Loading...
HomeMy WebLinkAboutContract 33386 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, JEAN ACRES, L.P., hereinafter called "Developer", desires to make certain improvements to COVENTRY EAST PHASE 1, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended, is hereby incorporated into this Community Facilities Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D, Developer acknowledges that there shall be no reduction in the amount of financial security prior to project completion and acceptance by the City. E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. 03-30-06 A08 : 09 IN i F. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. G. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or dama,aes are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. H. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. I. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). J. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). K. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. L. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to 2 •,, r (fin, construct current and future improvements provided for in this agreement. M. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached. N. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $824,343.38. SUMMARY OF COST Coventry East Phase I Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $635,787.00 635,787.00 2. Storm Drainage $97,886.00 97,886.00 3. Street Lights $44,200.00 44,200.00 4. Street Name Signs $2,450.00 2,450.00 B. Engineering Design $ C. Construction Engineering and Management by DOE $ $ 4% 29,346.92 29,346.92 D. Materials Testing by DOE $ $ 2% 14,673.46 14,673.46 TOTALS 824,343.38 $ - 824,343.38 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Developer's column for Item D represents two percent (2%) of paving and storm drain costs for materials testing. "J oil 4 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary,with the corporate seal of the City affixed, and said eveloper hA execut d this instrument in triplicate, at Fort Worth, Texas this the day of 200j RECEIVED Approval Recommended: Transportation and Pub is ks Department :N�O :M&C REQUIRI:D Robert Goode, P. E. Director ATTEST: City Of Fort By: �(Y1cu�� He d�,�C ott City Secretary Assistant City Manager Approved"to Form: Assistant C' A orney DEVELOPER Jean Acres, L.P., By: Jean Acres, Inc. ATTEST: Its General Partner By: Corporate Secretary Christopher Jean,gesident CFA-tpw-phl.doc P I H, TELA. 03-02-2006 21:09 GIOVANNI DEU PAGE2 03/06/2006 11:39 B1747BO443 JACKSON CONSTRUCTION rAvk CV vuL-rJriO C,✓_i.'7p L71U.'MIYIy� UC'J �.-e UNIT T:PAVING IlVBROVMWTS rMM A.PPROX DF.SCRI nON OF rrEms WrM DID PRICES UNIT TOTAL NO. QUANTITY WRfT =IN WORDS PRICK AMOUNT 1 15,917 S.Y. 6"Reiefbmw Conamte PaverOant with 7"wAt, Par Square Yard Mx= Dollars do Nippy _Conte $20.90 $333,501.30 2, 51947 S.Y. 7"RNnforoed Conemte Pavprnaatw{th 7"curb. Per gquwa Yards "I1mu kin n Dollars& TomCents $25.10 $149,269.70 3 22,644 S.Y. 6'Lithe Stabilized Subgrode(Includes Prep&Mkn of subprade), Per Square Ystd: Two Dollars do ZMM lava cents S2J5 sso,949.00 4, 340 Ton Lime for subgrsde(30 IMISY), Per Ton: 09-Hundred'i1v_a Dollm& _No _ caft $102,00 $34.680.00 ;4115, -i"0-' L.F. 4'We Sldewo* G� Per Linear Fc+ot iron Dollars 8e 1W OtJ �1 e�,2�q36•oo F1ttY Cetlts ' 96x00—" 6 22 FA ADA Sidewalk RauMn, ftr Bach: Ftva Hundred F Dollars 3c Na Cants $S40.00 $11,880.00 7. S TZ& End of Road Bareiads, Per Linear Foot: Fifty Fiero i oila�dt 42 -- tants $53.00 Sw.00 8. 62 S.Y. Remove 62 S.Y.of Temporary Asphalt,Trinsition Pavenent Per Squa+e Yard: Eight ' Dollars at No_ Cents $9.00 $496.00 W W0A%01401Wped014012.0109_doo B-2 tJpdata'do9l1a"M 03-02-2006 21:02 GIOVANNI DEV 03-02-2006 21:09 GIOUANNI DEU PAGES CJS/Ub/z0t)b 11: .7.7 71/41&VQ Q 4 JALAK )UN LkJN5I KUI,I LUN r-ak=. u.3i u.3 ra-rc-cdrvp cn:4rz PAGE3 rCF_m APPROX. DESCRiP'1"ION OF ITEMS WrM BID PRIGS UNIT TOTAL NO. QUANTTTY wikrn LN 1N WORDS MCE .AMOUNT 9. 113 L.F, CO=kr"d 113 L.F.of 6"Curb and(Sutter Par Lirteer Foot Fiarean Dollars& No_ _ Cents 915.00 S1,695.00 10. 736 L.F. 8m+vout and RMOW 736 LF.Of 6"Curb and Gu w Per Lineae Foot: D01180& No _ Cents $5.00 53,680.00 11. 60 3"PVC CorAult Croasing(Schedule 40) Por Linear foot S DoRin 6t Nn - Geft $6,00 $360.00 12. 4 Ea, Ground Pull Bows Per Each Fin 5evamv Five (7ellars d1: No Cents $575.00 $2,300.00 13. 180 Ea. Type H-CR4 Pavemeet Mm dwn Pet Saab: six DoUars do No _ Cents $6.00 $1,080.00 14. 2S3 EL Type W4 Pevm nt Mwia n Per Each: six Dollars do big _ Cues 56.00 51,518.00 1S. 1 LS. Storm Water Managmnm mind Mdaw moe Per Lump sant: Oem. aueand DOOM& Ne „Centa S1,000.00 S1A0.00 TOTAL AMOUNT BID PAvINa GRAND TOTAL AMOUNT BID S DNn:tlS�d �tr�.'1!R?-o0 N U0Wi4012Spse414M2.0108.doc UDdlftd WOFAWS 03-02-2006 21:02 GIOUANNI DEV UNIT III: STORM DRAIN ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT (Furnish and install,including all appurtenant work, complete in place,the following items) ITEM APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL NO. QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT 1. 589 L.F. 30"Class III R.C. Pipe Including Trench Excavation and Backfill, Per Linear Foot: Eighty Dollars & No Cents $80.00 $47,120.00 2. 23 L.F. 27" Class III R.C. Pipe Including Trench Excavation and Backfill, Per Linear Foot: Seventy Dollars & No Cents $70.00 $1,610.00 3. 246 L.F. 24" Class III R.C. Pipe Including Trench Excavation and Backfill, Per Linear Foot: Sixty Four Dollars & No Cents $64.00 $15,744.00 4. 53 L.F. 21" Class III R.C. Pipe, including trench excavation and backfill, Per Linear Foot: Fifty Seven Dollars & No Cents $57.00 $3,021.00 S. 3 Ea. 10' Standard Depth Curb Inlet, Per Each: Two Thousand Nine Hundred Dollars & No Cents $2,900.00 $8,700.00 6. 2 Ea. 10'Non-Standard Depth Curb Inlet, Per Each: Three Thousand Dollars & No Cents $3,000.00 $6,000.00 N:1JOB10140121Spec1014012.010A.doc B-8 ITEM APPROX. . DESCRIPTION OF ITEMS WITH BID UNIT TOTAL NO. QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT 7. 2 Ea. 30"Type B Headwall, Per Each: One Thousand Three Hundred Dollars& No Cents $1,300.00 $2,600.00 8. 3 Ea. 4' Square Manhole: Per Each Two Thousand One Hundred Dollars& No Cents $2,100.00 $6,300.00 9. 122 S.Y. Rock Rubble Rip Rap, Per Square Yard: Forty Dollars& No Cents $40.00 $4,880.00 10. 911 L.F. Trench Safety, Per Linear Foot: One Dollars& No Cents $1.00 $911.00 11. 1 L.S. Storm Water Management, Per Lump Sum: One Thousand Dollars& No Cents $1,000.00 $1,000.00 TOTAL AMOUNT BID STORM DRAIN $ 97,886.00 TOTAL AMOUNT BID WATER $ 172,614.10 TOTAL AMOUNT BID SEWER $ 281,423.00 TOTAL AMOUNT BID STORM DRAIN $ 97,886.00 GRAND TOTAL AMOUNT BID $ 551,923.10 N:\JOB\014012\Spec\014012.010A.doc B-9 Updated 05/16/2005 PART B - PROPOSAL(Cont.) After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security, if required is to become the property of the Developer. The undersigned bidder certified that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: 1. The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978,which may be purchased from the Water Department. 2. The Standard Specifications for Street and Storm Drain Construction which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within calendar days after issue of the work order, and to complete the contract within—working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. X B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. u . N:WOB\014012\Spec\014012.010A.doc B-10 Updated 05/16/2005 I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. I (Initials) Addendum No. 3 (Initials) Addendum No. 2 (Initials) Addendum No. 4 (Initials) Respectfully submitted, Jackson Construction, Ltd. By. -'Pr4sider4 of JCI Partners, Title Inc., General Partner Address Telephone: (Seal) Date: NAJOB\014012\Spec\014012.010A.doc B-11 Updated 05/16/2005 I. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 10 EA $ 2, 600 $26, 000 . 00 MID-BLOCK RESIDENTIAL 5 EA $ 2, 600 $13, 000. 00 CHANGE OF DIRECTION RESIDENTIAL 2 EA $ 2, 600 $5, 200. 00 MID-BLOCK COLLECTOR 0 EA $ 2, 600 $00, 000 . 00 MID-BLOCK ARTERIAL 0 EA $ 3, 000 $00, 000 . 00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 3, 000 $00, 000. 00 RELOCATE EXISTING LIGHT 0 EA $ 1, 650 $00, 000 . 00 Subtotal $44, 200 . 00 City' s Cost $00, 000 . 00 Developer' s Subtotal $44, 200 . 00 4% Inspection fee $00,000.00 Project Total $44, 200. 00 Adjacent Developer' s Cost $00 . 000 . 00 Developer' s Cost $44 ,200.00 CFA CODE #2006013 DEVELOPERS COST: $44,200.00 COVENTRY EAST, PHASE I February 20, 2006 Fort Worth, Texas February 20, 2006 CITY ✓.: iii PAGE I OF EXHIBIT `SC" II STREET LIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of street lights at the approximate locations shown in exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and/or collector streets can be installed using overhead or underground conductors with the approval of the director of transportation and Public Works. 3. The City of Fort Worth will install all the street lights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the City of Fort Worth the amount shown below prior to the City starting its design efforts, at the option of the developer and at their expense they may purchase the poles, fixtures, and mast arms from the City in order to assure compliance with city material standards 4 . Street lights on arterial streets shall be installed with underground conductors 5. The developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operations of the street light system 6. The estimated cost of this street light installation is detailed on page (1) of exhibit "C" and is summarized below. The street lights will remain the property of, and will be maintained by the City of Fort Worth February 20, 2006 DEVELOPERS COST: $44,200.00 COVENTRY EAST, PHASE I CFA CODE #2006013 PAGE 11 OF EXHIBIT "C" : VVkJ 1 III "STREET LIGHTS" INTERSECTIONS HILLSLAND AVE & HEMPHILL ST 1 HILLSLAND AVE & TREMPER DR 1 HILLSLAND AVE & FREELAND DR 1 TREMPER DR & LEWIN IN 1 TREMPER DR & WYKOFF WAY 1 TREMPER DR & FREELAND DR 1 FREELAND DR & FREELAND CT 1 FREELAND DR & LEWIN IN 1 FREELAND DR & WYKOFF WAY 1 FREELAND DR & HEMPHILL ST 1 MID BLOCK HILLSLAND AVE 1 TREMPER DR 2 WYKOFF WAY 1 LEWIN IN 1 CHANGE OF DIRECTIONS FREELAND CT 1 TREMPER DR 1 COVENTRY EAST, PHASE I PAGE III OF EXHIBIT "C" J' oouu 1 � I�Aa \ p IV STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $245.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following ten (10) intersections at a cost to the Developer of$2,450.00: Hemphill St & Freeland Dr Hemphill St & Hillsland Av Tremper Dr & Freeland Dr Tremper Dr & Wycoff Way Tremper Dr & Lewin Lane Tremper Dr & Hillsland Av Freeland Dr & Wycoff Way Freeland Dr & Lewin Lane Freeland Dr & Hillsland Av Freeland Dr & Freeland Ct Coventry East, Phase I CFA code: 2006013 February 15, 2006 2 i ICC"I E C 0 0 �11.M",1� � /lTA IIl3A i s FOU O: Z• ' POW Oy �YC i S;;S7R nuc R IE / LYIR � 3 IO 7 1 i !MM FOU ROVVLEY -� • FOP- WORTH 1 SPINKS AIRPORT 4� ciff LOCATION MAP COVENTRY EAST PHASE I CART73 3 BURGESS,INC. m nwl snEET ran ViCKM,Dt 76M MM rt5-ewo PROJECT NO. 01 4012.010.1.0630 PAGE 1 OF 7 ' \Jab\ 014012\clv\Phose I\ 0121cfia.dgn 4 } OV PNti .TION i5 i p �.=-� SCALEm 1" = 200' CFl� j t66 N 9 • IO „-.- ;-".��t '4 t 14 22 t ' b" 10 13 6 7 8 9 Q / 2 3 4 5 l2 D l0 12 C 14 .3 r g /9 18 17 16 15 ' COURT 20 d I 7 3 4 5 6 7 -�� 12 i 6 EXISTING "A" ONING o '4 5 0 13 12 ft /5 /4 /9 4 18 /7 16 7� 3 d �+ 8 y 10 �•'1 L 2 3 4 5 6 7 / 2 O 20 21 17 18 9 1 r 13 /4 15 16 r" 4 SLI r aCp• `Ss2 24 23 22 G1 v 2 12 26 75 3 27 p/ 4 j !O t 28 $SOT Kzyx 5 9 29 EXISTING, ZOINING 6 aSo s INS Itd�p9 1.0•i• 7 VOL-0.1.7.4.r. E—JS WG SCR'ZON-INvG LEGEND 'ROP. 29' B/B STREETS ROADWAY/50' ROW EKHIBI,- S' PROP. 41' B/B COVENTRY EAST ROADWAY/60' ROW PHASE I 3ROP. 4' S I DEWALK ••-•-•-•-•••••••-••• BY HOMEBUILDERI 3ROP. 4' S 1 DEWALK: BY DEVELOPER) caKrErt a suRGr:ss,irlc >n MAN MW 7X 76M _I M I TS OF PROJECT ———— MM MW PROJECT NO. 014012.010.1.0630 zW\Job\ 014012\c1v\F4 I\ 0121afa dpi PAGE 5 OF 7 '2T•HIM !`_ - - SCALEo l" = 200' ' It tUN 21•IDSL j < <, �t py�ppD. Got 'y"Exgfi99 G A,ESLI 32p9 N 9 / GELD to 1 24 121\ � i t �'' 1 ,•'• �' 1 i 10 ¢ 0, l 1 1 14 22 I •1 I !Z to 11 2 13 5 6 7 a 9 —i 4 Q ,1 12 / 2 3 01 I D t to _ lJ 12 � CA _ - 16 15 14 r COURT `Vn ` 9 70 19 18 1 I . 89 1 I 7 4 5 6 7 6 VA EXIST G Z 0' 6 2 AV 10• 1• 1 dct1C 5 to 4 l8 /7 /6 /5 14 19 J d to — � 2 4 5 6 7 a 9 2 J � 1 1 19 o I �.1 19 7 �t1oN I 16 17 Ry £} Oy9 / 13 14 15 0 p, -QE292� 2 74 23 22 ' 26 25 3 1/ 27 I4 10 GK t 28 ao zo I 5 9 LO -'-X__ZONING I 29 6 / s �t 1 I7 y0l p p.t.o•t' /EXISTING 'CR'ZONING t-1 L ' STORM DRAIN LEGEND EXHIBIT 'B-1' 'ROP. STORM DRAIN LINE COVENTRY EAST 'ROP. I NLET r PHASE I 'ROP, MANHOLE CROP, HEADWALL Carter:,81 IIIt0 --XIST. STORM DRAIN LINE CARTER d. BURGESS,INC. m MAN SrnffT LIMITS OF PROJECT ---• FOU WOWN,TX 76'@ (5171735-QW PROJECT NO. 014012.010.1.0630 •p\lob\ 014012\cIv\Phcee I\ 0121cfc.dgn PAGE 6 OF 7 �,t �, SCALEe 1" = 200' UNE►`fK, E iii By91 N t r� Et 1 - 10 1 14 22 I 3 9 10 2 3 Il � 13 5 6 7 B I -i 1 1 O - _ 10 l Lo 14 13 12 1 9 1B 17 16 15 I COURT ` 20 19 h'• ` B 9 I I 7 4 5 6 7 2 3 EXISTIN G `p 6 A `�CS 13 12 it M� 15 II 4 \ 19 18 /7 /6 d J ..• 3 g /0 1 4 5 6 7 B _ �f 1 2 3IL - , A 1 •..- 1 20 21 16 7 1 I NEz L 1 A • I 1 13 14 l5 • 2 � 22 co s$18r 4 23 0' I 1 2 /1 26 25 3 17 _ II ' I 4 10 28 5L.0c 9X I 5 9 �0 29 - Izh7S X INS 'A'"Z(7"G I 6 e i 7 VOE'1 101. ;C.!1EL EXISTING 'CR'ZONING �1 STREET LIGHTS LEGEND EXHIBIT 'C' PROP. SINGLE STREET LIGHT COVENTRY EAST EXIST. SINGLE STREET LIGHT O PHASE I ( ON STEEL POLE WITH STREET AND STOP SIGNS ATTACHED) PROP. STREET SIGN A Car tier B1/l SS EXIST. STREET SIGN 0 GARTER& BURGESS,INC. m MM moffT LIMITS OF PROJECT ————— FM� 76M2 P17)7PROJECT NO. 01 4012.010.1.0630 DG"\Job\ 014012\clv\Pho" I\ 0121cfa.dgn PAGE 7 OF