HomeMy WebLinkAboutContract 33417 AMENDMENT NO. 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. (No M&C Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Teague Nall and Perkins, Inc. , (Engineer) made and entered into City Secretary Contract No. 26843, (the Contract) which was authorized by the City Council by M&C C-18621; on the 12th day of June 2001 and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Water and Sanitary Sewer Extension for the Lake Crest Estates Area. WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated February 28, 2006, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $3,000.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $647,383.00. 04-1 1 -Q 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. t�� EXECUTED on this the , :_ -'-' day of , 2006, in Fort Worth, Tarrant County, Texas. ATTEST: N Marty Hendrix WO M&C REQUIRED 5 City Secretary APPROVAL RECOMMENDED: APPROVED: A. Douglas Rademaker, P.E. c A. Ott Director, Department of Assistant City Manager Engineering TEAGUE NALL AND PERKINS, INC. ENGINEER By: Name: Ty Hilton, P.E. , Principal 1100 Macon Street Fort Worth, TX 76102 APPROVED AS TO FORM AND LEGALITY: r Assistant C'ly Attorney ✓ `J+ a 1:3�V;!yT`�`. Responsive Service. Reliable Results. ,� TEAGUE NALL AND PERMNS ENGINEERS ♦ SURVEYORS ♦ CONSULTANTS February 28, 2006 Mr. Abe Calderon, P.E. Project Manager Department of Engineering City of Fort Worth 900 Monroe Street, Suite 201 Fort Worth, TX 76102 RE: Water and Sewer Extension for Lake Crest Estates (Northside 11 48" Water Main Extension - Eagle Mountain WTP to Marine Creek Pkwy.) D.O.E. Project No. 3885 Fee Proposal for Contract Amendment No. 2 Dear Mr. Calderon: Teague Nall and Perkins, Inc. is submitting this fee proposal for Amendment No. 2 to the contract for the above referenced project based on additional services requested. The following is a brief description and cost for the additional services provided on this project: Realignment of Approximately 1300 LF of 48" Water Main The owner of the property just south of the Eagle Mountain Water Treatment Plant has requested that the referenced water main be realigned to accommodate a new residential subdivision. This request requires additional engineering effort in that the water main design is complete and the City has acquired the necessary permanent utility easement and temporary construction easements. The fee for realigning the water line is listed below: Water Main Redesign (1300 LF): _ $ 3,000 Summary of Contract Fee: Original Contract Amount: $428,383.00 Amendment No. 1: $216,000.00 Amendment No. 2: $ 3,000.00 Revised Contract Amount: $647,383.00 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, TEAGUE NALL AND PERKINS, INC. Ty Hilton P.E. 1100 Macon Street Fort Worth,Texas 76102 • 817.336.5773 phone 817336.2813 fax www.tnp-online.com