the cost of street, storm drainage, street lighting, street name
signs as shown on the attached Exhibits B, Bl, and C. The estimated total cost of
current improvements and related support services specified in this agreement,
including design, construction and inspection is estimated to $1,008,637.45.
SUMMARY OF COST
Chadwick Farms Section IV
Item Developer City Cost Total Cost
Cost
A. Construction
1. Streets $692,613.25 - $692,613.25
2. Storm Drainage $183.540.00 - $183.540.00
3. Street Lights $77,220.00 - $77,220.00
4. Street Name Signs $2,695.00 - $2,695.00
B. Engineering Design - -C. Construction Engineering
and Mana ement by DOE 4% $35,046.13 - $35,046.13
D. Materials Testing by DOE (2%) 1 $17,523.07 1 $17,523.07
TOTALS $1,008,637.45 - $1,008,637.45
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent (2%) of paving and storm drain
costs for materials testing.
ar
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in
quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affix and d Dey toper has executed this
instrument in triplicate, at Fort Worth, Texas this thay o sa , 2006.
CITY OF FORT WORTH
Approval Recommended�r—;�
By: By:
Robert Goode, P.E., Director Marc . Ott
Transportation and Public Works Assistant City Manager
Approved as to Form and Legality:
By: 4/0 4,�"'5�� , ;,,�4
Assistant Attorney
ATTEST: NO M&C !RE(?UIRLE
By:
Marty Hendrix
City Secretary
DEVELOPER
Kimball Hill Chadwick Farms, LP
a Texas limited partnership
By: Kimball Hill Homes Dallas, LP
a Texas limited partnership, its general partner
By: Kimball Hill Homes Dallas Operations, LLC
Its general pa ner
B y:
Samuel L. Wys , III, Vice President
ATTEST:
BA Secretary
ENGINEER'S OPINION OF PROBABLE COST
Date: 12/19/2005 Project: Chadwick Farms, Section IV Client: Kimball Hill Homes
Job No: 9933 Location: Fort Worth, Texas Page: 1 of 3
ITEM UNIT TOTAL
No. DESCRIPTION UNIT QUANTITY PRICE COST
Paving Facilities
1. 6" Reinforced Conc. Pavement S.Y. 25,130 $22.00 $552,860.00
2. 6" Subgrade Preparation S.Y. 28,397 $2.25 $63,893.25
3. Hydrated Lime 27#/SY Ton 384.0 $105.00 $40,320.00
4. Barrier Free Ramps Ea. 20 $450.00 $9,000.00
5. End of Road Barricade L.F. 116 $50.00 $5,800.00
6. Construct Concrete Header L.F. 116 $50.00 $5,800.00
7. Connect to Concrete Header L.F. 58 $50.00 $2,900.00
8. 4' Sidewalk L.F. 860 $14.00 $12,040.00
Paving Subtotal $692,613.25
10% Contingency $69,261.33
Paving Total $761,874.58
This Engineer's opinion of probable construction cost is made on the basis of the Engineer's experience
and best judgement as a design professional. It must be recognized that any evaluation of work to be
performed to construct this project must by necessity be speculative in nature until completion of its actual
detailed design. In addition the engineer has no control over the cost of labor material or services to be
furnished by others or over market conditions. Accordingly Goodwin & Marshall, Inc. can not guarantee
that actual costs will not vary from the opinions expressed herein.
qn� ,
ENGINEER'S OPINION OF PROBABLE COST
Date: 12/19/2005 Project: Chadwick Farms, Section IV Client: Kimball Hill Homes
Job No: 9933 Location: Fort Worth, Texas Page: 2 of 3
ITEM UNIT TOTAL
No. DESCRIPTION UNIT QUANTITY PRICE COST
Storm Drain Facilities
1. 10' Curb Inlet Ea. 5 $2,200.00 $11,000.00
2. 15' Curb Inlet Ea. 8 $3,200.00 $25,600.00
3. 48" R.C.P. L.F. 480 $110.00 $52,800.00
4. 33" R.C.P. L.F. 39 $58.00 $2,262.00
5. 30" R.C.P. L.F. 706 $52.00 $36,712.00
6. 27" R.C.P. L.F. 521 $48.00 $25,008.00
7. 24" R.C.P. L.F. 99 $44.00 $4,356.00
8. 21" R.C.P. L.F. 102 $40.00 $4,080.00
9. 48" Sloped End Headwall Ea. 1 $3,000.00 $3,000.00
10. 30" Sloped End Headwall Ea. 2 $2,500.00 $5,000.00
11. 27" Sloped End Headwall Ea. 1 $2,400.00 $2,400.00
12. Connect To Existing Ea. 4 $500.00 $2,000.00
13. Rock Rip-Rap S.Y. 25 $35.00 $875.00
14. Gabion Mattress S.Y. 100 $65.00 $6,500.00
15. Trench Safety L.F. 1,947 $1.00 $1,947.00
Storm Drain Subtotal $183,540.00
10% Contingency $18,354.00
Storm Drain Total $201,894.00
This Engineer's opinion of probable construction cost is made on the basis of the Engineer's experience
and best judgement as a design professional. It must be recognized that any evaluation of work to be
performed to construct this project must by necessity be speculative in nature until completion of its actual
detailed design. In addition the engineer has no control over the cost of labor material or services to be
furnished by others or over market conditions. Accordingly Goodwin & Marshall, Inc. can not guarantee
that actual costs will not vary from the opinions expressed herein.
I . STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 9 EA $ 2, 600 $23, 400 . 00
MID-BLOCK RESIDENTIAL 13 EA $ 2, 600 $33, 800 . 00
CHANGE OF DIRECTION RESIDENTIAL 5 EA $ 2, 600 $13, 000 . 00
MID-BLOCK COLLECTOR 0 EA $ 2, 600 $00, 000 . 00
MID-BLOCK ARTERIAL 0 EA $ 3, 000 $00, 000 . 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 3, 000 $00, 000 . 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $00, 000 . 00
Subtotal $70, 200 . 00
City' s Cost $00, 000 . 00
Developer' s Subtotal $70, 200 . 00
loo Contingencies $7, 020 . 00
Project Total $77, 220 . 00
Adjacent Developer' s Cost $00 . 000 . 00
Cro.`.at : 77 ,20 . 00
CFA CODE #2005169
DEVELOPERS COST: $77,220.00
CHADWICK FARMS-SECTION IV
January 9, 2006
Fort Worth, Texas February 6, 2006
PAGE / OF EXHIBIT "C"
II STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of street lights at the
approximate locations shown in exhibit "C", immediately after final
acceptance of the street construction, in accordance with engineering plans
and specifications approved by the Transportation and Public Works
Department.
2 . Streetlights on residential and/or collector streets can be installed using
overhead or underground conductors with the approval of the director of
transportation and Public Works.
3. The City of Fort Worth will install all the street lights that use overhead
or underground conductors on residential, and collector streets. The
developer agrees to pay the City of Fort Worth the amount shown below prior
to the City starting its design efforts, at the option of the developer and
at their expense they may purchase the poles, fixtures, and mast arms from
the City in order to assure compliance with city material standards
4 . Street lights on arterial streets shall be installed with underground
conductors
5. The developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for the
installation of any electrical transformers required for the proper
operations of the street light system
6. The estimated cost of this street light installation is detailed on page
(1) of exhibit "C" and is summarized below. The street lights will remain
the property of, and will be maintained by the City of Fort Worth
January 9, 2006
DEVELOPERS COST: $77 ,220. 00
CHADWICK FARMS-SECTION IV
CFA CODE #2005169
PAGE /l OF EXHIBIT "C"
I
I//
"STREET LIGHTS"
INTERSECTIONS
LANDING CREEK IN & WHEELHORSE TRL 1
LANDING CREEK IN & GATEHOUSE DR 1
LANDING CREEK IN & SHRIKETRAIL 1
LANDING CREEK IN & KNIGHTERRANT 1
LANDING CREEK IN & RINGDOVE WAY 1
MAYFLOWER CT & RINGDOVE WAY 1
MAYFLOWER TRL & SHRIKETRAIL 1
WHEELHORSE TRL & GATEHOUSE DR 1
SHRIKETRAIL & RINGDOVE WAY 1
MID BLOCK
LANDING CREEK LN 4
WHEELHORSE TRL 5
GATEHOUSE DR 1
SWETTPINE IN 1
RINGDOVE WAY 1
MAYFLOWER CT 1
CHANGE OF DIRECTIONS
WHEELHORSE TRL 1
SWEETPINE LN 1
MAYFLOWER CT 1
GATEHOUSE DR 1
RIDGEDOVE WAY 1
CHADWICK FARMS-SECTION IV
PAGE III OF EXHIBIT "C"
� �
„f
g�7 �,
Iv
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $245.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following eleven (11) intersections at a
cost to the Developer of $2,695.00:
Landing Creek Lane & Knighterrant
Landing Creek Lane & Gatehouse Dr
Landing Creek Lane & Wheelhorse Tr
Landing Creek Lane & Spike Tr
Landing Creek Lane & Ringdove Way
Landing Creek Lane & Wheelhorse Tr
Wheelhorse Tr & Gatehouse Dr
Ringdove Way & Mayflower Ct
Ringdove Way & Spike Tr
Mayflower Tr & Spike Tr
Spike Tr & Sweetpine Lane
Chadwick Farms Section 4
CFA code: 2005169 January 9, 2006
i2'
v tl' L .
N N6R T.,1,11 1111'– – LIMIT
WE
c 5w SITE
LOCATION � NORTHLA�E E T J
� aTt of
',FORT WORTH
_emetery
/.
CHADWICK
IF,41f'M5 ;)
r,E .E
LIT b�Y RUC•.0 �__
VICINITY -M- AP
I i^1
N.T.S.
CJTH7AD 'v�i �C�� FAIU�S
`)IN HV
J) E(C T H�(,U
LGICATED IN
CETY OF FORT WOR 1L H9 =XAAS `vfYd ;.'_'� ?
OWNED/DEVELOPED BY: ra
PREPARED BY: zzgg
Kimball Hill Homes GODW t Tg 7 U�
ARS WALL
3019 LBd FREEWAY SUITE 1100 CIVIL ENGINEERS—PLANNERS—SURVEYORS
DALL , TEYAS 75234
Ft.- 1972 1 461-2214 2405 Mustang Drive,Grapevine,Texas 76051
For 197^1 243-3189 DECEMBER, 2M Metro(817)329-4373
F \9933\p1on; 2005\SeChon 4\chodwlck secllon 4 - CFA.pro Wed Dec 14 11 11 27 C005
m
r U ¢ T
� 0 o
� � � n T
^� S v] -mss ¢ LF)
�� Z N o a m G
C3)O U nN rA I F n
WLU m
O r N m wav , >rn
r .
ra--
CD
cr
co
W96
m 7
z
C
C
® •I
Ea
U�
"
> _ 11% .. I •I n„� � .. ;\\\\ - e \ " - \\\\. _ \ fel
i
_ a
I "
I
"
m
a ^
0
a
^ H _
I
— 1
11 I
41
uw
x -�
LLI Q Ct Q 'Z 0 s N CL nm
(31
G
il r� W 0. c a, [�� Lcls
.0 c
1—� W Cl- Cl- 0
�j OOdLL N =
O w o I
Q) 119
a L
y Ell, J I U n
I L
r
�f
2�
m � i
-, ? �ry x{76 - '�` 1 •,x(11 -, \\ -� - n
ai 1'J 11 �„ o♦ n
wn== l ill I`,II' \•\ \ \ -
IIa � i
_ -=,'; SIF._ _ SII !'I ._ II,• ;I - � .: - �;\ ��
,
e ;
I
"
; P
o
1 i ( tl
r
"
m-
I " � o .Q•I I j I I I � uNnovc tx�'X �%�� \\�1 m
m
CD
7
Lj
J
!
611
1
aSrla[;tK�_
"
e -
a �JW on
ly Vk
i
Ire
X
z oer N LE w
u
CS) cc
LEI
aj
yp 11 E� u S
t�
Ln
-
AA
cq
It
wXL
"
_L n
A
r
t
1 r
,
m -
" Ii
' i
"
m
/
I "
"
~ t
I, 1,
a
_ - - gydoH--
h ; P
/